ES-301 Control Roomlln-Plant Systems Outline
]) ~AJ!.-r Form ES-301-2 Facility:
Vogtle Nuclear Plant Exam Level (circle one): RO / SRO-I / SRO-U (see each JPM)
Date of Examination: June 1-12, 2009 Operating Test No.: 2009-301 Control Room Systems@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- a. Emergency Borate due to Rods below insertion limits (RIL)
M,A,S 1
==
Description:==
RWST flow path required due to equipment failures. This JPM has been modified to require the student to determine if rods are below RIL by responding to a rod bank 10-10 limit alarm using the Core Operating Limits Report prior starting the emergency boration.
(ROI SRO-I)
KiA: 004A2.14 (3.81 3.9)
- b. Transfer ECCS to Cold Leg Recirculation M,E,A,S,L 2
==
Description:==
Equipment failures will prevent cold leg recirculation. Required to EN identify a loss of emergency coolant recirculation. This JPM has been modified by adding a failure of an RWST suction valve to close.
(RO I SRO-II SRO-U)
KiA: 006A4.05 (3.91 3.8)
- c. Fill SI Accumulator at low RCS pressure M,L,S 3
==
Description:==
Required to use SI pump B. This requires a different alignment to prevent injecting into the RCS while at low RCS pressure. The SI pump common suction valve will be shut. The student will have to open this valve prior to starting the SI pump to prevent pump damage. This is based on recent plant operating experience.
(ROI SRO-I)
KiA: 006A1.13 (3.5/3.7)
- d. Identify and Isolate Ruptured SG with Failures D,P,E,L,A,S 4P
==
Description:==
MSIVs for ruptured SG fail to close requiring isolation of main steam loads from the ruptured SG. These include TDAFW steam supplies, condenser spargers, SJAE's, and steam dumps.
(ROI SRO-I)
KiA: 035A4.06 (4.5/4.6)
- e. Transfer CNMT Spray to Recirculation D,A,S 5
==
Description:==
Train A IRC suction valve fails to open requiring student to secure EN one train of CNMT spray to prevent damage to the ESF pump.
(RO I SRO-II SRO-U)
KiA: 026A2.07 (3.61 3.9)
ES-301 Control Roomlln-Plant Systems Outline
.D RA f=. 7 Form ES-301-2 Facility:
Vogtle Nuclear Plant Date of Examination: June 1*12, 2009 Exam Level (circle one): RO I SRO-I I SRO-U (see each JPM)
Operating Test No.: 2009*301 Control Room Systems@ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U, including 1 ESF)
System I JPM Titte Type Code' Safety Function
- a. Emergency Bo rate due to Rods below insertion limits (Rll)
M,A,S 1
==
Description:==
RWST flow path required due to eQuipment failures. This JPM has been modified to require the student 10 determine if rods afe below RIL by responding to a rod bank 10-10 limit alarm using the Core Operating limits Report prior starting the emergency horation.
(RO / SRO-I)
KiA: 004A2.14 (3.8 13.9)
- b. Transfer ECCS to Cold Leg Recirculation M,E,A,S,L 2
==
Description:==
Equipment failures witl prevent cold leg recirculalion_ Required to EN identify a loss of emergency coolant reclft:ulation. This JPM has been modified by adding a failure 01 an RWST suction valve to close.
(RO 1 SRO-I I SRO-U)
KIA: 006A4.05 (3.91 3.8)
- c. Fill 51 Accumulator at low ReS pressure M,L,S 3
==
Description:==
Required to use SI pomp B. This requires a different alignment to prevent injecting into the ReS while at low ReS pressure. The 51 pump common suction valve will be shut. The sludent will have 10 open this valve prior to starting the 51 pump to prevent pump damage. This is based on recent plant operating eltPerience.
(RO I SRO-I )
KIA: 006A1.13 (3.5 13.7)
- d. Identify and Isolate Ruptured SG with Failures D,P,E,L,A,S 4P
==
Description:==
MSlVs for ruptured 5G fail to close requiring Isolation of main steam loads from the ruptured 5G. These Include TDAFW steam supplies. oondenser spargers. SJAE*s. and steam dumps.
(RO / SRO-I )
KiA: 035A4.06 (4.5 / 4.6)
- e. Transfer CNMT Spray to Recirculation D,A,S 5
==
Description:==
Train A tRe suction valll'e failS to open requiring student to secure EN one train of CNMT spray to prevent damage to the E5F pump.
(RO I SRO-tl SRO-U)
KIA: 026A2.07 (3.6 1 3.9)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2
- f. DG Parallel Operation with load potentiometer failure P,D,A,S 6
==
Description:==
DG load rises uncontrollably after paralleling with bus. This requires EN tripping either the DG engine or output breaker. These actions are to protect the diesel generator from damage from an electrical overload condition.
(RO I SRO-I I SRO-U)
KIA: 062A1.01 (3.4 I 3.8)
- g. Place CR HVAC on Recirculation with High Radiation N,A,S 7
==
Description:==
CRI will fail to automatically or manually actuate. Students required to manually align dampers to isolate control room from high radiation.
(RO I SRO-I)
KIA: 072A3.01 (2.9 I 3.1)
- h. Place CNMT Main Purge In-Service N,S,L 8
==
Description:==
Unit in mode 5. Student required to shutdown mini-purge system and then place main purge system in service with equipment hatch open. Main purge supply fan should not be placed in service.
(RO)
KIA: 029A2.03 (2.7 13.1)
ES-301 Control Roomlln-Plant Systems Outline Form ES-301-2
- f. OG Parallel Operation with load potentiometer failure P,D,A,S 6
==
Description:==
OG load rises uncontrollably after paralleling with bus. This requires EN tripping either the DG engine or output breaker. These actions are to protect the diesel generator from damage from an electrical overtoad condition.
(RO I SRO-II SRO-U)
KJA: 062A t.01 (3.4 / 3.8)
- g. Place CR HVAC on Recirculation with High Radiation N,A,S 7
==
Description:==
CRt will fail to automalically or manually actuate. Students required to manually align dampers to Isolate control room from high radiation.
(RO I SRO-I)
KIA: 072A3.0t /2.9 /3. 1)
- h. Place CNMT Main Purge In-Service N,S,L 8
==
Description:==
Unit in mode 5. Student required to shutdown mini-purge system and then place main purge system in service with equipment hatch open. Main purge supply fan should not be placed in service.
(RO)
KIA: 029A2.03 (2.7 f 3.1)
SOUTHERN..
\\
COMPANY Energy to Serve Your -WOrld'"
PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM "a" V-RQ-JP-13009-005 EMERGENCY BORATE FROM THE RWST RODS BELOW THE RIL (ROD BANK Lo-Lo LIMIT)
(Faulted JPM for HL-15 NRC exam)
This Is A Modified JPM Revision 0 April 6, 2009 Written By
- Thad N. Thompson Date:
4/06/09 Approved By
- Dan Scukanec Date:
4/20/2009 Written By SOUTHERN.\\
COMPANY E1lergy to Serve Your World" PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM "a" V-RQ-JP-13009-005 EMERGENCY BORATE FROM THE RWST RODS BELOW THE RIL (ROD BANK Lo-Lo LIMIT)
(Faulted JPM for HL-15 NRC exam)
This Is A Modified JPM Revision 0 April 6, 2009
- Thad N, Thompson Date:
4/06/09 Approved By
- Dan Scukanec Date:
4/20/2009
This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
Initial Conditions: A rapid downpower per AOP-18013-C, "Rapid Power Reduction" has just been performed by the operating crew. The plant is currently stable at 70% power.
Assigned Task:
The SS has directed you to respond to annunciator window ALB-10, window 004.
2 This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
Initial Conditions: A rapid downpower per AOP-18013-C, "Rapid Power Reduction" has just been performed by the operating crew. The plant is currently stable at 70% power, Assigned Task:
The 55 has directed you to respond to annunciator window ALB-10, window 004.
2
V-RQ-JP-13009-005 JPM INFORMATION OPERATOR'S NAME: ____________ _
EVALUATION DATE:
/
/
JPM TITLE:
Emergency Borate from the RWST REVISION:
o April 6, 2009 COMPLETION TIME:
12 minutes Application:
RO/SRO KIA Number:
004A2.14 RO:
3.8 SRO:
3.9 Evaluation Method
[ ] Performed
[ ] Simulated Evaluation Location
[ ] Simulator
[ ] Control Room
[ ] Unit 1
[ ] Unit 2 Performance Time:
minutes OVERALL JPM EVALUATION
[ ] SATISFACTORY
[ ] UNSATISFACTORY Examiner Comments:
Examiner's Signature: ______________ _
3 V-RQ-JP-13009-005 JPM INFORMATION e
rr==========================
OPERATOR'S NAME: ___________
EVALUATION DATE:
I JPM TITLE:
Emergency Borate from the RWST REVISION:
o April 6, 2009 COMPLETION TIME:
12 minutes Application:
RO/SRQ KiA Number; 004A2.14 RO:
3.8 SRO:
3.9 Evaluation Method I 1 Performed
[ 1 Simulated Evaluation Location
[ 1 Simulator
[ 1 Control Room
[ J Unit 1
[jUnil2 Performance Time:
minutes e
OVERALL JPM EVALUATION
[ j SATISFACTORY
[ 1 UNSATISFACTORY Examiner Comments:
Examiner's Signature:
3
V-RQ-JP-13009-005 INSTRUCTIONS TO EXAMINER This JPM is based on the latest rev of 13009-1. Verify this JPM is in accord with the latest procedural revision prior to use. Cues preceded by a "©... " are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
SIMULATOR SETUP:
- 1.
- 2.
- 1.
- 2.
13009, eves Reactor Makeup Control System 17010, Window D04 for ROD BANK LO-LO LIMIT Reset to IC # 14 for HL-15 NRC Exam Place a Red Danger Tag on HS-0276A (Boric Acid Transfer # 1)
Simulator Setup From Scratch:
- 1.
Reset to IC # 14 (100% MOL)
- 2.
Insert the following overrides:
LV-112D closed HS-276A stop HS-276A green light - off HS-276A Red Danger Tag on hand switch HS-277 A stop - on Trigger 1 (T1)
HS-277A amber light on - on Trigger 1 (T1)
ALB37 window D01 (BBD Trouble) on - on Trigger 1 (T1)
- 3.
Select the following hand switch positions.
HS-277 A auto
- 4.
Place 75 gpm letdown in service and adjust charging flow as appropriate to maintain PRZR level stable.
- 5.
Reduce reactor power to - 70% power and stabilize the plant, ensure that eBD rods are below the RIL to ensure ALB-10, D04 for ROD BANK LO-LO LIMIT is illuminated. (Recommend 5 to 10 steps below the RIL to ensure the alarm does not inadvertently clear, some patience is required to accomplish this (- 106 steps on CBD should be pretty close).
- 6.
AckiReset alarms
- 7.
Freeze Setup time: 10 minutes 4
V-RQ-JP-13009-005 INSTRUCTIONS TO EXAMINER This JPM is based on the latest rev of 13009-1. Verify this JPM is in accord with the latest procedural revision prior to use. Cues preceded by a "©..," are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
ReQUIRED ITEMS:
SIMULATOR SETUP:
- 1.
- 2.
- 1.
- 2.
13009, CVCS Reactor Makeup Control System 17010, Window D04 for ROD BANK LO-LO LIMIT Reset to IC # 14 for HL-15 NRC Exam Place a Red Danger Tag on HS-0276A (Boric Acid Transfer # 1)
Simulator Setup From Scratch:
- 1.
Reset to IC # 14 (100% MOL)
- 2.
Insert the following overrides:
LV-112D closed HS-276A stop HS-276A green light - off HS-276A Red Danger Tag on hand switch HS-277A stop - on Trigger 1 (T1)
HS-277A amber light on - on Trigger 1 (T1)
ALB37 window D01 (BBD Trouble) on - on Trigger 1 (T1)
- 3.
Select the following hand switch positions.
HS-277 A auto
- 4.
Place 75 gpm letdown in service and adjust charging flow as appropriate to maintain PRZR level stable.
- 5.
Reduce reactor power to - 70% power and stabilize the plant, ensure that CBD rods are below the RIL to ensure ALB-10, D04 for ROD BANK LO-LO LIMIT is illuminated. (Recommend 5 to 10 steps below the RIL to ensure the alarm does not inadvertently clear, some patience is required to accomplish this (- 106 steps on CBD should be pretty close).
- 6.
AckiReset alarms
- 7.
Freeze Setup time: 10 minutes 4
V-RQ-JP-13009-005 INSTRUCTIONS TO EXAMINER DIRECTIONS TO OPERATOR You will be given information describing the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
INITIAL CONDITIONS: A rapid down power per AOP-18013-C, "Rapid Power Reduction" has just been performed by the operating crew. The plant is currently stable at 70% power.
ASSIGNED TASK:
The SS has directed you to respond to annunciator window ALB-10, window 004.
5 V-RQ-JP-13009-00S INSTRUCTIONS TO EXAMINER
<:) rr===================~D~I=R=E=CT=I~O~N~S~T~O~O=P=E=RA7T=O=R=====================
You will be given information describing the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
INITIAL CONDITIONS: A rapid down power per AOP-18013-C, "Rapid Power Reduction" has just been performed by the operating crew. The plant is currently stable at 70% power.
ASSIGNED TASK:
The SS has directed you to respond to annunciator window ALB-10, window 0 04.
5
START TIME: ______ _
STEP 1 CRITICAL ( * )
SAT O.S" UNSAT 0.15' JPM STEPS Determine if Control Bank "0" is below the Rod Insertion Limits (RIL)
V-RQ-JP-13009-005
'a-O
- Determines CBD to be below the RIL referencing the COLR and Tech Spec 3.1.6.
~ O
- Determines a Shutdown Margin is required within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> OR establishes Emergency Boration flow (# 1)
CUES: (# 1)
"The SS directs you to initiate an Emergency Boration through either HV-8104 or the Normal Charging flow path."
STEP 2 CRITICAL ( * )
SAT O.S" UNSAT 0.15' Align RWST suction to CCP Note For Simbooth Operator: Trigger 1 to trip the BA Transfer Pump should be initiated when BA Flow is first observed or when HV-8104 is open.
~ O
- Start Boric Acid Transfer Pump # 2
~ D
- Place either 1-HV-8104 to OPEN, or place 1-HV-110A and 1 HV-110B to OPEN
~ D
- Observes boric acid flow stops (or Boric Acid Transfer Pump has tripped). (# 1)
CUES: (# 1)
"Establish Emergency Boration through any available flow path."
6 START TIME: ______
STEP 1 CRITICAL (.)
SAT 0" UNSAT 0 "
JPM STEPS Determine if Control Bank "0" is below the Rod Insertion Limits (RIL)
V-RQ-JP-13009-005 aO
- Determines ceo to be below the RIL referencing the COlR and Tech Spec 3.1.6.
~ D
- Determines a Shutdown Margin is required within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> OR establishes Emergency Boration flow (# 1)
CUES: (# 1)
" The 55 directs you to initiate an Emergency Boration through either HV*8104 or the Normal Charging flow path
. ~
STEP2 CRITICAL (.)
SAT 0..,.
UNSAT O..tS' Align RWST suction to cCP Note For Simbooth Operator: Trigger 1 to trip the BA Transfer Pump should be initiated when BA Flow is first observed or when HV-8104 is open.
,,0
- Start Boric Acid Transfer Pump # 2
,,0
- Place either 1-HV-81 04 to OPEN, or place 1-HV-110A and 1 HV-110B to OPEN
,,0
- Observes boric acid flpw stops (or Boric Acid Transfer Pump has tripped). (# 1)
CUES: (# 1)
"Establish Emergency Boralion through any avaitable flow path."
6
STEP 3 CRITICAL ( + )
SAT O..!S' UNSAT D..!S' Align RWST suction to CCP JPM STEPS NOTE: There are two flow paths the candidate may use to achieve Emergency Boration flow.
Flow path # 1 is from the RWST through the normal charging path at > 100gpm.
V-RQ-JP-13009-005 Flow path # 2 is from the RWST through the BIT (BIT flow + total seal injection - seal return> 87.5 gpm)
NOTE: Keep in mind 1-LV-112D is failed shut for this JPM.
i:s.D
- Verify one Charging Pump running a D
+ Place 1-L V112E to OPEN position a D
+ Place 1-LV-112B or 1-LV-112C to CLOSED position i:s.D
+ Place 1-LV-112A placed in HUT position STEP 4 CRITICAL ( + )
SAT D..!S' UNSAT D..!S' Ensure adequate charging flow NOTE: There are two flow paths the candidate may use to achieve Emergency Boration flow.
Flow path # 1 is from the RWST through the normal charging path at > 100gpm.
Flow path # 2 is from the RWST through the BIT (BIT flow + total seal injection - seal return> 87.5 gpm)
NOTE: Keep in mind 1-LV-112D is failed shut for this JPM.
i:s.D
+ 1-FIC-121 adjusted to > 100 gpm charging flow OR a.D
+ 1-HV-8801A and 1-HV-8801B open (BIT flow + total seal injection - seal return> 87.5 gpm) a D
- Seal injection maintained between 8 -13 gpm per RCP using 1-HV-0182 as required 7
STEP 3 CRITICAL (.)
SAT D.l:f UNSAT 0..6 Align RWST suction to CCP JPM STEPS NOTE: There are two flow paths the candidate may use 10 achieve Emergency Beration flow.
Flow path # 1 is from the RWST through the normal charging path at > 100gpm.
V-RQ-JP-13009-005 Flow path # 2 is from the RWST through the BIT (BIT flow + total seal injection - seal return > 87,5 gpm)
NOTE: Keep in mind 1*LV*112D is failed shut for this JPM.
- s.D
- Verify one Charging Pump running
~ D
- Place 1-LV112E to OPEN position
...,..0
- Place 1-LV-112B or 1-lV-112C to CLOSED position
- s. D
- Place 1-LV-112A placed in HUT position STEP' CRITICAL (.)
SAT D AS' UNSAT 0,6 Ensure adequate charging flow NOTE: There are two flow paths the candidate may use to achieve Emergency Boralion flow.
Flow path # 1 is from the RWST through the normal charging path al > 100gpm.
Flow path # 2 is from the RWST through the BIT (BIT flow"'" total seal injection - seal return> 87.5 gpm)
NOTE: Keep in mind 1*LV*112D is failed shut for this JPM.
~D
- 1-FIC-121 adjusted to > 100 gpm charging flow OR
~D
- l-HV-8801A and 1-HV-88018 open (BIT flow"'" total seal injection -seal return > 87.5 gpm)
"lS.D
- Seal injection maintained between 8 - 13 gpm per RCP using 1-HV-0182 as required 7
STEP 5 SAT 0.6 UNSAT O ~
Observe plant parameters V-RQ-JP-13009-005 JPM STEPS Note:
This task is considered complete when boration flow has been initiated. After this has been accomplished, provide the cue given below to the operator.
~ O
- Place an additional letdown orifice in service (# 1)
~ 0
- Pressurizer heaters operated as necessary to equalize boron (# 2)
CUES: (# 1)
(# 2)
"The extra RO will address RCS inventory concerns and adjust letdown at a later time."
"The extra RO will monitor boron concentration and terminate emergency boration when appropriate. "
STOP TIME: ______ _
STEP 6 SAT O ~
UNSAT O ~
Report to 55
~ O
- Emergency boration flow initiated (# 1)
CUES: (# 1) 'The SS will have another operator complete the actions of the ARP".
Field Notes 8
Observe plant parameters V-RQ-JP-13009-005 JPM STEPS Note:
This task is considered complete when beralion flow has been initiated. After this has been accomplished. provide the cue given below to the operator.
~ D
- Place an additionalietdown orifice in service (# 1)
-::...0
- Pressurizer healers operated as necessary to equalize boron (# 2)
CUES: (# 1)
(# 2)
"The extra RO will address ReS inventory concerns and adjust letdown at a later time."
NThe extra RO will monitor boron concentration and terminate emergency baraUon when appropriate."
STOP TIME: ______
STEP 6 SAT 0,6 UNSAT D ~
Report to 55 a D
- Emergency berallon flow initiated (# 1)
CUES: (# 1) 'The 5S will have another operator complete the actions of the ARP".
Field Notes 8
SOUTHERN COM.--...t...
PLANT
~
E NCY Bo TE FROM THE RWST ulted JPM or HL-14 Audit exam)
This A Modified JPM Revision 0 June 20,2007 Written By had N. Thompson Date:
6/20107 Approved By
- R. Lee Mansfield Date:
6/22/07 SOUTHERN Energy to Serve PLANT JOB P RFORMA CE ME SURE
\\V'~.>(-RQ-JP-1 09-004
~
E NCY Bo TE FROM THE RWST ulted JPM or HL-14 Audit exam)
This A Modified JPM Revision 0 June 20, 2007 Written By had N. Thompson Date:
Approved By
- R. Lee Mansfield Date:
6/20107 6/22/07
This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
(5)
THIS IS A TIME CRITICAL JPM (5)
Initial Conditions: A reactor trip occurred and the plant has been stabilized In hot standby conditions. While in 19001-C, the crew determined Assigned Task:
3 control rods failed to fully insert.
The SS has directed you to "Initiate emergency boration of the RCS From the BAST through the Normal Charging Flow Path" per SOP-13009 section 4.9.
2 This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
(5)
THIS IS A TIME CRITICAL JPM (5)
Initial Conditions: A reactor trip occurred and the plant has been stabilized In hot slandby condilions. While in 19001-C, the crew determined 3 control rods failed to fully insert.
Assigned Task:
The SS has directed you to "Initiate emergency boration of the RCS From the BAST through the Normal Charging Flow Path" per SOP-13009 section 4.9.
2
V-RQ-JP-13009-004 JPM INFORMATION OPERATOR'S NAME: ______ ______
EVALUATION DATE: _, __
JPM TITLE:
Emergency Borate from the RWST REVISION:
o June 20, 2007 COMPLETION TIME:
8 minutes Time Critical <:.>
Application:
KIA Number:
RO/SRO 004A2.14 RO:
3.8 SRO:
3.9 Evaluation Method Evaluation Location Performance Time:
[ ] Performed
[ ] Simulator minutes OVERALL JPM EVALUATION Examiner Comments:
[ ] Simulated
[ ] Control Room
[ 1 SATISFACTORY Examiner'S Signature: ______________ _
3
[ ] Unit 1
[ ] Unit 2
[ 1 UNSATISFACTORY V-RQ-JP-13009-004 JPM INFORMATION e r==========================
e OPERATOR'S NAME: __________
EVALUATION DATE:
I I
JPM TITLE:
Emergency Borate from the RWST REVISION:
o June 20, 2007 COMPLETION TIME:
8 minutes Time Critical "
Application:
KJA Number:
RO/SRO 004A2.14 RO:
3.8 SRO:
3.9 Evaluation Method
[ ] Perfooned
( J Simulated Evaluation Location
[ 1 Simulator
[ J Conlrol Room
[]Unitl
[]Unit2 Performance Time:
minutes OVERALL JPM EVALUATION
[ J SATISFACTORY
[ J UNSATISFACTORY Examiner Comments:
Examiner'S Signature:
3
V-RQ-JP-13009-004 INSTRUCTIONS TO EXAMINER This JPM is based on the latest rev of 13009-1. Verify this JPM is in accord with the latest procedural revision prior to use. Cues preceded by a n©... n are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
SIMULATOR SETUP:
- 1.
- 1.
- 2.
13009, CVCS Reactor Makeup Control System Reset to IC # 121 for HL-14 Audit Exam Place a Red Danger Tag on HS-0276A (Boric Acid Transfer # 1)
Simulator Setup From Scratch:
- 1.
Reset to IC # 14 (100% MOL)
- 2.
Insert the following overrides:
LV-112D closed HS-276A stop HS-276A green light - off HS-276A Red Danger Tag on hand switch HS-277A stop - on Trigger 1 (T1)
HS-277 A amber light on - on Trigger 1 (T1)
ALB37 window 001 (BBD Trouble) on - on Trigger 1 (T1)
- 3.
Insert the following malfunctions:
RD 17E 24 steps (final value)
RD 17H 12 steps RD 17N 12 steps
- 4.
Select the following hand switch positions.
HS-277 A auto
- 5.
Trip the RX
- 6.
Stabilize plant conditions:
Trip both MFPs Throttle AFW @ 200gpm
- 7.
AckiReset alarms
- 8.
Freeze Setup time: 7 minutes 4
V*RQ*JP*13009*004 INSTRUCTIONS TO EXAMINER rr=:'Th";=SCCJP'"M::=';S=:b=a=.e=d"'o=n=:I"he=:'la"'te=.:=t r=e=v=Of;=,"'3COO'"09"."',.=V"'e=r;;;fy=t"h";.=:J:':P:':M:';.=";n=a=cc=o=rd:=w7.i1h=t=h=e"'ta7te"'."'t p=r=OC=e"'d:'U"'ra"'t r"'e=:v;"'.;"'on==
prior to use. Cues preceded by a "©... " are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the periormance of this JPM.
ReQUIRED ITEMS:
SIMUL.ATOR SeTUP:
- 1.
- 1.
- 2.
13009, CVCS Reactor Makeup Control System Reset to tC # 121 for HL*14 Audit Exam Place a Red Danger Tag on HS*0276A (Boric Acid Transfer # 1)
Simulator Setup From Scratch:
- 1.
Resetto IC# 14 (100% MOL)
- 2.
Insert the following overrides:
LV*11 2D closed HS*276A stop HS*276A green light - off HS*276A Red Danger Tag on hand switch HS*277A stop - on Trigger 1 (Tl )
HS*277A amber light on - on Trigger 1 (Tl )
ALB37 window 001 (BBD Trouble) on. on Trigger 1 (Tl )
- 3.
Insert the following malfunctions:
RD 17E 24 steps (final value)
RD 17H 12 steps RD 17N 12 steps
- 4.
Select the following hand switch positions.
HS*277 A auto
- 5.
Trip the RX
- 6.
Stabilize plant conditions:
Trip both MFP.
Throttle AFW @ 200gpm
- 7.
AckiReset alarms
- 8.
Freeze Setup time: 7 minutes 4
V-RQ-JP-13009-004 INSTRUCTIONS TO EXAMINER DIRECTIONS TO OPERATOR You will be given information describing the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
This is a TIME CRITICAL JPM INITIAL CONDITIONS:
A reactor trip occurred and the plant has been stabilized in hot standby conditions. While in 19001-C, the crew determined 3 control rods failed to fully insert.
ASSIGNED TASK:
The SS has directed you to an "Initiate emergency boration of the RCS from the BAST through the Normal Charging Flow Path per SOP-13009 section 4.9.
5 V-RQ-JP-13009-004 INSTRUCTIONS TO EXAMINER
"' rr=================~D~I=RE=C=T=IO~NS~TO~O~P~E=R~A=TO=R====================
You will be given information describing the Initial Conditions, Assigned Task. and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
This is a TIME CRITICAL JPM INITIAL CONDITIONS: A reactor trip occurred and the plant has been stabilized in hot standby conditions. While in 19001-C, the crew determined 3 control rods failed to fully insert.
ASSIGNED TASK:
The SS has directed you to an "Initiate emergency boralion of the RCS from the BAST through the Normal Charging Flow Path per SOP-13009 section 4.9.
5
STEP 1 CRITICAL ( + )
SAT D.,g UNSAT D.,g Align RWST suction to CCP V-RQ-JP-13009-004 JPM STEPS Note:
Trigger 1 to trip the BA Transfer Pump should be initiated when BA Flow is first observed or when HV-8104 is open.
& 0
- Start Boric Acid Transfer Pump # 2
& 0
+ Place either 1-HV-8104 to OPEN, or place 1-HV-110A and 1 HV-110B to OPEN
& 0
+ Observes boric acid flow stops (or Boric Acid Transfer Pump has tripped). (# 1)
CUES: (# 1)
"Establish Emergency Boration through any available flow path."
NOTE: The start time for time critical will start when direction has been given to establish Emergency Boration through any available flow path.
START TIME:
TIME CRITICAL 8 minutes STEP 2 CRITICAL ( + )
SAT O.,g UNSAT D.,g Align RWST suction to CCP NOTE: There are two flow paths the candidate may use to achieve Emergency Boration flow.
Flow path # 1 is from the RWST through the normal charging path at > 100gpm.
Flow path # 2 is from the RWST through the BIT (BIT flow + total seal injection - seal return> 87.5 gpm)
NOTE: Keep in mind 1-LV-112D is failed shut for this JPM.
& 0
- Verify one Charging Pump running
& 0
+ Place 1-L V112E to OPEN position
& 0
+ Place 1-LV-112B or 1-LV-112C to CLOSED position
& 0
+ Place 1-LV-112A placed in HUT position 6
V-RQ-JP-1 3009-004 JPM STEPS STEP 1 CRITICAL (. )
SAT O,e; UNSAT 0 "
Align RWST suction to cCP Note:
Trigger 1 to trip the BA Transfer Pump should be initiated when BA Flow is first observed or when HV-8104 is open.
,,0
- Start Boric Acid Transfer Pump # 2
,,0
- Place either 1-HV*8104 to OPEN, or place 1-HV-110A and 1 HV-11 08 to OPEN
",,0
- Observes boric acid flow stops (or Boric Acid Transfer Pump has tripped). (# 1)
CUES: (# 1)
"Establish Emergency Beration through any available flow path."
NOTE: The start time for time critical will start when direction has been given to establish Emergency Beration through any available flow path.
START TIME:
TIME CRITICAL 8 minutes STEP 2 CRITICAL (. )
SAT D..tf UNSAT D A5' Align RWST suction to CCP NOTE: There are two flow paths the candidate may use to achieve Emergency Boration flow.
Flow path # 1 is from the RWST through the normal charging path at > 100gpm.
Flow path # 2 is from the RWST through the BIT (BIT flow'" lotal seal injection - seal return > 87.5 gpm)
NOTE: Keep in mind 1-LV-112D is failed shut for this JPM.
1S.D
- Verify one Charging Pump running
~ D
- Place 1-LV112E to OPEN position a D
- Place1-LV-1 12B or1 -LV-112CtoCLOSEDposition t:'!o.D
- Place 1-LV-1 12A placed in HUT position 6
STEP 3 CRITICAL ( * )
SAT O..S" UNSAT O..S" Ensure adequate charging flow JPM STEPS NOTE: There are two flow paths the candidate may use to achieve Emergency Boration flow.
Flow path # 1 is from the RWST through the normal charging path at > 100gpm.
V-RQ-JP-13009-004 Flow path # 2 is from the RWST through the BIT (BIT flow + total seal injection - seal return> 87.5 gpm)
NOTE: Keep in mind 1-LV-112D is failed shut for this JPM.
~ O
- 1-FIC-121 adjusted to > 100 gpm charging flow OR
'110
- 1-HV-8801A and 1-HV-8801 B open (BIT flow + total seal injection - seal return> 87.5 gpm)
~ O
- Seal injection maintained between 8 - 13 gpm per RCP using 1-HV-0182 as required STOP TIME:
TIME CRITICAL 8 minutes STEP 4 SAT O £l" UNSAT O ~
Observe plant parameters Note:
This task is considered complete when boration flow has been initiated. After this has been accomplished, provide the cue given below to the operator.
~ O
- Place an additional letdown orifice in service (# 1)
~ O
- Pressurizer heaters operated as necessary to equalize boron (# 2)
CUES: (# 1)
(# 2)
STEP 5 SAT O ~
"The extra RO will address RCS inventory concerns and adjust letdown at a later time."
"The extra RO will monitor boron concentration and terminate emergency boration when appropriate."
UNSAT D ~
Report to SS
~ O
- Emergency boration flow initiated Field Notes 7
STEP 3 CRITICAL (. )
SAT 0 "
UNSAT 0 "
Ensure adequate charging flow JPM STEPS NOTE: There are two flow paths the candidate may use to achieve Emergency Boration flow.
Flow path # 1 is from the RWST through the normal charging path at > 100gpm.
V*RQ*JP*1 3009*004 Flow path # 2 is from the RWST through the BIT (BIT flow + lotal seal injection - seal return> 87.5 gpm)
NOTE: Keep in mind 1-LV-1 12D is failed shut for this JPM.
I'l>.D
- 1-FIC-121 adjusted to > 100 gpm charging flow OR
'lS.O
- 1-HV-8801A and 1-HV-8801B open (BIT flow + total seal injection - seat return> 87.5 gpm)
~O
- Seal injection maintained between 6 - 13 9pm per Rep using 1-HV-0182 as required STOP TIME:
TIME CRITICAL 8 minutes STEP 4 SAT 0 ",
UNSAT 0 ",
Observe plant parameters Note:
This task is considered complete w'hen borallen now has been initiated. After this has been accomplished, provide the cue given below to the operator.
~ O
- Place an additional letdown orifice in service (# 1)
~ O
- Pressurizer heaters operated as necessary to equalize boron (# 2)
CUES: (# 1)
(# 2)
STEPS SAT O,g
" The extra RO will address ReS inventory concerns and adjust letdown at a later lime. ~
The extra RO wll1 monitor boron concentration and terminate emergency boration when appropriate. ~
UNSAT Dd Report to 55
-:s.O
- Emergency boration flow initiated Field Notes 7
SOUTHERN 1<<\\
COMPANY Energy to Serve Your World v PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM "b" RQ-JP-19013-003 TRANSFER ECCS PUMPS TO COLD LEG RECIRCULATION WITH FAILURE OF HV-8812AAND HV-8811B (This is a MODIFIED JPM for the HL-15 NRC Exam)
Revision 0 April 6, 2009 Written By
- Thad N. Thompson Date:
4/06/2009 Approved By
- Dan Scukanec Date:
4/20/2009 SOUTHERN'\\
COMPANY E1lergy to Serve Your World" PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM Ub" RQ*JP*19013*003 TRANSFER ECCS PUMPS TO COLD LEG RECIRCULATION WITH FAILURE OF HV*8812AAND HV*8811B (This is a MODIFIED JPM for the HL*15 NRC Exam)
Revision 0 April 6. 2009 Written By
- Thad N. Thompson Date:
4/06/2009 Approved By
- Dan Scukanec Date:
4/20/2009
This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
(9 THIS IS A TIME CRITICAL JPM (9 Initial Conditions: A large break LOCA has occured. While performing 19010, RWST level decreased below 29%. Transition to 19013 is required based on foldout page guidance.
Assigned Task:
The SS has directed you to "Transfer the ECCS pumps to cold leg recirculation using 19013".
2 This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
(5)
THIS IS A TIME CRITICAL JPM (5)
Initial Conditions: A large break LOCA has occured. While performing 19010, RWST level decreased below 29%. Transition to 19013 is required based on foldout page guidance.
Assigned Task:
The SS has directed you to "Transfer the ECCS pumps to cold leg recirculation using 19013".
2
JPM INFORMATION OPERATOR'S NAME: ____________
EVALUATION DATE: _1 _
JPM TITLE:
REVISION:
Transfer ECCS Pumps to Cold Leg Recirculation With Failure of HV-8812A and HV-8811B o
April 6, 2009 RQ-JP-19013-003 COMPLETION TIME:
11 minutes (6 minutes to stop RHR pumps)
TIME CRITICAl C9 Note:
This time limit is based on FSAR Table 6.3.2-7 as revised by REA 97-VAA673.
Application:
Task Number:
KIA Number:
10CFR55.45 Ref.:
Evaluation Method Evaluation Location Performance Time:
RO/SRO 37009 006A4.05 4, 6, 7
[ 1 Performed
[ ] Simulator minutes OVERALL JPM EVALUATION Examiner Comments:
Examiner's Signature:
RO:
3.9 SRO:
3.8
[ ] Simulated
[ 1 Control Room
[ ] Unit 1
[ ] Unit 2
( ] SATISFACTORY
( ] UNSATISFACTORY 3
RQ-JP-19013-003 JPM INFORMATION e r===========================
e OPERATOR'S NAME: ___ ________
EVALUATION DATE:
I JPM TITLE:
REVISION:
Transfer ECCS Pumps to Cold Leg Recirculation With Failure of HV-8812A and HV-8811 B o
April 6, 2009 COMPLETION TIME:
11 minutes (6 minutes to stop RHR pumps)
TIME CRITICAL (9 NotlJ:
This time firml '$ basedOfl FSAR TobitJ 6.3.2-7 9S revised by REA 97-VAAfil3.
Application:
Task Number:
KIA Number:
10CFR55.45 Ref.:
Evaluation Method Evaluation Location Performance Time:
RO/SRO 37009 006A4.05 4, 6, 7 I I Performed
{ J Simulator minutes OVERALL JPM EVALUATION Examiner Comments:
EXaminer's Signature:
RO:
3.9 SRQ:
3.8
{ J Simulated l I Control Room IJUnl11 I J Unil2 I I SATISFACTORY I I UNSATISFACTORY 3
RQ-JP-19013-003 INSTRUCTIONS TO EXAMINER This JPM is based on 19013-C. Verify this JPM is in accord with the latest procedural revision prior to use. Cues preceded by a "©... " are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
SIMULATOR SETUP:
- 1.
19013, Transfer to Cold Leg Recirculation Snap to IC # 14 (HL-15 NRC Protected Snap) OR
- 1.
Reset to IC14 (MOL 100%)
- 2.
OVERRIDE HV-8812A TO THE OPEN POSITION.
- 3.
Override HV-8811B TO THE SHUT Position
- 4.
Insert malfunction RC03C AT 100% (DBA LOCA)
- 5.
Trip all RCPs
- 6.
Reset SI
- 7.
After Cnmt Emergency Sump Levels are ~ 14 inches, set RF: TK02 = 28% (RWST)
- 8.
Ensure HV-8811A is FULL OPEN
- 9.
AcklReset alarms
- 10.
Freeze simulator Setup time: 18 minutes DIRECTIONS TO OPERATOR You will be given information describing the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
INITiAl CONDITIONS:
AsSIGNED TASK:
TASK STANDARD:
This Is a TIME CRITICAL JPM A large break LOCA has occured. While performing 19010, RWST level decreased below 29%. Transition to 19013 is required based on foldout page guidance.
The SS has directed you to "Transfer the ECCS pumps to cold leg recirculation using 19013~.
ECCS pumps operating In the cold leg recirculation mode.
4 RQ-JP-19013-003 INSTRUCTIONS TO EXAMINER e F===========================
e This JPM is based on 19013-C. Verify this JPM is in accord with the lalest procedural revision prior to use. Cues preceded by a ~©... ~ are provided to en-hance simulation of this JPM and should only be used wtlen the simulator is unavailable. Cues deSignated by (#) are to be provided to the examInee durIng the performance of this JPM.
REQUIRED ITEMS:
SIMULATOR SETUP:
1901 3, Transfer to Cold Leg Recirculation Snap to IC # 14 (HL-15 NRC Protected Snap) OR
- 1.
Reset to IC14 (MOL 100%)
- 2.
OVERRIDE HV-8812A TO THE OPEN POSITION.
- 3.
Override HV-881 1 B TO THE SHUT Position
- 4.
Insert malfunction RC03C AT 100% (DBA LOCA)
- 5.
Trip all RCPs
- 6.
Reset SI
- 7.
After Cnmt Emergency Sump Levels are ~ 14 inches, set RF: TK02 = 28% (RWST)
- 8.
Ensure HV-8811A is FULL OPEN
- 9.
AckiReset alarms
- 10.
Freeze simulator Setup time: 18 minutes DtRECTIONS TO OPERATOR You wilt be given information describing the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any ilem normally used to perform this task.
INITIAL CONOITIONS:
AsSIGNED T ASK:
TASK S TANDARD :
This Is a TIME CRITICAL JPM A large break LOCA has occured. While performing 19010, RWST level decreased below29%. Transition to 19013 is required based on foldout page guidance.
The SS has directed you to ~Transrer the ECCS pumps to cold leg recirculation using 19013*.
ECCS pumps operating In the cold leg recirculation mode.
4
JPM STEPS START TIME: ___
TIME CRITICAL (9 STEP 1 SAT D~
UNSAT D~
Ensure SI Reset and CNMT Emergency Sump Levels Adequate l!>.D
- SI reset
~D
- BPLP window 1:5 lit (Auto SI blocked)
~D
- BPLP window 1:4 dark (SI actuated)
~D
~D
~D
- Initiates Attachment A (# 1)
CUES:
(# 1)
The SS will continue with step 4 while you perform Attachment A."
STEP 2 SAT D~
UNSAT D~
Verify adequate RHR cooling
- TWO CCW pumps in each train running
- CCW pump discharge pressures and flows above red indicator line
- TWO NSCW pumps in each train running
- FOUR NSCW fans in each train in auto STEP 3 CRITICAL ( * )
SAT DA'S" UNSAT DA'S" Align RHR Pump A flow path
~D
- RHR pump A running
~D
- HV-8811A OPEN
~D
~D
- RNO - STOPS RHR pump A
~D
- RNO - Goes to step 3 5
RQ-JP-19013-003 JPM STEPS START TIME: ___
TIME CRITICAL (9 STEP 1 SAT D~
UNSAT D~
Ensure SI Reset and CNMT Emergency Sump Levels Adequate l!>.D
- SI reset
~D
- BPLP window 1:5 lit (Auto SI blocked)
~D
- BPLP window 1:4 dark (SI actuated)
~D
~D
~D
- Initiates Attachment A (# 1)
CUES:
(# 1)
The SS will continue with step 4 while you perform Attachment A."
STEP 2 SAT D~
UNSAT D~
Verify adequate RHR cooling
- TWO CCW pumps in each train running
- CCW pump discharge pressures and flows above red indicator line
- TWO NSCW pumps in each train running
- FOUR NSCW fans in each train in auto STEP 3 CRITICAL ( * )
SAT DA'S" UNSAT DA'S" Align RHR Pump A flow path
~D
- RHR pump A running
~D
- HV-8811A OPEN
~D
~D
- RNO - STOPS RHR pump A
~D
- RNO - Goes to step 3 5
RQ-JP-19013-003
STEP 4 CRITICAL ( * )
SAT O,g UNSAT O,g Align RHR Pump B flow path
&0
- Checks RHR pump B running
&0
- Checks HV-8811 B OPEN (NOTE # 1)
&0
+ RNa - STOPS RHR pump B JPM STEPS
&0
&0
- RNa - Attempts to open HV-8811 B
&0
+ DOES NOT START RHR pump B (NOTE # 2)
&0
- RNa - Goes to step 3d (NOTE # 1) HV-8811B is closed and will not open.
RQ-JP-19013-003 (NOTE # 2) RHR Pump does not have a suction source at this time, the pump should NOT be started.
STEPS CRITICAL (.)
SAT O,g UNSAT O,g CUES:
Determines Cold Leg Recirculation is NOT available.
- Checks RHR Heat Exchanger B flow indication FI-619A < 500 gpm
+ RNa - Informs SS a procedure transition to 19111-C, ECA-1.1 Loss of Emergency Coolant Recirculation is required. (# 1)
(# 1)
The SS will initiate 19111-C, ECA-1.1 Loss of Emergency Coolant Recirculation". Another operator will take the actions of 19111-C, ECA-1.1 Loss of Emergency Coolant Recirculation.
STOP TIME: _____
Field Notes 6
STEP 4 CRITICAL ( * )
SAT O,g UNSAT O,g Align RHR Pump B flow path
&0
- Checks RHR pump B running
&0
- Checks HV-8811 B OPEN (NOTE # 1)
&0
+ RNa - STOPS RHR pump B JPM STEPS
&0
&0
- RNa - Attempts to open HV-8811 B
&0
+ DOES NOT START RHR pump B (NOTE # 2)
&0
- RNa - Goes to step 3d (NOTE # 1) HV-8811B is closed and will not open.
RQ-JP-19013-003 (NOTE # 2) RHR Pump does not have a suction source at this time, the pump should NOT be started.
STEPS CRITICAL (.)
SAT O,g UNSAT O,g CUES:
Determines Cold Leg Recirculation is NOT available.
- Checks RHR Heat Exchanger B flow indication FI-619A < 500 gpm
+ RNa - Informs SS a procedure transition to 19111-C, ECA-1.1 Loss of Emergency Coolant Recirculation is required. (# 1)
(# 1)
The SS will initiate 19111-C, ECA-1.1 Loss of Emergency Coolant Recirculation". Another operator will take the actions of 19111-C, ECA-1.1 Loss of Emergency Coolant Recirculation.
STOP TIME: _____
Field Notes 6
SOUTHERN.\\
COMPANY Energy to Serve Your World W
PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM "e" LO*JP-13105-003 INCREASE ACCUMULATOR LEVEL AT Low RCS PRESSURE This Is A Modified JPM For The HL-15 NRC Exam Revision 0 April 6th I 2009 Written By
- Thad N. Thompson Date:
04/06/2009 Approved By : Dan Scukanec Date:
04/20/2009 SOUTHERN.\\
COMPANY Energy to Serve Your Wo1'id "
PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM U c" LO-JP-13105-003 INCREASE ACCUMULATOR LEVEL AT Low RCS PRESSURE This Is A Modified JPM For The HL-15 NRC Exam Revision 0 April 6th. 2009 Written By
- Thad N. Thompson Date:
04/06/2009 Approved By : Dan Scukanec Date:
04/20/2009
This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
Initial Conditions: The plant is in Mode 4 at 350 psig and stable.
Assigned Task:
Maintenance personnel have just reported a leak on Accumulator #2 has been repaired.
The SS has directed you to "Restore level and pressure in Accumulator
- 2" using SOP-13105 section 4.4.1 to raise accumulator level to clear the level and pressure alarms.
2 This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
tnltlal Conditions: The plant is in Mode 4 at 350 psig and stable.
Assigned Task:
Maintenance personnel have just reported a leak on Accumulator #2 has been repaired.
The 55 has directed you to "Restore level and pressure in Accumulator
- 2" using SOP-13105 section 4.4.1 to raise accumulator level to clear the level and pressure alarms.
