Acceptance Review E-mail of License Amendment to Provide Consistency in Division 3 Emergency Diesel Generator Start Time TS Surveillance Requirements
ML092100499
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 07/29/2009
From: Goodwin C
Plant Licensing Branch III
To: Heintz C, Lashley P
FirstEnergy Corp, FirstEnergy Nuclear Operating Co
Goodwin, Cameron/DORL, 415-3719
References
TAC ME1691
Download: ML092100499 (2)


Text

From:

Goodwin, Cameron Sent:

Wednesday, July 29, 2009 2:32 PM To:

phlashley@firstenergycorp.com; cjheintz@firstenergycorp.com Cc:

Goodwin, Cameron; Campbell, Stephen

Subject:

Acceptance Review of TAC ME1691 July 29, 2009 Mr. C. Heintz Perry Nuclear Power Plant Licensing.

SUBJECT:

Acceptance of License Amendment Request to Provide Consistency in Division 3 Emergency Diesel Generator Start Time Technical Specification Surveillance Requirements (TAC No. ME1691).

Mr. Heintz:

By letter dated June 30, 2009, Perry Nuclear Power Plant (PNPP) submitted a request for an amendment to the technical specifications (TS) for the PNPP. The proposed amendment would revise the acceptance criteria for Technical Specification Surveillance Requirement 3.8.1.7 to make the Division 3 Emergency Diesel Generator (EDG) start time requirement consistent with the time incorporated in the safety analysis for design basis events and with the time specified in the other TS 3.8.1 EDG start time surveillances. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review of the proposed alternative and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment.

If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact the Perry Project Manager, Cameron Goodwin at (301) 415-3719.

Thank you, Cameron Goodwin Mrs. Cameron Goodwin Division of Operating Reactor Licensing Davis-Besse and Perry Project Manager Phone: (301)415-3719 Email: Cameron.Goodwin@nrc.gov

E-mail Properties Mail Envelope Properties (83F82891AF9D774FBBB39974B6CB134F948D8C909A)

Subject:

Acceptance Review of TAC ME1691 Sent Date: 07/29/2009 2:31:48 PM Received Date: 07/29/2009 2:31:48 PM From: Goodwin, Cameron Created By: Cameron.Goodwin@nrc.gov Recipients:

phlashley@firstenergycorp.com (phlashley@firstenergycorp.com)

Tracking Status: None cjheintz@firstenergycorp.com (cjheintz@firstenergycorp.com)

Tracking Status: None Cameron.Goodwin@nrc.gov (Goodwin, Cameron)

Tracking Status: None Stephen.Campbell@nrc.gov (Campbell, Stephen)

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 18156 07/29/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: True Return Notification: False Sensitivity: olNormal Recipients received: