ML093270550

From kanterella
Jump to navigation Jump to search

Acceptance Review of Schedular Exemption Request Associated with 10 CFR 73.55
ML093270550
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 11/23/2009
From: Siva Lingam
Plant Licensing Branch II
To: Casey K
Tennessee Valley Authority
Lingam, S NRR/DORL 415-1564
References
TAC ME2601, TAC ME2602
Download: ML093270550 (2)


Text

From:

Lingam, Siva Sent:

Monday, November 23, 2009 12:03 PM To:

Casey, Kevin E Cc:

Boyce, Tom (NRR); Wengert, Thomas; Lamb, John; Milano, Patrick; Raghavan, Rags; Mashburn, Fredrick C Jr; Feintuch, Karl

Subject:

Watts Bar 1 and 2 - Acceptance Review of Schedular Exemption Request Associated with 10 CFR 73.55 (TAC Nos. ME2601/2602)

By letter dated November 6, 2009, you submitted a schedular exemption request from certain physical security implementation requirements of 10 CFR Part 73.55 for Watts Bar Nuclear Plant, Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this schedular exemption request.

The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed exemption request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2)

Sequoyah Nuclear Plant Location: O8-D5; Mail Stop: O8-G9a Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov E-mail Properties Mail Envelope Properties ()

Subject:

Watts Bar 1 and 2 - Acceptance Review of Schedular Exemption Request Associated with 10 CFR 73.55 (TAC Nos. ME2601/2602)

Sent Date: 11/23/2009 11:57:37 AM Received Date: 11/23/2009 12:02:00 PM From: Lingam, Siva

Created By: Siva.Lingam@nrc.gov Recipients:

kecasey@tva.gov (Casey, Kevin E)

Tracking Status: None Tom.Boyce@nrc.gov (Boyce, Tom (NRR))

Tracking Status: None Thomas.Wengert@nrc.gov (Wengert, Thomas)

Tracking Status: None John.Lamb@nrc.gov (Lamb, John)

Tracking Status: None Patrick.Milano@nrc.gov (Milano, Patrick)

Tracking Status: None Rags.Raghavan@nrc.gov (Raghavan, Rags)

Tracking Status: None fcmashburn@tva.gov (Mashburn, Fredrick C Jr)

Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 18169 11/23/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: