ML091400534
| ML091400534 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 07/01/2008 |
| From: | Tamburro P Exelon Corp |
| To: | Richmond J NRC Region 1 |
| References | |
| FOIA/PA-2009-0070 | |
| Download: ML091400534 (18) | |
Text
John Richmond From:
Sent:
To:
Cc:
Subject:
Attachments:
Peter.Tamburro@exeloncorp.com Tuesday, July 01, 2008 10:29 AM John Richmond howie.ray@exeloncorp.com; Charles.Albert@exeloncorp.com; Calvin.Taylor@exeloncorp.com; fred.polaski@exeloncorp.com Oyster Creek License Renewal Preliminary Schedule - October Refueling Outage License Renewal Activities.pdf John Attached is a Preliminary Schedule for Oyster Creek's Licensing Renewal Related Inspections in our 1 R22 Refueling Outage As you can see many of the inspections are related to the Drywell. Please note that the schedule is still Preliminary
<<License Renewal Activities.pdf>>
Thise-mail and any of its attachments may contain Exelon Corporation proprietary in nrmation, wh' is privileged, confidential, or subject to copyright belonging to the Exelon Corporation family Comp les. This e-mail is intended solely for the use of the individual or entity to which it is addressed. If u
e not the intended recipient of this e-mail, you are hereby notified that any dissemination, distribution, cop4, or action taken in relation to the contents of and attachments to this e-mail is strictly prohibited nd be unlawful. If you have received this e-mail in error, please notify the sender immediately and pe anently lete the original and any copy of this e-mail and any printout. Thank Y ou.*****************
I C/2-
Received: from OWMSO1.nrc.gov (148.184.100.43) by R1 MS01.nrc.gov
.(148.184.99.10) with Microsoft SMTP Server (TLS) id 8.0.751.0; Tue, 1 Jul 2008 10:29:18 -0400 Received: from mail.nrc.gov (148.184.176.41) by OWMS01.nrc.gov (148.184.100.43) with Microsoft SMTP Server id 8.0.751.0; Tue, 1 Jul 2008 10:29:17 -0400 X-lronport-ID: maiil X-SBRS: 6.3 X-MID: 26937044 X-IronPort-AV: E=Sophos;i="4.27,731,1204520400";
d="pdfr?scan'208,217";a="26937044" Received: from maileastl.peco.com (HELO exeloncorp.com) ([1.59.214.124.51]) by maill.nrc.gov with ESMTP; 01 Jul 2008 10:29!12 -0400 Received: from ([159.214.172.33])
by mobuniron2.exeloncorp.com with ESMTP id 5502179.105632041;Tue, 01 Jul 2008 10:28:29 -0400 Received: from mobmsxch06.energy.power.corp ([159.214.141.27]) by MOBMSCON02.energy.power.corp with Microsoft SMTPSVC(6.0.3790.3959);
Tue, 1 Jul 2008 10:28:31 -0400 X-MimeOLE: Produced By Microsoft Exchange V6.5 Content-Class: urn: content-classes: message MIME-Version: 1.0
Subject:
Oyster Creek License Renewal Preliminary Schedule - October Refueling Outage Date: Tue, 1 Jul 2008 10:28:30 -0400 Message-ID:
<D298806D8440D041 B2E5D4AD8242F3BF5AAOE4@mobmsxcho6.energy. power.corp>
X-MS-Has-Attach: yes X-MS-TNEF-Correlator:
Thread-Topic: Oyster Creek License Renewal, Preliminary Schedule --October Refueling Outage Thread-Index: Acjbhrv+/10vYtl eRmujWYyHJbXnsA==
,,From: <Peter.Tamburro@exeloncorp.com>
To: <John.Richmond@NRC.gov>
CC: <howie.ray@exeloncorp.com>,
<Charles.Albert@exeloncorp.com>,
<Calvin.Taylor@exeloncorp.com>,
<fred.polaski@exeloncorp.com>
Return-Path: Peter.Tamburro@exeloncorp.com X-OriginalArrivalTime: 01 Jul 2008 14:28:31.0187 (UTC) FILETIME=[BC555A30:01C8DB86]
Content-Type: multipart/mixed; boundary="---- = NextPart_001*_01C8DB86.BC161C29"
Aclivity 0ISP SPL IMILE suPV P4DI Acvt~y Orig Early Eady Total ID Deecriplbon Dur Start Finish FRoa J208849501 T
4 12 P
C LEAKAGE MONITOR TORUS.
3 29OCT08 29OCT08 210 j9 'E..
SANDBEDS & RX DRAIN 02.:00 04:59 J208849502 T
4 12
'EPB PC LEAKAGE MONITOR TORUS, 3
29OCT08 29OCT08 210 SANOBEDS
& RX DRAIN 05:00 07:59 PJ20
,0 4
12 E
c P
LEAKAGE MONITOR TORUS.
3 29OCT08 29OCT08 210 J28__0 T 4
1 SANDBEDS
& RX DRAIN 0o8:00 10:59 J2884 9-504 T
-4 12 EPE PC LEAKAGE MONITOR TORUS.
3 29OCT08 29OCT08 210 SANDBEDS & RX DRAIN 11:00 13:59 J
T 4
12 OEPB PC LEAKAGE MONITOR TORUS, 3
29OCT08 29OCT08 210 58 5 SANDBEDS & RX DRAIN
[14:00 16:59 OCT I
may J208849506 T-4 12 OEPB PC LEAKAGE MONITOR TORUS.
3 29OCT08 29OCT08 210 I
ISANDBEDS & RX DRAIN 117:00 19:59 J208849507 T
4 12 OEPB PC LEAKAGE MONITOR TORUS.
3 29OCT08 29OCT08 210 SANDBEDS & RX DRAIN 20:00 22:59 J208849508 T
4 12 QEPB PC LEAKAGE MONITOR TORUS.
3 29OCT08 30OCT08 210 SANOBEDS & RX DRAIN 23:00 01:59 J208849509 T
4 12 OEPB PC LEAKAGE MONITOR TORUS.