LO-JP-131 05-003 JPM INFORMATION OPERATOR'S NAME: ____________
EVALUATION DATE: _
JPM TITLE:
Increase Accumulator Level REVISION:
o April 6th, 2009 COMPLETION TIME:
20 minutes Application:
RO/SRO This JPM is for the HL-15 NRC Exam KJA Number:
006A1.13 RO: 3.5 SRO: 3.7 Evaluation Method Evaluation Location Performance Time:
[ J Performed
[ ] Simulator
.minutes OVERALL JPM EVALUATION Examiner Comments:
[ J Simulated
[ ] Control Room
( ] SATISFACTORY Examiner's Signature: _____________
3
[ J Unit 1 f ] Unit 2
[ ] UNSATISFACTORY LO-JP-13105-003 JPM INFORMATION e r===========================
OPERATOR'S NAME: ___________
EVALUATION DATE:
JPM TITLE:
Increase Accumulator level REVISION:
o April 6th, 2009 COMPLETION TIME:
20 minutes Application:
ROISRO This JPM is for the HL-15 NRC Exam KIA Number; OOSA1.13 RO: 3.5 SRO: 3.7 Evaluation Method
[ I Pertormed I 1 Simulated Evaluation Location
( J Simulator I J Control Room
[ I Unit1
[ I Unl12 e
Perfonnance TIme:
minutes OVERALL JPM EVALUATION I 1 SATISFACTORY I 1 UNSATISFACTORY Examiner Comments:
Examiner's Signature:
e J
LO-JP-131 05-003 INSTRUCTIONS TO EXAMINER This JPM is based on the latest rev of 13105-1. Verify this JPM is in accord with the latest procedural revision prior to use. Cues preceded by a "©..." are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
SIMULATOR SETUP:
- 1.
- 1.
- 2.
13105, Safety Injection System Reset to IC # 3 for the HL-15 NRC Exam Place SIP "A" in PTL with a Red Danger Tag on the hand switch.
Simulator Setup From Scratch
- 1.
Reset to IC # 3 (Mode 4,350 psig)
- 2.
Insert malfunction SI028 with a Final Value of 100%
- 3.
Verify Accum Tank 2 Hi I La Level annunciator alarms
- 4.
Remove malfunction when level annunciator illuminates
- 5.
Place SIP "A" in PTL with a Red Danger Tag on the hand switch
- 6.
Close 1-HV-8821A, SIP "A" Discharge Isolation valve
- 7.
Close 1-HV-8806, SIP Common Suction Valve
- 8.
Place HV-8806 Lockout Switch to OFF
- 8.
AcklReset alarms
- 9.
Freeze simulator Setup time: 5 minutes DIRECTIONS TO OPERATOR You will be given information describing the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
INITIAL CONDITIONS:
AsSIGNED TASK:
The plant is in Mode 4 at 350 psig and stable.
Maintenance personnel have just reported a leak on Accumulator #2 has been repaired.
The S5 has directed you to "Restore level and pressure in Accumulator #2" using SOP-13105, section 4.4.1 to raise accumulator level to clear the level and pressure alarms.
4 LO-JP-13105-003 INSTRUCTIONS TO EXAMINER e r=========================
This JPM is based on the latest rev of 13105-1. Verify this JPM is in accord with the latest procedural revision prior to use. Cues preceded by a ~©... ~ are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
ReQUIRED ITEMS:
- 1.
13105. Safety Injection System SIMULATOR SeTUP:
- 1.
Reset to IC # 3 forthe HL-15 NRC Exam
- 2.
Place SIP "A" in PTL with a Red Danger Tag on the hand switch.
Simulator Setup From Scratch
- 1.
Reset to IC # 3 (Mode 4, 350 psig)
- 2.
Insert malfunction SI028 with a Final Value of 100%
- 3.
Verify Accum Tank 2 Hi I La Level annunciator alarms
- 4.
Remove malfunction when level annunciator illuminates
- 5.
Place SIP "A" in PTL with a Red Danger Tag on the hand switch
- 6.
Close l-HV-8821A, SIP "A" Discharge Isolation valve
- 7.
Close 1-HV-8806, SIP Common Suction Valve
- 8.
Place HV-8806 Lockout Switch to OFF
- 8.
AckiReset alarms
- 9.
Freeze simulator Setup time: 5 minutes DIRECTIONS TO OPERATOR You will be given information describing the Initial Conditions. Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning, You will be allowed access to any item normally used to perform this task, INITIAL CONDITIONS:
AsSIGNED TASK:
The plant is in Mode 4 al 350 psig and slable.
Maintenance personnel have iust reported a leak on Accumulator #2 has been repaired.
The SS has directed you 10 -Restore level and pressure In Accumulalor #2-using SOP*
13105. section 4.4,1 to raise accumulator level 10 clear the level and pressure alarms.
4
LO-JP-131 05-003 JPM STEPS STARTTIME: ___
STEP 1 SAT O£>'
UNSAT O£>'
Select procedure and section
&0
.13105, section 4.4.1 selected STEP 2 CRITICAL ( + )
SAT 0..e'S' UNSAT 0..e'S' Isolates SIP "A" Injection Capability From The RCS
&0
+ Places 1-HS-8835A Lockout Switch to ON (# 1)
&0
+ CLOSES 1-HV-8835 CL INJ FROM SIS
&0
- Places 1-HS-8835A Lockout Switch to LOCKOUT CUE: (# 1) The SS has addressed the CAUTIONS prior to step 4.4.1 (IF, the candidate mentions the CAUTIONS)
STEP 3 NON-CRITICAL (.)
SAT O£>'
UNSAT O£>'
Performs other steps to ensure SIP "A" Injection Capability is Isolated From The RCS
&0
- Checks 1-HV-8802A CLOSED
&0
- Checks 1-HS-8802C in LOCKOUT
&0
- Checks 1-HV-8802B CLOSED
&0
- Checks 1-HV-8802D in LOCKOUT STEP 4 CRITICAL ( + )
SAT 0..e'S' UNSAT 0..e'S' Establishes Flow Path From SIP "8"
&0
+ OPENS 1-HV-8821A SIP "A" Discharge
&0
- Verifies 1-HV-8821 B OPEN
&0
- Requests documentation of alignment changes on controlling UOP (# 1)
CUE: (# 1) The SS will document the alignment changes in the UOP.
5 LO-JP-131 05-003 JPM STEPS STARTTIME: ___
STEP 1 SAT O£>'
UNSAT O£>'
Select procedure and section
&0
.13105, section 4.4.1 selected STEP 2 CRITICAL ( + )
SAT 0..e'S' UNSAT 0..e'S' Isolates SIP "A" Injection Capability From The RCS
&0
+ Places 1-HS-8835A Lockout Switch to ON (# 1)
&0
+ CLOSES 1-HV-8835 CL INJ FROM SIS
&0
- Places 1-HS-8835A Lockout Switch to LOCKOUT CUE: (# 1) The SS has addressed the CAUTIONS prior to step 4.4.1 (IF, the candidate mentions the CAUTIONS)
STEP 3 NON-CRITICAL (.)
SAT O£>'
UNSAT O£>'
Performs other steps to ensure SIP "A" Injection Capability is Isolated From The RCS
&0
- Checks 1-HV-8802A CLOSED
&0
- Checks 1-HS-8802C in LOCKOUT
&0
- Checks 1-HV-8802B CLOSED
&0
- Checks 1-HV-8802D in LOCKOUT STEP 4 CRITICAL ( + )
SAT 0..e'S' UNSAT 0..e'S' Establishes Flow Path From SIP "8"
&0
+ OPENS 1-HV-8821A SIP "A" Discharge
&0
- Verifies 1-HV-8821 B OPEN
&0
- Requests documentation of alignment changes on controlling UOP (# 1)
CUE: (# 1) The SS will document the alignment changes in the UOP.
5
STEPS CRITICAL ( * )
SAT 0..l'S' UNSAT 0..l'S' JPM STEPS Aligns SI System and Initiates accumulator fill
'&.0
- Places 1-HV-8806A Lockout Switch to ON
'&.0
'&.0
- Checks 1-HV-8923 SI Pump 8 Suction Isolation OPEN
'&.0
- Checks 1-HV-8813 SIP Common Mini Flow OPEN
'&.0
- Checks 1-HV-8920 SIP "8" mini flow OPEN
'&.0
- STARTS SIP "8" using 1-HS-0999A
'&.0
- OPENS 1-HV-8888 Accum Fill
'&.0
- OPENS 1-HV-8871 SIS Check Valve Test CNMT Iso
'&.0
- OPENS 1-HV-88788 Accum Fill
'&.0
- Monitors 1-Ll-0952 / 1-Ll-0953 Level Indication ( # 1)
'&.0
- CLOSES 1-HV-88788 Accum Fill
'&.0
- Independent verification requested (# 2)
'&.0
- CLOSES 1-HV-8871
'&.0
- Independent verification requested (# 2)
'&.0
- CLOSES 1-HV-8888
'&.0
- Independent verification requested (# 2)
LO-JP-13105-003 NOTE: It will take approximately 7 to 8 minutes after fill initiation to clear the Accumulator Pressure alarm, it will take about 5 minutes after fill initiation to clear the Accumulator Hi / Lo Level alarm.
CUES: (# 1) Once the Accumulator Pressure alarm clears, inform the candidate the "SS has determined accumulator level and pressure are satisfactory".
(# 2) "The Unit Operator will perform the IV."
STEP 6 CRITICAL ( * )
SAT 0..l'S' UNSAT 0..l'S' Stop the SI Pump
'&.0
- SIP "8" stopped
'&.0
- SIP "8" handswitch 1-HS-0999A in AUTO (# 1)
CUES: (# 1) "The Unit Operator will relieve SI header pressure and complete the procedure".
6 STEPS CRITICAL ( * )
SAT 0..l'S' UNSAT 0..l'S' JPM STEPS Aligns SI System and Initiates accumulator fill
'&.0
- Places 1-HV-8806A Lockout Switch to ON
'&.0
'&.0
- Checks 1-HV-8923 SI Pump 8 Suction Isolation OPEN
'&.0
- Checks 1-HV-8813 SIP Common Mini Flow OPEN
'&.0
- Checks 1-HV-8920 SIP "8" mini flow OPEN
'&.0
- STARTS SIP "8" using 1-HS-0999A
'&.0
- OPENS 1-HV-8888 Accum Fill
'&.0
- OPENS 1-HV-8871 SIS Check Valve Test CNMT Iso
'&.0
- OPENS 1-HV-88788 Accum Fill
'&.0
- Monitors 1-Ll-0952 / 1-Ll-0953 Level Indication ( # 1)
'&.0
- CLOSES 1-HV-88788 Accum Fill
'&.0
- Independent verification requested (# 2)
'&.0
- CLOSES 1-HV-8871
'&.0
- Independent verification requested (# 2)
'&.0
- CLOSES 1-HV-8888
'&.0
- Independent verification requested (# 2)
LO-JP-13105-003 NOTE: It will take approximately 7 to 8 minutes after fill initiation to clear the Accumulator Pressure alarm, it will take about 5 minutes after fill initiation to clear the Accumulator Hi / Lo Level alarm.
CUES: (# 1) Once the Accumulator Pressure alarm clears, inform the candidate the "SS has determined accumulator level and pressure are satisfactory".
(# 2) "The Unit Operator will perform the IV."
STEP 6 CRITICAL ( * )
SAT 0..l'S' UNSAT 0..l'S' Stop the SI Pump
'&.0
- SIP "8" stopped
'&.0
- SIP "8" handswitch 1-HS-0999A in AUTO (# 1)
CUES: (# 1) "The Unit Operator will relieve SI header pressure and complete the procedure".
6
STEP?
SAT O~
UNSAT O~
'&0
- Accumulator level raised to clear the level and pressure alarms.
STOP TIME: _____
Field Notes 7
LO-JP-131 05-003 STEP?
SAT O~
UNSAT O~
'&0
- Accumulator level raised to clear the level and pressure alarms.
STOP TIME: _____
Field Notes 7
LO-JP-131 05-003
SOUTHERN.\\
COM~
Energy to Serve Your CONTROL ROOM OPERA TOR INCREASE Acc LATOR LEVEL AT l.,ow ReS PRESSURE This Is A New M For The HL:.-14 Audit Exam I
M Is For The RO's Only For This Exam)
/
evision 0
/ June 20th, 2007
/
Written By
- Thad N. Thompson Date:
06/20/2007 Approved By : R. Lee Mansfield Date:
06/22/2007 SOUTHERN A Energyt~~~~.
PLANT VOGTLE CONTROL ROOM OPERA TOR JOBPE INCREASE Acc LATOR LEVEL AT L w ReS PRESSURE This Is A New M For The I1l-14 Audit Exam M "M Th7
",M Th" '-I
~
/
ReViSion a
~
/ June 20th, 2007
/
Written By
- Thad N. Thompson Date:
06/20/2007 Approved By : R. Lee Mansfield Date:
06/22/2007
This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
Initial Conditions: The plant is in Mode 4 at 350 psig and stable.
Assigned Task:
Maintenance personnel have just reported a leak on Accumulator #2 has been repaired.
The SS has directed you to "Restore level and pressure in Accumulator
- 2" using SOP-131 05 section 4.4.1 to raise accumulator level to clear the level and pressure alarms.
2 This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be aI/owed access to any item normally used to perform this task.
Initial Conditions: The plant is in Mode 4 at 350 psig and stable.
Assigned Task:
Maintenance personnel have just reported a leak on Accumulator #2 has been repaired.
The SS has directed you to "Restore level and pressure in Accumulator
- 2" using SOP-1 3105 section 4.4.1 to raise accumulator level to clear the level and pressure alarms.
1
LO-JP-131 05-003 JPM INFORMATION OPERATOR'S NAME: ____________
EVALUATION DATE:
I JPM TITLE:
Increase Accumulator Level REVISION:
o June 20th, 2007 COMPLETION TIME:
20 minutes Application:
RO/SRO This JPM is for the HL-14 Initial License Audit Exam (RO only JPM)
KJA Number:
006A4.07 RO: 4.4 SRO: 4.4 Evaluation Method
[ ] Performed
[ 1 Simulated Evaluation Location
[ ] Simulator
[ 1 Control Room
[ ] Unit 1
[ ] Unit 2 Performance Time:
minutes OVERALL JPM EVALUATION
[ ] SATISFACTORY
[ ) UNSATISFACTORY Examiner Comments:
Examiner's Signature: _______ ___ ____ _
3 LO-JP-1310S-003 JPM INFORMATION e r=========================
OPERATOR'S NAME: _
EVALUATION DATE: __ 1_
JPM TITLE:
Increase Accumulator Level REVISION:
o June 20th. 2007 COMPLETION TIME:
20 minutes Application:
ROISRO This JPM is for the Hl-14 Initial License Audit Exam (RO only JPM)
KIA Number:
006A4.07 RO: 4.4 SRO: 4.4 Evaluation Method
[ 1 Performed
{ ) Simulated Evaluation l ocation t J Simulator I I Control Room I)Uni11 I ) Unit2 e
Performance Time:
minutes OVERALL JPM EVALUATION I J SATISFACTORY
[ J UNSATISFACTORY Examiner Comments:
Examiner's Signature:
e 3
LO-JP-13105-003 INSTRUCTIONS TO EXAMINER This JPM is based on the latest rev of 13105-1. Verify this JPM is in accord with the latest procedural revision prior to use. Cues preceded by a "©... " are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
SIMULATOR SETUP:
- 1.
- 1.
- 2.
13105, Safety Injection System Reset to IC # 123 for the HL-14 Audit Exam Place SIP "An in PTL with a Red Danger Tag on the hand switch.
Simulator Setup From Scratch
- 1.
Reset to Ie # 12 (Mode 4,350 psig)
- 2.
Insert malfunction SI028 with a Final Value of 100%
- 3.
Verify Accum Tank 2 Hi I Lo Level annunciator alarms
- 4.
Remove malfunction when level is < 17%
- 5.
Place SIP "A" in PTL with a Red Danger Tag on the hand switch
- 6.
Close 1-HV-8821A. SIP "A" Discharge Isolation valve
- 7.
AcklReset alarms
- 8.
Freeze simulator Setup time: 5 minutes DIRECTIONS TO OPERATOR You will be given information describing the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
INITIAL CONDITIONS:
ASSIGNED TASK:
The plant is in Mode 4 at 350 psig and stable.
Maintenance personnel have just reported a leak on Accumulator #2 has been repaired.
The SS has directed you to "Restore level and pressure in Accumulator #2" using SOP-13105, section 4.4.1 to raise accumulator level to clear the level and pressure alarms.
4 LO*JP*13105*003 INSTRUCTIONS TO EXAMINER
. r======================
This JPM is based on the latest rev of 13105-1. Verify this JPM is In accord with the latest procedural revision prior 10 use. Cues preceded by a "C..," are provided to enhance Simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
RECUIRED ITEMS:
SIMULATOR SETUP:
- 1.
- 1.
- 2.
13105, Safety Injection System Reset to IC # 123 forthe HL*14 Audit Exam Place SIP "A" in PTL with a Red Danger Tag on the hand switch.
Simulator Setup From Scratch
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
8.
Reset to IC # 12 (Mode 4, 350 psig)
Insert malfunction SI028 with a Final Value of 100%
Verify Accum Tank 2 Hi I Lo Level annunciator alarms Remove malfunction when level is < 17%
Place SIP "A' in PTL with a Red Danger Tag on the hand switch Close 1*HV*8821A, SIP "A' Discharge Isolation valve AckiReset alarms Freeze simulator Setup lime: 5 minutes DIRECTIONS TO OPERATOR You will be given Information describing the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
INITIAL CONDITIONS:
ASSIGNED TASK:
The plant is in Mode 4 at 350 psig and stable.
Maintenance personnel have just reported a leak on Accumulator #2 has been repaired.
Tt'1e 55 has directed you to "Restore level and pressure in Ac.:cumulator #2" using 50P-13105, section 4.4.1 to raise accumulator level to clear the level and pressure alarms.
4
LO-JP-131 05-003 JPM STEPS STARTTIME: ___
STEP 1 SAT O~
UNSAT O~
Select procedure and section
&0
- 13105, section 4.4.1 selected STEP 2 CRITICAL ( * )
SAT O~
UNSAT O~
Isolates SIP "A" Injection Capability From The RCS
&0
+ Places 1-HS-8835A Lockout Switch to ON (# 1)
&0
+ CLOSES 1-HV-8835 CL INJ FROM SIS
&0
- Places 1-HS-8835A Lockout Switch to LOCKOUT CUE: (# 1) The SS has addressed the CAUTIONS prior to step 4.4.1 (IF, the candidate mentions the CAUTIONS)
STEP 3 NON-CRITICAL (.)
SAT O~
UNSAT O~
Performs other step to ensure SIP "A" Injection Capability is Isolated From The RCS
&0
- Checks 1-HV-8802A CLOSED
&0
- Checks 1-HS-8802C in LOCKOUT
&0
- Checks 1-HV-8802B CLOSED
&0
- Checks 1-HV-8802D in LOCKOUT STEP 4 CRITICAL ( * )
SAT O~
UNSAT O~
Establishes Flow Path From SIP "8"
&0
+ OPENS 1-HV-8821A SIP "An Discharge
&0
- Verifies 1-HV-8821 B OPEN
&0
- Requests documentation of alignment changes on controlling UOP (# 1)
CUE: (# 1) The SS will document the alignment changes in the UOP.
5 LO-JP-131 05-003 JPM STEPS STARTTIME: ___
STEP 1 SAT O~
UNSAT O~
Select procedure and section
&0
- 13105, section 4.4.1 selected STEP 2 CRITICAL ( * )
SAT O~
UNSAT O~
Isolates SIP "A" Injection Capability From The RCS
&0
+ Places 1-HS-8835A Lockout Switch to ON (# 1)
&0
+ CLOSES 1-HV-8835 CL INJ FROM SIS
&0
- Places 1-HS-8835A Lockout Switch to LOCKOUT CUE: (# 1) The SS has addressed the CAUTIONS prior to step 4.4.1 (IF, the candidate mentions the CAUTIONS)
STEP 3 NON-CRITICAL (.)
SAT O~
UNSAT O~
Performs other step to ensure SIP "A" Injection Capability is Isolated From The RCS
&0
- Checks 1-HV-8802A CLOSED
&0
- Checks 1-HS-8802C in LOCKOUT
&0
- Checks 1-HV-8802B CLOSED
&0
- Checks 1-HV-8802D in LOCKOUT STEP 4 CRITICAL ( * )
SAT O~
UNSAT O~
Establishes Flow Path From SIP "8"
&0
+ OPENS 1-HV-8821A SIP "An Discharge
&0
- Verifies 1-HV-8821 B OPEN
&0
- Requests documentation of alignment changes on controlling UOP (# 1)
CUE: (# 1) The SS will document the alignment changes in the UOP.
5
STEP 5 CRITICAL ( + )
SAT OAf UNSAT OAf Initiates accumulator fill JPM STEPS
&0
- Checks 1-HV-8813 SIP Common Mini Flow OPEN
&0
- Checks 1-HV-8920 SIP "B" mini flow OPEN
&0
+ STARTS SIP "B" using 1-HS-0999A
&0
+ OPENS 1-HV-8888 Accum Fill
&0
+ OPENS 1-HV-8871 SIS Check Valve Test CNMT Iso
&0
+ OPENS 1-HV-8878B Accum Fill
&0
- Monitors 1-Ll-0952 / 1-Ll-0953 Level Indication ( # 1)
&0
+ CLOSES 1-HV-8878B Accum Fill
&0
- Independent verification requested (# 2)
&0
+ CLOSES 1-HV-8871
&0
- Independent verification requested (# 2)
&0
+ CLOSES 1-HV-8888
&0
- Independent verification requested (# 2)
LO-JP-131 05-003 NOTE: It will take approximately 7 to 8 minutes after fill initiation to clear the Accumulator Pressure alarm, it will take about 5 minutes after fill initiation to clear the Accumulator Hi / Lo Level alarm.
CUES: (# 1) Once the Accumulator Pressure alarm clears, inform the candidate the "SS has determined accumulator level and pressure are satisfactory".
(# 2) "The BOP will perform the IV."
STEP 6 CRITICAL ( + )
SAT OAf UNSAT OAf Stop the SI Pump
&0
+ SIP "B" stopped
&0
- SIP "B" handswitch 1-HS-0999A in AUTO 6
STEP 5 CRITICAL ( + )
SAT OAf UNSAT OAf Initiates accumulator fill JPM STEPS
&0
- Checks 1-HV-8813 SIP Common Mini Flow OPEN
&0
- Checks 1-HV-8920 SIP "B" mini flow OPEN
&0
+ STARTS SIP "B" using 1-HS-0999A
&0
+ OPENS 1-HV-8888 Accum Fill
&0
+ OPENS 1-HV-8871 SIS Check Valve Test CNMT Iso
&0
+ OPENS 1-HV-8878B Accum Fill
&0
- Monitors 1-Ll-0952 / 1-Ll-0953 Level Indication ( # 1)
&0
+ CLOSES 1-HV-8878B Accum Fill
&0
- Independent verification requested (# 2)
&0
+ CLOSES 1-HV-8871
&0
- Independent verification requested (# 2)
&0
+ CLOSES 1-HV-8888
&0
- Independent verification requested (# 2)
LO-JP-131 05-003 NOTE: It will take approximately 7 to 8 minutes after fill initiation to clear the Accumulator Pressure alarm, it will take about 5 minutes after fill initiation to clear the Accumulator Hi / Lo Level alarm.
