ML092730358

From kanterella
Jump to navigation Jump to search
Revisions to Technical Requirements Manual
ML092730358
Person / Time
Site: Susquehanna 
Issue date: 09/17/2009
From:
Susquehanna
To: Gerlach R
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML092730358 (41)


Text

Sep.

17, 2009 Page 1

of 2

MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2009-39821 USER INFORMATION:

GERLACH*ROSE M EMPL#:028401 CA#:

0363 Address: NUCSA2 Phone#:

254-3194 TRANSMITTAL INFORMATION:

TO:

GERLACH*ROSE M 09/17/2009 LOCATION:

USNRC FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.

HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.

WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.

TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION:

"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRM2 -

TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 06/26/2009 ADD MANUAL TABLE OF CONTENTS DATE: 09/16/2009 CATEGORY:

DOCUMENTS TYPE: TRM2 ADD I M 9-6

Sep.

17, 2009 Page 2

of 2

ID:

TEXT 3.11.2.6 ADD:

REV:

4 REMOVE:

REV:3 CATEGORY:

ID:

TEXT REMOVE:

DOCUMENTS TYPE: TRM2 LOES REV:51 ADD:

REV:

52 CATEGORY:

ID:

TEXT REMOVE:

DOCUMENTS TYPE: TRM2 TOC REV:15 ADD:

REV:

16 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.

UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.

FOR ELECTRONIC MANUAL

USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:

0 Procedure Name TEXT LOES

Title:

LIST OF EF]

9/16/2009 Rev 52 FECTIVE SECTIONS Issue Date 09/16/2009 Change ID Change Number TEXT TOC

Title:

16 09/16/2009 7

TABLE OF CONTENTS

\\

s TEXT 1.1 0

11/19/2002

n..

-,c~

,wn

~nn mnnrrr r?,rl

~n XLJJ ~VL~k+/-U1Ji~r 1LL.UAJ TEXT 2.1

Title:

TEXT 2.2

Title:

TEXT 3.0

Title:

N 1

02/04/2005 PLANT PROGRAMS AND SETPOINTS PLANT-PROGRAMS

/.,

\\\\

8 05-/14/2009' PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE A/~

05/'23/2008 APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3. 1. 1 1

.11/09/2007

Title:

REACTIVITY' CONTROL \\SYSTEMS ANTICIPATED INJECTION '(ATWS-ýARI)

INSTRUMENTATION TEXT 3.1.2

/ (

0 11/1912002

Title:

REACTIVI\\TYiCONTROL SYSTEMS CONTROL ROD TRANSIENT WITHOUT SCRAM ALTERNATE ROD DRIVE (CRD)

HOUSING SUPPORT TEXT 3.1.3 4

05/14/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 8

05/14/2009

Title:

CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)

LDCN 4712 Page 1 of 15 Report Date: 09/16/09 Page 1 of

.15 Report Date: 09/16/09

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0

11/19/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 2

11/09/2007

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2

11/09/2007

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 5

05/23/2008

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0

11/19/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 2

10/19/2005

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1

11/09/2007

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1

10/22/2003

Title:

INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3

05/14/2009

Title:

INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1

12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1

10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0

04/16/2009

Title:

WATER MONITORING INSTRUMENTATION Page Z of 15 Report Date: 09/16/09 Page 2 of 15 Report Date: 09/16/09

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1 1

04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2

Title:

REACTOR TEXT 3.4.3

Title:

REACTOR TEXT 3.4.4

Title:

REACTOR TEXT 3.4.5

Title:

REACTOR TEXT 3.5.1 1

04/16/2009 COOLANT SYSTEM STRUCTURAL INTEGRITY 1

11/09/2007 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) 2 05/14/2009 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE.LIMIT 1

04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1

02/04/2005

Title:

ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1

11/09/2007

Title:

ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0

11/19/2002

Title:

ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0

11/19/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0

11/19/2002

Title:

CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0

11/19/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0

11/19/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES Page 3 of

.15 Report Date: 09/16/09

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.1

Title:

PLANT TEXT 3.7.2

Title:

PLANT TEXT 3.7.3.1

Title:

PLANT TEXT 3.7.3.2

Title:

PLANT 0

11/19/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)

SHUTDOWN 0

11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)

AND GROUND WATER LEVEL 2

04/16/2009 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 3

04/16/2009 SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3

Title:

PLANT TEXT 3.7.3.4

Title:

PLANT TEXT 3.7.3.5

Title:

PLANT TEXT 3.7.3.6

Title:

PLANT TEXT 3.7.3.7

Title:

PLANT TEXT 3.7.3.8

Title:

PLANT TEXT 3.7.4

Title:

PLANT TEXT 3.7.5.1

Title:

PLANT 3

SYSTEMS C02 SYSTEMS 2

SYSTEMS HALON SYSTEMS 04/16/2009 04/16/2009 2

04/16/2009 SYSTEMS FIRE HOSE STATIONS 2

04/16/2009 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1

04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES 7

11/09/2007 SYSTEMS FIRE DETECTION INSTRUMENTATION 1

04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM 0

11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR Page 4 of 15 Report Date: 09/16/09 Page 4 of 15 Report Date: 09/16/09

SSES MANTJA-L Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.2

Title:

PLANT TEXT 3.7.5.3

Title:

PLANT TEXT 3.7.6

Title:

PLANT TEXT 3.7.7

Title:

PLANT 0

11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 1

04/26/2006 SYSTEMS LIQUID HOLDUP TANKS 2

06/27/2008 SYSTEMS ESSW PUMPHOUSE VENTILATION 2

09/05/2008 SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 6

06/21/2007

'Iitle:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1

08/28/2006

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1

12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7.11

Title:

PLANT SYSTE TEXT 3.8.1

Title:

ELECTRICAL PROTECTIVE TEXT 3.8.2.1

Title:

