Closure Letter for Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
ML092600247
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/28/2009
From: Balwant Singal
Plant Licensing Branch IV
To: Muench R
Wolf Creek
Singal, Balwant, 415-3016, NRR/DORL/LPL4
References
TAC MD7896
Download: ML092600247 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 28, 2009 Mr. Rick A. Muench President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation Post Office Box 411 Burlington, KS 66839 SUB~IECT:

WOLF CREEK GENERATING STATION - RE: CLOSURE LETTER FOR GENERIC LETTER 2008-01, "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS" (TAC NO. MD7896)

Dear Mr. Muench:

On January 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910759). The stated purpose of GL 2008-01 was (a) to request addressees to submit information to demonstrate that the subject systems are in compliance with the current licensing and design bases and applicable regulatory requirements, and that suitable design, operational, and testing control measures are in place for maintaining this compliance; and (b) to collect the requested information to determine if additional regulatory action is required.

GL 2008-01 requested that licensees provide the following information within 9 months of the GL:

(a)

A description of the results of evaluations that were performed pursuant to the requested actions specified in the GL. This description should provide sufficient information to demonstrate that you are or will be in compliance with the quality assurance criteria in Sections III, V, XI, XVI, and XVII of Appendix B to Title 10 of the Code of Federal Regulations Part 50 and the licensing basis and operating license as those requirements apply to the subject systems; (b)

A description of all corrective actions, including plant, programmatic, procedure, and licensing basis modifications that you determined were necessary to assure compliance with these regulations; and, (c)

A statement regarding which corrective actions were completed, the schedule for completing the remaining corrective actions, and the basis for that schedule.

In your letters dated October 10,2008, and August 17, 2009 (ADAMS Accession Nos. ML082950487 and ML092370297, respectively), you poovided information in response to the GL. The NRC staff has reviewed the submitted information and has concluded that, for Wolf Creek Generating Station, your response to the GL is acceptable. Consequently, your GL

R. Muench

- 2 response is considered closed and no further information or action is requested of you.

Notwithstanding, the NRC's Region IV staff may decide to perform (and would contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). The TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01.

If you have any questions regarding this letter, please feel free to contact me at (301) 415-3016.

/

',//

Ba ant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-482 cc: Distribution via Listserv

ML082950666). The TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01.

If you have any questions regarding this letter, please feel free to contact me at (301) 415-3016.

Sincerely, IRA by Lynnea E. Wilkins fori Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-482 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrPMWolfCreek Resource LPLIV R/F RidsOgcRp Resource RidsAcrsAcnw_MailCTR Resource RidsRgn4MailCenter Resource RidsNrrDorlDpr Resource DBeaulieu, NRR/DPR/PGCB RidsNrrDorlLpl4 Resource DWoodyatt, NRR/DSS/SRXB RidsNrrDprPgcb Resource WLyon, NRR/DSS/SRXB RidsNrrDssSrxb Resource TFarnholz, RIV/DRS/EB1 RidsNrrLAJBurkhardt Resource ADAMS Accession No'.. ML092600247

  • Memo dated OFFICE NRRlLPL4/PM NRR/LPL4/PM NRR/LPL4/LA NRRlDSS/SRXB/BC NRR/LPL4/BC NRRlLPL4/PM NAME LWilkins BSingal JBurkhardt GCranston*

MMarkley BSingal LWilkins for DATE 10/23/09 10/23/09 10/23/09 9/3/09 10/28/09 10/28/09