3 30OCTO8 30OCT08 210 SANDBEDS & RX DRAIN 02:00 04:59 J208849511 T
4 12 OEPB PC LEAKAGE MONITOR TORUS, 3
30OCT08 30OCT08 210 SANDBEDS & RX DRAIN 05:00 07:59 J208849511 T
4 12 GEPE PC LEAKAGE MONITOR TORUS.
3 30OCT08 30OCT08 1 210 SANDBEDS & RX DRAIN 08:00 10:59 J208949512 4T 12 DEP PC LEAKAGE MONITOR TORUS.
3 =30OCT08 30OCT08 210 SANDBEDS & RX DRAIN 111:00 13.59 J2088903TR T
4 131 0CC H25 PC P
URAVEYN-IDOWN POST 6
27C0T08 1 310 BDLNR INPET17:00 12:5 l
TOP OF TORUS..:
2.
J2088903R5 T
4 13 OPRF H25 PC BAY RIP SURVEY AFTER SHIELD 1
27OCT08 27OCT08 315
_SBAG REMOVAL 17:00 1759 J2088903R6R T 4
13 OPRF H25 PC BAY1 ROVVIDEO 1
27OCT08 270CT08 V 315 5
B RO17:00 17:59 TR PC NOTIFYT RAUSCH OF BAY 1 SAND 0
27OCT0 8
15 OPRF BED LINER INSPECT 117:00
~~: ::
1T M VA_
_ _117_
ji R
4 113ORFH25 PC IBAY9 RP SURVEYAFTERSHIELD 1 -27OCT08 27CT08 315 BAG REMOVAL 17:00 17:59 J2088918N8 IT 4
13OPRF IH25 IPC IBAY97ROV VIDEO 1
127OCT08 27OCT08 315 L_.
I
--. ~!T 117:00 17:59 J208890R5 T
4 13 OPRF H25 PC BAY 9 RP SURVEY AFTER SHIELD 1T 27CT8* 270CT08 3115 BAT REMOVAL T17OC0 8759 1.
J2088918R5 T
4 i13 OPRFH5P C
1 270CTO8 27OCT08 315 J298890R5 T
4 13 OPW I25 PCBAY 13 RP SURVEY AFTER SHIELD0 17CT81 1
1 BA REMOVAL17:00*-
17:59 J288920R6 T
4 13 OPRF H2SPC BAY 13 ROV VIDEO 5
127CTOB 27OCT08 J2 2.
4 IX CCI2PCNOTIFY T. RAUSCH OF BAY 13 10 127OC0
,6 SAND BED LINER INSPEC 17C00 2,88....
ILEAKAGE MONITOR TORUS, SANDBEDS & RX DRAIN ILEAKAGE MONITOR TORUS, SANDBEDS & RX DRAIN ILEAKAGE MONITOR TORUS, SANDBEDS & RX DRAIN ILEAKAGE MONITOR TORUS, SANOBEDS & RX DRAIN ILEAKAGE MONITOR TORUS. SANDBEDS & RX DRAIN ILEAKAGE MONITOR TORUS, SANDBEDS & RX DRAIN ILEAKAGE MONITOR TORUS, SANDBEDS & RX DRAIN ILEAKAGE MONITOR TORUS, SANDBEDS & RX DRAIN
[LEAKAGE MONITOR TORUS, SANDBEDS & RX DRAIN ILEAKAGE MONITOR TORUS. SANDBEDS & RX DRAIN ELEAKAGE MONITOR TORUS. SANDBEDS & RX DRAIN ILEAKAGE MONITOR TORUS, SANDBEDS 8 RX DRAIN lRAD PRO SURVEY - DOWN POST TOP OF TORUS
[BAY 1 RP SURVEY AFTER SHIELD BAG REMOVAL IBAY 1 ROV VIDEO
- NOTIFY T. RAUSCH OF BAY 1 SAND BED LINER INSPECT BAY 5 RP SURVEY AFTER SHIELD BAG REMOVAL BSAY 7 RP SURVEY AFTER SHIELD BAG REMOVAL
[BAY 7 ROV VIDEO IBAY 9 RP SURVEY AFTER SHIELD BAG REMOVAL IBAY 9 ROV VIDEO tBAY 13 RP SURVEY AFTER SHIELD BAG REMOVAL tBAY 13 ROV VIDEO
- NOTIFY T. RAUSCH OF BAY 13 SAND BED LINER INSPEC IBAY 15 RP SURVEY AFTER SHIELD BAG REMOVAL J2088524R5 IT 4
13 IOPRF IH25 IPC IBAY 15 RP SURVEY AFTER SHIELD 1 127OCT08 127OCT08I 315 I1I BAG REMOVAL 17:00 17:59 Data Daleata 26JUN08 08:00 LFV Opening Layoutl Sheet 1 ofl1 Run Date 26JUN08 15:58 License Reneral Actiities Oyster Creek Date Revision Checked nAp ed D Primavera Systems, Inc.
1R22
7 Actil~ty DISP SP MILE SUPV jP4WI Acoiwty Ong Early Earl TotI ID.
.D esc riptio n
.D uL S tart F inis Fo_
J28848T 4 1
PFH25 PC AY1 O V IDO 27OCT05 27OT0 315 J208892SRS IT 4
13 OPF 25 BAY 19 RP SURVEY AFTER SHIELD [1 127ocTo8 f27OOT08 315*
S J BAG REMOvAL 117-:00
[17:
J08892R 3
OPRF 5
C 0OV VIDEO i
I i 17:00 17:5
.1L~At.~18I2o21 22,2~26 2936)
I*
- A 1=
BAY 15 ROV VIDEO IBAY 18 RP SURVEY AFTER SHIELD BAG REMOVAL BRAY 19 ROV VIDEO J2-92868R5 T
4 13 OPRF H25 PC BAY 11 RP SURVEY'AFTER SHIELD 1 127OCT0 127OCT08 1315 BAG REMOVAL
____1__11:0 175 J20928R6 T
4 13 OPRF IH25 JPC jBAY 11 ROVVIDEO 1
127CT08 127OCTO8 315 I
117:00 117:59 Y2 0 92867R5 T
4 13 OPRF ýH25 ýPC [BAY 3 RP SURVEY AFTER SHIELD 1
27OCT08 27OCT08 3.15 BAG REMOVAL 17:00 17:5 9 J2092867R6 T
4 13 0PRF H25 PC iBAY 3 ROV VIDEO 1
27OCT08 27OCT08 315 4
133 OPRF H25 PC BAY 17 RP SURV AFTER SHIELD 1 127OCT08 1270CT08 1 315 J2092868R6 4
13 OPRFH25CBAY17 ROy VIDEO 1
27OCTO8 '27OCTO 315
_I I PR BAG! REMOVI
°17:00 17.:59 J288905R6 T
4 13 OPRF"H2PC AY5 ROVVIDEO I 127OCT08 27OCT08 315 ossil I
___° R080519101 K
5 06 tOMMT 02 OPEN & INSPECT C ECK VALVE.
f 2412OC0 0CT08 21 PERFORM IN3 TEST P J
040 0 5 R080519102 K
5.
106 IOMMT I0ý2 PS-ANENCTST 130OCT08
ý30OCT0.8 28 I I i I117:00 11759 I 0201509501 K
5 14 OVC1I CS 1S1-241 TORS PRP NO-1-0049 6
27OCT08 28OCT08 291 12 PIPE 0900 1859 0201509503 K
5 i14 NDE4 CS ISI-241 TONS HOE NO-1-0049 6
29OCT08 30OCT08 280 12"PIPE 19:00 00:59 0201509505 K 5
14 NDE4 CS ISI-241 TORS HOE VT 6
30OCT08 30OCT08 260 01:00 06:59 0201509506 K
5 14 NDE4 CS ISI-241 TORS NDE VT 3
30OCT08 30OCT08 260 07:00 09:59 0201509504 K
5 14 DMW3 CS ISI-241 TORUS PAINT NO-1-0049 8
30OCT08 30OCT08 260 12"PIPE 10:00 17:59 C2015-9505 5-40vM1 CS D
-421 TORE C E
ION 1:0 I 3OCT0
[03NOV08 260
_____0 j
2 ACIJINT 2:00 09:59 0c20742601 IK 5
10 MM535 REM OV-2 E REPLAC 1
03NOV08 103NOV08 630 l___E S
FOR1NSPCTI ON 21:00 20:59 tE 01---!* 6 l j I o, 0
wm C ID 42 REPLA,,C EE PAN CS V-O
-, 1 120 129 o,,08 10 N v o 118
/
I FOR INSPECTION 21:00 112Z59 IBAY 11 RP SURVEY AFTER SHIELD BAG REMOVAL IBAY 11 ROV VIDEO SAY 3 RP SURVEY AFTER SHIELD BAG REMOVAL
[BAY 3 ROV VGDEO
[BAY 17 RP SURVEY AFTER SHIELD BAG REMOVAL IBAY 17 ROV VIDEO IBAY 5 ROV VIDEO I
OPEN & INSPECT C ECK VALVE. PERFORM IN3 TEST P IPOST-MAINTENANCE TEST NISI-241 TORS PRP NO-1-0W49 ITPIPE MISI-241 TORS PRP NQ-1-0049 12PIPE
- ISI-241 TORS NDE NO-1-0049 12PIPE IISI-241 TORS NDE VT IISI-241 TORS NDE VT MISI-241 TORUS PAINT NO-1-0049 12"PIPE 21 REPLACE EXPANSION JOINTS 1535 HEAT TRACE REMOVAL ACTIVITY
=535 REMOVE) REPLACE V-3-41 FOR INSPECTION
=535 LRA (VISUALI INSPECTION OF V3-41
=535 (HARDNESS TESTING) INSPECTION OF V-3-41 I10201742602 K
5 I10 NDE4 I SW 535 LRA (VISUAL) INSPECTION OF V-3-41 16 16 C201742603 J2017426A1 K -*-r 0 NDE4ý 6Oi I SW SW 535 (HARDNESS TESTING)
INSPECTION OF V-3-41 535 REPLACE V-3-41 FOR INSPECTION 04NOV08 05NOV08 1 30 13:06 045 051NOV08I 0NOV0 30) 05:00 205 05NOV08
-06NOV0 0
21:00 12:59 16 M535 REPLACE V-3-41 FOR INSPECTION Oata Date Rue Date 26JUN08 08:00 ILFV Opening Layout 26JUN08 15:586Ucense Renewl Activities Sheet 2 of 16L Oyster Creek I R22 I
n-l I
I Checked I Aprýed
- Prim*v*
- t*m*
Ine
@PrimaveraS tems Inc ys i
I
Ao*hrt j,SP L
s MILE! SUPV P4 WI At t OrIg Early Early Toale ID Descripto Our Start
_Finish
.Floa C201742605-5s 10 OMM2 SW53HEAT TRACENSLLATION 2
06NOV08 3NOV 0
3
_I ACT.
1 3:00 14:58 L
-_J 1
20-17-682 C201768201 K
2..02 OMM3 VRW V16-230 REPLACE VALVE (LRA) l, 02NOV08 02NOV08 134 2
1 RW08:00 08:59 C201768202 K
2 10 OEPP RW V-16-230 INSPECT VALVE 1
02NOV08 02NOV08 137 C201768204 K
2 10 N4O RW V-16-230 VT-3 INSPECTION 4
02NOV08 9
02V08 134 SL NTRNLS0:000 92:59 C201768203 K
07NOV08 07NOV08 I12 1
19:00 1808 0900 09/58 C201"76800 K-ELC LA 6C0 6C0 8
C201768902 K
6 14 OEPP CW V.-33-i INSPECT VALVE INTERNALS 1
02NOV08 02NOV08 185 C2076803 6
__20:00 20:58 C26_769963
___V-3-1 PM I
02NOV08 02NOV08 184 C207690
__________14__
C V-lO 4
O20:00 20:590 C201768904 K
6 14 NDE4 CW V-33-1 VT-3 INSPECTION 4
02NOVB06 N V0 182 S~
~2
]0:00 123:58 R602613101 K
3 05 OMM2 XF AUX TRANS(BANK4) ELECTRICAL 32 25OCT08 26OCTOB 185 TESTS 00O00 07:58 R2026131 K"
3 0*5-AUX XFORMER C8-1332 ERECT 8
25OCT08 25OCT08 144 KSCAFFOLD 00:00 07:59 R20613104 'K 3
05 OMM2 XF AUX XFMR REMOVE BUSS LINKS 16 25OCT08 25OCT08 1
(ISOPHASE) 08:00 23:00 R202613105 K
3 05 OMM2 XF AUX XFMR SUPPORT GROUNDING 3
26OCT08 26OCT08 144 APPLICATION 100:00 02:59 R202613108 K
3 05 DMM2 XF AUX XFMR REMOVE GRD 16 26OCT08 26OCT8 144
.RESISTOR CAGE 03:00 18:59 R202613109 K
3 05 OMM2 AUXXF'MR REPLACE COOLING 8
26OCT08 126-CT08 151 FANS & MOTORS 04ý00 111:59 R202613106 K
3 0
M AUX XFMR SUPPORT GROUNDING 2
2608 REMOVAL 1900 20:59 R
1 3
0 AUX XFMR REINSTALL BUSS LINKS!
8 26OCT082ý7OCT08 44
[R02613103 K
3 16 OMVS SFFAUX XFORMER C8-1332 REMOVE 1 4 29OCT08 129OCT08:409 SCAFFOLD 1:008 13:59 R202613110 K
3 16 SSVS AUX XFMR OPS POST 29OCT08 409
[MAINTENANCE TESTS 1_
140 14:59 R203370001 K
3 07 OMM2 XF SU TRANS. BANK 6 ELECTRICAL 32 01NOV08 1 02N0V08 119 TESTS I11 18_59 1
R203370002 K
3 7
O 2
F SUTRANSBAKN6 REMOVE GRD 16 0INOV08 102NOV08 135 RESISTOR CAGE 11:00 02:59 R203270003 K
3 07 OMM2 XF SIU TRANS SB REPLACE COOLING 8
O1NOV-08 01NOV08 143 FANS 11:00 1859 R203370004 K
3 16 5V5
05NOV08 05NOV08 236 MAINTENANCE TESTS 19 0
- ,!o_
OCT "TNOV 1535 HEAT TRACE INSTALLATION ACT.
IV-16-230 REPLACE VALVE (LRA)
IV-16-230 INSPECT VALVE INTERNALS
§V-16-230 VT-3 INSPECTION IV-16-230 PMT W-33-t REPLACE VALVE (LRA)
NV-33-1 INSPECT VALVE INTERNALS tV-33-1 PMT EV-33-1 VT-3 INSPECTION I
AUX TRANS(BANK4) ELECTRICAL TESTS MAUX XFORMER C8-1332 ERECT SCAFFOLD AMUX XFMR REMOVE BUSS LINKS (ISOPNASE)
AUX XFMR SUPPORT GROUNDING APPLICATION AUX XFMR REMOVE G08 RESISTOR CAGE mAlUX SFMR REPLACE COOLING FANS & MOTORS
[AUXSXFMR SUPPORT GROUNDING REMOVAL AUX XFMR REINSTALL BUSS LINKS
'AUX XFORMER CB-1332 REMOVE SCAFFOLD lAUX XFMR OPS POST MAINTENANCE TESTS SU TRANS, BANK 6 ELECTRICAL TESTS EMU TRANS BAXN 6 REMOVE GIR RESISTOR CAGE MSOO TRANS SB REPLACE COOLING FANS ISO] TRANS SB O9 POST MAINTENANCE TESTS 1R2054006011 P 4
P OMM2 Al VEIFY NEW CABLE AVAILABLE 2
6 JU0'2JN08 3,061 I
126_UN0 FOR P.-37-1 j_
0:
0 05 A
I PERFORM A HIGH VOLTAGE TESE 12 1227OCT0 128OCT08 99 ON CABLE 13-1 j_
20:00 07:59 PERFORMAHIGH VOLTAGE TEST ON CABLE 13-1 Data Date 26JUNO8 08:00 LFV Opening Layout Sheet 3 of 16S Run Date 26JUN08 15:58 LiUcense Renewal Actities Oyster Creek Revision Checked Aproed
©Pnmaaera Systems, Inc.
1 R22 I
I
AcIA*
jDISPSPLjL{tSLPV PWI Purl-Etart J
Early Tsoal L ur LStart Finish Rloat OCT 17.1 1,
20 I
21.
22.
