Text
From:
Herrin, Dennis W. [Dennis.Herrin@pgnmail.com]
Sent:
Friday, October 30, 2009 9:13 AM To:
Saba, Farideh
Subject:
RE: CR-3 RAI Response -- RR #09-001-IT
- Farideh, The question as we understand it, from the NRC reviewer, is: Can we confirm that the upper bound for flow acceptance, in a test where differential pressure is set and flow is determined, will be 1.06 x Reference Value?
The scenario on which the question is based is not applicable. This was not discussed in the CR3 relief request because it does not apply to CR3s testing methodology. For the pumps mentioned in the relief request, flow is set at a reference condition then differential pressure is measured and compared against the acceptance criteria. By the nature of this test method, there is no need to apply an upper end acceptance criterion to the flow.
Dennis W. Herrin Lead Engineer - Licensing & Regulatory Programs Progress Energy Florida, Inc.
Crystal River Unit 3 352-563-4633 Voicenet 240-3299 Dennis.Herrin@pgnmail.com From: Saba, Farideh [1]
Sent: Tuesday, October 27, 2009 2:01 PM To: Herrin, Dennis W.
Subject:
FW: CR-3 RAI Response -- RR #09-001-IT
- Dennis, Please respond to the following question/request for confirmation from the reviewer regarding the subject relief request.
Farideh Farideh E. Saba, P.E.
Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV From: Wolfgang, Robert Sent: Tuesday, October 27, 2009 9:31 AM To: Saba, Farideh
Subject:
RE: CR-3 RAI Response -- RR #09-001-IT
- Farideh, FPC states in their relief request that the upper bound for differential pressure when testing will be 1.06.
However, they do not state that the upper bound for flow will be 1.06 (instead of 1.10). Can you confirm with them that the upper bound for flow will be 1.06?
- Thanks, Bob Wolfgang Senior Mechanical Engineer U. S. Nuclear Regulatory Commission 301-415-1624 Received: from mail1.nrc.gov (148.184.176.41) by OWMS01.nrc.gov (148.184.100.43) with Microsoft SMTP Server id 8.1.393.1; Fri, 30 Oct 2009 09:12:54 -0400 X-Ironport-ID: mail1 X-SBRS: 5.3 X-MID: 7733808 X-IronPort-Anti-Spam-Filtered: true X-IronPort-Anti-Spam-Result:
Am4BAP+C6kqfbvwxmWdsb2JhbACCOhiCIJUmgTsBAQEBAQgLCgcTtQqCFAmOcIJUgRZTBA X-IronPort-AV: E=Sophos;i="4.44,653,1249272000";
d="scan'208,217";a="7733808" Received: from amsg0003o.progress-energy.com (HELO amsg0003.progress-energy.com) ([159.110.252.49]) by mail1.nrc.gov with ESMTP; 30 Oct 2009 09:12:54 -0400 X-AuditID: 9f6efc11-b7b7dae000000993-bc-4aeae5eee6f1 Received: from lx000097.oak.zone1.progress-energy.com (Unknown_Domain
[10.80.107.161])
by (Progress Energy SMTP Gateway) with SMTP id 3E.13.02451.EE5EAEA4; Fri, 30 Oct 2009 09:11:10 -0400 (EDT)
Received: from localhost (localhost.localdomain [127.0.0.1])
by lx000097.oak.zone1.progress-energy.com (postfix) with ESMTP id E86BDEFD6A for
<Farideh.Saba@nrc.gov>; Fri, 30 Oct 2009 09:12:53 -0400 (EDT)
Received: from NT000987.oak.zone1.progress-energy.com (nt000987.oak.zone1.progress-energy.com [10.22.25.143])
by lx000097.oak.zone1.progress-energy.com (postfix) with ESMTP for
<Farideh.Saba@nrc.gov>; Fri, 30 Oct 2009 09:12:52 -0400 (EDT)
Received: from nt000832.oak.zone1.progress-energy.com ([10.22.28.77]) by NT000987.oak.zone1.progress-energy.com with Microsoft SMTPSVC(6.0.3790.3959);
Fri, 30 Oct 2009 09:12:51 -0400 X-MimeOLE: Produced By Microsoft Exchange V6.5 Content-Class: urn:content-classes:message MIME-Version: 1.0 Content-Type: multipart/alternative; boundary="----_=_NextPart_001_01CA5962.AF4FBA87"
Subject:
RE: CR-3 RAI Response -- RR #09-001-IT Date: Fri, 30 Oct 2009 09:12:51 -0400 Message-ID: <47F9568DC0004E4F8B09AFE32F2DA25E05AEC1C4@NT000832.oak.zone1.progress-energy.com>
In-Reply-To: <36CF286628C20846A68047F24632330906A8818BF5@HQCLSTR02.nrc.gov>
X-MS-Has-Attach:
X-MS-TNEF-Correlator:
Thread-Topic: CR-3 RAI Response -- RR #09-001-IT Thread-Index:
Acnfiiu/ZzVV7FKPSD6CRr5MjHggsAAOuZgwAAEFgeAAAFqyEAAC3QwQACAXp4AAAP0iYAAAvfiwHa sIuqAACV76IAACQ1RQAAApH+AABB6scAAiCV0gAAAsvUAAAMui8AAHhCsAAAFowZAADMcHsAAD7 7iwABjeiiAAFOgQkAABYaf8ABCoStAACH3WEAABZAwg
References:
<47F9568DC0004E4F8B09AFE32F2DA25E05AEC1B9@NT000832.oak.zone1.progress-energy.com> <36CF286628C20846A68047F24632330906A8818BF5@HQCLSTR02.nrc.gov>
From: "Herrin, Dennis W." <Dennis.Herrin@pgnmail.com>
To: "Saba, Farideh" <Farideh.Saba@nrc.gov>
X-OriginalArrivalTime: 30 Oct 2009 13:12:51.0999 (UTC) FILETIME=[AF86BAF0:01CA5962]
X-Brightmail-Tracker: AAAAAA==
Return-Path: Dennis.Herrin@pgnmail.com