July 24, 2009 Mr. Alexander Marion, Vice President Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708
SUBJECT:
DIGITAL INSTRUMENTATION AND CONTROL STANDARD REVIEW PLAN CHAPTER SCHEDULED CLOSURE PLAN
Dear Mr. Marion:
The purpose of this letter is to provide you with an update and expected closure schedule for the various Standard Review Plan (SRP) chapters as outlined in the U.S. Nuclear Regulatory Commissions (NRCs) Digital Instrumentation and Control (DI&C) Project Plan dated May 13, 2009, Revision 2 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML091380154). The Standard Review Plan, NUREG-0800, establishes the criteria that the NRC staff responsible for the review of applications to construct and operate nuclear power plants intends to use in evaluating whether an applicant/licensee meets the NRC's regulations.
Revision 2 of the DI&C Project Plan outlined the current status and the expected completion dates for specific milestones, assignments, and deliverables; including those related to the development of regulatory documents that will close the Interim Staff Guidance (ISGs) currently implemented by the NRC staff. Deliverables associated with the long-term objectives of this plan are to update the SRP, Branch Technical Positions (BTPs), and other regulatory documents. The following table outlines the expected schedule for issuance of the various SRP chapters and the NRC offices involved.
SRP Chapter Description Lead Office /
Support Office(s)
Expected Public Comment Expected Final Closure Chapter 7 Cyber Security:
Step 1: Develop SRP section on Cyber Security, and incorporate ISG#1 into new BTP/SRP Step 2: After detailed ISG is developed on technical review of cyber security, add to the BTP/SRP.
NRO / NRR, RES, NSIR Step 1: Issue draft SRP for public comments:
11/30/2009 Step 2: Issue draft SRP for public comments:
03/15/2011 Step 1:
1/30/2010 Step 2:
5/30/2011
Chapter 7 Defense-in-Depth and Diversity:
Update BTP/ SRP to incorporate ISG-2 NRO/ RES, NRR Issue draft SRP for public comments:
11/30/2009 1/30/2010 Chapter 7 and RG 1.152 Communications:
ISG-4 is being incorporated into IEEE 7-4.3.2. RG will be developed to endorse IEEE 7-4.3.2 with appropriate condition.
Update SRP to reflect new guidance.
NRR/ RES, NRO Issue draft SRP for public comments:
03/15/2011 (IEEE 7-4.3.2 and RG 1.152 expected due 07/2010) 5/30/2011 Chapter 18 Human Factors:
Minimum Inventory section of the SRP NRO / NRR Issue draft SRP for public comments:
09/30/2009 11/30/2009 Chapter 18 Human Factors:
Manual Operator Action section of SRP NRO Issue draft SRP for public comments:
11/30/2009 1/30/2010 Chapter 19 Risk:
Incorporate ISG-3 into the SRP NRO Issue draft SRP for public comments:
10/15/2010 11/30/2010 Revision 2 of the DI&C Project Plan will be updated, as necessary, to reflect the dates outlined in the above table and subsequently reissued as Revision 3. The Steering Committee appreciates the continued contributions of industry representatives to develop and refine regulatory guidance supporting the application of digital technology of operating and new nuclear power reactors and fuel cycle facilities.
If you have any questions, please contact me at 301-415-1274.
Sincerely,
/RA/
John A. Grobe, Associate Director for Engineering and Safety Systems Office of Nuclear Reactor Regulation cc: see next page
Chapter 7 Defense-in-Depth and Diversity:
Update BTP/ SRP to incorporate ISG-2 NRO/ RES, NRR Issue draft SRP for public comments:
11/30/2009 1/30/2010 Chapter 7 and RG 1.152 Communications:
ISG-4 is being incorporated into IEEE 7-4.3.2. RG will be developed to endorse IEEE 7-4.3.2 with appropriate condition.
Update SRP to reflect new guidance.
NRR/ RES, NRO Issue draft SRP for public comments:
03/15/2011 (IEEE 7-4.3.2 and RG 1.152 expected due 07/2010) 5/30/2011 Chapter 18 Human Factors:
Minimum Inventory section of the SRP NRO / NRR Issue draft SRP for public comments:
09/30/2009 11/30/2009 Chapter 18 Human Factors:
Manual Operator Action section of SRP NRO Issue draft SRP for public comments:
11/30/2009 1/30/2010 Chapter 19 Risk:
Incorporate ISG-3 into the SRP NRO Issue draft SRP for public comments:
10/15/2010 11/30/2010 Revision 2 of the DI&C Project Plan will be updated, as necessary, to reflect the dates outlined in the above table and subsequently reissued as Revision 3. The Steering Committee appreciates the continued contributions of industry representatives to develop and refine regulatory guidance supporting the application of digital technology of operating and new nuclear power reactors and fuel cycle facilities.
If you have any questions, please contact me at 301-415-1274.
Sincerely,
/RA/
John A. Grobe, Associate Director for Engineering and Safety Systems Office of Nuclear Reactor Regulation cc: see next page DISTRIBUTION See Next Page ADAMS: ML092050227 NRR-106 OFFICE DI&C PM NRR/DE NRR/ADES NAME SWalker PHiland (Meena Khanna for)
JGrobe DATE 7/24/09 7/24/09 7/24/09 OFFICIAL RECORD COPY
LETTER TO NEI: DIGITAL INSTRUMENTATION AND CONTROL STANDARD REVIEW PLAN CHAPTER SCHEDULED CLOSURE PLAN DISTRIBUTION Email PUBLIC RidsNrrAdro RidsNrrAdes RidsNrrOd RidsNrrDpr RidsNrrDprPgcb RidsOpaMail RidsNrrDe RidsOgcMailCenter RidsAcrsAcnwMailCenter SMorris TBergman MBailey MCase SRichards LDudes DSkeen IJung ELee DHarrison MJunge WBurton SBurrows DDesauliners BMarcus EEagle HHamzehee PRebstock GSingh LHardin TMossman KNguyen RSydnor DZhang MWaterman SWalker
Nuclear Energy Institute Project No. 689 cc:
Mr. James Riley, Director of Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jhr@nei.org Mr. Gordon Clefton, Senior Project Manager Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708\\
gac@nei.org Mitch Lucas, (TXU) mlucas3@luminant.com Rick Libra, (DTE)