5, 2
50-R208151103 K
6 10 OMVM CW Y-3-14 INSPECT 72" N-INLET 6
25OCT08 26OCT08 158 EX-JOINT 22:00 03:59 R208151104 K
6 10 OMVM CW Y-3-15 INSPECT 72" S-INLET 6
26OCT08 26OCT08 158 EX-JOINT (04:00 09:59 R208151109 K
6 10 OMVh4 CW Y-3-20 INSPECT6 W N-OUTLET 6
26OCT08 26OCT08 158 E -JOINT 10:00 15:58 R268-151,10 K
6 10 OMVM-cW Y-3-21 INSPECT 72" S-OUTLET 6
26O0CT08 26OCT08 158
____EX-JOINT 16:00 21:59 R208151115 K
6 10 OMV0 CW Y-3-29 INSPECT 72"N-OUTLET 6
26OCT08 27OCT08 158
____51 EX-JOINT 122:00 03:59 R208151116 K
6 10 OMVm CW Y-3-30 INSPECT72"S-OUTLET 6
127OCT08 27OCT08 158 R8 1
14EX-JOINT 04:00 09:59 R208151101 K
6 14 OMVM CW Y-3-12 INSPECT 72" N-INLET 6
27OCT08 27OCT08 287 EX-JOINT 17:00 22:59 i~~2 N*NE
_6*JTi*o 35 6
CW Y-3-13 INSPECT 72" S-INLET 6
27OCT08 28OCT08 283 IEX-JOINT 21:00" 02:59 17K 4CW 1 INSPECT 60" N-OUTLET 8
27OCT08 28OCT08 287 X-JoINT 23:00 04:59 RV CW Y-3-19 INSPECT 60" S-OUTLET 8
28OCT08 28OCT08 283 R208151107 K
6 14 jOVM CW Y-3-12 INSPECT 72" N-OUTLET 6
28OCT08 28OCT08 287
__________EX-JINSET 050705
_ _EX-JOINT 02:00 04:59 R2085105 K
6 14 OMVMI CW Y-316 INSPECT 70" N-INLET 8
29OCT08 28OCT0 "268 K
6 1E OMVMJNT0:00 13:58 R0815C Y-INSPECT 7XPASINLET 6
29OCT08 29OCT08 226 3EX-JOINT 0:00 13:59 R208151113 K
6 14 OMVM CW Y-3-27 INSPECT 0" N-O UTLET 6
29OCT08 29OCT08 265 EX-JOINT 01:00 19:59 R208151114 K
6 14 OMVM CW Y-3-23 INSPECT 60"AS-OUTLET 6
29OCT08 29OCT08 285 2083513 K
6.EX-JOINT 14:00 19:59 R208151105 Ký 6
- 14.
OMVM CW Y-3-16 INSPECT72IN-ULET 62OCT08 30OCT08 285
_______EX-JOINT 20:00 013:59 R208151118 6
14 IOMVM~
OW Y-3-12 INSPECT 72" S-OUTLET 8
30OCT08 30OCT08 2659
........... -EX-JOINT 02:00" 130:59 R208151111 K
6 10 OMVMT CD Y-2-82 INSPECT EXPANSION JOINT 1
29OCT08 29OCT08 225 13:00 13:59 R2083515081 K 6
10 OMV10 CO Y--2-3 INSPECT EXPASION JOIT 1
29OCT08 29OCT08 2265 13:00 13:59 R208351517 K
6 10 OMVM CO Y-2-10 INSPECT EXPANSION JOINT 1
29OCT08 29OCT08
.22 I
16:00 16:59 R20851102K 81 OmV CO Y-3--32 INSPECT EXPASION JOIT 1
30OCT08 29OCT08 222]
02__1:00*
17:59 R208351505 lK 6
10 OMVm CO Y-2-82 INSPECT EXPANSION JOIN 1
29OCT08 29OCT08 221 1R20&351501 IK 6
10 OMVM CE Y-2-10 INSPECT EXPANSION JOINT 1
28OCT08 29OCT08 221 16:00 18:59 MY-3-14 INSPECT 72" N-INLET EX-JOINT MY-3-15 INSPECT 72" S-INLET EX-JOINT
- Y-3-20 INSPECT 60" N-OUTLET EX-JOINT EY-3-21 INSPECT 6(0 S-OUTLET EX-JOINT UY-3-29 INSPECT 72" N-OUTLET EX-JOINT
- Y-3-30 INSPECT 7" S-OUTLET EX-JOINT NY-3-12 INSPECT 72" N-INLET EX-JOINT
.EY-3-13 INSPECT 72" S-INLET EX-JOINT UY-3-18 INSPECT 60" N-OUTLET EX-JOINT MY-3-19 INSPECT 60" S-OUTLET EX-JOINT UY-3-27 INSPECT 72" N-OUTLET EX-JOINT IY-3-28 INSPECT 72" S-OUTLET EX-JOINT
- Y-3-16 INSPECT 72" N-NLET EXJOINT
- Y-3-17 INSPECT 72" S-INLET EX-JOINT UY-3-22 INSPECT 60" N-OUTLET EX-JOINT
- Y-3-23 INSPECT 60" S-OUTLET EXJOINT
- Y-3-31 INSPECT 72" N-OUTLET EX.JOINT EY-3-32 INSPECT 72" S-OUTLET EX-JOINT IY-2-8 INSPECT EXPANSION JOINT IY-2-9 INSPECT EXPANSION JOINT 1Y-2-10 INSPECT EXPANSION JOINT IY-2-11 INSPECT EXPANSION JOINT IY-2-12 INSPECT EXPANSION JOINT IY-2-13 INSPECT EXPANSION JOINT IV-3-31 VISUAL INSPECTION OF V-3-31 (C-NORTH)
IV-3-31 NOE VT-3 INSPECTION R208974201 K
6 14 NDE4 1 CW V-3-31 VISUAL INSPECTION OF 2
29OCT08 129OCT08 I 280 R28!C_
V-3-31 (C-NORTH).
j 08:00 09:59 K2089V4202 CW NOE VTNSPECTION 1
02NOV08 02NOV08 172 I ___
j 22:00 122:59 I 1
122:00 1 2 1
I Data Date 26JUN58 08:00 1LFV Opening Layout Sheet 4 of 161 Run Date 26JUN08 15:58 License Renewal Activities Oyster Creek Date Revision Checked roved 0 PHmaverm Systems, Inc.
1R22
A sPI.
sI LEI suPv P4 Awlc Avily 10o9 1 Early Eart*y Total R206o99701 K
6 10 OMM3 CW V-3-793 INSPECT VALVE 1R22 IRA 4
25OCT08 25OCT08 196
... -..-.-.1---16:00 19:59 iR208999702 K
6 14 NOE4 CW V-3-793 PERFORM INTERNAL 1
25OCT08 25OCT06 349 4]
INSPECTION
_____20:00 20:59 IR208999704 K
6 1'4* NDE4 CW V-3-793 NDE 'IT-3 INSPECTION 4
25OCT08 26OCT08 349 LICENSE RENEWA 21:00
. 00:59 IR208999703 K
31OCT08 31OCT08 64 I
I
___-L----__
1 J
.°I.-12:00 12:59 2090021.