CUES: (# 1) Once the Accumulator Pressure alarm clears, inform the candidate the "SS has determined accumulator level and pressure are satisfactory".
(# 2) "The BOP will perform the IV."
STEP 6 CRITICAL ( + )
SAT OAf UNSAT OAf Stop the SI Pump
&0
+ SIP "B" stopped
&0
- SIP "B" handswitch 1-HS-0999A in AUTO 6
STEP 7 NON-CRITICAL (.)
SAT Dz;-
UNSAT D£l Relieve SI header pressure
~D
- OPENS 1-HV-8871 and 1-HV-8823
~D
- CYCLES 1-HV-8964 (# 1)
JPM STEPS
~D
- 1-HV-8871 and 1-HV 8823 and 1-HV-8964 CLOSED
~D
- Independent verification requested (# 2) (# 3)
CUES: (# 1) "The SS has determined Safety Injection Header Pressure is adequate".
( # 2) "The BOP will perform the IV."
(# 3) "Another operator will complete the procedure".
STEP 8 SAT D£l UNSAT D£l Report to SS
~D
- Accumulator level raised to clear the level and pressure alarms.
STOP TIME: _____
Field Notes 7
LO-JP-131 05-003 STEP 7 NON-CRITICAL (.)
SAT Dz;-
UNSAT D£l Relieve SI header pressure
~D
- OPENS 1-HV-8871 and 1-HV-8823
~D
- CYCLES 1-HV-8964 (# 1)
JPM STEPS
~D
- 1-HV-8871 and 1-HV 8823 and 1-HV-8964 CLOSED
~D
- Independent verification requested (# 2) (# 3)
CUES: (# 1) "The SS has determined Safety Injection Header Pressure is adequate".
( # 2) "The BOP will perform the IV."
(# 3) "Another operator will complete the procedure".
STEP 8 SAT D£l UNSAT D£l Report to SS
~D
- Accumulator level raised to clear the level and pressure alarms.
STOP TIME: _____
Field Notes 7
LO-JP-131 05-003
SOUTHERN.\\
COMPANY Ene1-gy to Serve Your World'"
PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM "d" RQ*JP*19030*006 ISOLATE A RUPTURED STEAM GENERATOR WITH FAILURE OF TDAFW STEAM SUPPLY AND MSIV 3006AI B TO CLOSE THIS Is A BANK JPM FOR THE HL-15 JPM EXAM (FAULTED JPM - PREVIOUSLY USED ON HL-14 NRC EXAM)
(This JPM Was Randomly Selected)
Revision 0 April 6th. 2009 Written By
- Thad N. Thompson Date:
4/06/2009 Approved By : Dan Scukanec Date:
4/20/2009 SOUTHERN.'
COMPANY Energy to Serve Your World" PLANT VOGTLE CONTROL ROOM OPERATOR JOB PERFORMANCE MEASURE System JPM " d" RQ-JP-19030-006 ISOLATE A RUPTURED STEAM GENERATOR WITH FAILURE OFTDAFW STEAM SUPPLY AND MSIV 3006AI B TO CLOSE THIS Is A BANK JPM FOR THE HL-15 JPM EXAM (FAULTED JPM - PREVIOUSLY USED ON HL-14 NRC EXAM)
(This JPM Was Randomly Selected)
Revision 0 April 6th. 2009 Written By
- Thad N. Thompson Date:
4/06/2009 Approved By
- Dan Scukanec Date:
4/20/2009
This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
(5)
THIS IS A TIME CRITICAL JPM (5)
Inilial Conditions: A turbine trip/reactor trip occurred from 100% power. While the crew was attempting to stabilize the plant, a low PRZR pressure SI occurred. The crew was transitioned from 19000, E-O to 19030.
Assigned Task:
The SS has directed you to "Isolate the ruptured SG using 19030 starting at step # 4."
2 This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
(5)
THIS IS A TIME CRITICAL JPM (5)
Initial Conditions: A turbine trip/reactor trip occurred from 100% power. While the crew was attempting to stabilize the plant, a low PRZR pressure 81 occurred. The crew was transitioned from 19000, E-O to 19030.
Assigned Task:
The 88 has directed you to "Isolate the ruptured 8G using 19030 starting at step # 4."
2
RQ-JP-19030-006 JPM INFORMATION OPERATOR'S NAME: ____________
EVALUATION DATE:
I JPM TITLE:
Isolate a Ruptured SG With Failure of TDAFW Steam & MSIV 3006A / B to Close REVISION :
o April 6, 2009 COMPLETION TIME:
12 minutes TIME CRITICAL (9 The time limit Is based on FSAR Chapter 15, Table 15.6.3*1 Application:
Task Number:
KJA Number:
10CFR55.45 Ref.:
Evaluation Method Evaluation Location Performance Time:
RO/SRO 37011 035A4.06 9
[ ] Performed
[ ] Simulator minutes OVERALL JPM EVALUATION Examiner Comments:
[ ] Simulated
[ ] Control Room
[ ] SATISFACTORY Examiner's Signature: _____________
3
[ ] Unit 1
[ ] Unit 2
[ ] UNSATISFACTORY RQ-JP-19030-006 JPM INFORMATION e r=========================
ce e
OPERATOR'S NAME: ___ ________
EVALUATION DATE:
I I
JPM TITLE:
Isolate a Ruptured SG With Failure of TDAFW Steam & MSIV 3006A I B to Close REVISION:
o April 6, 2009 COMPLETION TIME:
12 minutes TIME CRITICAL G Application:
Task Number:
KIA Number; 10CFR55.45 Ref.:
Evaluation Method Evaluation Location Performance Time:
The"me IImiffs basedon FSAR Chap/llf 15, Table ' 5. 4 3-1 RO/SRO 37011 035A4.06 9
( I Perfonned
[ ) Simulator minutes RO 4.5 SRO 4.6
[ I Simulated
( I Control Room OVERALL JPM EVALUATION
[ ) SATISFACTORY Examiner Comments:
Examiner's Signature:
3 (IUni11
( I Unit 2
[ ) UNSATISFACTORY
RQ-JP-19030-006 INSTRUCTIONS TO EXAMINER This JPM is based on 19030-C. Verify this JPM is in accord with the latest procedural revision prior to use. Cues preceded by a "©... " are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
- 1.
19030-C. Steam Generator Tube Rupture SIMULATOR SETUP:
- 1.
Reset to IC14 (IC 14 for HL-15 NRC Exam, pre-snapped)
- 2.
INSERT OVERRIDE ON 1 HV-300SA TO OPEN
- 3.
INSERT OVERRIDE ON 1 HV-300SA GREEN LIGHT To OFF
- 4.
INSERT OVERRIDE ON 1 HV-300S8 TO OPEN
- 5.
INSERT OVERRIDE ON 1 HV-300S8 GREEN LIGHT To OFF S.
INSERT OVERRIDE ON 1 HV-3009 TO OPEN
- 7.
Insert malfunction SG01A at 50% severity
- 8.
Initiate manual Rx trip and SI
- 9.
Throttle AFW flow to 200 gpm an ALL SGs
- 10.
Verify ruptured SG level> 10%
- 11.
AckJReset alarms
- 12.
Freeze simulator Setup time: 10 minutes DIRECTIONS TO OPERATOR You will be given information describing the Initial Conditions. Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
INITIAL CONDITIONS; AsSIGNED TASK:
~
This is a TIME CRfTlCAL JPM
~
A turbine tripireactor trip occurred from 100% power. While the crew was attempting to stabilize the plant, a low PRZR pressure SI occurred. The crew was transitioned from 19000, E-O to 19030.
The S5 has directed you to "Isolate the ruptured SG using 19030 starting at step # 4."
4 RQ-JP-19030-006 INSTRUCTIONS TO EXAMINER O r=======================
This JPM is based on 19030-C. Verify this JPM is in accord with the lalest procedural revision prior to use. Cues preceded by a.. e..... are provided 10 enhance sImulation of this JPM and should only be used When the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
1, 19030-C, Steam Generator Tube Rupture SIMUL.ATOR S ETUP:
1, Reset to IC14 (IC 14 for HL-15 NRC Exam, pre-snapped) 2, INSERT OVERRIDE ON 1 HV-3006A TO OPEN 3,
INSERT OVERRIDE ON 1 HV-3006A GREEN LIGHT To OFF 4,
INSERT OVERRIDE ON 1 HV-30068 TO OPEN
- 5.
INSERT OVERRIDE ON 1 HV-30068 GREEN LIGHT To OFF 6,
INSERT OVERRIDE ON 1 HV-3009 TO OPEN 7,
Insert malfunction SG01A at 50% severity 8,
Initiate manual Rx trip and SI 9,
Throttle AFW flow to 200 gpm an ALL SGs 10, Verify ru ptured SG level> 10%
11.
AckiReset alarms 12, Freeze simulator Selup time: 10 minutes DIRECTIONS TO OPERATOR You will be given information describing the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any flem normally used to perform this task.
INITIAL CONDITIONS:
AsSIGNED TASK:
(9 This is a TIME CRITICAL JPM (9
A turbine lrip/reactor trip occurred from 100% power. While Ihe crew was attempting to stabilize the plant, a low PRZR pressure 51 occurred. The crew was Iransitioned from 19000, E-o 10 19030, The 55 has directed you 10 "Isolate the ruptured 5G using 19030 starting at step # 4. w 4
STEP 1 SAT O~
UNSAT O~
Checks if RCPs should be stopped.
JPM STEPS
~O
~O
- Determines RCS pressure> 1375 psig
~O
- Determines RCPs do NOT need to be stopped, goes to step # 5.
STEP 2 CRITICAL ( * )
SAT 0-f'S" UNSAT 0-f'S" Identify ruptured steam generator by any of the following conditions.
~O
- SG # 1 identified as ruptured based on uncontrolled level rise ©
~O
- High radiation from any SG sample.
&0
- High radiation from any SG steamline.
~O
- High radiation from any SG blowdown line.
START TIME: ___
STEP 3 CRITICAL ( * )
SAT 0-f'S" UNSAT 0-f'S" TIME CRITICAL (9 Isolate ruptured SG ARV(s).
RQ-JP-19030-006 Note:
The ARV should be allowed to control pressure automatically. Placing the controller in Manual and closing the ARV is considered UNSA T.
~O
- ARV controller PIC-3000 in AUTO (see note above)
~O
- Adjust PIC-3000 potentiometer at 7.73 (::::; 1160 psig)
~O
UNSAT O~
Checks at least one MDAFW pump - RUNNING AND CAPABLE OF FEEDING SG(s) NEEDED FOR RCS COOLDOWN.
~O
5 STEP 1 SAT O~
UNSAT O~
Checks if RCPs should be stopped.
JPM STEPS
~O
~O
- Determines RCS pressure> 1375 psig
~O
- Determines RCPs do NOT need to be stopped, goes to step # 5.
STEP 2 CRITICAL ( * )
SAT 0-f'S" UNSAT 0-f'S" Identify ruptured steam generator by any of the following conditions.
~O
- SG # 1 identified as ruptured based on uncontrolled level rise ©
~O
- High radiation from any SG sample.
&0
- High radiation from any SG steamline.
~O
- High radiation from any SG blowdown line.
START TIME: ___
STEP 3 CRITICAL ( * )
SAT 0-f'S" UNSAT 0-f'S" TIME CRITICAL (9 Isolate ruptured SG ARV(s).
RQ-JP-19030-006 Note:
The ARV should be allowed to control pressure automatically. Placing the controller in Manual and closing the ARV is considered UNSA T.
~O
- ARV controller PIC-3000 in AUTO (see note above)
~O
- Adjust PIC-3000 potentiometer at 7.73 (::::; 1160 psig)
~O
UNSAT O~
Checks at least one MDAFW pump - RUNNING AND CAPABLE OF FEEDING SG(s) NEEDED FOR RCS COOLDOWN.
~O
5
STEP 5 CRITICAL (.)
SAT OLl" UNSAT OLl" JPM STEPS Close affected TDAFW Pump Steam Supply Valve(s):
~n
- TDAFW steam supply HV-3009A identified will NOT close
'&0
- Checks at least one MDAFW pump running
~n
- Trips the TDADW Pump (NOTE)
RQ-JP-19030-006 NOTE: It is expected the candidate will take the T & T valve to the CLOSE position using HS-1S111, however, if he does not use HS-1S111 and attempts to use HV-S1 06 instead, it will not shut. The candidate may dispatch personnel to shut the manual isolations to the affected SG # 1. This would be acceptable.
STEP6 SAT O~
UNSAT O~
Verify SG Blowdown Isolation Valves - CLOSED WITH HANDSWITCHES IN CLOSE POSITION.
Note:
Positioning the handswitch to CLOSE should be performed for satisfactory completion.
'&0
- Places SG8D isolations HV-7603A, 8, C, D in close position (NOTE)
NOTE: The procedure does not delineate the handswitches to close.
STEP 7 CRITICAL ( * )
SAT OLl" UNSAT OLl" Isolate flow from the ruptured SG(s) by closing its Main Steam line Isolation and Bypass Valves.
'&0
- MSIVs HV-3006A and HV-30068 will NOT close.
'&0
- MS8Vs HV-1300SA and HV-1300S8 shut 6
STEP 5 CRITICAL (.)
SAT OLl' UNSAT OLl' JPM STEPS Close affected TDAFW Pump Steam Supply Valve(s):
~n
- TDAFW steam supply HV-3009A identified will NOT close
'&0
- Checks at least one MDAFW pump running
'&0
- Trips the TDADW Pump (NOTE)
RQ-JP-19030-006 NOTE: It is expected the candidate will take the T & T valve to the CLOSE position using HS-1S111, however, if he does not use HS-1S111 and attempts to use HV-S1 06 instead, it will not shut. The candidate may dispatch personnel to shut the manual isolations to the affected SG # 1. This would be acceptable.
STEP6 SAT O~
UNSAT O~
Verify SG Blowdown Isolation Valves - CLOSED WITH HANDSWITCHES IN CLOSE POSITION.
Note:
Positioning the handswitch to CLOSE should be performed for satisfactory completion.
'&0
- Places SG8D isolations HV-7603A, 8, C, D in close position (NOTE)
NOTE: The procedure does not delineate the handswitches to close.
STEP 7 CRITICAL ( * )
SAT OLl' UNSAT OLl' Isolate flow from the ruptured SG(s) by closing its Main Steam line Isolation and Bypass Valves.
'&0
- MSIVs HV-3006A and HV-30068 will NOT close.
'&0
- MS8Vs HV-1300SA and HV-1300S8 shut 6
STEP 8 CRITICAL ( * )
SAT O~
UNSAT O~
JPM STEPS Performs the following (Step 10 RNO when MSIV for loop # 1 does not shut)
'&0
+ Shuts all remaining MSIVs (HV-3016A & S, 3026A & S, 3036A & S) (NOTE # 1)
'&0
+ Shuts all remaining MSSVs (HV-13006A & S, 13007A & S, 13008A & S) (NOTE # 1)
RQ-JP-1S030-006
'&0
+ Verifies shut all steam dump valves on ZLS-2 and closes dumps if not shut. (NOTE # 2)
'&0
- Verifies HV-6194A Aux and Main Steam Sparger valve is shut
'&0
+ Shuts SJAE valves by selecting HS-4085A (HV-4085S closed by ZLS) to OFF (NOTE # 3) (CUE # 1)
'&0
- Verifies shut MSR A & C Reheat Steam Source Stop Valves (HS-6030 verified in CLOSE)
'&0
- Verifies shut MSR S & D Reheat Steam Source Stop Valves (HS-6015 verified in CLOSE)
'&0
- Use intact ARVs for steam dump (control of Tave)
'&0
+ Goes to step # 11 of 19030-C, versus transition to 19131-C, SGTR with LOCA Subcooled Recovery NOTE # 1 NOTE #2 NOTE#3 The candidate may close each of the steamline isolation and bypass valves individually OR he may perform a Steam Line Isolation using the SLI handswitches.
If Steams Dumps are open (expected), the operator can close by either:
- Selecting OFF / RESET on handswitch to the OFF position, or
- Selecting Steam Pressue Mode and using the 1 PIC-507 controller and lowering demand until the green down arrow is lit.
Taking the SJAE HS-4085A (HV-4085S) to close will satisfy this step. The valves for this are long winded and the candidate does not have to wait for these to close to proceed as he has no further control over the valves from the QMCS.
CUE: # 1 If necessary, state "Another operator will verify the SJAE valves go fully shut".
STEPS CRITICAL (. )
SAT O~
UNSAT O~
Checks ruptures SG(s) level.
'&0
- Check ruptured SG # 2 NR level> 10%
'&0
+ MDAFW throttle valve HV-5132 closed (NOTE # 1)
'&0
- TDAFW throttle valve HV-5125 closed
'&0
- AFW flow to ruptured SG at 0 gpm NOTE: # 1 This is the stop time for time critical as there are no further valves required for isolation unless the student has missed performing a step or incorrectly performed a step. The valves and flow indicator are not delineated in the procedure step.
STOP TIME: _____
7 STEP 8 CRITICAL ( * )
SAT O~
UNSAT O~
JPM STEPS Performs the following (Step 10 RNO when MSIV for loop # 1 does not shut)
'&0
+ Shuts all remaining MSIVs (HV-3016A & S, 3026A & S, 3036A & S) (NOTE # 1)
'&0
+ Shuts all remaining MSSVs (HV-13006A & S, 13007A & S, 13008A & S) (NOTE # 1)
RQ-JP-1S030-006
'&0
+ Verifies shut all steam dump valves on ZLS-2 and closes dumps if not shut. (NOTE # 2)
'&0
- Verifies HV-6194A Aux and Main Steam Sparger valve is shut
'&0
+ Shuts SJAE valves by selecting HS-4085A (HV-4085S closed by ZLS) to OFF (NOTE # 3) (CUE # 1)
'&0
- Verifies shut MSR A & C Reheat Steam Source Stop Valves (HS-6030 verified in CLOSE)
'&0
- Verifies shut MSR S & D Reheat Steam Source Stop Valves (HS-6015 verified in CLOSE)
'&0
- Use intact ARVs for steam dump (control of Tave)
'&0
+ Goes to step # 11 of 19030-C, versus transition to 19131-C, SGTR with LOCA Subcooled Recovery NOTE # 1 NOTE #2 NOTE#3 The candidate may close each of the steamline isolation and bypass valves individually OR he may perform a Steam Line Isolation using the SLI handswitches.
If Steams Dumps are open (expected), the operator can close by either:
- Selecting OFF / RESET on handswitch to the OFF position, or
- Selecting Steam Pressue Mode and using the 1 PIC-507 controller and lowering demand until the green down arrow is lit.
Taking the SJAE HS-4085A (HV-4085S) to close will satisfy this step. The valves for this are long winded and the candidate does not have to wait for these to close to proceed as he has no further control over the valves from the QMCS.
CUE: # 1 If necessary, state "Another operator will verify the SJAE valves go fully shut".
STEPS CRITICAL (. )
SAT O~
UNSAT O~
Checks ruptures SG(s) level.
'&0
- Check ruptured SG # 2 NR level> 10%
'&0
+ MDAFW throttle valve HV-5132 closed (NOTE # 1)
'&0
- TDAFW throttle valve HV-5125 closed
'&0
- AFW flow to ruptured SG at 0 gpm NOTE: # 1 This is the stop time for time critical as there are no further valves required for isolation unless the student has missed performing a step or incorrectly performed a step. The valves and flow indicator are not delineated in the procedure step.
STOP TIME: _____
7
STEP 10 SAT O.£S' UNSAT O.£S' JPM STEPS Checks ruptured SG(s) isolated from intact SG(s).
Either of the following conditions satisfied.
&0
- Ruptured SG(s), steamline(s), ISOLATED.
&0
RQ-JP-19030-006
&0
NOTE # 1 - The Trip and Throttle valve was shut earlier in the procedure to isolate the TDAFW steam supply.
CUE #1 - When the candidate proceeds to step # 13, state: "The SS will have another operator complete the procedure".
STEP 11 SAT O.£S' UNSAT O.£S' Report to SS
- Ruptured SG isolated Field Notes 8
STEP 10 SAT O.£S' UNSAT O.£S' JPM STEPS Checks ruptured SG(s) isolated from intact SG(s).
Either of the following conditions satisfied.
&0
- Ruptured SG(s), steamline(s), ISOLATED.
&0
RQ-JP-19030-006
&0
NOTE # 1 - The Trip and Throttle valve was shut earlier in the procedure to isolate the TDAFW steam supply.
CUE #1 - When the candidate proceeds to step # 13, state: "The SS will have another operator complete the procedure".
STEP 11 SAT O.£S' UNSAT O.£S' Report to SS
- Ruptured SG isolated Field Notes 8
SOUTHERN A.
COMPANY Energy to Serve Your World'*
PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM "e" RQ*JP-19013*005 TRANSFER CONTAINMENT SPRAY SYSTEM TO RECIRCULATION (ALTERNATE PATH JPM FOR THE HL*15 NRC EXAM)
THIS Is A BANK JPM Revision 0 April 6,2009 Written By
- Thad N. Thompson Date:
04/06/2009 Approved By : Dan Scukanec Date:
04/20/2009 o
SOUTHERN.\\
COMPANY Energy to Serve Ytmr World" PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM "eU RQ-JP-19013-005 TRANSFER CONTAINMENT SPRAY SYSTEM TO RECIRCULATION (ALTERNATE PATH JPM FOR THE HL-15 NRC EXAM)
THIS Is A BANK JPM Revision 0 April 6. 2009 Written By
- Thad N. Thompson Dale:
0410612009 Approved By : Dan Scukanec Dale:
0412012009
This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
Initial Conditions: A large break LOCA has occured. The crew performed the cold leg recirculation lineup using 19013, and returned to 19010. After transitioning to 19010, RWST level decreased below 8%. The Auxiliary Building Operator is standing by the local Containment Spray suction and discharge pressure gauges.
Assigned Task:
The SS has directed you to "Align Containment Spray for recirculation beginning with 19013, step # 17."
2 This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
Initial Conditions: A large break LOCA has occured. The crew performed the cold leg recirculation lineup using 19013, and returned to 19010. After Iransitioning to 19010, RWST level decreased below 8%. The Auxiliary Building Operator is standing by the local Containment Spray suction and discharge pressure gauges.
Assigned Task:
The SS has directed you to "Align Containment Spray for recirculation beginning with 19013, step # 17."
2
V-RQ-JP-19013-005 JPM INFORMATION OPERATOR'S NAME: ____
EVALUATION DATE: _1 __
JPM TITLE:
Transfer Containment Spray System to Recirculation REVISION:
o April 6, 2009 COMPLETION TIME:
10 minutes Application:
KIA Number:
Evaluation Method Evaluation Location Performance Time:
ROISRO 026A2.07
[ ] Performed
[ ] Simulator minutes OVERALL JPM EVALUATION Examiner Comments:
RO:
3.6 SRO:
3.9
[ J Simulated
[ ] Control Room
[ ] SATISFACTORY Examiner's Signature: _ ___
3 f ] Unit 1
[ ] Unit 2
( ] UNSATISFACTORY V-RQ-JP-19013-005 JPM INFORMATION e rr===========================
e e
OPERATOR'S NAME: ___
EVALUATION DATE:
I I
JPM TITLE:
Transfer Containment Spray System to Recirculation REVISION:
o April 6. 2009 COMPLETION TIME:
10 minutes Application:
KIA Number:
Evaluation Method Evaluation Location Performance Time:
RO/SRO 026A2.07
[ I Performed
[ ) Simulator minutes OVERALL JPM EVALUATION Examiner Comments:
Examiner's Signature:
RO:
3.6 SRO:
3.9 I 1 Simulated
[ 1 Control Room
[ ) SATISFACTORY 3
[IUn;!t
[I Un;12
[ ) UNSATISFACTORY
V-RQ-JP-19013-005 INSTRUCTIONS TO EXAMINER This JPM is based on the latest rev of 19013-C. Verify this JPM is in accord with the latest procedural revision prior to use. Cues preceded by a u©... " are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
SIMULATOR SETUP:
- 1.