ELECTRICAL CONTINUOUS TEXT 3.8.2.2

Title:

ELECTRICAL AUTOMATIC I]MS 0

04/16/2009 2

02/04/2005 POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 2

11/09/2007 POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

2 12/14/2004 POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

TEXT 3.8.3 0

11/19/2002

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES Page ~

of 15 Report Date: 09/16/09 Page5 of 15 Report Date: 09/16/09

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.4 1

02/04/2005

Title:

ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 0

11/19/2002

Title:

ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 0

11/19/2002

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 1

06/15/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0

11/19/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0

11/19/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0

11/19/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1

04/26/2006

Title:

MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1

04/09/2007

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 1

04/26/2006

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.11.1.1 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE Page.~.

of 15 Report Date: 09/16/09 Page 6 of 15 Report Date: 09/16/09

SSES MANTA-L Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.3

Title:

RADIOACTIVE TEXT 3.11.1.4

Title:

RADIOACTIVE TEXT 3.11.1.5

Title:

RADIOACTIVE TEXT 3.11.2.1

Title:

RADIOACTIVE TEXT 3.11.2.2

Title:

RADIOACTIVE TEXT 3.11.2.3

Title:

RADIOACTIVE FORM TEXT 3.11.2.4

Title:

RADIOACTIVE TEXT 3.11.2.5

Title:

RADIOACTIVE TEXT 3.11.2.6

Title:

RADIOACTIVE TEXT 3.11.3

Title:

RADIOACTIVE TEXT 3.11.4.1

Title:

RADIOACTIVE TEXT 3.11.4.2

Title:

RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1

04/26/2006 LIQUID WASTE TREATMENT SYSTEM 1

12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2

05/02/2007 RADIOACTIVE LIQUID-PROCESS MONITORING INSTRUMENTATION 3

04/26/2006 DOSE RATE 1

04/26/2006 DOSE -

NOBLE GASES 1

04/26/2006 DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE 0

11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM EFFLUENTS EFFLUENTS 3

11/14/2006 VENTILATION EXHAUST 4

09/16/2009 RADIOACTIVE GASEOUS 1

04/26/2006 TOTAL DOSE 3

04/26/2006 MONITORING PROGRAM 2

04/26/2006 LAND USE CENSUS TREATMENT SYSTEM EFFLUENT MONITORING INSTRUMENTATION EFFLUENTS EFFLUENTS EFFLUENTS Page 2 of 15 Report Date: 09/16/09 Page 7 of 15 Report Date: 09/16/09

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.3

Title:

RADIOACTIVE EFFLUENTS TEXT 3.12.1

Title:

LOADS CONTROL PROGRAM TEXT 3.12.2

Title:

LOADS CONTROL PROGRAM 1

04/26/2006 INTERLABORATORY COMPARISON PROGRAM 0

11/19/2002 CRANE TRAVEL-SPENT FUEL STORAGE POOL 4

04/17/2008 HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0

11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT B3.0 4

05/23/2008

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)

APPLICABILITY TEXT B3.1.1 1

11/09/2007

Title:

REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT ROD INJECTION (ATWS-ARI)

INSTRUMENTATION SCRAM ALTERNATE TEXT B3.1.2 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD)

HOUSING SUPPORT TEXT B3.1.3 3

04/10/2007

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0

11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1 0

11/19/2002

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 1

11/09/2007 S.Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION Page 8 of 15 Report Date: 09/16/09

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.3

Title:

INSTRUMENTATION TEXT B3.3.4

Title:

INSTRUMENTATION TEXT B3.3.5

Title:

INSTRUMENTATION TEXT B3.3.6

Title:

INSTRUMENTATION TEXT B3.3.7

Title:

INSTRUMENTATION TEXT B3.3.8

Title:

INSTRUMENTATION TEXT B3.3.9

Title:

INSTRUMENTATION TEXT B3.3.10

Title:

INSTRUMENTATION TEXT B3.3.11

Title:

INSTRUMENTATION TEXT B3.3.12 2

11/09/2007 BASES METEOROLOGICAL MONITORING INSTRUMENTATION 3

11/09/2007 BASES TRM POST ACCIDENT MONITORING (PAM)

INSTRUMENTATION 2

11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK 3

10/19/2005 BASES TRM ISOLATION ACTUATION INSTRUMENTATION 1

11/09/2007 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1

10/22/2003 BASES TRM RPS INSTRUMENTATION 3

05/14/2009 BASES LPRM UPSCALE ALARM INSTRUMENTATION 1

12/18/2008 BASES REACTOR RECIRCULATION PUMP MG SET STOPS 1

10/22/2003 BASES MVP ISOLATION INSTRUMENTATION 0

04/16/2009

Title:

WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0

11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1

04/16/2009

Title:

REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY Page ~

of 15 Report Date: 09/16/09 Page 9 of 15 Report Date: 09/16/09

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.4.3 1

11/09/2007

Title:

REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0

11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0

11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.5.1 0

11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1

11/09/2007

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1

11/09/2007

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0

11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0

11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1

04/19/2007

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1

12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0

11/19/2002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0

11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS)

GROUND WATER LEVEL Page 10 of

.15 Report Date: 09/16/09

SSES MM~TANUA Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.1

Title:

PLANT TEXT B3.7.3.2

Title:

PLANT TEXT B3.7.3.3

Title:

PLANT TEXT B3.7.3.4

Title:

PLANT TEXT B3.7.3.5

Title:

PLANT TEXT B3.7.3.6

Title:

PLANT TEXT B3.7.3.7

Title:

PLANT TEXT B3.7.3.8

Title:

PLANT TEXT B3.7.4

Title:

PLANT TEXT B3.7.5.1

Title:

PLANT TEXT B3.7.5.2

Title:

PLANT TEXT B3.7.5.3

Title:

