October 13, 2009 MEETING
SUMMARY
LICENSEE:
NEXTERA ENERGY SEABROOK, LLC (NEXTERA)
FACILITY:
SEABROOK STATION, UNIT NO. 1 (SEABROOK)
SUBJECT:
SUMMARY
OF THE SEPTEMBER 2009 B EMERGENCY DIESEL GENERATOR (EDG) REGULATORY CONFERENCE On September 30, 2009, at 9:30 a.m., the NRC conducted a Regulatory Conference to discuss the preliminary WHITE finding associated with the Seabrook B EDG failure that occurred on February 25, 2009. The conference was conducted at the Region I office in King of Prussia, PA.
It provided NextEra the opportunity to present additional information not considered in the preliminary risk assessment for the finding that may affect the final significance and enforcement determinations for the finding. A list of meeting attendees is attached.
The NRCs presentation for the regulatory conference included information on the enforcement process, event description, inspection details and the significance determination process (SDP) logic used to characterize the finding. NextEra then presented new information to support the final significance and enforcement determinations for the finding. After NextEras presentation, NRC attendees asked several questions regarding the new information presented and also requested additional details related to several areas that were discussed. NextEra committed to provide the requested additional information to the NRC by October 9, 2009. At the end of the meeting between the NRC and NextEra, public attendees were offered the opportunity to ask questions of NRC officials.
The NRCs final decision on this matter will be issued via written correspondence from the NRC to NextEra within 90 days of the issue date for Inspection Report 05000443/2009007 (ML092400410)1. The regulatory conference meeting notice with the attached meeting agenda (ML092600714) and the meeting slides with the information NextEra provided to the NRC prior to the meeting (ML092740304) can be located in ADAMS package ML092600470. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. Feedback forms were provided to meeting attendees and those submitted will be evaluated for potential future regulatory process improvements.
Sincerely,
/RA/
Arthur Burritt, Chief Projects Branch 3 Division of Reactor Projects Attachments:
List of Attendees 1 Designation in parenthesis refers to an ADAMS accession number. Documents referenced in this letter are publicly available using the accession number in ADAMS.
LIST OF ATTENDEES SEABROOK GENERATING STATION SEPTEMBER 2009 REGULATORY CONFERENCE PUBLIC MEETING WEDNESDAY, SEPTEMBER 30, 2009 NAME TITLE ORGANIZATION G. St. Pierre VP North NextEra R. Noble Engineering Site Director NextEra E. Metcalf Operations Manager NextEra M. OKeefe Licensing Manager NextEra M. Mashhadi Attorney NextEra K. Kiper PRA Principle Engineer NextEra L. Letourneau Electrical Principle Engineer NextEra G. Sessler Mechanical Principle Engineer NextEra S. Sandbothe AmerenUE A. DeFrancisco Enforcement Specialist NRC D. Roberts Division Director, DRS NRC W. Raymond Sr. Resident Inspector NRC A. Burritt Branch Chief, DRP NRC M. Patel Inspector, DRS NRC D. Orr Sr. Inspector, DRS NRC K. Farrar Attorney NRC W. Schmidt Sr. Reactor Analyst NRC J. Clifford Acting Division Director, DRP NRC O. Ayegbusi Inspector, DRS NRC N. Lafferty NSPDP NRC R. Moore Project Engineer, DRP NRC E. Keighley NSPDP NRC M. Orr Reactor Engineer, DRS NRC E. Bonney Reactor Engineer, DRS NRC A. Turilin Project Engineer, DRP NRC
October 13, 2009 MEETING
SUMMARY
LICENSEE:
NEXTERA ENERGY SEABROOK, LLC (NEXTERA)
FACILITY:
SEABROOK STATION, UNIT NO. 1 (SEABROOK)
SUBJECT:
SUMMARY
OF THE SEPTEMBER 2009 B EMERGENCY DIESEL GENERATOR (EDG)
REGULATORY CONFERENCE On September 30, 2009, at 9:30 a.m., the NRC conducted a Regulatory Conference to discuss the preliminary WHITE finding associated with the Seabrook B EDG failure that occurred on February 25, 2009. The conference was conducted at the Region I office in King of Prussia, PA. It provided NextEra the opportunity to present additional information not considered in the preliminary risk assessment for the finding that may affect the final significance and enforcement determinations for the finding. A list of meeting attendees is attached.
The NRCs presentation for the regulatory conference included information on the enforcement process, event description, inspection details and the significance determination process (SDP) logic used to characterize the finding. NextEra then presented new information to support the final significance and enforcement determinations for the finding. After NextEras presentation, NRC attendees asked several questions regarding the new information presented and also requested additional details related to several areas that were discussed. NextEra committed to provide the requested additional information to the NRC by October 9, 2009. At the end of the meeting between the NRC and NextEra, public attendees were offered the opportunity to ask questions of NRC officials.
The NRCs final decision on this matter will be issued via written correspondence from the NRC to NextEra within 90 days of the issue date for Inspection Report 05000443/2009007 (ML092400410)¹. The regulatory conference meeting notice with the attached meeting agenda (ML092600714) and the meeting slides with the information NextEra provided to the NRC prior to the meeting (ML092740304) can be located in ADAMS package ML092600470. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
Feedback forms were provided to meeting attendees and those submitted will be evaluated for potential future regulatory process improvements.
Sincerely,
/RA/
Arthur Burritt, Chief Projects Branch 3 Division of Reactor Projects Distribution:
S. Collins, RA M. Dapas, ORA D. Lew, DRP J. Clifford, DRP A. Burritt, DRP L. Cline, DRP A. Turilin, DRP W. Raymond, DRP, SRI J. Johnson, DRP, RI E. Jacobs, DRP, OA L. Trocine, RI OEDO H. Chernoff, NRR R. Nelson, NRR D. Egan, NRR, PM R. Ennis, NRR, Backup N. Valentine, NRR ROPreports@nrc.gov Region I Docket Room (with concurrences)
SUNSI REVIEW COMPLETE: ____alb_________(Reviewers Initials)
DOCUMENT NAME: G:\\DRP\\BRANCH3\\COMMUNICATIONS\\PUBLIC MEETINGS\\2009-09-30 SEABROOK REGULATORY CONFERENCE\\SEA EDG B REG CONF MEETING
SUMMARY
.DOC After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME ATurilin/at LCline/lc ABurritt/alb DATE 10/07/09 10/07 /09 10/13/09 OFFICIAL RECORD COPY Package ML092600470 Summary ML092910002