- 1.
19013, Transfer to Cold Leg Recirculation Reset to IC # 14 for HL-15 NRC Exam Simulator Setup from Scratch
- 1.
Reset to IC # 14, MOL 100%
- 2.
Insert malfunction RC03C (DBA LOCA)
- 3.
Trip all RCPs
- 4.
Throttle AFW flow to - 200 gpm/SG
- 5.
When Containment Emergency Sump levels are ::::I 15":
set RF: TK02 = 29% (RWST)
- 6.
Perform 190 13-C steps 1 thru 16
- 7.
Set RF: TK02 = 8%
- 8.
Use Panel Drawings to over ride HV-9002A to SHUT
- 9.
AcklReset alarms
- 10.
Freeze simulator Setup time: 20 minutes DIRECTIONS TO OPERA TOR You will be given information describing the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
INITIAL CONDITIONS:
ASSIGNED TASK:
A large break LOCA has occured. The crew performed the cold leg recirculation lineup using 19013, and returned to 19010. After transitioning to 19010, RWST level decreased below 8%. The Auxiliary Building Operator is standing by the local Containment Spray suction and discharge pressure gauges.
The SS has directed you to "Align Containment Spray for recirculation beginning with 19013, step 17."
4 V-RQ-JP-19013-005 INSTRUCTIONS TO EXAMINER IF-T"'h='S=J::P"'M"',:=."'b=a=sed=';'O=n=I"'h=. "'la=:I= ** =:,=r,=y=o=:f:=1::9::0"'13='-"'C:=. '7v"'.=r,"'ty='h*:=:=J'=PM:=':=S='n=a=c=C=O=rd:=W
:':'h='h=. la=,.=.'7,=p=roc=.'7dU=r=a:=' r=' =Y':=":=o=n=
prior to use. Cues preceded by a "<e... " are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
R EQUIRED ITEMS:
S IMULATOR SETUP:
- 1.
- 1.
19013. Transfer to Cold Leg Recirculation Reset to IC # 14 for HL-15 NRC Exam Simulator Setup from Scratch
- 1.
Reset to IC # 14. MOL 100%
- 2.
Insert malfunction RC03C (DBA LOCA)
- 3.
Trip all RCPs
- 4.
ThroHle AFW flow to ~ 200 gpmlSG
- 5.
When Containment Emergency Sump levels are ~ 15":
set RF: TK02 = 29% (RWST)
- 6.
Perform 19013-C steps 1 thru 16
- 7.
Set RF: TK02 = 8%
- 8.
Use Panel Drawings to over ride HV-9002A to SHUT
- 9.
AckiReset alarms
- 10.
Freeze simulator Setup lime: 20 minutes DIRECTIONS TO OPERATOR You will be given information describing the Initial Conditions, ASSigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
INITIAL CONDITIONS:
ASSIGNED TASK:
A large break lOCA has occured. The crew performed the cold leg recirculation lineup using 19013. and returned to 19010. After Iransilioning to 19010, RWST level decreased below 8%. The Auxiliary Building Operator is standing by the local Containment Spray suction and discharge pressure gauges.
The SS has directed you to "Align Containment Spray for recirculation begInning with 19013. step 17."
4
V-RQ-JP-19013-005 JPM STEPS STARTTIME: ___
STEP 1 CRITICAL (.)
SAT O,g UNSAT O,g Reset containment spray
'Cl-O
- Cntmt Spray reset handswitches HS-40058 and HS-40059 in RESET
'Cl-O
- ALB 06 006 clear (Cnmt spray actuation)
STEP 2 CRITICAL ( * )
SAT O,g UNSAT O,g Align Train A for recirculation
'Cl-O
- Sump suction HV-9002A determined to NOT open.
'Cl-O
- Containment Spray pump "A" placed in STOP per RNO for step # 18
'Cl-O
- Initiates perform ace of step # 19 STEP 3 CRITICAL ( * )
SAT O,g UNSAT O,g Align Train B for recirculation
'Cl-O
- Sump suctions HV-9002B and HV-9003B open
'Cl-O
- RWST suction HV-9017B closed
'Cl-O
- Local gauges for pump suction and discharge pressure verified (# 1)
'Cl-O
- CNMT pressure verified stable or decreasing (# 2)
CUES:
(# 1)
(# 2)
"Suction pressure (PI-972) is 18 psig; Discharge pressure (PI-974) is 204 psig".
Another operator will complete the procedure starting with step # 20.
5 V-RQ-JP-19013-005 JPM STEPS STARTTIME: ___
STEP 1 CRITICAL (.)
SAT O,g UNSAT O,g Reset containment spray
'Cl-O
- Cntmt Spray reset handswitches HS-40058 and HS-40059 in RESET
'Cl-O
- ALB 06 006 clear (Cnmt spray actuation)
STEP 2 CRITICAL ( * )
SAT O,g UNSAT O,g Align Train A for recirculation
'Cl-O
- Sump suction HV-9002A determined to NOT open.
'Cl-O
- Containment Spray pump "A" placed in STOP per RNO for step # 18
'Cl-O
- Initiates perform ace of step # 19 STEP 3 CRITICAL ( * )
SAT O,g UNSAT O,g Align Train B for recirculation
'Cl-O
- Sump suctions HV-9002B and HV-9003B open
'Cl-O
- RWST suction HV-9017B closed
'Cl-O
- Local gauges for pump suction and discharge pressure verified (# 1)
'Cl-O
- CNMT pressure verified stable or decreasing (# 2)
CUES:
(# 1)
(# 2)
"Suction pressure (PI-972) is 18 psig; Discharge pressure (PI-974) is 204 psig".
Another operator will complete the procedure starting with step # 20.
5
STEP 4 SAT O~
UNSAT O~
&0
- Containment spray aligned for recirculation STOP TIME: _____
Field Notes 6
V-RQ-JP-19013-005 STEP 4 SAT O~
UNSAT O~
&0
- Containment spray aligned for recirculation STOP TIME: _____
Field Notes 6
V-RQ-JP-19013-005
Written By SOUTHERN..
COMPANY Energy to Serve Your 0
PLANTVOGTL RQ-JP-19013-003 Date:
05/24/2005 Approved By
- R. D. Brigdon Date:
06/01/2005 SOUTHERN.\\
COMPANY Energy to Serve Your n"o=-,.u -
PLANTVOGTL CONTROL RO)J31,,,-£)
JOB PER ORMANCE EASURE RQ*JP*19013*003 Written By
- --t.M. Thornton Date
05/24/2005 Approved By : R. D. Brigdon Date:
06/01 /2005
This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
Initial Conditions: A large break LOCA has occured. The crew performed the cold leg recirculation lineup using 19013, and returned to 19010. After transitioning to 19010. RWST level decreased below 10%. The Auxiliary Building Operator is standing by the local Containment Spray suction and discharge pressure gauges.
Assigned Task:
The USS has directed you to "Align Containment Spray for recirculation beginning with 19013, step 11."
Task Standard:
Containment spray system operating in the recirculation mode.
2 This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
Initial Conditions: A large break LOCA has occured. The crew performed the cold leg recirculation lineup using 19013, and returned to 19010. After transitioning to 19010, RWST level decreased below 10%. The Auxiliary Building Operator is standing by the local Containment Spray suction and discharge pressure gauges.
Assigned Task:
The USS has directed you to "Align Containment Spray for recirculation beginning with 19013, step 11."
Task Standard:
Containment spray system operating in the recirculation mode.
2
RQ-JP-19013-003 JPM INFORMATION OPERATOR'S NAME: _
EVALUATION DATE:
I I
JPM TITLE:
Transfer Containment Spray System to Recirculation REVISION:
19 May 24, 2005 COMPLETION TIME:
8 minutes Application:
Task Number:
KIA Number:
10CFR55.45 Ref.:
Evaluation Method Evaluation Location Performance Time:
RO/SRO 37009 000011EA112 RO:
4.1 SRO:
4.4 6, 12
[ ] Performed
[ 1 Simulated
( ] Simulator
[ ] Control Room
_ minutes OVERALL JPM EVALUATION
[ ] SATISFACTORY Examiner Comments:
Examiner's Signature: ___
3
[ ] Unit 1
[ ] Unit 2
[ ] UNSATISFACTORY RQ.JP-19013-003 JPM INFORMATION e F===========================
e e
OPERATOR'S NAME: _
EVALUATION DATE:
I I
JPM TITLE:
Transfer Containment Spray System to Recirculation REVISION:
19 May 24. 2005 COMPLETION TIME:
8 minutes Application:
Task Number:
RO/SRO 37009 KIA Number:
10CFR55.45 Ref.:
0OOO1 1EA112 RO:
4.1 SRO:
4.4
- 6. 12 Evaluation Method
[ I Performed
[ 1 Simulated Evaluation Location
[ I Simulator
( J Control Room Performance Time:
minutes OVERALL JPM EVALUATION r J SATISFACTORY Examiner Comments:
Examinets Signature:
3
[ I Uni\\1
[I Unit2 r J UNSATISFACTORY
RQ-JP-19013-003 INSTRUCTIONS TO EXAMINER This JPM is based on the latest rev of 19013-C. Verify this JPM is in accord with the latest procedural revision prior to use. Cues preceded by a "©... " are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
SIMULATOR SETUP:
- 1.
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
19013, Transfer to Cold Leg Recirculation Reset to IC14 (MOL 100%)
Insert malfunction RC03C (DBA LOCA)
Trip all RCPs Throttle AFW flow to ~ 200 gpm/SG When Containment Emergency Sump levels are;::: 15":
set RF: TK02 = 39% (RWST)
Perform 19013-C steps 1 thru 6 Set RF: TK02 = 10%
AcklReset alarms Freeze simulator Setup time: 20 minutes DIRECTIONS TO OPERATOR You will be given information describing the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any Item normally used to perform this task.
INITIAL CONDITIONS:
AsSIGNED TASK:
TASK STANDARD:
A large break LOCA has occured. The crew performed the cold leg recirculation lineup using 19013, and returned to 19010. After transitioning to 19010, RWST level decreased below 10%. The Auxiliary Building Operator is standing by the local Containment Spray suction and discharge pressure gauges.
The USS has directed you to "Align Containment Spray for recirculation beginning with 19013, step 11."
Containment spray system operating in the recirculation mode.
4 RQ*JP*19013*003 INSTRUCTIONS TO EXAMINER e
rr=T=h=;S=J"'P=M=;=S=b=a=S.=d=on
= th=. =la=I.=S=I='.=Y=O=f=1"'9=O=1J.==C=.=V=.=';=fy=l=h;=S=J"'P=M=;=S=;n=acco
=='d=W=;=lh=l=h=. =la=I.=S=I=P='oced
u=ra=I=,=. =y;=s;=on
prior to use. Cues preceded by a "~.. : are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
SIMULATOR S ETUP;
- 1.
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
19013. Transfer 10 Cold Leg Recirculalion Reset to IC14 (MOL 100%)
Insert malfunction RC03C (DBA LOCA)
Trip all RCPs Throttle AFW flow 10 ~ 200 gpm/SG When Containment Emergency Sump levels are ~ 15":
set RF: TK02 = 39% (RWST)
Perform 19013*C sleps 1 Ihru 6 Set RF: TK02 = 10%
AcklReset alarms Freeze simulator Setup time: 20 minutes DIRECTIONS TO OPERATOR You Wilt be given information describing the Initial Conditions, Assigned Task. and the Task Standard. Please ensure you understand the assigned task before beginnIng. You will be allowed access 10 any item normally used to perform this task.
INITIAL CONDITIONS:
AsSIGNED TASK:
TASK STANDARD:
A large break LOCA has occured. The crew performed the cold leg recirculation lineup using 19013. and retumed to 19010. After transitioning to 19010. RWST level decreased below 10%. The Auxiliary Building Operator is standing by the local Containment Spray suctIon and discharge pressure gauges.
The USS has directed you 10 "Align Containment Spray for recirculation beginning with 19013. step 11.~
Containment spray system operating in the recirculation mOde.
4
JPM STEPS STARTTIME: ___
STEP 1 CRITICAL ( * )
SAT D~
UNSAT D~
Reset containment spray
/:l).D
- Cntmt Spray reset handswitches HS-40058 and HS-40059 in RESET
/:l).D
- ALB 06 D06 clear (Cnmt spray actuation)
STEP 2 CRITICAL ( * )
SAT D~
UNSAT D~
Align Train A for recirculation
/:l).D
- Sump suctions HV-9002A and HV-9003A open
/:l).O
- RWST suction HV-9017A closed
/:l).O
- Local gauges for pump suction and discharge pressure verified (1)
/:l).D
- CNMT pressure verified stable or decreasing CUES:
(1)
"Suction pressure (PI-972) is 18 psig; Discharge pressure (PI-974) is 204 psig".
STEP 3 CRITICAL ( * )
SAT D~
UNSAT D~
Align Train B for recirculation
/:l).O
- Sump suction HV-9002B and HV-9003B open
/:l).D
- RWST suction HV-9017B closed
/:l).O
- Local gauges for pump suction and discharge pressure verified (1)
/:l).D
- CNMT pressure verified stable or decreasing CUES:
(1)
"Suction pressure (PI-973) is 16 psig; Discharge pressure (PI-975) is 202 psig."
5 RQ-JP-19013-003 JPM STEPS STARTTIME: ___
STEP 1 CRITICAL ( * )
SAT D~
UNSAT D~
Reset containment spray
/:l).D
- Cntmt Spray reset handswitches HS-40058 and HS-40059 in RESET
/:l).D
- ALB 06 D06 clear (Cnmt spray actuation)
STEP 2 CRITICAL ( * )
SAT D~
UNSAT D~
Align Train A for recirculation
/:l).D
- Sump suctions HV-9002A and HV-9003A open
/:l).O
- RWST suction HV-9017A closed
/:l).O
- Local gauges for pump suction and discharge pressure verified (1)
/:l).D
- CNMT pressure verified stable or decreasing CUES:
(1)
"Suction pressure (PI-972) is 18 psig; Discharge pressure (PI-974) is 204 psig".
STEP 3 CRITICAL ( * )
SAT D~
UNSAT D~
Align Train B for recirculation
/:l).O
- Sump suction HV-9002B and HV-9003B open
/:l).D
- RWST suction HV-9017B closed
/:l).O
- Local gauges for pump suction and discharge pressure verified (1)
/:l).D
- CNMT pressure verified stable or decreasing CUES:
(1)
"Suction pressure (PI-973) is 16 psig; Discharge pressure (PI-975) is 202 psig."
5 RQ-JP-19013-003
STEP 4 SAT D~
UNSAT D~
Report to USS JPM STEPS
~D
- Containment spray aligned for recirculation STOP TIME: _____
Field Notes 6
RQ-JP-19013-003 STEP 4 SAT D~
UNSAT D~
Report to USS JPM STEPS
~D
- Containment spray aligned for recirculation STOP TIME: _____
Field Notes 6
RQ-JP-19013-003
SOUTHERN.\\
COM aNY Energy to Serve Your World'"
PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM "f' NRC-JP-13427-002 DIG 1 B PARALLEL OPERATION WITH FAILURE OF LOAD POT (THIS JPM Is A BANK JPM FOR THE HL-15 NRC EXAM)
THIS JPM WAS ON THE HL-13 NRC EXAM As AN ALTERNATE PATH JPM AND WAS RANDOMLY SELECTED FOR THE HL-15 NRC EXAM Written By
- Thad N. Thompson Date:
02/26/2009 Approved By : Dan Scukanec Date:
4/20/2009 SOUTHERN.\\
COMPANY Energy to Serve Your World "
PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM "P' NRC*JP*13427*002 DIG 1 B PARALLEL OPERATION WITH FAILURE OF LOAD POT (THIS JPM Is A BANK JPM FOR THE HL*15 NRC EXAM)
THIS JPM WAS ON THE HL-13 NRC EXAM As AN ALTERNATE PATH JPM AND WAS RANDOMLY SELECTED FOR THE HL-15 NRC EXAM Written By
- Thad N. Thompson Date:
02/26/2009 Approved By : Dan Scukanec Date:
4/20/2009
This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
Initial Conditions:
Assigned Task:
Following a 7 day DIG 18 outage, Maintenance and Engineering Support are standing by for a DIG 18 test run. DIG 18 was just started, and is now operating unloaded with the DIG output breaker open. You are relieving the 80P, and will be performing the remainder of this test run. The outside area SO is stationed at the DIG to support the evolution.
The applicable portions of 13145-1 have been completed for starting DG-18.
In accordance with procedure 134278-1, parallel DIG 18 to 18A03 and raise DG-18 load to 7000 kw per Section 4.2.1., starting with step 4.2.1.3.
2 This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
Initial Conditions:
Assigned Task:
Following a 7 day DIG 1 B outage, Maintenance and Engineering Support are standing by for a DIG 1B test run. DIG 1B was just started, and is now operating unloaded with the DIG output breaker open. You are relieving the BOP, and will be performing the remainder of this test run. The outside area SO is stationed at the DIG to support the evolution.
The applicable portions of 13145*1 have been completed for starting DG-1B.
In accordance with procedure 13427B-1, paranel DIG 1B to 1BA03 and raise DG-1B load to 7000 kw per Section 4.2.1., starting with step 4.2.1.3.
2
NRC-JP-13427 -02 JPM INFORMATION OPERATOR'S NAME: _ ___________
EVALUATION DATE: _, _
JPM TITLE:
DIG 1 B PARALLEL OPERATION WITH FAILURE OF LOAD POT Application:
KJA Number:
RO/SRO 062A1.01 REVISION:
0 COMPLETION TIME:
21 minutes Evaluation Method
[ ] Perform ed Evaluation Location
[ ] Simulator Performance Time:
minutes OVERALL JPM EVALUATION Examiner Comments:
RO:
3.4 SRO:
3.8
[ ] Simulated
[ ] Control Room
[ 1 SATISFACTORY Examiner's Signature: _ _________
3
[ ] Unit 1
[ ] Unit 2
[ ) UNSATISFACTORY NRC-JP-13427-02 JPM INFORMATION e
F===========================
0 e
OPERATOR'S NAME: ___________ _
EVALUATION DATE:
JPM TITLE:
DIG 1 B PARALLEL OPERATION WITH FAILURE OF LOAD POT Application; KiA Number:
RO/SRO 062A1.01 REVISION:
0 COMPLETION TIME:
21 minutes Evaluation Method I ) Performed Evaluation Location
( I Simulator Performance nme:
minutes OVERALL JPM EVALUATION Examiner Comments:
Examiner's Signature:
RO:
3.4 SRO:
3.8
[ ] Simulated
[ J Control Room I)Unit1
( J Unit2
( J SATISFACTORY
( J UNSATISFACTORY 3
NRC-JP-13427-02 INSTRUCTIONS TO EXAMINER This JPM is based on the latest rev of 13427-1. Verify this JPM is in accordance with the latest procedural revision prior to use. Cues preceded by a u©... " are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
- 1. 134278-1 and 17038-1 SIMULATOR SETUP:
- 1.
Reset to IC # 14 for HL-1 5 NRC Exam Simulator Setup from Scratch
- 1.
Reset to IC 14 (1 00% MOL)
- 2.
Start DIG 18 allow it to run unloaded until all annunicators are clear
- 3.
Set Trigger 1 with the following overrides:
DG 1 B (A) Load Pot to 100%
ALB 38 E01 - ON (DG 18 Trouble)
ALB 38 A04 - ON with a 10 sec time delay (LO outlet temp)
ALB 38 C04 - ON with a 20 sec time delay (JW outlet temp)
DG1 B TRIP after 300 second time delay
- 4.
Acknowledge alarms and freeze simulation Setup time: 5 minutes DIRECTIONS TO OPERATOR You will be given information describing the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
Initial Conditions:
Following a 7 day DIG 1 B outage, Maintenance and Engineering Support are standing by for a DIG 1 B test run. DIG 1 B was just started, and is now operating unloaded with the DIG output breaker open. You are relieving the BOP, and will be performing the remainder of this test run. The outside area SO is stationed at the DIG to support the evolution.
Assigned Task:
The applicable portions of 13145-1 have been completed for starting DG-1B.
In accordance with procedure 13427B-1, parallel DIG 1B to 1 BA03 and raise DG-1 B load to 7000 Kw per Section 4.2.1., starting with step 4.2.1.3.
4 NRC-JP-13427-02 INSTRUCTIONS TO EXAMINER e F===========================
This JPM is based on the latest rev of 13427-1. Verify this JPM is in accordance with the latest procedural revision prior to use. Cues preceded by a.. e..... are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
- 1. 134278-1 and 17038-1 S IMULATOR SeTUP:
- 1.
Reset to IC # 14 for HL-15 NRC Exam Simulator Setup from Scratch
- 1.
- 2.
- 3.
- 4.
Reset to IC 14 (100% MOL)
Start DIG 18 allow it to run unloaded until all annunlcators are clear Set Trigger 1 with the following overrides:
DG 1B (A) Load Pot to 100%
ALB 38 E01 - ON (DG 1B Trouble)
ALB 38 A04 - ON with a 10 sec time delay (LO outlet temp)
ALB 38 C04 - ON with a 20 sec lime delay (JW outlet temp)
DG1 B TRIP after 300 second time delay Acknowledge alarms and freeze simulation
<::> ~iiiiiiiiiiiiiiiiiiiiiiiiiiiiiisiei,uiPiitjmiie :i5imii lniui~isiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii DIRECTIONS TO OPERATOR You will be given Information describing the Inilial Conditions. Assigned Task. and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
Initial Conditions:
Assigned Task:
Following a 7 day DIG 18 outage, Maintenance and Engineering Support are standing by for a DIG 18 test run. DIG 18 was just started, and is now operating unloaded with the DIG output breaker open. You are relieving the 80P, and will be performing the remainder of this test run. The outside area SO is stationed at the DIG to support the evolution.
The applicable portions of 13145-1 have bean completed for starting DG*18.
In accordance with procedure 134278-1, parallel DIG 18 to 18A03 and raise OG*18 load to 7000 Kw per Section 4.2.1" starting with step 4.2.1.3.
4
NRC-JP-13427 -02 JPM STEPS STARTTIME: ___
STEP 1 SA T OLf' UNSA T OLf' Paralleling Diesel Generator To 1 BA03
'l1D
- ENSURE the Diesel Generator 1 B Sync Mode Selector Switch TS-DG1 B is in AUTO
'l1D
- ENSURE Breaker 1 BA03-05 and 1 BA03-01 Synchronization Switches are OFF
'l1D
- PLACE the Breaker 1BA03-19 Synchronization Switch to ON
'l1D
- VERIFY Diesel Generator is in the Parallel Mode by observing the blue DSL GEN 1 B UNIT MODE/FAST START light is not illuminated.