R209002102 K
6 114 OEPP CW fV-3-799 PERFORM VISUAL 1
29OCT08 29OCT08 292 INSPECTION 05:00 05:59 IR209G02104 K
6 14 NOE4 CW tV-3-799,NOE VT-3 INSPECTION 429OCTO8 29OCT08 292 1/06:00 09:59 R209002101 R
06 OMM3 MI V-3-799 INSPECT VALVE 1 R22 1OCT08p1OCT08 228 ILRA 14 17:59 1:0 I 22:00 122:9 I
_'JURA 19:00 20:59 R209004304 K
5 14 NOE4 SW IV-3-986 VT-3 INSPECTION 1
03NOV08 03NOV08 85 I I 21:00 21:59 R209004301 K
14 OMM3 sw v-986 INSPECT VALVE 1R22 LRA 8
03NOV08 04NOV08 85 I 1 22:00 0°5,59 R209004303 5
114 OMM3 SW
-6PMT 1
07NOV08 07NOV08 6
j19:00
.19:58 5.
26 I 27.
2R.
26.
U6.
1_1Q_!1. 12. 13. 14, 11 EV-3-793 INSPECT VALVE 1R22 URA IV-3-793 PERFORM INTERNAL INSPECTION
6 10 OMM3 CW V-3-112 INSPECT VALVE 1PR22 LRA' 8
25OCT08 26OCT081 183 K
21:00
'04:59 R20005702 K
6 I0 OEPP CW V-3-112 INTERNAL INSPECTION 2
26OCT08 26OCT08 I 186 05:00 06ý59 1
R205704 K
6 14 NDE4 CW V-3-112 VT-3 INSPECTION 1
260CT08 26OCT08 366 07:00 07:59 R209005703 K
6 14 OMM3 ON V-3-112 PMT 1
02NOV08 02NOV08 184
- ,:,0.:
2059 IV-3-799 PERFORM VISUAL INSPECTION
- V-3-799 NDE VT-3 INSPECTION IV-3-799 INSPECT VALVE 1R22 LRA IV-3-799 PMT IV-3-986 INTERNAL INSPECTION LRA IV-3-986 VT-3 INSPECTION IV-3-996 INSPECT VALVE 1R22 LRA IV-3-986 PMT IUV-3-112 INSPECT VALVE 1R22 LRA IV-3-112 INTERNAL INSPECTION IV-3-112 VT-3 INSPECTION IVo3-112 PUT UV-3-32 NOE VTSPECTION OF V-3-32 (1C SOUTH EV-3-32 NDE VT-3 INSPECTION IWELD NECK FL4ANGE VT-i INSPECTION V1-ItT7 IV-1-177 PREP PIPE FOR UT MV-1-177 NOE PERFORM UT IV-1-177 CLOSE CHILOED ARA2163525 rST645.6.017 IC SWITCHGEAR INSPECTION POINTS R209006001
ýK 6
14 NDE4 I CW IV.3-32 NOE VTSPECTION OF 14 129OCT08 129OCT08 274 V_3-32 (C SOUTH 08:00 11:59 R209006002IK
!6 114 NE4 cW V-3-32 HDE VT-3 INSPECTION1 4
129OCT08 29OCT0 8 274 I
I.
12:00 115:59 2991382 R208138201 K 4
10 N084 MSVIMSO1 WELO NECK FLANGE VT-i 6
29OCT08 30OCT08 I 192 i
i 1R.0938201 K
4 10 NDE4 MSV MSO WELD NECK FLANGE VT-1 6 29CT08 3o0CT08 192 1 ___ ___
I INSPECTION V-1-177 23:00 04:59 R209138202 K
4 10 OMW3 MSV MSD V-1-177 PREP PIPE FOR UT 4
30OCT08 3DOCT08 192 05:00 08:59 R209138203 K
4 10 NDE4 MSV MSD V-1-177 NOE PERFORM UT 6
30OCT08 30OCT08 192 I
09:00 14:59 R209138204 K
4 13 jNOE4 MSV MSD V-1lT7 CLOSE CHILDED AR 1
30OCT081 30OCT08 262 2003471 A2163525 15:00
'15:59 R209347101 T
3 05 OMI3 ST2 AS ST045.6.017 lC SWITCHGEAR 4
27OCT08 1270CT08 123 INSPECTION POINTS 20:00 23:59 t
2"M313 R209351301 4
13 OMM M-8 17 TORUS MONORAIL 4
28OCT08 128OCT08 302
! 13 I20 PC INSPECTION 03:00 06:59 1
IM-888-17 TORUS MONORAIL INSPECTION Data Date 26JUN08 08:00 LFV Opening Layout Sheet5 of16 Run Date 26JUN08 15:58 License Renewal Activies Oyster Creek Date
© Primavera Systems, Inc.
1R22 Ano.oved
AcS*
DISP SPL sMILESUV P4+tFj Actvty Orig E
Early Total ID J
LI Description Our IStart nish L Float 2094317 RZO9431701 T 4
13 I0 MS TV-IINS03-A(.
GL8-4 JNSTAIR 8 C°-
30OCT08 267 LEA TEST.1:0 15 R20431702 K
3 SSV5 MS -V--1-7 SUPPORT VALVE STROKE 1
29OCT08 29OCT08 283
__/_J 181:00 18:59 j.
2094450 R~Ol9.4-00 1
3 1
0 07 DOM13 ST2 A4 1ST64.50 1DSWlTCHGEAR 2
01NOV08 101NOV08 141 J__-*
1 I
INSPECTION POINTS
/
11:00 112ý59 2094520___
R209452001 T
2 14 OMI1 NI SRM/1RM JUMPERIN AND 12
[02NOV08 102NOV08 1 171 MEGGER (IR) TESTS 10o00 121:59
- R209452002 K
2 14 OMIl NI CABLE RESTORATIo N AND PMT 4
1 08NO0 8,08NOV08 31 S118:00 21:59 1112 214 OM54 I NI SRM CHARTEST 2400-SMI-362303 5
!04NOV08 104NOV08 181 II I
I (OUTAGE) 10600 110:59 3
4 t
R209462303 P
4 P
OMW1 187 BAY 9 SET-UP, STAGE TOOLS. AND 16 26JUN08 27JUN08 760.
