Request for Additional Information Regarding Relief RR-09
ML092240047
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 08/12/2009
From: Boska J
Plant Licensing Branch 1
To:
Entergy Nuclear Operations
Boska J, NRR, 301-415-2901
References
TAC ME1658
Download: ML092240047 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 12, 2009 Vice President, Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

INDIAN POINT NUCLEAR GENERATING UNIT NO.2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST RR-09 (TAC NO. ME1658)

Dear Sir or Madam:

By letter dated July 1,2009, Entergy Nuclear Operations, Inc. (the licensee), submitted relief request (RR)-09 for Nuclear Regulatory Commission (NRC) review and approval. The licensee requested to implement an alternative to the requirements of paragraph 50.55a(g)(6)(ii)(D)(3) of Title 10 of the Code of Federal Regulations. The request pertains to inservice inspection (lSI) of the reactor vessel upper head nozzles at Indian Point Nuclear Generating Unit No.2. The duration of request is for the fourth 1O-year lSI interval which began March 1, 2007 and concludes April 3, 2016.

The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). On August 11, 2009, the Entergy staff indicated that a response to the RAI would be provided within 45 days of the date of this letter.

Please contact me at (301) 415-2901 if you have any questions on this issue.

Sincerely, hn P. Boska, Senior Project Manager lant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-247

Enclosure:

RAI cc w/encl: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST RR-09 ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT NUCLEAR GENERATING UNIT NO.2 DOCKET NO. 50-247 By letter dated July 1, 2009, Agencywide Documents Access and Management System (ADAMS) Accession No. ML091950333, Entergy Nuclear Operations, Inc. (the licensee),

submitted relief request (RR)-09 for Nuclear Regulatory Commission (NRC) review and approval. The licensee requested to implement an alternative to the requirements of paragraph 50.55a(g)(6)(ii)(D)(3) of Title 10 of the Code of Federal Regulations. The request pertains to inservice inspection (lSI) of the reactor vessel upper head nozzles at Indian Point Nuclear Generating Unit NO.2. The duration of request is for the fourth 1O-year lSI interval which began March 1,2007 and concludes April 3, 2016. The NRC staff is reviewing the submittal and has the following questions:

1. Please provide your flaw analysis including your assumptions, specific methodology and results of the stress analysis performed for the subject nozzles, or provide references to previously submitted documents which contain the above information relevant to this submittal.
2. Discuss if the crack growth evaluation was based on the as-built weld geometry.

Enclosure

August 12, 2009 Vice President, Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 SUB~IECT:

INDIAN POINT NUCLEAR GENERATING UNIT NO.2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST RR-09 (TAC NO. ME1658)

Dear Sir or Madam:

By letter dated July 1,2009, Entergy Nuclear Operations, Inc. (the licensee), submitted relief request (RR)-09 for Nuclear Regulatory Commission (NRC) review and approval. The licensee requested to implement an alternative to the requirements of paragraph 50.55a(g)(6)(ii)(D)(3) of Title 10 of the Code of Federal Regulations. The request pertains to inservice inspection (lSI) of the reactor vessel upper head nozzles at Indian Point Nuclear Generating Unit No.2. The duration of request is for the fourth 1O-year lSI interval which began March 1, 2007 and concludes April 3, 2016.

The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). On August 11, 2009, the Entergy staff indicated that a response to the RAI would be provided within 45 days of the date of this letter.

Please contact me at (301) 415-2901 if you have any questions on this issue.

Sincerely, IRA!

John P. Boska, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-247

Enclosure:

RAI cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrDorlLpl1-1 RidsNrrPMJBoska RidsOGCRp LPL1-1 Reading File RidsNrrLASLittle RidsAcrsAcnw MailCTR ARezai RidsNrrDorlDpr RidsRgn1 MailCenter RidsNrrDciCpnb ADAMS ACCESSION NO'.. ML092240047

  • See memo dated 8/5/09 OFFICE LPL1-1/PM LPL1-1/LA CPNB/BC*

LPL 1-1/BC NAME JBoska SLittie TChan NSalgado DATE 8/12/09 8/12/09 8/5/09 8/12/09 OFFICIAL RECORD COPY