Agenda for TSTF and NRC Meeting September 23, 2009 9:00 a.m. - 3:00 p.m.

1. Administrative
a. Introductions
b. Agenda Review
c. Other Administrative Issues
2. Process Issues
a. Status of NRC letter concerning Regulatory Guide 1.174 Tier 2 requirements
3. Specific Traveler Review Issues
a. Discussion of Status and Outstanding Issues for Travelers Under NRC Review
4. CLIIP Status
a. Industry generic comments on TSTF-501, "Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control" Notice for Comment
5. Issues with Previously Approved Travelers
a. Industry actions in response to NRC's July 13, 2009, letter regarding revision of RITSTF Initiative 1 Travelers.
b. NRC questions on TSTF-490, "Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec."
c. NRC questions on TSTF-363-A, "Revise Topical Report references in ITS 5.6.5, COLR," TSTF-408-A, "Relocation of LTOP Enable Temperature and PORV Lift Setting to the PTLR ( CE NPSD-683)," and TSTF-419-A, "Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR."
d. Industry questions regarding plant-specific adoption issues with TSTF-439, "Eliminate Second Completion Times Limiting Time From Discovery of Failure To Meet an LCO."
e. Follow-up discussion on TSTF-400, "Clarify SR on Bypass of DG Automatic Trips."
f. Status of publication of revised Notice of Availability for TSTF-475-A, "Control Rod Notch Testing Frequency and SRM Insert Control Rod Action."
6. Technical Issues
a. Industry consideration of a Traveler to relocate the DG power factor value to licensee control.
7. Future Planning
a. Response to NRC request to provide more precise projected submittal dates for TSTF-425 and TSTF-505 and expected submittals for TSTF-493, Option B.
b. Discussion of industry approach and schedule for TSTF-505, "Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b."
8. Discussion of Development of ISTS Revision 4
9. Next Meeting
a. Confirm November 4 date for next meeting
10. Public Comments
11. Action Item Review ENCLOSURE