.EQUIP 0800 15:59 R2094K2301 K
4 13 OMW PC BAY9 REMOVE FLOOR PLUGS 8
27OCT08 28OCT08 I 224
_______30 I
17:00 L00:59
.1___
R209462302 K
4 13 OMS
[PC BAY 9 FIREWATCH FOR PLUG 92 27OCT08 31OCT08 224 REMOVED 17.00 1 2 5 9 2
R209462305 K
4 13 OMwi PC BAY 9 REMOVE SHIELD BAGS 8
28OCT08 28OCT08 240 I
FROM TUNNEL 01:00 08:59 R209462304 K
4 13 OMW I PC BAY9 CSP ACTIVITY 60 28OCT08 30OCT08 240 0:0 20:59 R209462306 K
4 13 NDE4 PC BAY 9 NDE PERFORM VT 8
28OCT08 28OCT08 240 INSPECTIONS OF AREA 09:00 16:59 R209462311 K
4 13 OMVS PC 187 MODIFY GRATING PLATFORM 8
28OCT08 28OCT08 92 (CONT) 08:00 16:59 R209462307 K
4 13 OMW1 PC BAY 9 COATING 24 28OCT08 29OCT08 268 REAPAIR(CONTINGENCY) 17:00 1659 R209462312 K
4 13 NDE4 PC 17 (CM-1) PERFORM UT 12 28OCT08 29OCT08 268 INSPECTIONS 17:00 04:59 R209462309 K
'4 14 OMW1 PC BAY 9 DEMOB & RESTOW TOOLS 8
29OCT08 29OCT08 269 I
AND EQUIP 05:00 12:59 R209462308 K
4 14 OMW1 PC BAY9 REINSTALL SHIELD BAGS 12 29OCT08 30OCT08 269 13:00 00:59 R209462310 K
4 14 OMW1 PC BAY9 REINSTALL FLOOR PLUG 8
i30OCT0 30OCT08 269 01:00 08:59 R209546703 P
14 PToMWI 187 BAY 17 SET-UP, STAGE TOOLS.
A18 28JU 08 59UN0 1 70 AND________________
EQUIP 08:0 315:59 K
4" 13 PC BAY 17 REMOVE FLOOR PLUG 8
27OCT08 28OCT08 224 R209546702 K
4 13 O149 PC BAY 17 FIREWATCH FOR PLUG 92 27CT08 3 1OCT08 224 REMOVED 17:00 12:59 BY-1-7 1NSO3-A); GL 88-14 INST. AIR LEAK TEST.
IV-1-7 SUPPORT VALVE STROKE IST645.6.017 ID SWITCHGEAR INSPECTION POINTS MSRMIRM JUMPERIN. AND MEGGER (IR) TESTS
@CABLE RESTORATIO N AND PMT USRM CHAR TEST 2400-SMI-3623.03 (OUTAGE)
UBAY 9 REMOVE FLOOR PLUGS SAY 9 FIREWATCH FOR PLUG REMOVED IUBAY 9 REMOVE SHIELD BAGS FROM TUNNEL mEAY S CSP ACTIVITY UBAY 9 NDE PERFORM Vr INSPECTIONS OF AREA
- 187 MODIFY GRATING PLATFORM (CONT)
I BAY 9 COATING REAPAIR(CONTINGENCY)
M187 (CM-I) PERFORM UT INSPECTIONS IIIBAY 9 DEMOB & RESTOW TOOLS AND EQUIP 8BAY 9 REINSTALL SHIELD BAGS EBAY 9 REINSTALL FLOOR PLUG 1BAY 17 REMOVE FLOOR PLUG EIIIIIIIIIIIIAY 17 FIREWATCH FOR PLUG REMOVED mEBAY 17 CSP ACTIVITY UBAY 17 REMOVE SHIELD BAGS FROM TUNNEL IBAY 17 NDE PERFORM VT INSPECTIONS OF AREA IIIBAY 17 COATING REAPAIR(CONTINGENCY) jR2095qV4670 R209546705 R 09546706 JR209546707 I%
4 13 O,*IVV PCL K
4 13 OMWl1 PC RAY 17
-~o ACT.IVITY{
BAY 17 REMOVE SHIELD BAGS FROM TUNNEL 80 11:00 22:59 28OCT08 I28OýCT08t 238 11:00 18:59 K
4 13 INDE4 4
13 omWI PC PC BAY 17 NDE PERFORM VT IINSPECTIONS OF AREA BAY 17 COATING REAPAIR(CONTINGENCY) 5 24 28OCT08 28OCT08 259 19:00 123:59 I
29OCT08 129OCT08 r 261 00:00 123:59 Data Date 26JUN08 08:08 LFV Openi1g Layout Sheet 6 of 16' Run Date 26JUN08 15:58 _icerse Renemal AcEtviR Oyster Creek Date Revision C Primavera Systems. Inc.
.1R22 ved
Activity DISP to R209546711 jK R209546708 1K R209546710 K
R209546803 P
R209546801 K
R209546602 K
R209546804 K
R209546805 K
R209546806 K
R20954(3807 K R209546812 K
R209546808 K
R209546810 1K R209546809 1K SPIL 4
4 4
4 MILE 13 13 SUPV NDE4 omw1 OMWIN OM~W1 P4 SWIN PC PC PC PC Activity Desc...
_*_p 187 (CM-1) PERFORM UT IN BAY
-17 BAY 17 REINSTALL SHIELD BAGS BAY 17 REINSTALL FLOOR PLUG BAY 17 DEMOB & RESTOW TOOLS AND EQUIP Ong Early
_.Our Start 6
29OCT08 00:00 1
29OC T08 06:00 8 129OCT08 18:00 8
30 T08 Early Finish 29OCT08 05:59 29OCT08 17:59 30OCT09 01:59 30OCT08 09:59 Total Root 259 259 259 268 11
'. 10 I 20.1 "
I. =,
i I..