PLANT 2

01/07/2008 FIRE SUPPRESSION WATER SUPPLY SYSTEM SYSTEMS BASES 2

04/26/2006 SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0

11/19/2002 C02 SYSTEMS 1

04/26/2006 HALON SYSTEMS 1

04/26/2006 FIRE HOSE STATIONS 1

04/26/2006 YARD FIRE HYDRANTS AND SYSTEMS BASES HYDRANT HOSE HOUSES SYSTEMS BASES SYSTEMS BASES 0

11/19/2002 FIRE RATED ASSEMBLIES 1

01/12/2004 FIRE DETECTION INSTRUMENTATION 0

11/19/2002 SYSTEMS BASES SOLID RADWASTE SYSTEM SYSTEMS BASES SYSTEMS BASES 0

11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0

11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0

11/19/2002 SYSTEMS BASES LIQUID HOLDUP TANKS Page ii of 15 Report Date: 09/16/09 Page 11 of

.15 Report Date: 09/16/09

SSES MANUJAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.6 2

06/27/2008

Title:

PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2

01/31/2008

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 3

06/21/2007

Title:

PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 1

12/14/2004

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1

12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11

Title:

STRUCTURAL TEXT B3.8.1

Title:

ELECTRICAL PROTECTIVE TEXT B3.8.2.1

Title:

ELECTRICAL CONTINUOUS TEXT B3.8.2.2

Title:

ELECTRICAL AUTOMATIC 0

04/16/2009 INTEGRITY 1

02/04/2005 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0

11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD 1

09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

PROTECTION -

TEXT B3.8.3 0

11/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES TEXT B3.8.4 0

11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 0

11/19/2002

Title:

ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION Page 12 of 15 Report Date: 09/16/09

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.8.6 1

02/04/2005

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 1

06/15/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0

Title:

REFUELING OPERATIONS BASES TEXT B3.9.2 0

Title:

REFUELING OPERATIONS BASES TEXT B3.9.3 0

Title:

REFUELING OPERATIONS BASES 11/19/2002 DECAY TIME 11/19/2002 COMMUNICATIONS 11/19/2002 REFUELING PLATFORM TEXT B3.10.1 0

11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1

04/10/2007

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0

11/19/2002

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.11.1.1 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.111.4 0

.11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION Page 13 1 of 15 Report Date: 09/16/09

SSES MANUTrAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.1.5

Title:

RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.2.1

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.2.2

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.2.3

Title:

RADIOACTIVE EFFLUENTS PARTICULATES FORM TEXT B3.11.2.4

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.2.5

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.2.6

Title:

RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.3

Title:

RADIOACTIVE EFFLUENTS 0

11/19/2002 BASES RADIOACTIVE LIQUID PROCESS MONITORING 1

12/14/2004 BASES DOSE RATE 0

11/19/2002 BASES DOSE -

NOBLE GASES 0

11/19/2002 BASES DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN 0

11/19/2002 BASES GASEOUS RADWASTE TREATMENT SYSTEM 4

11/14/2006 BASES VENTILATION EXHAUST 1

01/27/2004 BASES RADIOACTIVE GASEOUS TREATMENT SYSTEM EFFLUENT MONITORING 0

11/19/2002 BASES TOTAL DOSE TEXT B3.11.4.1 2

01/06/2006

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS, TEXT B3.11.4.3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1

10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL Page 14 of

.15 Report Date: 09/16/09

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.12.2 0

11/19/2002

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS TEXT B3.12.3 0

11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS REQUIREMENTS TEXT 4.1

Title:

TEXT 4.2

Title:

TEXT 4.3

-Title:

TEXT 4.4

Title:

TEXT 4.5

Title:

TEXT 4.6

Title:

TEXT 4.7

Title:

ADMINISTRATIVE ADMINISTRATIVE 0

09/27/2003 CONTROLS ORGANIZATION 0

09/27/2003 CONTROLS REPORTABLE EVENT ACTION ADMINISTRATIVE CONTROLS 1

ADMINISTRATIVE CONTROLS 0

ADMINISTRATIVE CONTROLS 0

ADMINISTRATIVE CONTROLS 0

ADMINISTRATIVE CONTROLS 09/27/2003 SAFETY LIMIT VIOLATION 12/18/2008 PROCEDURES & PROGRAMS 09/27/2003 REPORTING REQUIREMENTS 09/27/2003 RADIATION PROTECTION PROGRAM 09/27/2003 TRAINING Page 15 of 15 Report Date: 09/16/09 Page 15 of 15 Report Date: 09/16/09

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 16 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 1.0 U S E A N D A PPLICATIO N............................................................................

1.0-1 1.1 D efinition s.....................................................................................

T R M /1.0-2 2.0 P LA N T P R O G RA M S...................................................................................

2.0-1 2.1 P la nt P rog ra m s......................................................................................

2.0-1 2.2 Instrum ent Trip Setpoint Table....................................................

TRM/2.0-5 3.0 A P P LIC A B ILITY.................................................................................

T R M /3.0-1 3.0 (TRO) - TR for Operation (TRO) Applicability...............................

TRM/3.0-1 3.0 (TRS) - TR Surveillance (TRS) Applicability.......................... %

T\\RM/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS.................................

T M/3.1-1 3.1.1 Alternate Rod Injection.............................................

TRM/3.1-1 3.1.2 CRD Housing Support 31-4 3.1.3 Control Rod Block Instrumentation........

V

........... 3.1-5 3.1.4 Control Rod Scram Accumulators Instrumentation and\\,/

Check Valve....................................

\\...

TRM/3.1-9 3.2 CORE OPERATING LIMITS REPORT..........

... 3.2-1 3.2.1 Core Operating Limits Report......

3.2-1 3.3 INSTRUMENTATION..

TRM/3.3-1 3.3.1 Radiation Monitoring Instrumentation::.-.

