From:
Paige, Jason Sent:
Monday, August 17, 2009 9:03 AM To:
Tomonto, Bob; Olga_Hanek@fpl.com Cc:
Mozafari, Brenda
Subject:
RAI questions RE Turkey Point's H* LAR Bob/Olga, These are the current questions we have regarding the Model 44F Westinghouse WCAP report and the Turkey Point H* PARC LAR. We are still reviewing both documents and may have additional questions later. Please review and if needed, I will setup a call to discuss.
- 1.
Reference 1, Page 6-21, Table 6-6. This table contains a number of undefined parameters and some apparent inconsistencies with Table 5-2 on page 5-6. Please define the input parameters in Table 6-6.
- 2.
Reference 1, Section 6.2.2.2. Why was the FEA analysis not run directly with the modified temperature distribution rather than running with the linear distribution and scaling the results?
- 3.
Reference 1, Section 6.2.3. Why is radial displacement the figure of merit for determining the bounding segment? Does circumferential displacement not enter into this? Why is the change in tube hole diameter not the figure of merit?
- 4.
Reference 1, Page 6-66. In Section 6.2.5.3, it is concluded that the tube outside diameter and the tubesheet tube bore inside diameter always maintain contact in the predicted range of tubesheet displacements. However, for tubes with through wall cracks at the H* distance, there may be little or no net pressure acting on the tube for some distance above H*. In Tables 6-18 and 6-19, the fourth increment in the step that occurs two steps prior to the last step suggests that there may be no contact between the tube and tubesheet, over a portion of the circumference, for a distance above H*. Is the conclusion in 6.2.5.3 valid for the entire H* distance, given the possibility that the tubes may contain through wall cracks at that location? Additionally, please address the following issues:
- a. Clarify the nature of the finite element model (slice model versus axisymmetric SG assembly model) used to generate the specific information in Tables 6-1, 2, and 3 (and accompanying graph entitled Elliptical Hole Factors) of Reference 6-15. What loads were applied? How was the eccentricity produced in the model? (By modeling the eccentricity as part of the geometry? By applying an axisymmetric pressure the inside of the bore?) Explain why this model is not scalable to lower temperatures.
- b. Provide a table showing the maximum eccentricities (maximum diameter minus minimum diameter) from the 3 dimensional (3-D) finite element analysis for normal operating and steam line break (SLB), for model F and D5.
- c. In Figure 2 of the White Paper, add plot for original relationship between reductions in contact pressure and eccentricity as given in Reference 6-15 in the graph accompanying Table 6-3. Explain why this original relationship remains
conservative in light of the new relationship. Explain the reasons for the differences between the curves.
- d. When establishing whether contact pressure increases when going from normal operating to steam line break conditions, how can a valid and conservative comparison be made if the normal operating case is based on the original delta contact pressure versus eccentricity curve and the SLB case is based on the new curve?
- 5.
Reference 1, Section 6.3. Are the previously calculated scale factors and delta D factors in Section 6.3 conservative for steam line break (SLB) and feed line break (FLB)? Are they conservative for an intact divider plate assumption? Are they conservative for all values of primary pressure minus crevice pressure that may exist along the H* distance for intact tubes and tubes with through-wall cracks at the H* distance?
- 6.
Reference 1, Page 6-90. How is tube temperature (TT) on page 6-90 determined? For normal operating conditions (NOP), how is the TT assumed to vary as function of elevation?
- 7.
Reference 1, Page 6-107, Figure 6-75. Contact pressures for nuclear plants with Model F steam generators are plotted in Figure 6-75, but it is not clear what operating conditions are represented in the plotted data, please clarify.
- 8.
Reference 1, Page 6-115, Reference 6-5. This reference seems to be incomplete; please provide a complete reference.
- 9.
Reference 1, Page 6-116, Reference 6-15. Table 6-3 in Reference 6-15 (SM-94-58, Rev 1) appears inconsistent with Table 6-2 in the same reference. Explain how the analysis progresses from Table 6-2 to Table 6-3.
- 10.
Reference 1, Page 8-9, Figure 8-1. There is an apparent discontinuity in the plotted data of the adjustment to H* for distributed crevice pressure, please provide any insight you may have as to why this apparent discontinuity exists.
- 11.
Reference 1, Page 8-5, Section 8.1.4. Clarify whether the biased H* distributions for each of the four input variables are sampled from both sides of the mean H* value during the Monte Carlo process, or only on the side of the mean H* value yielding an increased value of H*.
- 12.
Reference 1, Page 8-20, Case S-4. Why does the assumption of a 2-sigma value for the coefficient of thermal expansion of the tube (T) and the tubesheet (TS) to determine a very conservative biased mean value of H* conservatively bound the interaction effects between T and TS? Describe the specifics of how the very conservative biased mean value of H*, as shown in Table 8-4, was determined.
- 13.
Reference 1, Page 8-22, Case M-5. The description for this case seems to correspond to a single tube H* estimate rather than a whole bundle H* estimate. How is the analysis performed for a whole bundle H* estimate?
- 14.
Reference 1, Page 8-22, Case M-5 states: Interaction effects are included because the 4.157 sigma variations were used that already include the effective interactions among
the variables. Case M-5 also states that the 4.157 sigma variations come from Table 8-2. However, Table 8-2 does not appear to include interactions among the variables.
Explain how the 4.157 sigma variations include the effect of interactions among the variables.
- 15.
Reference 1, Page 8-23, Case M-7. Was the 2 sigma variation of all variables divided by a factor of 2?
- 16.
Reference 1, Page 8-23, Case M-7. Is the number 4.147 supposed to be 4.157?
- 17.
Reference 1, Page 8-23, Case M-7. Explain how this case includes the interaction effects between the two principle variables, T and TS.
- 18.
Section 8 of Reference 1. The variability of H* with all relevant parameters is shown in Figure 8-3. The interaction between T and TS are shown in Figure 8-5. Please explain why the direct relationships shown in these two figures were not sampled directly in the Monte Carlo analysis, instead of the sampling method that was chosen. Also, please explain why the sampling method chosen led to a more conservative analysis than directly sampling the relationships in Figures 8-3 and 8-5. As part of response, include discussion of main steam line break and whether it continues to be less limiting, from maximum H* perspective, than three times normal operating pressure.
- 19.
In the July 23, 2009, letter, FPL commits to determine the position of the bottom of the expansion transition in relation to the top of the tubesheet and to enter "any significant deviation" into their corrective action program. This is a one-time verification prior to implementation of H*. The commitment should be modified to also include a commitment to notify the staff if significant deviations in the location of the bottom of the expansion transition relative to the top of the tubesheet are detected.
- 20.
During review of the FPL amendment request, it was noticed that wording associated with a regulatory commitment, regarding use of the leakage factor, had been stated in the body of the document (page 9 of Enclosure 1) but the licensee did not actually make a commitment to establish an administrative operational leakage limit on page 9 of, in the list of regulatory commitments in the July 23, 2009 cover letter, or in. See below for an example of a complete commitment.
For the Condition Monitoring assessment, the component of leakage from the prior cycle from below the H* distance will be multiplied by a factor of 1.82 and added to the total leakage from any other source and compared to the allowable accident induced leakage limit. For the Operational Assessment, the difference between the allowable accident induced leakage and the accident induced leakage from sources other than the tubesheet expansion region will be divided by 1.82 and compared to the observed operational leakage. An administrative operational leakage limit will be established to not exceed the calculated value.
References:
- 1. WCAP-17091-P, Rev. 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model 44F), dated June 2009.
Jason Paige, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: (301) 415-5888