'l1D
- SET the Diesel Generator Load Pot 1-SE-4916 to 1.00 STEP 2 CRITICAL ( * )
SAT D~
UNSAT D~
Adjust D/G 1 B voltage and frequency
- SELECT 1 BA03 4160V Bus phase voltage of the highest value
- CHECK 1 BA03 bus voltage between 4025 and 4250 V
- SELECT the Diesel Generator 1 B voltage of the lowest value
- VERIFY Sync Scope Meter is rotating, Synchronizing Lights are bright at the 6 o'clock position, Synchronizing lights are dark at the 12 o'clock position, and the Red AUTO SYNC PERMISSIVE LIGHT comes on near the 12 o'clock position
- ADJUST generator voltage to approximately 50V above the highest phase of the bus voltage
- ADJUST the generator speed until the Sync Scope needle is rotating slowly in the clockwise direction (fast)
NOTE: When the DG is paralleled to 1 BA03 during the next step, the DG will uncontrollably pick up maximum load.
5 NRC-JP-13427 -02 JPM STEPS STARTTIME: ___
STEP 1 SA T OLf' UNSA T OLf' Paralleling Diesel Generator To 1 BA03
'l1D
- ENSURE the Diesel Generator 1 B Sync Mode Selector Switch TS-DG1 B is in AUTO
'l1D
- ENSURE Breaker 1 BA03-05 and 1 BA03-01 Synchronization Switches are OFF
'l1D
- PLACE the Breaker 1BA03-19 Synchronization Switch to ON
'l1D
- VERIFY Diesel Generator is in the Parallel Mode by observing the blue DSL GEN 1 B UNIT MODE/FAST START light is not illuminated.
'l1D
- SET the Diesel Generator Load Pot 1-SE-4916 to 1.00 STEP 2 CRITICAL ( * )
SAT D~
UNSAT D~
Adjust D/G 1 B voltage and frequency
- SELECT 1 BA03 4160V Bus phase voltage of the highest value
- CHECK 1 BA03 bus voltage between 4025 and 4250 V
- SELECT the Diesel Generator 1 B voltage of the lowest value
- VERIFY Sync Scope Meter is rotating, Synchronizing Lights are bright at the 6 o'clock position, Synchronizing lights are dark at the 12 o'clock position, and the Red AUTO SYNC PERMISSIVE LIGHT comes on near the 12 o'clock position
- ADJUST generator voltage to approximately 50V above the highest phase of the bus voltage
- ADJUST the generator speed until the Sync Scope needle is rotating slowly in the clockwise direction (fast)
NOTE: When the DG is paralleled to 1 BA03 during the next step, the DG will uncontrollably pick up maximum load.
5
NRC-JP-13427-02 JPM STEPS STEP 3 CRITICAL ( + )
SAT D~
UNSAT D~
Closing DIG 1 B output breaker a..D
+ When the Sync Scope needle reaches the 11 o'clock position DEPRESS and HOLD the Diesel Generator 1 B AUTO SYNC PERMISSIVE PUSHBUTTON PB-DG1 B a..D
- VERIFY that the DG1B OUTPUT BRKR 1BA03-19 CLOSES NOTE TO SIMULATOR INSTRUCTOR:
After the DG output breaker is closed, INSERT Trigger 1.
STEP 4 CRITICAL (+)
SAT D~
UNSAT D~
Respond to Uncontrollable DG Load Increase a..D
+ Recognize that DG load is NOT stable at minimum load (700 kW), and that it is increasing uncontrollably.
a..D
- Attempt to lower load using DG load pot a..D
+ Perform either of the following:(NOTE: # 1)
- OPEN the DG output breaker or
- TRIP the DG (NOTE # 1) If the DG is not manually tripped within 5 minutes, the DG will automatically trip after the initiation of Trigger # 1. This would be UNSATISFACTORY performance of this JPM.
STOP TIME: _____
6 NRC-JP-13427-02 JPM STEPS STEP 3 CRITICAL ( + )
SAT D~
UNSAT D~
Closing DIG 1 B output breaker a..D
+ When the Sync Scope needle reaches the 11 o'clock position DEPRESS and HOLD the Diesel Generator 1 B AUTO SYNC PERMISSIVE PUSHBUTTON PB-DG1 B a..D
- VERIFY that the DG1B OUTPUT BRKR 1BA03-19 CLOSES NOTE TO SIMULATOR INSTRUCTOR:
After the DG output breaker is closed, INSERT Trigger 1.
STEP 4 CRITICAL (+)
SAT D~
UNSAT D~
Respond to Uncontrollable DG Load Increase a..D
+ Recognize that DG load is NOT stable at minimum load (700 kW), and that it is increasing uncontrollably.
a..D
- Attempt to lower load using DG load pot a..D
+ Perform either of the following:(NOTE: # 1)
- OPEN the DG output breaker or
- TRIP the DG (NOTE # 1) If the DG is not manually tripped within 5 minutes, the DG will automatically trip after the initiation of Trigger # 1. This would be UNSATISFACTORY performance of this JPM.
STOP TIME: _____
6
SOUTHERN..
\\
COMPANY Energy to Serve Your World" PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM "g" RQ.JP-13301-003 MANUALLY ALIGN DAMPERS AND FANS FOR CRI UPON RECEIPT OF HIGH RAD ON CONTROL ROOM AIR INTAKE RAn MONITORS THIS IS A NEW JPM FOR THE HL-15 NRC EXAM Written By:
Thad N. Thorn pson Date:
04/06/2009 Approved By: Dan Scukanec Date:
04/20/2009 SOUTHERN.\\
COMPANY Ellergy to Serve Your World "
PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM "g" RQ*JP*13301*003 MANUALLY ALIGN DAMPERS AND FANS FOR CRI UPON RECEIPT OF HIGH RAD ON CONTROL ROOM AIR INTAKE RAD MONITORS THIS ISA NEWJPM FOR THE HL*15 NRC EXAM Written By:
Thad N. Thompson Date:
04/06/2009 Approved By: Dan Scukanec Date:
04/20/2009
This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
Initial Conditions: You are the Unit Operator.
Assigned Task:
The SS has directed you to "Monitor the Control Room and respond to plant conditions."
2 This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
Initial Conditions: You are the Unit Operator.
Assigned Task:
The SS has directed you to "Monitor the Central Room and respond to plant conditions."
2
RQ-JP-13301-003 JPM INFORMATION OPERATOR'S NAME: _______ _____ _
EVALUATION DATE: _, __
JPM TITLE:
Manually Align Dampers and Fans for CRI Upon Receipt of High Rad on Control Room Air Intake Radiation Monitors REVISION:
o AprilB, 2009 COMPLETION TIME:
10 minutes Application:
Task Number:
KJA Number:
10CFR55.45 Ref.:
Evaluation Method Evaluation Location Performance Time:
RO/SRO 23005 071A3.01
[ ) Performed
[ J Simulator minutes OVERALL JPM EVALUATION Examiner Comments:
RO:
2.9 SRO:
3.1
[ I Simulated
[ J Control Room
[ 1 SATISFACTORY Examiner's Signature: _ _ ___
3
[ ) Unit 1
[ ) Unit 2
[ ] UNSATISFACTORY RQ-JP-13301-003 JPM INFORMATION e r.===========================
8 e
OPERATOR'S NAME: ____________ _
EVALUATION DATE:
I I
JPM TITLE:
Manually Align Dampers and Fans for CRr Upon Receipt of High Rad on Control Room Air Intake Radiation Monitors REVISION:
o April 6, 2009 COMPLETION TIME:
10 minutes Application:
Task Number:
KJA Number:
10CFR55.45 Ref.:
EvaluatIon Method EValuation Location Performance Time; RO/SRO 23005 071A3.01
( ] Performed
[ J Simulator minutes OVERAlL JPM EVALUATION Examiner Comments:
Examiner's Signature:
RO:
2.9 SRO:
3.1
[ 1 Simulated
{ 1 Control Room
[ [ SATISFACTORY 3
((Unit1
((Unit2
[ [ UNSATISFACTORY
RQ-JP-13301 -003 INSTRUCTIONS TO EXAMINER This JPM is based on the latest rev of 13301-C. Verify this JPM is in accord with the latest procedural revision prior to use. Cues preceded by a u©... " are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this J PM.
REQUIRED ITEMS:
SIMULATOR SETUP:
- 1.
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
13301, CBCR Normal HVAC and Emergency Filtration System Reset to IC14 (MOL 100%)
INSERT MALFUNCTION ES04A (FAILURE OF TRAIN A CRI)
Insert malfunction ES04B (Failure of Train B CRI)
Insert malfunctions for High Rad on RE-1 2116 and Re-12117 On Trigger 1.
Override BOTH SSMP TROUBLE alarms to OFF AcklReset alarms Freeze simulator Setup time: 3 minutes DIRECTIONS TO OPERATOR You will be given information describing the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
INITIAL CONDITIONS:
You are the Unit Operator.
ASSIGNED TASK:
The SS has directed you to "Monitor the Control Room and respond to plant conditions*.
4 RQ-JP-13301-003 INSTRUCTIONS TO EXAMINER e r===========================
e This JPM is based on the latest rev of 13301-C. Verify this JPM is in accord with the latest procedural revision prior to use. Cues preceded by a "~..." are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
S1MULATOR SeTUP:
- 1.
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
13301. CBCR Normal HVAC and Emergency Filtration System Reset to IC14 (MOL 100%)
INSERT MALFUNCTION ES04A (FAILURE OF TRAIN A CRI)
Insert malfunction ES04B (Failure of Train B CRI)
Insert malfunctions for High Rad on RE-1211 6 and Re-12117 On Trigger 1.
Override BOTH SSMP TROUBLE alarms to OFF AckiReset alarms Freeze simulator Setup tl".,e ~ 3 minutes DIRECTIONS TO OPERATOR You will be given information describing the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any Item nonnal1y used 10 perform thfs task.
INITIAl CONOITIONS:
You are the Unit Operator.
AsSIGNED TASK:
The SS has directed you to "Monitor the Control Room and respond to plant conditlons ~.
4
RQ-JP-13301-003 JPM STEPS STARTTIME: ___
STEP 1 SAT O~
UNSAT O~
Select procedure and section NOTE TO SIMBOOTH: Intiate Trigger 1 for High Rad on Control Room Air Intake Monitors NOTE: The operator may reference ARP 17102 for High Rad on SROC Rad monitors RE-12116 and RE-12117 based on the annunciators. The ARP states "verify CRI". The operator may attempt to initiate CRI using the two CRI Actuate handswitches on the QHVC panel without reference to a procedure. However, when CRI fails to actuate, the expectation would be for him to pull SOP-13301 for guidance on manual system alignment.
'&0
- 17102, annunciator response for SRDC rad monitors RE-12116 or RE-12117 referenced.
'&0
- May attempt to actuate CRI from the QHVC handswitches (yellow).
'&0
- 13301, section 4.4.1 selected STEP 2 SAT O~
UNSAT O~
Manually attempts to actuate CRI
- CRI actuation 1-HS-12195A or 1-HS-12196A in ACTUATE NOTE: The actuation handswitches are failed and will not function, the candidate will probably attempt to use both handswitches to actuate the system.
STEP 3 CRITICAL (.)
SAT OLS" UNSAT OLS" Start the lead Filter Unit fan.
'&0
- Verify / starts Train 8 Filter Unit Supply Fan 1-1531-N7-002 (810)
'&0
- Verify Train A Filter Unit Supply Fan 1-1531-N7-001 (88) remains SHUTDOWN STEP 4 CRITICAL ( * )
SAT OLS" UNSAT OLS" Check the Kitchen, Toilet, and Conference rooms isolated
'&0
- Places Kit Toil & Conf Rm damper AHV-12162 (06) in CLOSED position.
'&0
- Places Kit Toil & Conf Rm damper AHV-12163 (07) in CLOSED position.
5 RQ-JP-13301-003 JPM STEPS STARTTIME: ___
STEP 1 SAT O~
UNSAT O~
Select procedure and section NOTE TO SIMBOOTH: Intiate Trigger 1 for High Rad on Control Room Air Intake Monitors NOTE: The operator may reference ARP 17102 for High Rad on SROC Rad monitors RE-12116 and RE-12117 based on the annunciators. The ARP states "verify CRI". The operator may attempt to initiate CRI using the two CRI Actuate handswitches on the QHVC panel without reference to a procedure. However, when CRI fails to actuate, the expectation would be for him to pull SOP-13301 for guidance on manual system alignment.
'&0
- 17102, annunciator response for SRDC rad monitors RE-12116 or RE-12117 referenced.
'&0
- May attempt to actuate CRI from the QHVC handswitches (yellow).
'&0
- 13301, section 4.4.1 selected STEP 2 SAT O~
UNSAT O~
Manually attempts to actuate CRI
- CRI actuation 1-HS-12195A or 1-HS-12196A in ACTUATE NOTE: The actuation handswitches are failed and will not function, the candidate will probably attempt to use both handswitches to actuate the system.
STEP 3 CRITICAL (.)
SAT OLS" UNSAT OLS" Start the lead Filter Unit fan.
'&0
- Verify / starts Train 8 Filter Unit Supply Fan 1-1531-N7-002 (810)
'&0
- Verify Train A Filter Unit Supply Fan 1-1531-N7-001 (88) remains SHUTDOWN STEP 4 CRITICAL ( * )
SAT OLS" UNSAT OLS" Check the Kitchen, Toilet, and Conference rooms isolated
'&0
- Places Kit Toil & Conf Rm damper AHV-12162 (06) in CLOSED position.
'&0
- Places Kit Toil & Conf Rm damper AHV-12163 (07) in CLOSED position.
5
STEPS CRITICAL ( * )
SAT DLl' UNSAT DLl' JPM STEPS Check normal air supply and return dampers closed
~D
- Place Normal air supply damper 1-HV-12146 (C6) in CLOSED position.
~D
- Place Normal air supply damper 1-HV-12147 (C7) in CLOSED position.
~D
- Place Normal air return damper 1-HV-12149 (E6) in CLOSED position.
~D
- Place Normal air return damper 1-HV-12148 (E7) in CLOSED position.
STEP 6 SAT DA UNSAT DA Check Filter Unit dampers
~D
- Verify Filter Unit outlet damper 1-HV-12129 (C11) OPENS
~D
- Verify Return fan inlet damper 1-HV-12131 (D10) OPENS STEP 7 SAT DA UNSAT DA Check outside air to normal HVAC fans isolated
STEP 8 SAT DA UNSAT DA Check normal HVAC fans shutdown Note: AHS-12164 (located in shift clerk's office) is not simulated.
~D
- Verify Normal supply fan A-1531-A7-001 (C4) and A-1531-A7-002 (C5) SHUTDOWN
~D
- Verify Normal exhaust fan A-1531-B7-009 (D4) and A-1531-B7-010 (D5) SHUTDOWN
~D
- Verify Kit Toil & Conf Rm exhaust fan STOPPED (AHS-12164) (# 1)
CUES:
(# 1)
CBO reports "A-HS-12164's green light is lit and the fan has stopped."
6 RQ-JP-13301-003 STEPS CRITICAL ( * )
SAT DLl' UNSAT DLl' JPM STEPS Check normal air supply and return dampers closed
~D
- Place Normal air supply damper 1-HV-12146 (C6) in CLOSED position.
~D
- Place Normal air supply damper 1-HV-12147 (C7) in CLOSED position.
~D
- Place Normal air return damper 1-HV-12149 (E6) in CLOSED position.
~D
- Place Normal air return damper 1-HV-12148 (E7) in CLOSED position.
STEP 6 SAT DA UNSAT DA Check Filter Unit dampers
~D
- Verify Filter Unit outlet damper 1-HV-12129 (C11) OPENS
~D
- Verify Return fan inlet damper 1-HV-12131 (D10) OPENS STEP 7 SAT DA UNSAT DA Check outside air to normal HVAC fans isolated
STEP 8 SAT DA UNSAT DA Check normal HVAC fans shutdown Note: AHS-12164 (located in shift clerk's office) is not simulated.
~D
- Verify Normal supply fan A-1531-A7-001 (C4) and A-1531-A7-002 (C5) SHUTDOWN
~D
- Verify Normal exhaust fan A-1531-B7-009 (D4) and A-1531-B7-010 (D5) SHUTDOWN
~D
- Verify Kit Toil & Conf Rm exhaust fan STOPPED (AHS-12164) (# 1)
CUES:
(# 1)
CBO reports "A-HS-12164's green light is lit and the fan has stopped."
6 RQ-JP-13301-003
STEP 9 SAT D~
UNSAT D~
Isolate outside air to the control room RQ-JP-13301-003 JPM STEPS NOTE: (Not applicable for High Radiation). This step is expected to be N/A for this JPM.
NOTE: It is not expected the UO will manipulate these dampers for this JPM.
~D
- Place Outside air dampers 1-HV-12114 and 1-HV-12115 in the CLOSED position
~D
- Place Outside air dampers 2-HV-12114 and 2-HV-12115 in the CLOSED position (# 1)
CUES:
(# 1) IF requested, "Unit 2 BOP will ensure proper alignment of the Unit 2 HVAC panel."
STEP 10 SAT D~
UNSAT D~
Report to SS
~D
- CRI equipment manually aligned
~D
- Verify proper TSC Air Filtration System operation (# 1)
~D
- Verify proper Essential Chiller operation (# 2)
CUES:
(# 1)
"Another Operator will verify proper operation of the TSC Air Filtration System."
(# 2)
"Another Operator will verify proper operation of the Chiller."
STOP TIME: _____
Field Notes 7
STEP 9 SAT D~
UNSAT D~
Isolate outside air to the control room RQ-JP-13301-003 JPM STEPS NOTE: (Not applicable for High Radiation). This step is expected to be N/A for this JPM.
NOTE: It is not expected the UO will manipulate these dampers for this JPM.
~D
- Place Outside air dampers 1-HV-12114 and 1-HV-12115 in the CLOSED position
~D
- Place Outside air dampers 2-HV-12114 and 2-HV-12115 in the CLOSED position (# 1)
CUES:
(# 1) IF requested, "Unit 2 BOP will ensure proper alignment of the Unit 2 HVAC panel."
STEP 10 SAT D~
UNSAT D~
Report to SS
~D
- CRI equipment manually aligned
~D
- Verify proper TSC Air Filtration System operation (# 1)
~D
- Verify proper Essential Chiller operation (# 2)
CUES:
(# 1)
"Another Operator will verify proper operation of the TSC Air Filtration System."
(# 2)
"Another Operator will verify proper operation of the Chiller."
STOP TIME: _____
Field Notes 7
SOUTHERN.\\'
COMPANY Energy to Serve Your World'"
PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM "h" LO.. JP*13125*002 PLACE CONTAINMENT MAIN PURGE IN SERVICE WITH THE EQUIPMENT HATCH OPEN THIS IS A NEW JPM FOR THE HL*15 NRC EXAM Written By
- Thad N. Thompson Date:
04/06/2009 Approved By : Dan Scukanec Date:
04/20/2009 SOUTHERN A COMPANY Ellcrgy to Serve Your World "
PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM "h" LO-JP-13125-002 PLACE CONTAINMENT MAIN PURGE IN SERVICE WITH THE EQUIPMENT HATCH OPEN THIS IS A NEW JPM FOR THE HL-15 NRC EXAM Written By
- Thad N. Thompson Date:
04/06/2009 Approved By : Dan Scukanec Date:
04/20/2009
This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
Initial Conditions: The Plant is in Mode 5 with the Containment Equipment Hatch Open.
Assigned Task:
The 88 has authorized Gaseous Release Permits and has directed you to "Place Containment Main (Preaccess) Purge in service" using procedure 13125-1.
"Checklist 1 for Main Purge isolation dampers and valves has been performed",
2 This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be aI/owed access to any item normafly used to perform this task.
Initial Conditions: The Plant is in Mode 5 with the Containment Equipment Hatch Open, Assigned Task:
The 55 has authorized Gaseous Release Permits and has directed you to ' Place Containment Main (Preaccess) Purge in service" using procedure 13125-1,
"Checklist 1 for Main Purge isolation dampers and valves has been performed",
2
JPM INFORMATION OPERATOR'S NAME: _
EVALUATION DATE:
I JPM TITLE:
Place Containment Main (Preaccess) Purge In Service REVISION:
o April 06, 2009 COMPLETION TIME:
8 minutes This JPM is a NEW JPM for the HL-15 NRC Exam.
Application:
Task Number:
KiA Number:
10CFR55.45 Ref.:
Evaluation Method Evaluation Location Performance Time:
RO/SRO 29006 029A2.03
[ ) Performed
[ ] Simulator
_ minutes RO:
2.7 SRO:
3.1
[ J Simulated
[ ] Control Room
[ ] Unit 1 LO-JP-1312S-002
[ ] Unit 2 OVERALL JPM EVALUATION
[ ] SATISFACTORY
[ ] UNSATISFACTORY Examiner Comments:
Examiner's Signature: ___ ___ ___
3 JPM INFORMATION OPERATOR'S NAME: ___ _________ _
EVALUATION DATE:
I I
JPM TITLE:
Place Containment Main (Preaccess) Purge In Service REVISION:
o April 06, 2009 COMPLETION TIME:
8 minutes This JPM is a NEW JPM for the HL*15 NRC Exam.
Application:
Task Number:
KIA Number:
10CFR55.45 Ref.:
Evaluation Method Evaluation Location Performance Time:
RO/SRO 29006 029A2.03
( I Performed
( J Simulator minutes RO:
2.7 SRO:
3.1
( I Simulated
( I Control Room (IUni11 LO-JP-13125-002
( I Unil2 OVERALL JPM EVALUATION
[ J SATISFACTORY
[ J UNSATISFACTORY Examiner Comments:
Examiner's Signature:
3
LO-JP-1312S-002 INSTRUCTIONS TO EXAMINER This JPM is based on the latest rev of 13125-1. Verify this JPM is in accord with the latest procedural revision prior to use. Cues preceded by a "©... " are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
SIMULATOR SETUP:
- 1.
- 1.
- 2.
- 3.
- 4.
- 5.
13125. Containment Purge System Reset to IC # 14 for HL -15 NRC Exam Place Mini-Purge supply fan in service per 13125 and ensure Containment Pressure is atmospheric.
Turn on Power to the Containment Main Purge dampers using Remote Function AcklReset alarms Freeze simulator Setup time: 10 minutes DIRECTIONS TO OPERATOR You will be given information describing the Initial Conditions. Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
INITIAL CONDITIONS:
AsSIGNED TASK:
The Plant is in Mode 5 with the Containment Equipment Hatch Open.
The SS has authorized Gaseous Release Permits and has directed you to "Place Containment Main (Preaccess) Purge in service" using procedure 13125-1.
"Checklist 1 for Main Purge isolation dampers and valves has been performed".
4 LO-JP-1312S-002 INSTRUCTIONS TO EXAMINER e r===========================
e e
This JPM is based on the latest rev of 1312S.1. Verify this JPM is in accord with the latesl procedural revision prior to use, Cues preceded by a *e..... are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
S IMULATOR SETUP:
- 1.