.......................... TRM/3 3-1 3.3.2 Seismic Monitoring Instruyme~ntation TRM/3.3-4 3.3.3 Meteorological Monitonnritg instrumentation...................................

TRM/3.3-7 3.3.4 TRM Post-AccidenttMonitoring Instrumentation............................

TRM/3.3-9 3.3.5 Section Not Used TRM/3.3-12 3.3.6 TRM ContainmenrtlsolatiohnInstrumentation.................................

TRM/3.3-13 3.3.7 Turbine Overspeed Protection System.........................................

TRM/3.3-17 3.3.8 S ection-Not U sed..........................................................................

T R M /3.3-19 3.3.9 O PRM Instrum entation.................................................................

TRM /3.3-21 3.3.10 Reactor Recirculation Pump MG Set Electrical and M e *ahical Stops.........................................................................

T RM /3.3-22 3.3.11

'MVP Isolation Instrum entation......................................................

TRM/3.3-24 3.3.12 "W ater-Monitoring Instrumentation.................................................

TRM/3.3-26 3.4 REACTOR COOLANT SYSTEM..........................................................

TRM/3.4-1 3.4.1 Reactor Coolant System Chem istry.......................................................

3.4-1 3.4.2 N ot U sed........................................................................................

T R M /3.4-6 3.4.3 High/Low Pressure Interface Leakage Monitors....................................

3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit............................

TRM/3.4-12 3.4.5 Reactor Vessel Material Surveillances Program...........................

TRM/3.4-13 SUSQUEHANNA - UNIT 2 TRM / TOC-1 EFFECTIVE DATE 09/08/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 16 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.5 EMERGENCY CORE COOLING AND RCIC......................................

TRM/3.5-1 3.5.1 ADS Manual Inhibit.......................................................................

TRM/3.5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation............................ 3.5-3 3.5.3 Long Term Nitrogen Supply to ADS......................................................

3.5-6 3.6 C O N TA IN M E N T..........................................................................................

3.6-1 3.6.1 VENTING or PURGING........................................................................

3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position In d ic a tio n...............................................................................................

3.6 -3 3.6.3 Suppression Pool Alarm Instrumentation...............................................

3.6-4 3.6.4 Primary Containment Closed System Boundaries........................ TRM/3.6-7 3.7 PLANT SYSTEMS..............................................................................

TRM/3.7-1 3.7.1 Emergency Service Water System (Shutdown)............................

TRM/3.7-1 3.7.2 Ultimate Heat Sink and Ground Water Level..................

3.7-3 3.7.3.1 Fire Suppression Water Supply System.......................................

TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems.......................................................

TRM/3.7-8 3.7.3.3 C02 systems................................................................................

TRM/3.7-12 3.7.3.4 Halon Systems.............................................................................

TRM/3.7-16 3.7.3.5 Fire Hose Stations.......................................................................

TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses............................

TRM/3.7-22 3.7.3.7 Fire Rated Assemblies.................................................................

TRM/3.7-24 3.7.3.8 Fire Detection Instrumentation......................................................

TRM/3.7-26 3.7.4 Solid Radwaste System................................................................

TRM/3.7-34 3.7.5.1 Main Condenser Offgas Hydrogen Monitor...........................................

3.7-37 3.7.5.2 Main Condenser Explosive Gas Mixture.......................................

TRM/3.7-38 3.7.5.3 Liquid Holdup Tanks.....................................................................

TRM/3.7-39 3.7.6 ESSW Pumphouse Ventilation..............................................................

3.7-40 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation...........................................................

TRM/3.7-41 3.7.8 S nubbers......................................................................................

T R M /3.7-43 3.7.9 Control Structure HVAC................................................................

TRM/3.7-49 3.7.10 Spent Fuel Storage Pools (SFSPs)..............................................

TRM/3.7-51 3.7.11 Structural Integrity.........................................................................

TRM/3.7-54 3.8 ELECTRICAL POWER.......................................................................

TRM/3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent P rotective D evices........................................................................

T R M /3.8-1 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

C o ntinuo us...................................................................................

T R M /3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

A uto m atic......................................................................................

T R M /3.8-1 1 3.8.3 Diesel Generator (DG) Maintenance Activities......................

3.8-13 SUSQUEHANNA - UNIT 2 TRM / TOC-2 EFFECTIVE DATE 09/08/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 16 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.8.4 24VDC Electrical Power Subsystem....................

TRM/3.8-15 3.8.5 Degraded Voltage Protection.......................................................

TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling..................................................

3.8-24 3.8.7 Battery Monitoring and Maintenance Program..............................

TRM/3.8-26 3.9 REFUELING OPERATIONS.......................................................................

3.9-1 3.9.1 D e ca y T im e...........................................................................................

3.9-1 3.9.2 C om m unications....................................................................................

3.9-2 3.9.3 R efue ling P latform.................................................................................

3.9-3 3.10 MISCELLANEOUS.............................................................................

TRM/3.10-1 3.10.1 Sealed Source Contamination......................................................

TRM/3.10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation............

3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI).................... TRM/3.10-7 3.10.4 Section Not Used..........................................................................

TRM/3.10-8 3.11 RADIOACTIVE EFFLUENTS..............................................................

TRM/3.11-1 3.11.1 Liquid E ff luents.............................................................................

T R M /3.1 1-1 3.11.1.1 Liquid Effluents Concentration......................................................

TRM/3.11-1 3.11.1.2 Liquid Effluents Dose...................................................................

TRM/3.11-4 3.11.1.3 Liquid Waste Treatment System..................................................

TRM/3.11-6 3.11.1.4 Liquid Radwaste Effluent Morhitoring Instrumentation............

3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation............... TRM/3.11-13 3.11.2 Gaseous Effluents........................................................................

TRM/3.11-17 3.11.2.1 D ose R ate.....................................................................................

T R M /3.11-17 3.11.2.2 Dose - Noble Gases.....................................................................

TRM/3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in P articulate Form...........................................................................

T R M /3.11-2 1 3.11.2.4 Gaseous Radwaste Treatment System........................................

TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System.........................................

TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrum entation.............................................................................

T R M /3.11-25 3.11.3 T otal D ose....................................................................................

T R M /3.11-33 3.11.4 Radiological Environmental Monitoring.........................................

TRM/3.11-35 3.11.4.1 Monitoring Program......................................................................

TRM/3.11-35 3.11.4.2 Land Use Census.........................................................................

TRM/3.11-45 3.11.4.3 Interlaboratory Comparison Program.......................... I.................. TRM/3.11-47 3.12 LOADS CONTROL PROGRAM..........................................................

TRM/3.12-1 3.12.1 Crane Travel - Spent Fuel Storage Pool.......................................

TRM/3.12-1 3.12.2 Heavy Loads Requirements.........................................................

TRM/3.12.3 3.12.3 Light Loads Requirements............................................................

TRM/3.12-5 SUSQUEHANNA UNIT 2 TRM / TOC-3 EFFECTIVE DATE 09/08/2009 SUSQUEHANNA - UNIT 2 TRM / TOC-3 EFFECTIVE DATE 09/08/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 16 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 4.0 ADMINISTRATIVE CONTROLS.................................................................

4.0-1 4.1 O rg a n iz a tio n..........................................................................................

4.0-1 4.2 Reportable Event Action........................................................................

4.0-2 4.3 S afety Lim it V iolation.............................................................................

4.0-3 4.4 Procedures and Programs....................................................................

4.0-4 4.5 Reporting Requirements........................................................................

4.0-5 4.6 Radiation Protection Program.................................................................

4.0-7 4.7 T ra in in g..................................................................................................

4.0 -8 SUSQUEHANNA UNIT 2 TRM I TOC-4 EFFECTIVE DATE 09/08/2009 SUSQUEHANNA - UNIT 2 TRM /TOC-4 EFFECTIVE DATE 09/08/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 16 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.0 (TRO) - TR for Operation (TRO) Applicability......................................

B 3.0-1 B 3.0 (TRS) - TR Surveillance (TRS) Applicability.........................................

B 3.0-9 B 3.1.1 Alternate Rod Injection................................................................

TRM/B 3.1-1 B 3.1.2 CRD Housing Support.........................................................................

B 3.1-4 B 3.1.3 Control Rod Block Instrumentation..............................................

TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve.........................................................................

TRM/B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR).................................................

B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation.........................................

TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation.............................................

TRM/B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation..................................

TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation........................... TRM/B 3.3-4 B 3.3.5 Section Not Used.........................................................................

TRM/B 3.3-9 B 3.3.6 TRM Containment Isolation Instrumentation........................................

B 3.3-10 B 3.3.7 Turbine Overspeed Protection System........................................

TRM/B 3.3-14 B 3.3.8 Section Not Used.........................................................................

TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation................................................................

TRM/B 3.3-18 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops........................................................................

TRM/B 3.3-20 B 3.3.11 MVP Isolation Instrumentation.....................................................

TRM/B 3.3-22 B 3.3.12 Water Monitoring Instrumentation.....................

TRM/B 3.3-24 B 3.4.1 Reactor Coolant System Chemistry.....................................................

B 3.4-1 B 3.4.2 N ot U sed......................................................................................

T R M /B 3.4-2 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit........................... TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program..................................

B 3.4-6 B 3.5.1 A D S M a nual Inhibit..............................................................................

B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation.................. TRM/B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS....................................................

B 3.5-4 B 3.6.1 VENTING or PURGING...............................................................

TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position In d ic a tio n............................................................................................

B 3.6 -3 B 3.6.3 Suppression Pool Alarm Instrumentation.............................................

B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries....................... TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown)...................................

B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level.......................................

B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System......................................

TRM/B 3.7-3 SUSQUEHANNA UNIT 2 TRM I TOC-5 EFFECTIVE DATE 09/08/2009 SUSQUEHANNA - UNIT 2 TRM / TOC-5 EFFECTIVE DATE 09/08/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 16 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.7.3.2 Spray and Sprinkler Systems......................................................

TRM/B 3.7-5 B 3.7.3.3 C 0 2 System s..............................................................................

TRM /B 3.7-7 B 3.7.3.4 Halon System s............................................................................

TRM /B 3.7-8 B 3.7.3.5 Fire Hose Stations.......................................................................

TRM/B 3.7-10 B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses............

TRM/B 3.7-11 B 3.7.3.7 Fire Rated Assemblies.................................................................

TRM/B 3.7-12 B 3.7.3.8 Fire Detection Instrumentation.....................................................

TRM/B 3.7-14 B 3.7.4 Solid Radwaste System...............................................................

TRM/B 3.7-15 B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor.........................................

B 3.7-17 B 3.7.5.2 Main Condenser Explosive Gas Mixture..............................................

B 3.7-19 B 3.7.5.3 Liquid H oldup Tanks...........................................................................

B 3.7-20 B 3.7.6 ESSW Pumphouse Ventilation....................................................

TRM/B 3.7-21 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation..........................................................

TRM/B 3.7-22 B 3.7.8 S nubbers.....................................................................................

T R M /B 3.7-24 B 3.7.9 Control Structure HVAC...............................................................

TRM/B 3.7-31 B 3.7.10 Spent Fuel Storage Pools............................................................

TRM/B 3.7-33 B 3.7.11 Structural Integrity........................................................................

TR M /B 3.7-36 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective D evices.......................................................................

T R M /B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

C ontinuous...................................................................................

T R M /B 3.8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

A utom atic.....................................................................................