- 1.
- 2.
- 3.
- 4.
- 5.
13125, Containment Purge System Reset to IC # 14 for HL-15 NRC Exam Place Mini-Purge supply fan in service per 13125 and ensure Containment Pressure is atmospheric.
Turn on Power to the Containment Main Purge dampers using Remote Function AckiReset alarms Freeze simulator Setup time: 10 minutes DIRECTIONS TO OPERATOR You will be g1\\1en informatlon describing the Jnitial Conditions. Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You win be allowed access to any item normally used to perform this task..
INITIAL C ONDITIONS:
AsSIGNED T ASK:
The Plant is in Mode 5 with the Containment Equipment Hatch Open.
The SS has authorized Gaseous Release Permits and has directed you to "Place Containment Main (Preaccess) Purge in service" using procedure 13125-1.
"Checklist 1 for Main Purge isolation dampers and valves has been performed".
4
LO-JP-1312S-002 JPM STEPS START TIME: ___
STEP 1 SAT O~
UNSAT O~
Select procedure and section
'&0
.13125 section 4.1.2 selected (# 1) (# 2) (# 3)
'&0
- Step 4.1.2.1 noted to run Exhaust fan only and supply fan off. (# 4)
CUES:
(# 1)
(# 2)
(# 3)
(# 4)
Chemistry has prepared the appropriate release permits, releases have been authorized."
The SS is aware of the seating requirements for the Main Purge valves.
The SS is aware of the radiation monitor requirements.
If asked, "Checklist 1 power restoration to Main Purge dampers and fans has been performed".
STEP 2 CRITICAL (.)
SEQ 1 SAT O.\\'"
UNSAT O.\\'"
'&0
'&0
'&0
'&0
'&0
'&0
'&0
'&0
'&0 CUES:
Shuts down Mini-Purge System per Section 4.3.2
- Notify Chemistry that containment purge will be shifted from Mini-Purge to Main Purge. (# 1)
- STOPS the CTS Mini-Purge Exh Fan using 1-HS-2631S (034)
- CLOSES CTS Mini-Purge Exh ORC Isol Vlv-Mini 1-HV-2629S (S34)
- CLOSES CTS Norm Purge ORC Iso Vlv-Mini 1-HV-2628S (A34)
- CLOSES CTS Mini-Purge Exh Ompr 1-HV-12592 (C34)
- Logs Containment Mini-Purge termination time and date on release permit. (# 2)
- CLOSES CTS Preaccess Purge Sply Unit Inlet Ompr 1-HV-2593 (A31)
- Notifies Chemistry Containment Mini-Purge has been terminated. (# 3)
- Verifies Mini-Purge valve status per Checklist 3. (# 4)
(# 1)
"The SS has notified Chemistry Mini-Purge will be shifted to Main Purge."
(# 2)
"The SS will ensure termination time and date are logged on the release permit".
(# 3)
"The SS will notify Chemistry of Mini-Purge termination and release permit closure, the SS will also document the person contacted in the Unit Control Log".
(# 4)
"The SS will have another operator perform the IV.
5 LO-JP-1312S-002 JPM STEPS START TIME: ___
STEP 1 SAT O~
UNSAT O~
Select procedure and section
'&0
.13125 section 4.1.2 selected (# 1) (# 2) (# 3)
'&0
- Step 4.1.2.1 noted to run Exhaust fan only and supply fan off. (# 4)
CUES:
(# 1)
(# 2)
(# 3)
(# 4)
Chemistry has prepared the appropriate release permits, releases have been authorized."
The SS is aware of the seating requirements for the Main Purge valves.
The SS is aware of the radiation monitor requirements.
If asked, "Checklist 1 power restoration to Main Purge dampers and fans has been performed".
STEP 2 CRITICAL (.)
SEQ 1 SAT O.\\'"
UNSAT O.\\'"
'&0
'&0
'&0
'&0
'&0
'&0
'&0
'&0
'&0 CUES:
Shuts down Mini-Purge System per Section 4.3.2
- Notify Chemistry that containment purge will be shifted from Mini-Purge to Main Purge. (# 1)
- STOPS the CTS Mini-Purge Exh Fan using 1-HS-2631S (034)
- CLOSES CTS Mini-Purge Exh ORC Isol Vlv-Mini 1-HV-2629S (S34)
- CLOSES CTS Norm Purge ORC Iso Vlv-Mini 1-HV-2628S (A34)
- CLOSES CTS Mini-Purge Exh Ompr 1-HV-12592 (C34)
- Logs Containment Mini-Purge termination time and date on release permit. (# 2)
- CLOSES CTS Preaccess Purge Sply Unit Inlet Ompr 1-HV-2593 (A31)
- Notifies Chemistry Containment Mini-Purge has been terminated. (# 3)
- Verifies Mini-Purge valve status per Checklist 3. (# 4)
(# 1)
"The SS has notified Chemistry Mini-Purge will be shifted to Main Purge."
(# 2)
"The SS will ensure termination time and date are logged on the release permit".
(# 3)
"The SS will notify Chemistry of Mini-Purge termination and release permit closure, the SS will also document the person contacted in the Unit Control Log".
(# 4)
"The SS will have another operator perform the IV.
5
STEP 3 CRITICAL ( + )
SEQ2 SAT O~
UNSAT O~
JPM STEPS Place containment Main-purge exhaust fan ONLY in service
"&0
- Verifies release conditions are met. (# 1)
"&0
+ Places 1-HS-2632A (C33) CTB Preaccess Purge Exh Dmpr in AUTO
"&0
+ OPENS 1-HV-2593 (A31) CTB Preaccess Purge Sply Unit Inlet Dmpr
"&0
+ OPENS 1-HV-2629A (B33) CTB Norm Purge Exh ORC Iso Vlv-Main
"&0
+ OPENS 1-HV-2628A (A33) CTB Norm Purge Exh IRC Iso Vlv-Main
"&0
+ STARTS 1-HS-2631A (033) CTB Preaccess Purge Exh Fan
"&0
- Logs release start time and date on Chemistry data sheet. (# 2)
"&0
- Verifies release flow rate on Comm Console. (# 3)
LO-JP-13125-002
"&0
+ Does NOT initiate Main Purge Supply fan flow with Containment Equipment Hatch open.
(Note: Placing Main Purge Supply fan in service would be a failure of the JPM, opening the Main Purge Supply dampers without starting the fan would NOT be a failure)
- Notes and logs flow rates, notifies Chemistry Main Purge is operating. (# 4)
CUES:
(# 1) The SS has verified the release permit conitions are met, permits obtained, and all required radiation monitors are OPERABLE.
(# 2) The SS will ensure the release start and date are logged.
(# 3) Flow rate on the Comms Console is within allowable values.
(# 4) Flow rate is within allowable values, the SS will ensure log entries are made and will notify Chemistry of Main Purge initiation".
6 STEP 3 CRITICAL ( + )
SEQ2 SAT O~
UNSAT O~
JPM STEPS Place containment Main-purge exhaust fan ONLY in service
"&0
- Verifies release conditions are met. (# 1)
"&0
+ Places 1-HS-2632A (C33) CTB Preaccess Purge Exh Dmpr in AUTO
"&0
+ OPENS 1-HV-2593 (A31) CTB Preaccess Purge Sply Unit Inlet Dmpr
"&0
+ OPENS 1-HV-2629A (B33) CTB Norm Purge Exh ORC Iso Vlv-Main
"&0
+ OPENS 1-HV-2628A (A33) CTB Norm Purge Exh IRC Iso Vlv-Main
"&0
+ STARTS 1-HS-2631A (033) CTB Preaccess Purge Exh Fan
"&0
- Logs release start time and date on Chemistry data sheet. (# 2)
"&0
- Verifies release flow rate on Comm Console. (# 3)
LO-JP-13125-002
"&0
+ Does NOT initiate Main Purge Supply fan flow with Containment Equipment Hatch open.
(Note: Placing Main Purge Supply fan in service would be a failure of the JPM, opening the Main Purge Supply dampers without starting the fan would NOT be a failure)
- Notes and logs flow rates, notifies Chemistry Main Purge is operating. (# 4)
CUES:
(# 1) The SS has verified the release permit conitions are met, permits obtained, and all required radiation monitors are OPERABLE.
(# 2) The SS will ensure the release start and date are logged.
(# 3) Flow rate on the Comms Console is within allowable values.
(# 4) Flow rate is within allowable values, the SS will ensure log entries are made and will notify Chemistry of Main Purge initiation".
6
STEP 3 SAT O£J UNSAT O£J Report to 55 JPM STEPS
&0
- Containment Main Purge is in service with only the exhaust fan operating.
STOP TIME: _____
Field Notes 7
LO-JP-13125-002 STEP 3 SAT O£J UNSAT O£J Report to 55 JPM STEPS
&0
- Containment Main Purge is in service with only the exhaust fan operating.
STOP TIME: _____
Field Notes 7
LO-JP-13125-002
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
==
Description:==
Use attachment B of AOP 18019-C (Loss of RHR cooling) to establish gravity drain during mid-loop operations to restore temporary core cooling.
(RO 1 SRO-II SRO-U)
KIA: 025AK1.01 (3.9/4.3)
==
Description:==
Battery voltage less than 105 VDC on loss of all AC power. Requires student to shutdown AC inverter to prevent equipment damage.
(RO 1 SRO-I)
KIA: 055EK3.02 (4.3/4.6)
- k. Bypass CNMT HI-1 Bistables Following Loss of Heat Sink D,C,E,L 7
==
Description:==
Bistables must be bypassed using the BTl equipment in order to align a feedwater flow path to the SGs during a loss of secondary heat sink. This will also require knowledge of how 1 where to obtain multiple BTl keys to bypass 2 trains of equipment (RO 1 SRO-II SRO-U)
KIA: 012A4.03 (3.6/3.6)
All control room (and in-plant) systems must be different and serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO 1 SRO-I 1 SRO-U (A)lternate path 4-6 1 4-6 1 2-3 (C)ontrol room (D)irect from bank
- 9/:::8/:::4 (E)mergency or abnormal in-plant
~ 1 1 ~1 1 ~ 1 (EN)gineered Safety Feature I> 1 (control room system)
(L)ow-Power 1 Shutdown
~1/~1/~1 (N)ew or (M)odified from bank including 1 (A)
~2/~2/~1 (P)revious 2 exams
- 3 I::: 31::: 2 (randomly selected)
(R)CA
~1/~1/~1 (S)imulator ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
==
Description:==
Use attachment B of AOP 18019-C (Loss of RHR cooling) to establish gravity drain during mid-loop operations to restore temporary core cooling.
(RO 1 SRO-II SRO-U)
KIA: 025AK1.01 (3.9/4.3)
==
Description:==
Battery voltage less than 105 VDC on loss of all AC power. Requires student to shutdown AC inverter to prevent equipment damage.
(RO 1 SRO-I)
KIA: 055EK3.02 (4.3/4.6)
- k. Bypass CNMT HI-1 Bistables Following Loss of Heat Sink D,C,E,L 7
==
Description:==
Bistables must be bypassed using the BTl equipment in order to align a feedwater flow path to the SGs during a loss of secondary heat sink. This will also require knowledge of how 1 where to obtain multiple BTl keys to bypass 2 trains of equipment (RO 1 SRO-II SRO-U)
KIA: 012A4.03 (3.6/3.6)
All control room (and in-plant) systems must be different and serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO 1 SRO-I 1 SRO-U (A)lternate path 4-6 1 4-6 1 2-3 (C)ontrol room (D)irect from bank
- 9/:::8/:::4 (E)mergency or abnormal in-plant
~ 1 1 ~1 1 ~ 1 (EN)gineered Safety Feature I> 1 (control room system)
(L)ow-Power 1 Shutdown
~1/~1/~1 (N)ew or (M)odified from bank including 1 (A)
~2/~2/~1 (P)revious 2 exams
- 3 I::: 31::: 2 (randomly selected)
(R)CA
~1/~1/~1 (S)imulator
SOUTHERN"\\'
COMPANY Energy to Serve Your World'"
PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM "i" RQ-JP-18019-005 ESTABLISH RWST GRAVITY DRAIN THROUGH SI PUMPS TO COLD LEGS THIS Is A BANK JPM FOR THE HL-15 NRC EXAM (THIS JPM REQUIRES AN RCS ENTRY)
Revision 0 March 2nd I 2009 Written By
- Thad N. Thompson Date:
3/2/2009 Approved By : Dan Scukanec Date:
4/20/2009 SOUTHERN A COMPANY Ellergy to Serve Your World" PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM "jll RQ-JP-18019-005 ESTABLISH RW5T GRAVITY DRAIN THROUGH 51 PUMPS TO COLO LEGS THIS Is A BANK JPM FOR THE HL-15 NRC EXAM (THIS JPM REQUIRES AN RC5 ENTRY)
Revision 0 March 2"". 2009 Written By
- Thad N. Thompson Date:
3/2/2009 Approved By : Dan Scukanec Date:
4/20/2009
This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
REMEMBER: All steps required for this task are to be simulated.
Plant equipment is not to be operated.
Initial Conditions: During midloop operations, Unit experienced a loss of all AC Assigned Task:
power to the 1 E buses. The crew is performing step B 15 attempting to a restore RCS level to greater than or equal to 188 feet.
The SS has directed you to perform step B15 of 18019-C, "Loss of RHR
- Mode 5 or 6 Below PRZR IR Or SG Nozzel Dams Installed":
2 This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be aI/owed access to any item normally used to perform this task.
REMEMBER: All steps required for this task are to be simulated.
Plant equipment is not to be operated, Initial Conditions: During mid loop operations, Unit experienced a loss of all AC power to the 1 E buses. The crew Is performing step B 15 attempting to a restore RCS level to greater than or equal to 188 feel.
Assigned Task:
The SS has directed you to perform step B15 of 18019-C. "Loss of RHR
- Mode 5 or 6 Below PRZR IR Or SG Nozzel Dams Installed":
2
RQ-JP-18019-005 JPM INFORMATION OPERATOR'S NAME: _
EVALUATION DATE: _, __
JPM TITLE:
Establish RWST Gravity Drain Through SI Pumps to Cold Legs REVISION:
o March 2, 2009 COMPLETION TIME:
15 minutes Application:
Task Number:
KIA Number:
10CFR55.45 Ref.:
Evaluation Method Evaluation Location Performance Time:
RO/SRO 60025 025AK1.01
[ 1 Performed
[ 1 Simulator
_ minutes OVERALL JPM EVALUATION Examiner Comments:
RO:
3.9 SRO:
4.3
[ 1 Simulated
[ ] Control Room
[ ] SATISFACTORY Examiner's Signature: _ _
3
[ ] Unit 1
[ 1 Unit 2
[ ] UNSATISFACTORY RQ-JP*18019*005 JPM INFORMATION e r============================
e OPERATOR'S NAME: ___
EVALUATION DATE:
JPM TITLE:
Establish RWST Gravity Drain Through 5 1 Pumps to Cold legs REVISION:
o March 2. 2009 COMPLETION TIME:
15 minutes Application:
Task Number:
KIA Number:
1 OCFR55.45 Ref.:
Evaluation Method Evaluation Locatlon Performance Time:
RO/SRO 60025 025AK1.01 I 1 Performed
( J SImulator
_ minutes OVERALL JPM EVALUATION Examiner Comments:
Examiner's Signature:
RO:
3.9 SRO:
4.3
[ I Simulated
[ 1 Control Room
[ J SATISFACTORY J
I J Unit 1 I J Unil2
[ J UNSATISFACTORY
RQ-JP-18019-005 INSTRUCTIONS TO EXAMINER This JPM is based on the latest rev of 18019-C. Verify this JPM is in accord with the latest procedural revision prior to use. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
- 1.
RWP and associated dosimetry COMPONENT LOCATION:
UNIT 1: HV-8821A (AB-B15); HV-8821B (AB-B19)
UNIT 2: HV-8821A (AB-B119); HV-8821B (AB-B117)
DIRECTIONS TO OPERATOR You will be given information describing the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
INITIAL CONDITIONS:
ASSIGNED TASK:
REMEMBER: All steps required for this task are to be simulated.
Plant eqUipment is not to be operated.
During midloop operations, Unit _
experienced a loss of all AC power to the 1 E buses. The crew is performing slep B15 attempting to a restore RCS level to greater than or equal to 188 feet.
The SS has directed you to perform step B15 of 18019-C, "Loss of RHR
- Mode 5 or 6 Below PRZR IR Or SG Nozzel Dams Installed":
NOTE: THE FOLLOWING VALVE LOCATIONS ARE FOR EXAMINER REFERENCE ONLY. THESE ARE NOT TO BE PROVIDED TO THE CANDIDATE. THE VALVE LOCATIONS ARE LISTED IN ATTACHEMENT A OF 18019-C.
_ -HV-8821 A('--_--J) and
__ -HV-8821 B(\\-__
)."
4 RQ-JP-1BOI9-005 INSTRUCTIONS TO EXAMINER e r.===========================
e This JPM is based on the latest rev of 18019-C. Verify this JPM is in accord with the latest procedural revision prior to use. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
ReQUIRED ITEMS:
- 1.
RWP and associaled dosimelry COMPONENTlOCATION: UNIT 1: HV-8821A (AB-B1 5); HV-8821B (AB-B19)
UNIT 2: HV-8821A (AB-B119); HV-8821B (AB-B117)
DIRECTIONS TO OPERATOR You will be given information describing the Initial Conditions, Assigned Task. and the Task Standard, Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perfonn this task.
INtTlAL C ONDITIONS:
AsSIGNED T ASK:
REMEMBER: All steps required for this task are to be simulated.
Plant equipment is not to be operated.
During midloop operations, Unit __ experienced a loss of all AC power to the 1 E buses. The crew is performing step 815 attempting to a restore ReS level to greater than or equal to 188 feel.
The SS has directed you to perform step B15 of 18019-C, "Loss of RHR
- Mode 5 or 6 Below PRZR IR Or SG Nozzel Dams Installed":
NOTE: THE FOLLOWING VALVE LOCATIONS ARE FOR ExAMINER REFERENCE O NLY. THESE ARE NOT TO BE PROVIDED TO TliE CANDIDATE. T HE VALVE LOCATIONS ARE LISTED IN AnACHEMENT AOF 18019-C.
__ -HV.a821A\\...( __
.J) and
__ -HV.a821B(
).-
4
RQ-JP-18019-005 JPM STEPS START TIME: ___
STEP 1 CRITICAL (. )
SAT O..S' UNSAT O..S' Checks RHR Pumps NOT available and selects Attachment A, Section 8
&0
- Step B15a, check RHR pumps - AVAILABLE (NOTE: # 1)
&0
- Performs RNO of Step 15a (# 1)
&0
- Selects Attachment A, Section B of 18019-C (NOTE: # 2)
CUES: (#1) The SS reports the RHR flow paths to the Cold Legs are not available at this time.
NOTE: (# 1) RHR pumps are NOT available at this time due to Loss of All AC Power.
NOTE: (# 2) Provide candidate with Attachment A at this time. Performance of Section A, C, or D of Attachment A would be improper performance of the procedure and would constitute a failure of this JPM. This is NOT the order of preferability as stated in the NOTE prior to step 815.
STEP 2 CRITICAL ( * )
SAT O..S' UNSAT O..S' Checks RCP Pressure, RCS vent paths, and Selects Section "8" of Attachment A
&0
- Checks RCS pressure - LESS THAN 35 psig. ( # 1)
&0
- Verify at least one RCS Vent paths. (# 2)
&0
- Selects Attachment A, Section B of 18019-C (NOTE: # 1)
CUES: (# 1) The SS reports, "RCS pressure is at atmospheric pressure."
(# 2) The SS reports, "RCS vent paths are adequate".
NOTE: (# 1) Performance of Section A, C, or D of Attachment A would be improper performance of the Procedure and would constitute a failure of this JPM. This is NOT the order of preferability as stated in the NOTE prior to step 815.
5 RQ-JP-18019-005 JPM STEPS START TIME: ___
STEP 1 CRITICAL (. )
SAT O..S' UNSAT O..S' Checks RHR Pumps NOT available and selects Attachment A, Section 8
&0
- Step B15a, check RHR pumps - AVAILABLE (NOTE: # 1)
&0
- Performs RNO of Step 15a (# 1)
&0
- Selects Attachment A, Section B of 18019-C (NOTE: # 2)
CUES: (#1) The SS reports the RHR flow paths to the Cold Legs are not available at this time.
NOTE: (# 1) RHR pumps are NOT available at this time due to Loss of All AC Power.
NOTE: (# 2) Provide candidate with Attachment A at this time. Performance of Section A, C, or D of Attachment A would be improper performance of the procedure and would constitute a failure of this JPM. This is NOT the order of preferability as stated in the NOTE prior to step 815.
STEP 2 CRITICAL ( * )
SAT O..S' UNSAT O..S' Checks RCP Pressure, RCS vent paths, and Selects Section "8" of Attachment A
&0
- Checks RCS pressure - LESS THAN 35 psig. ( # 1)
&0
- Verify at least one RCS Vent paths. (# 2)
&0
- Selects Attachment A, Section B of 18019-C (NOTE: # 1)
CUES: (# 1) The SS reports, "RCS pressure is at atmospheric pressure."
(# 2) The SS reports, "RCS vent paths are adequate".
NOTE: (# 1) Performance of Section A, C, or D of Attachment A would be improper performance of the Procedure and would constitute a failure of this JPM. This is NOT the order of preferability as stated in the NOTE prior to step 815.
5
JPM STEPS STEP 3 CRITICAL ( * )
SAT O~
UNSAT O~
Align SIP A for RWST gravity drain
&0
- Verifies HV-8835 - OPEN (# 1)
&0
+ SIP A to Cold Leg isolation HV-8821A located
&0
+ HV-8821A OPEN CUES: (# 1) "The SS reports that HV-8835 is OPEN",
STEP 4 CRITICAL ( * )
SAT O~
UNSAT O~
Align SIP B for RWST gravity drain
&0
+ SIP B to Cold Leg isolation HV-8821 B located
&0
+ HV-8821 B OPEN STEP 5 SAT O~
UNSAT O~
Report to SS
&0
- SI system aligned for gravity drain STOP TIME: _____
Field Notes 6
RQ-JP-18019-005 JPM STEPS STEP 3 CRITICAL ( * )
SAT O~
UNSAT O~
Align SIP A for RWST gravity drain
&0
- Verifies HV-8835 - OPEN (# 1)
&0
+ SIP A to Cold Leg isolation HV-8821A located
&0
+ HV-8821A OPEN CUES: (# 1) "The SS reports that HV-8835 is OPEN",
STEP 4 CRITICAL ( * )
SAT O~
UNSAT O~
Align SIP B for RWST gravity drain
&0
+ SIP B to Cold Leg isolation HV-8821 B located
&0
+ HV-8821 B OPEN STEP 5 SAT O~
UNSAT O~
Report to SS
&0
- SI system aligned for gravity drain STOP TIME: _____
Field Notes 6
RQ-JP-18019-005
SOUI'HERNA COMPANY Energy to Serve YoU1" World'"
PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM "j" RQ-JP-1l4l1-001 SHUTDOWN 120V AC 1E VITAL INVERTER DURING Loss OF ALL AC THIS Is A BANK JPM FOR THE HL-15 NRC EXAM (THIS JPM WAS ON THE HL-14 NRC EXAM AND WAS RANDOMLY SELECTED)
(THIS JPM REQUIRES AN RCA ENTRY)
Revision 1 March 2nd. 2009 Written By
- Thad N" Thompson Date:
3/02/2009 Approved By
- Dan Scukanec Date:
4/20/2009 o
Written By SOUTHERN A COMPANY Ellergy to Se"ve Your World" PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM "j" RQ*JP-13431-001 SHUTDOWN 120V AC 1E VITAL INVERTER DURING Loss OF ALLAC THIS IsA BANK JPM FOR THE HL-15 NRC EXAM (THIS JPM WAS ON THE HL-14 NRC EXAM AND WAS RANDOMLY SELECTED)
(THIS JPM REQUIRES AN RCA ENTRY)
Revision 1 March 2nd. 2009
- Thad N. Thompson Date:
310212009 Approved By
- Dan Scukanec Date:
412012009
This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
REMEMBER: All steps required for this task are to be simulated.
Plant equipment is not to be operated.
Initial Conditions: Unit 1 control room has experienced a prolonged Loss of All AC Power, 125V 1E DC Bus 1BD1 voltage is currently reading 103V DC.
Assigned Task:
You have been directed by the SS to perform step 28 of 19100-C, "Loss of All AC Power'.
2 This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
REMEMBER: All steps required for this task are to be simulated.
Plant eqUipment Is not to be operated.
Initial Conditions: Unit 1 conlrol room has experienced a prolonged Loss of All AC Power, 125V 1 E DC Bus 1 BD1 voltage is currently reading 103V DC.
Assigned Task:
You have been directed by the 55 to perform step 28 of 19100-C, "Loss of All AC Power".
2
RQ-JP-13431-001 JPM INFORMATION OPERATOR'S NAME: ___________
EVALUATION DATE:
I JPM TITLE:
Shutdown 120V AC 1 E Vital Inverter During A Loss of All AC Power REVISION:
1 March 2, 2009 COMPLETION TIME:
20 minutes Application:
KIA Number:
Evaluation Method Evaluation Location Performance Time:
RO/SRO 055EK3.02
[ ] Performed
[ ] Simulator minutes OVERALL JPM EVALUATION Examiner Comments:
RO:
4.3 SRO:
4.6
[ ] Simulated
[ ] Control Room
[ ] SATISFACTORY Examiner's Signature: _ _
3
[ ] Unit 1
[ ] Unit 2
[ ] UNSATISFACTORY RQ-JP-13431-001 JPM INFORMATION e F===========================
e e
OPERATOR'S NAME: ____________ _
EVALUATION DATE:
I I
JPM TITLE:
Shutdown 120V AC 1 E Vital Inverter During A Loss of All AC Power REVISION :
1 March 2, 2009 COMPLETION TIME:
20 minutes Application:
KIA Number:
Evaluation Method Evaluation Location Performance Time:
RO/SRO 055EK3.02
( ) Performed
[ I Simulator minutes OVERALL JPM EVALUATION Examiner Comments:
Examiner's Signature:
RO:
4.3 SRO:
4.6 r ) Simulated
[ J Control Room
( ) SATISFACTORY 3
( ) Unil1
( ) Unit2
( ) UNSATISFACTORY
RQ-JP-13431-001 INSTRUCTIONS TO EXAMINER This JPM is based on the latest rev of 13431-1. Verify this JPM is in accord with the latest procedural revision prior to use. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
- 1.
- 2.
- 3.
19100-C. Loss of All AC Power 13431-1, 120V AC 1E Vilallnstrument Distribution System EDRD Dosimetry COMPONENT LOCATION:
Unit 1 Train B: Level B Control Building (Battery Breaker & Switchgear)
Unit 1 Train B: Level 1 Auxiliary Building (Inverter) - RWP required.
DIRECTIONS TO OPERATOR You will be given information describing the Initial Conditions. Assigned Task and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
INITIAL CONDITIONS:
REMEMBER: All steps required for this task are to be simulated.
Plant equipment is not to be operated.
Unit 1 control room has experienced a prolonged Loss of All AC Power. 125V DC 1 E Bus 1 SD1 voltage is currently reading 103V DC.
AsSIGNED TASK: You have been directed by the SS to perform step # 28 of 191 OO-C, "Loss of All AC Power'.
4 RQ-JP-13431-001 INSTRUCTIONS TO EXAMINER e r.===========================
e This JPM is based on the latest rev of 13431-1. Verify this JPM ;s In accord with the latest procedural revision prior to use. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
I,
2, 3,
19100-C, Loss of All AC Power 13431-1, 120V AC IE Vital Instrument Distribution System EDRD Dosimetry COMPONENT LOCATION:
Unit 1 Train B: Level B Control Building (Ballery Breaker & Switchgear)
Unit 1 Train B: Levell Auxiliary Building (Inverter) - RWP required, DtRECTlONS TO OPERATOR You will be given Information describing the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the aSSigned task before beginning. You will be allowed access to any item normally used to perform this task.
INITIAl CONDITIONS:
REMEMBER: All steps required for this task are to be simulated, Plant equipment is not to be operated.
Unit 1 control room has experienced a prolonged Loss of All AC Power. 125V DC 1 E Bus 1B01 vortage Is currently reading' 03V DC.
AsSIGNEOTAS.: You have been directed by the SS to perform step # 28 of 19100-C, "Loss of All AC Powe(',
4
RQ-JP-13431-001 JPM STEPS STARTTIME: ___
STEP 1 SAT O.e; UNSAT O.e; Checks DC Bus Loads, and initiates the RNO per 191 OO-C step # 28a.
NOTE: If the candidate does not perform the RNO and procedes to step # 28b, this would be an unsatisfactory performance of this JPM.
&0
&0
- Determines associated Inverter(s) to be shutdown per 13431-1. (# 1)
NOTE: There are two inverters powered from 1 BD1 (1 BD112 and 1 BD1112).
CUE: (# 1) After candidate references 13431-1 section 4.3.2 and determines there are two inverters on 1 BD1, "You are directed to secure 1B01112, another operator will secure 1B0112".
STEP 1 SAT O.e; UNSAT O.e; 1B01112 Inverter Shutdown NOTE: This step is located in Control Building Level B.
&0
- Selects section 4.3.2 of SOP-13431-1 for 1 BD1112 Inverter Shutdown.
&0
- Verifies closed the applicable Battery Breaker BD1-01. (# 1)
CUE: (# 1) The breaker red light is illuminated OR the breaker position indicator flag is red and reads CLOSED if the candidate indicates he used the actual indicator on the breaker.
NOTE: Performance of step 4.3.2.2 would be an IMPROPER action since a Loss of All AC Power is in progress.
There would NOT be an alternate source for transfer of the instrument distribution panel. This step should be marked as N/A by the candidate.
5 RQ-JP-13431-001 JPM STEPS STARTTIME: ___
STEP 1 SAT O.e; UNSAT O.e; Checks DC Bus Loads, and initiates the RNO per 191 OO-C step # 28a.
NOTE: If the candidate does not perform the RNO and procedes to step # 28b, this would be an unsatisfactory performance of this JPM.
&0
&0
- Determines associated Inverter(s) to be shutdown per 13431-1. (# 1)
NOTE: There are two inverters powered from 1 BD1 (1 BD112 and 1 BD1112).
CUE: (# 1) After candidate references 13431-1 section 4.3.2 and determines there are two inverters on 1 BD1, "You are directed to secure 1B01112, another operator will secure 1B0112".
STEP 1 SAT O.e; UNSAT O.e; 1B01112 Inverter Shutdown NOTE: This step is located in Control Building Level B.
&0
- Selects section 4.3.2 of SOP-13431-1 for 1 BD1112 Inverter Shutdown.
&0
- Verifies closed the applicable Battery Breaker BD1-01. (# 1)
CUE: (# 1) The breaker red light is illuminated OR the breaker position indicator flag is red and reads CLOSED if the candidate indicates he used the actual indicator on the breaker.
NOTE: Performance of step 4.3.2.2 would be an IMPROPER action since a Loss of All AC Power is in progress.
There would NOT be an alternate source for transfer of the instrument distribution panel. This step should be marked as N/A by the candidate.
5
STEP 3 CRITICAL ( * )
SAT OkS" UNSAT OkS" Opens the INVERTER OUTPUT Breaker RQ-JP-13431-001 JPM STEPS NOTE: This is located in the Auxiliary Building Level 1 and will require an RWP for entry.
~D
- Inverter 1BD1112 INVERTER OUTPUT Breaker OPEN. (# 1)
CUE:
(# 1) Give indication the toggle switch is showing open after the candidate indicates he would open the breaker. (The switch would be pointing down when open)
STEP 4 CRITICAL ( * )
SAT OkS" UNSAT OkS" Opens the Inverter DC INPUT Breaker
~D
- Inverter 1BD1112 DC INPUT Breaker OPEN. (# 1)
CUE:
(# 1) Give indication the toggle switch is showing open after the candidate indicates he would open the breaker. (The switch would be pointing down when open)
STEPS SAT D~
UNSAT D~
Check Inverter completely shutdown.
~D
- Observes zero volts showing on the Inverter AC OUTPUT Voltmeter. (# 1)
CUES: (# 1) Indicate the AC output voltmeter is ZERO V DC. (This meter is located on top right side of inverter) 6 STEP 3 CRITICAL ( * )
SAT OkS" UNSAT OkS" Opens the INVERTER OUTPUT Breaker RQ-JP-13431-001 JPM STEPS NOTE: This is located in the Auxiliary Building Level 1 and will require an RWP for entry.
~D
- Inverter 1BD1112 INVERTER OUTPUT Breaker OPEN. (# 1)
CUE:
(# 1) Give indication the toggle switch is showing open after the candidate indicates he would open the breaker. (The switch would be pointing down when open)
STEP 4 CRITICAL ( * )
SAT OkS" UNSAT OkS" Opens the Inverter DC INPUT Breaker
~D
- Inverter 1BD1112 DC INPUT Breaker OPEN. (# 1)
CUE:
(# 1) Give indication the toggle switch is showing open after the candidate indicates he would open the breaker. (The switch would be pointing down when open)
STEPS SAT D~
UNSAT D~
Check Inverter completely shutdown.
~D
- Observes zero volts showing on the Inverter AC OUTPUT Voltmeter. (# 1)
CUES: (# 1) Indicate the AC output voltmeter is ZERO V DC. (This meter is located on top right side of inverter) 6
STEP 6 CRITICAL SAT O.S' UNSAT O.S' JPM STEPS Opens Inverter DC Supply Breaker at 125V DC Switchgear 1BD1.
NOTE: This is located in Control Building Level B.
RQ-JP-13431-001
'&0
+ Inverter OC Supply Breaker 1 B01-04 handswitch taken to Open or Trip push button depressed.
CUES: (# 1) Indicate the OC supply breaker 1 B01-04 open by hand switch green light lit, red extinguished OR by breaker flag showing green and reading OPEN.
STEP 7 CRITICAL ( * )
SAT O.S' UNSAT O.S' Opens 1 BD1 Battery Breaker NOTE: This is directed by step 28a (2) RNO of 19100-C
'&0
+ Panel1B01 Battery Breaker 1B01-01 hand switch taken to Open or Trip button depressed. (#1) (# 2)
(# 3)
CUES, (# 1) IF, the candidate asks whether to continue and open the battery breaker, state' "The 88 would like you to continue with the procedure".
(# 2) Indicate the OC supply breaker 1 B01-01 open by hand switch green light lit, red extinguished OR by breaker flag showing green and reading OPEN.
(# 3) Once the battery breaker is open state "The SS will have another operator continue the procedure".
STEP 8 SAT O~
UNSAT O~
Report to SS
'&0
- Inverter 1 B01112 has been shutdown and 1 B01 Battery Breaker has been opened.
STOP TIME: _____
Field Notes 7
STEP 6 CRITICAL SAT O.S' UNSAT O.S' JPM STEPS Opens Inverter DC Supply Breaker at 125V DC Switchgear 1BD1.
NOTE: This is located in Control Building Level B.
RQ-JP-13431-001
'&0
+ Inverter OC Supply Breaker 1 B01-04 handswitch taken to Open or Trip push button depressed.
CUES: (# 1) Indicate the OC supply breaker 1 B01-04 open by hand switch green light lit, red extinguished OR by breaker flag showing green and reading OPEN.
STEP 7 CRITICAL ( * )
SAT O.S' UNSAT O.S' Opens 1 BD1 Battery Breaker NOTE: This is directed by step 28a (2) RNO of 19100-C
'&0
+ Panel1B01 Battery Breaker 1B01-01 hand switch taken to Open or Trip button depressed. (#1) (# 2)
(# 3)
CUES, (# 1) IF, the candidate asks whether to continue and open the battery breaker, state' "The 88 would like you to continue with the procedure".
(# 2) Indicate the OC supply breaker 1 B01-01 open by hand switch green light lit, red extinguished OR by breaker flag showing green and reading OPEN.
(# 3) Once the battery breaker is open state "The SS will have another operator continue the procedure".
STEP 8 SAT O~
UNSAT O~
Report to SS
'&0
- Inverter 1 B01112 has been shutdown and 1 B01 Battery Breaker has been opened.
STOP TIME: _____
Field Notes 7
SOUTHERN..
\\
COMPANY Energy to Serve Your World'"
PLANT VOGTLE CONTROL ROOM OPERA TOR JOB PERFORMANCE MEASURE System JPM "k" RQ-JP-13509*001 BYPASS CONTAJNMENT HI-1 FOLLOWING A Loss OF HEAT SINK (THIS Is A BANK JPM FOR THE HL-15 NRC EXAM)
(This JPM Will Be Performed In The Main Control Room)
Revision 6 March 2nd, 2009 Written By
- Thad N. Thompson Date:
3/02/2009 Approved By : Dan Scukanec Date:
4/20/2009 Written By SOUTHERN.\\
COMPANY Eneo"gJI to Serve Yoltr World" PLANT VOGTLE CONTROL ROOM OPERATOR JOB PERFORMANCE MEASURE System JPM "kit RQ-JP-13509-001 BYPASS CONTAINMENT HI-1 FOLLOWING A Loss OF HEAT SINK (THIS Is A BANK JPM FOR THE HL-15 NRC EXAM)
(This JPM Will Be Performed In The Main Control Room)
Revision 6 March 2"d. 2009
- Thad N. Thompson Date:
3/02/2009 Approved By : Dan Scukanec Date:
4/20/2009
This information describes the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normally used to perform this task.
REMEMBER: All steps required for this task are to be simulated.
Plant equipment is not to be operated.
Initial Conditions: While responding to a Loss of Heat Sink on Unit __, Containment pressure reached the Hi-1 setpoint. The crew is preparing to establish feedwaterflow in accordance with step 19 of 19231-C.
Assigned Task:
The SS has directed you to "Bypass Containment Hi-1 pressure channels
- PB936B and _
- PB935B by initiating 13509-C."
2 This information describes the Initial Conditions. Assigned Task, and the Task Standard. Please ensure you understand the task before beginning. You will be allowed access to any item normalfy used to perform this task.
REMEMBER: All steps required for this task are to be simulated.
Plant equipment is not to be operated.
Initial Conditions: While responding to a Loss of Heat Sink on Unit ~
Containment pressure reached the Hi-1 setpoin!. The crew is preparing to establish feedwater flow in accordance with step 19 of 19231-C.
Assigned Task:
The SS has directed you to "Bypass Containment Hi-1 pressure channels
- PB936B and _
- PB935B by initiating 13509-C:
2
RQ-JP-13509-001 JPM INFORMATION OPERATOR'S NAME: _
EVALUATION DATE:
I JPM TITLE:
Bypass Containment Hi-1 Following a Loss of Heat Sink REVISION:
6 March 2, 2009 COMPLETION TIME:
10 minutes Application:
Task Number:
KIA Number:
10CFR55.45 Ref.:
Evaluation Method Evaluation Location Performance Time:
RO/SRO 37051 012A4.03 6
[ ] Performed
[ ] Simulator minutes OVERALL JPM EVALUATION Examiner Comments:
RO:
3.6 SRO:
3.6
[ ] Simulated
[ ] Control Room
[ ] SATISFACTORY Examiner's Signature: _ _ ____
3
[ ] Unit 1
[ ] Unit 2
[ ] UNSATISFACTORY RQ-JP-13509-001 JPM INFORMATION e F===========================
e e
OPERATOR'S NAME: ___________
EVALUATION DATE:
I JPM TITLE:
Bypass Containment Hi-1 Following a Loss of Heal Sink REVISION; 6
March 2, 2009 COMPLETION TIME:
10 minutes Application:
Task Number:
KIA Number:
10CFR55.45 Ref.:
Evaluation Method Evaluation LocatIon Periormance Time:
RO/SRO 37051 012A4.03 6
I J Performed r ) Simulator minutes OVERALL JPM EVALUATION Examiner Comments:
Examiner's Signature:
RO:
3.6 SRO:
3.6 r ) Simulated
{ I Control Room
[ 1 SATISFACTORY 3
I j Unil1 IjUnil2
[ j UNSATISFACTORY
RQ-JP-13509-001 INSTRUCTIONS TO EXAMINER This JPM is based on 13509-C. Verify this JPM is in accord with the latest procedural revision prior to use. Cues preceded by a "©... " are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
- 1.
- 2.
13509-C, BTl Panel Operation Two (2) BTl panel keys COMPONENT LOCATION:
Main Control Room Note to Examiner: Permission from the SS must be obtained to open the Protection Cabinet doors. A BTl key may be obtained from the 55.
DIRECTIONS TO OPERATOR You will be given information describing the Initial Conditions. Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
INITIAL CONDITIONS:
AsSIGNED TASK:
REMEMBER: All steps required for this task are to be simulated.
Plant equipment is not to be operated.
While responding to a Loss of Heat Sink on Unit -'
Containment pressure reached lhe Hi-1 setpoint. The crew is preparing to establish feedwater flow in accordance with step 19 of 19231-C.
The SS has directed you to "Bypass Containment Hi-1 pressure channels
_ - PB936B and __ - PB935B by Initiating 13509-C:
4
...I.
RQ-JP-13509-lJ01 INSTRUCTIONS TO EXAMINER o ~======================
This JPM is based on 13509-C. Verify this JPM is in accord with the latest procedural revision prior to use. Cues preceded by a "to..," are provided to enhance simulation of this JPM and should only be used when the simulator is unavailable. Cues designated by (#) are to be provided to the examinee during the performance of this JPM.
REQUIRED ITEMS:
- 1.
- 2.
13509-C, BTl Panel Operation Two (2) BTl panel keys COMPONENT L OCATION:
Main Control Room Note to Examiner: Pennisslon from the SS must be obtained to open the Protection Cabinet doors. A BTl key may be obtained from the S5.
DIRECTIONS TO OPERATOR You will be given Information describing the Initial Conditions, Assigned Task, and the Task Standard. Please ensure you understand the assigned task before beginning. You will be allowed access to any item normally used to perform this task.
o INITIAL CONDITIONS:
AsSIGNED TASK:
REMEMBER: All steps required for this task are to be simulated.
Plant equipment Is not to be operated.
While responding to a Loss of Heat Sink on Unit -'
Containment pressure reached the Hi*l setpoint. The crew is preparing to establish feedwater flow In accordance with step 19 of 19231..c.
The SS has directed you 10 "Bypass Containment Hi*' pressure channels
__ - PB936B and __ - PB935B by Initiating 13509..c:
4
RQ-JP-13509-001 JPM STEPS STARTTIME: ___
STEP 1 SAT 016 UNSAT 016 Verify initial conditions Note:
Permission from the appropriate SS will be required to open the Protection Cabinet doors to access the BTl panels..
Discussion of the requirements to obtain 2 BTl panel keys will satisfy performance of the step.
~O
- Checklist 2 & 3 bistables circled (13509-C)
~O
- Obtain BTl Enable keys (reference above note)
~O
- Verify all bypass switches on selected panel positioned in NORMAL
~O
- Verify circuit breaker is ON
~O
- Verify red power available LED illuminated STEP 2 CRITICAL ( * )
SAT O.f:')
UNSAT O.f:')
Bypass NSSS Channel" Hi-1 bistable, 936B
- BTl Enable Key inserted into keylock
- Keylock switch positioned to BYPASS ENABLE & Verify LED illuminates
- Verify ALB05B02 illuminated
- PB936B BTl switch #34 positioned to BYPASS
- Verify 936B LED illuminated
- Verify TSLB extinguished STEP 3 CRITICAL ( * )
SAT O.f:')
UNSAT O.f:')
Bypass NSSS Channel III Hi-1 bistable, 935B
~O
- Verify all bypass switches on selected panel positioned in normal
~O
- Verify circuit breaker is ON
~O
- Verify red power available LED illuminated
~O
- BTl Enable Key inserted into keylock
~O
- Keylock switch positioned to BYPASS ENABLE & Verify LED illuminates
~O
- Verify ALB05C02 illuminated
~O
- PB935B BTl switch #34 positioned to BYPASS
~O
- Verify 935B LED illuminated
~O
- Verify TSLB extinguished 5
RQ-JP-13509-001 JPM STEPS STARTTIME: ___
STEP 1 SAT 016 UNSAT 016 Verify initial conditions Note:
Permission from the appropriate SS will be required to open the Protection Cabinet doors to access the BTl panels..
Discussion of the requirements to obtain 2 BTl panel keys will satisfy performance of the step.
~O
- Checklist 2 & 3 bistables circled (13509-C)
~O
- Obtain BTl Enable keys (reference above note)
~O
- Verify all bypass switches on selected panel positioned in NORMAL
~O
- Verify circuit breaker is ON
~O
- Verify red power available LED illuminated STEP 2 CRITICAL ( * )
SAT O.f:')
UNSAT O.f:')
Bypass NSSS Channel" Hi-1 bistable, 936B
- BTl Enable Key inserted into keylock
- Keylock switch positioned to BYPASS ENABLE & Verify LED illuminates
- Verify ALB05B02 illuminated
- PB936B BTl switch #34 positioned to BYPASS
- Verify 936B LED illuminated
- Verify TSLB extinguished STEP 3 CRITICAL ( * )
SAT O.f:')
UNSAT O.f:')
Bypass NSSS Channel III Hi-1 bistable, 935B
~O
- Verify all bypass switches on selected panel positioned in normal
~O
- Verify circuit breaker is ON
~O
- Verify red power available LED illuminated
~O
- BTl Enable Key inserted into keylock
~O
- Keylock switch positioned to BYPASS ENABLE & Verify LED illuminates
~O
- Verify ALB05C02 illuminated
~O
- PB935B BTl switch #34 positioned to BYPASS
~O
- Verify 935B LED illuminated
~O
- Verify TSLB extinguished 5
STEP 4 SAT OA UNSAT OA Report to SS JPM STEPS
~O
- Containment Hi-1 Channels 936 and 935 are bypassed STOP TIME: _____
Field Notes 6
RQ-JP-13509-001 STEP 4 SAT OA UNSAT OA Report to SS JPM STEPS
~O
- Containment Hi-1 Channels 936 and 935 are bypassed STOP TIME: _____
Field Notes 6
RQ-JP-13509-001