T R M /B 3.8-4 B 3.8.3 Diesel Generator (DG) Maintanence Activities............................

TRM/B 3.8-5 B 3.8.4 24VDC Electrical Power Subsystem............................................

TRM/B 3.8-6 B 3.8.5 Degraded Voltage Protection........................

TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling.......................................

TRM/B 3.8-17 B 3.8.7 Battery Monitoring and Maintenance Program............................. TRM/B 3.8-18 B.3.9.1 D ecay T im e.........................................................................................

B 3.9-1 B 3.9.2 C om m unications..................................................................................

B 3.9-2 B 3.9.3 R efueling P latform..............................................................................

B 3.9-3 8 3.10.1 Sealed Source Contamination...........................

B 3.10-1 B 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation........................

B 3.10-2 B 3.10.3 Independent Spent Fuel Storage Installation (ISFSI)................... TRM/B 3.10-4 B 3.10.4 Section Not Used.........................................................................

TR M /B 3.10-6 8 3.11.1.1 Liquid Effluents Concentration...........................

B 3.11-1 8 3.11.1.2 Liquid Effluents Dose................................................................

B8 3.11-4 B 3.11.1.3 Liquid Waste Treatment System.........................................................

B 3.11-6 B 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation.......................... 8 3.11-7 B 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation.............. TRM/B 3.11-10 SUSQUEHANNA - UNIT 2 TRM / TOC-6 EFFECTIVE DATE 09/08/2009

SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

PPL Rev. 16 SECTION B 3.11.2.1 B 3.11.2.2 B 3.11.2.3 B 3.11.2.4 B 3.11.2.5 B 3.11.2.6 B 3.11.3 B 3.11.4.1 B 3.11.4.2 B 3.11.4.3 B 3.12 B.3.12.1 B.3.12.2 B.3.12.3 TITLE PAGE D ose R ate....................................................................................

T R M /B 3.11-12 D ose - N oble G ases............................................................................

B 3.11-16 Dose - Iodine, Tritium, and Radionuclides in P articulate Form..................................................................................

B 3.11-18 Gaseous Radwaste Treatment System.......................................

TRM/B 3.11-20 Ventilation Exhaust Treatment System........................................

TRM/B 3.11-21 Radioactive Gaseous Effluent Monitoring Instrum entation............................................................................

T R M /B 3.11-24 T ota l D o se...........................................................................................

B 3.1 1-26 Monitoring Program..............................

TRM/B 3.11-28 Land U se C ensus................................................................................

B 3.11-34 Interlaboratory Comparison Program...........................................

TRM/B 3.11-36 LOADS CONTROL PROGRAM...................................................

TRM/B 3.12-1 Crane Travel - Spent Fuel Storage Pool.....................................

TRM/B 3.12-1 Heavy Loads Requirements........................................................

TRM/B 3.12-2 Light Loads Requirements...........................................................

TRM/B 3.12-3 TRM2 Text TOC 9/8/09 SUSQUEHANNA - UNIT 2 TRM / TOC-7,

EFFECTIVE DATE 09/08/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 52 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TOC 1.0 TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM / 1.0-3 2.0 3.0 3.1 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Page TRM / 2.0-8 Pages TRM / 2.0-9 through TRM / 2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM / 2.0-14 Page TRM / 2.0-15 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 Pages TRM / 3.1-2 through TRM / 3.1-5 Page TRM / 3.1-6 Page TRM / 3.1-7 Page TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-54 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Pages TRM / 3.3-4 and TRM / 3.3-5 Page 3.3-6 Page TRM 3.3-7 Page 3.3-8 09/08/2009 08/31/1998 10/04/2002 08/31/1998 08/31/1998 01/28/2005 06/25/2002 04/12/1999 04/15/2009 05/15/2008 04/15/2009 11/15/2004 04/15/2009 11/15/2004 11/15/2005 04/14/2008 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/27/2007 04/15/2009 03/27/2007 02/18/1999 02/18/1999 08/31/1998 04/17/2009 07/16/1999 10/31/2007 08/31/1998 10/31/2007 08/31/1998 3.2 3.3 SUSQUEHANNA

- UNIT 2 TRM / LOES-1 EFFECTIVE DATE 09/08/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 09/08/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 52 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.3-9 Page TRM / 3.3-9a Page TRM / 3.3-10 Page TRM / 3.3-11 Page TRM / 3.3-11 a Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Page TRM / 3.3-15 Page TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM / 3.3-21 Page TRM / 3.3-21a Pages TRM /3.3-21b through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 Pages TRM / 3.3-26 and TRM / 3.3-27 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM / 3.4-6 through TRM / 3.4-8 Page 3.4-9 Page 3.4-10 Page 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 04/12/2007 12/17/1998 10/31/2007 06/02/2005 04/14/2008 03/30/2001 09/13/2005 12/14/1998 10/22/2003 06/27/2001 06/14/2002 10/31/2007 10/22/2003 04/15/2009 11/15/2004 03/27/2007 12/03/2004 05/16/2003 10/22/2003 04/07/2009 03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/31/2007 08/31/1998 04/17/2009 03/31/2006 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.4 3.5 3.6 SUSQUEHANNA

- UNIT 2 TRM / LOES-2 EFFECTIVE DATE 09/08/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 09/08/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 52 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Page TRM / 3.7-4 Page TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Pages TRM / 3.7-25 and TRM / 3.7-26 Page TRM / 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Page TRM / 3.7-40 Page TRM / 3.7-40a Page TRM / 3.7-41 Page TRM / 3.7-42 Pages TRM / 3.7-43 through TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Pages TRM / 3.7-54 through TRM/ 3.7-56 07/29/1999 08/31/1998 03/31/2006 04/07/2009 08/02/1999 04/07/2009 01/21/2000 08/02/1999 04/07/2009 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 10/31/2007 11/29/20"06 11/16/2001 11/30/2005 11/16/2001 01/09/2004 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 06/20/2008 09/04/2008 08/31/1998 10/05/2006 06/07/2007 10/05/2006 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/1.5/2003 07/29/1999 04/01/2009 SUSQUEHANNA-UNIT2 TRM / LOES-3 EFFECTIVE DATE 09/08/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 09/08/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 52 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Pages 3.8-13 and 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Page TRM / 3.8-26 Page TRM / 3.8-27 Pages TRM / 3.8-28 and TRM / 3.8-29 04/02/2002 01/28/2005 01/31/2005 04/02/2002 10/31/2007 08/10/2004 12/03/2004 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 05/28/2009 11/29/2006 05/28/2009 08/31/1998 03/31/2006 08/30/1998 03/27/2007 03/31/2006 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 3.10 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM / 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 12/03/1004 09/01/1998 03/31/2006 SUSQUEHANNA

- UNIT 2 TRM I LOES-4 EFFECTIVE DATE 09/08/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 09/08/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 52 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM /3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 and TRM / 3.11-27 Page TRM / 3.11-28 Page TRM / 3.11-29 Pages TIRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM I 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 Page TRM / 4.0-4 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 3.12 4.0 SUSQUEHANNA

- UNIT 2 TRM / LOES-5 EFFECTIVE DATE 09/08/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 09/08/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 52 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Page TRM / B 3.0-5 Page TRM B B 3.0-6 Page TRM B B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / 8 3.0-14 Page TRM / B 3.0-15 B 3.1 B 3.2 B 3.3 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Pages TRM / B 3.3-2 and TRM / B-3.3-2a Pages TRM / B 3.3-3 and TRM / B 3.3-3a Pages TRM / B 3.3-4 and TRM / B 3.3-5 Pages TRM / B 3.3-6 through TRM / B 3.3-9 Page B 3.3-10 Pages TRM / B 3.3-11 and TRM / B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 through TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a and TRM / B 3.3-19b Page TRM / B 3.3-19c Pages TRM / B 3.3-19d and TRM / B 3.3-19e Page TRM / B 3.3-20 Page TRM / B 3.3-21 Page TRM / B 3.3-22 Page TRM / B 3.3-23 Pages TRM / B 3.3-24 and TRM / B 3.3-25 Effective Date 08/31/1998 01/10/2007 04/14/2008 08/31/1998 04/12/2007 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1998 04/07/2000 10/31/2007 10/31/2007 05/30/2006 10/31/2007 08/31/1998 09/13/2005 12/03/2004 06/25/2002 10/31/2007 06/14/2002 10/22/2003 03/27/2007 03/27/2007 04/17/2009 03/27/2007 12/11/2008 05/16/2003 10/22/2003 05/16/2003 04/07/2009 SUSQUEHANNA-UNIT2 TRM / LOES-6 EFFECTIVE DATE 09/08/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 09/08/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 52 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.4 B 3.5 B 3.6 B 3.7 REACTOR COOLANT SYSTEM BASES Page TRM / B 3.4-1 Pages TRM / B 3.4-2 and TRM / B3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 and TRM / B 3.5-3a Page B 3.5-4 Page TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 and TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Pages TRM / B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Pages TRM / B 3.7-1Oa through TRM / B 3.7-11 a Pages TRM / B 3.7-12 through TRM / B 3.7-14 Pages TRM / B 3.7-14a and TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Page TRM / B 3.7-21a Pages TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-29 Page TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-32 Page TRM / B 3.7-33 08/31/1998 04101/2009 10/31/2007 10/15/1999 08/31/1998 08/31/1998 10/31/2007 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/29/2007 04/04/2007 12/03/2004 12/31/2002 08/31/1998 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 01/09/2004 02/01/1999 08/31/1998 02/14/2005 06/20/2008 01/30/2008 10/05/2006 06/07/2007 10/05/2006 03/09/2001 04/15/2003 SUSQUEHANNA-UNIT2 TRM / LOES-7 EFFECTIVE DATE 09/08/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 09/08/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 52 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.8 B.3.9 Page TRM / B 3.7-34 Page TRM / B 3.7-35 Pages TRM / B 3.7-36 through TRM / B 3.7-40 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Pages TRM / B 3.8-18 through TRM / B 3.8-20 Pages TRM / B 3.8-21 through TRM / B 3.8-24 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 12/03/2004 07/05/2000 04/01/2009 04/02/2002 01/28/2005 04/02/2002 04/02/2002 04/02/2002 08/10/2004 08/31/1998 04/02/2002 01/28/2005 11/29/2006 05/28/2009 08/31/1998 10/23/1998 08/31/1998 03/27/2007 08/23/1999 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11-23 Page TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages B 3.11-31 through B 3.11-35 Page TRM / B 3.11-36 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 04/02/2002 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/31/1998 11/30/2005 12/03/2004 08/31/1998 02/12/1999 SUSQUEHANNA

- UNIT 2 TRM I LOES-8 EFFECTIVE DATE 09/08/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-8 EFFECTIVE DATE 09/08/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 52 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Pages TRM / B 3.12-2 and TRM / B 3.12-3 09/19/2007 02/05/1999 TRM2 text LOES.doc 6/5/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-9 EFFECTIVE DATE 09/08/2009

Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 PPL Rev. 4 3.11 Radioactive Effluents 3112 Gaseous Effluents 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation TRO 3.11.2.6 The radioactive gaseous effluent monitoring instrumentation channels shown in Table 3.11.2.6-1 shall be OPERABLE with their setpoints established in accordance with the ODCM to ensure that the limits of Requirement 3.11.2.1 are not exceeded.

APPLICABILITY:

According to Table 3.11.2.6-1 ACTIONS


NOTE-

1. Separate condition entry is allowed for each channel.
2. The provisions of TRO 3.0.6 are not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A.

Radioactive gaseous A.1 Suspend the release of Immediately effluent monitoring radioactive gaseous effluents instrumentation channel monitored by the affected alarm/trip setpoint less channel conservative than OR required to ensure that the limits of Requirement A.2 Declare the channel Immediately 3.11.2.1 are not inoperable exceeded (continued)

SUSQUEHANNA - UNIT 2 TRM /3.11-25 S EFFECTIVE DATE 04/12/2007

Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 PPL Rev. 4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B.

Reactor Building B.1 Take grab samples Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Ventilation System Noble while release is in Gas Activity Monitor low progress.

range channel inoperable AND B.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of isotopic activity to the grab sample required LLDs for principal noble gas gamma emitters (Table 3.11.2.1-1)

AND B.3 Restore monitoring 30 days instrumentation.

C.

Deleted D.

Reactor Building D.1 Estimate flow rate.

Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Ventilation Monitoring while release is in System Effluent System progress Flow Rate Monitor or AND Sampler Flow Rate Monitor inoperable D.2 Restore monitoring 30 days instrumentation.

(continued)

SUSQUEHANNA - UNIT 2 TRM / 3.11-26 EFFECTIVE DATE 01/21/2004

Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 PPL Rev. 4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E.

Turbine Building Ventilation E.1 Verify mechanical vacuum Immediately System Noble Gas Activity pump is not in operation.

Monitor low range channel inoperable AND E.2 Take grab samples.

Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> while release is in progress AND E.3 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after isotopic activity to the sample required LLDs for principal noble gas gamma emitters (Table 3.11.2.1-1).

AND E.4 Restore monitoring 30 days instrumentation F.

Deleted G.

Turbine Building Ventilation G.1 Estimate flow rate.

Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Monitoring System Effluent while release is in System Flow Rate Monitor progress.

or Sampler Flow Rate AND Monitor inoperable G.2 Restore monitoring 30 days instrumentation (continued)

SUSQUEHANNA - UNIT 2 TRM / 3.11-27 EFFECTIVE DATE 01/21/2004

Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 PPL Rev. 4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME H. Standby Gas Treatment H.1 Take grab samples.

Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> System Noble Gas Activity during operation of Monitor low range channel SGTS inoperable AND H.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of isotopic activity to the required grab sample being LLDs for principal noble gas taken.

gamma emitters (Table 3.11.2.1-1).

AND H.3 Restore monitoring 30 days instrumentation.

Deleted J.

SGTS Ventilation J.1 Estimate flow rate.

Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Monitoring System Effluent during operation of flow rate monitor or sample SGTS flow rate monitor AND Inoperable.

J.2 Restore monitoring 30 days Instrumentation.

(continued)

SUSQUEHANNA - UNIT 2 TRM / 3.11-28 EFFECTIVE DATE 09/08/2009

Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 PPL Rev. 4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME K. Required Actions and K.1 Explain why this inoperability In the next Completion Times not was not corrected in a timely Radioactive Effluent met for Conditions B manner.

Release Report per through J.

TS Section 5.6.

TECHNICAL REQUIREMENT SURVEILLANCE NOTE-Refer to Table 3.11.2.6-1 to determine which TRSs apply for each Monitoring Function.

SURVEILLANCE FREQUENCY TRS 3.11.2.6.1 Perform CHANNEL CHECK 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TRS 3.11.2.6.2 Deleted TRS 3.11.2.6.3 Perform Source Check 31 days TRS 3.11.2.6.4 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.11.2.6.5 Perform CHANNEL CALIBRATION 24 months SUSQUEHANNA - UNIT 2 TRM / 3.11-29 EFFECTIVE DATE 12/03/2004

Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 PPL Rev. 4 TABLE 3.11.2.6-1 (Page 1 of 3)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS

1.

REACTOR BUILDING VENTILATION MONITORING SYSTEM

a.

Noble Gas Activity Monitor At all Times 1

TRS 3.11.2.6.1 (Low Range)

TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5

b.

Deleted

c.

Deleted d

Effluent System Flow Rate Monitor At all Times 1

TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5

e.

Sampler Flow Rate Monitor At all Times 1

TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)

SUSQUEHANNA - UNIT 2 TRM / 3.11-30 EFFECTIVE DATE 01/21/2004

Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 PPL Rev. 4 TABLE 3.11.2.6-1 (Page 2 of 3)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS

2.

TURBINE BUILDING VENTILATION MONITORING SYSTEM

a.

Noble Gas Activity Monitor At all Times 1

TRS 3.11.2.6.1 (Low Range)

TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5

b.

Deleted

c.

Deleted

d.

Effluent System Flow Rate Monitor At all Times 1

TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5

e.

Sampler Flow Rate Monitor At all Times 1

TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)

SUSQUEHANNA - UNIT 2 TRM / 3.11-31 EFFECTIVE DATE 01/21/2004

Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 PPL Rev. 4 TABLE 3.11.2.6-1 (Page 3 of 3)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS

3.

STANDBY GAS TREATMENT SYSTEM (SGTS) MONITOR

a.

Noble Gas Activity Monitor During 1

TRS 3.11.2.6.1 (Low Range) operation of TRS 3.11.2.6.3 SGTS(a)

TRS 3.11.2.6.4 TRS 3.11.2.6.5

b.

Deleted

c.

Deleted

d.

Effluent System Flow Rate Monitor During 1

TRS 3.11.2.6.1 operation of TRS 3.11.2.6.4 SGTS(a)

TRS 3.11.2.6.5

e.

Sampler Flow Rate Monitor During 1

TRS 3.11.2.6.1 operation of TRS 3.11.2.6.4 SGTS(a)

TRS 3.11.2.6.5 (a)

The provisions of TRO 3.0.4 are not applicable.

SUSQUEHANNA - UNIT 2 TRM / 3.11-32 EFFECTIVE DATE 01/21/2004