P DM8 187.
I4 4
4 4
4 4
4 4
4 I p 13 13 13 13 13 13 13 13 OMW1 13OMW1 P
13OMW1 P
13NDE4-P 13OMW1 P
NDE4 OMWI 187 PC PC PC PC PC PC PC PC BAY 7 SET-UP. STAGE TOOLS. AND 16 26JUN08 27JUN08 I 760 EQUIP 08:00 15:59 BAY 7 REMOVE FLOOR PLUG 8
27OCT08 28OCTO8 224 17:00 00:59 BAY 7 FIREWATCH FOR PLUG 92 27OCT08 31OCT08 224 REMOVED 17:00 12:59 BAY 7 CSP ACTIVITY 60 28OCT08 30OCT08 248 01:00 12:59 BAY 7 REMOVE SHIELD BAGS-8 28OCT08 28OCT08 248 FROM TUNNEL 01:00 08:59 I.
28OCT08 28OCT08 260 INSPECTIONS OF AREA 09:00 16:59 BAY 7 COATING 24 28OCT08 29OCT08 268 REAPAIR(CONTINGENCY) 17:00 16:59 187 (CM-1) PERFORM UT 12 28OCT08 29OCT08 260 INSPECTIONS 17:00 04:59 BAY 7 REINSTALL SHIELD BAGS 12 29OCT08 290CT08 260 05:00 16:59 BAY 7 REINSTALL FLOOR PLUG 8
29OCT08 30OCT08 "260 o
17:00 00:59 BAY 7 DEMOB & RESTOW TOOLS B
30OCT08 30OCT08 269 AND EQUIP 01:00 08:59 4
13 4+141 OMW0 OMWl PC!
IN187 (CM-1) PERFORM UT IN BAY #17 IBAY 17 REINSTALL SHIELD BAGS OBAY 17 REINSTALL FLOOR PLUG UBAY 17 DEMOB & RESTOW TOOLS AND EQUIP EBAY 7 REMOVE FLOOR PLUG 9
BAY 7 FIREWATCH FOR PLUG REMOVED I
Il
- SAY 7 CSP ACTIVITY
- BAY 7 REMOVE SHIELD BAGS FROM TUNNEL IIBAY 7 NOE PERFORM VT INSPECTIONS OF AREA I81EAY 7 COATING REAPAIR(CONTINGENCY)
I187 (CM-1) PERFORM UT INSPECTIONS 1BAY 7 REINSTALL SHIELD BAGS IUBAY 7 REINSTALL FLOOR PLUG
=aAY 7 DEMOB & RESTOW TOOLS AND EQUIP IBAY 1 REMOVE FLOOR PLUG EBAY 1 HOURLY FIREWATCH FOR PLUG REMOVED EE lNAY 1 CSP ACTIVITY
- 8AY I REMOVE SHIELD BAGS FROM TUNNEL mBAY 1
NOE PERFORM VT INSPECTIONS OF AREA mE111BAY 1 COAT1NG REAPAIR(CONTINGENCY) m187 (CM-1) PERFORM UT ON THE SHELL m1BAY 1 REINSTALL SHIELD BAGS IBAY 1 REINSTALL FLOOR PLUG EBAY 1 DEMOB & RESTOW TOOLS AND EQUIP UBAY 11 REMOVE FLOOR PLUG R209546*03 P
14 IP'om
-l 187 BAY1 SET-UP, STAGE TOOLS ANDI 16 26JUN08 27JUN08 710
________I__
I___
EQUIP 108:001155 R209546901 K
4 13 OMW1 PC BAY I REMOVE FLOOR PLUG 8
27T08201280CT08 I 24_
I17.00 I00:59 R209546902 K
4 D
oMw,1 PC BAY 1 HOURLY FIREWATCH FOR BE 272OCT08 30OCT08 259 III__PLUG REMOVED 17:00 10:59 R209546904 K
4 13 *M*-1 PC BAY 1 CSP ACTIVITY 60 2280CT08 30OCT08 238 11:00 22:59 R209546905 K
4 13 0101 PC BAY 1 REMOVE SHIELD BAGS 8
28OCT08 28OCT08 238 FROM TUNNEL 11:00
. 18:595 R209546906 K
4 13 NDE4 PC BAY 1 NDE PERFORM VT 8
28OCT68 29OCT08 258 INSPECTIONS OF AREA 19:00 02:59 R209546907 K
4 13 OMW0i PC BAY 1 COATING 24 29OCT08 30OCT08 258 REAPAIR(CONTINGENCY) 0 03:00 02:59 R209546912 K
4 13 NDE4 1
iPC 187 (CM-1) PERFORM UT ON THE 12 29OCT08 29OCT08 258
___SHELL 03:00 14:59 R209546908 K
4
,13 OMW08 PC BAY 1 REINSTALL SHIELD BAGS 12 29OCT08 30OCT08 258 I______
I
/
_"15:00 02:59 JR209546910 K
4 14 DOM01 PC BAY 1 REINSTALL FLOOR PLUG 8
30OCTOB 30OCT08 2*9
_ _t
-1
_i0 3 :0 0 1 0 :5 99 m
R209546909 K
4 14 DM081 PC BAY 1 DEMOB & RESTOW TOOLS 8
30OCT08 30OCT08 259
___ \\
I AND EQUIP 11:00 18:59
-20:
,954.71.
- L :!
iR209547101 K
4
°13 MW8 IPC BAY11 REMOVE FLOOR PLUG 8
27OCT0I 28OCT08 216 Data Date 26JUN08 08:00 ILFV Opening Layout Sheet 7 of 168 Run Date 26JUN08 15:58 Uceru Reneeal Activite Oyster Creek Date Revision C
hecked roe Q Pri.avera Systeors. Inc.
1IR22
Acbivity DlI ID R.209547103 P
R.209547102 K
R.209547104 K
P.26947105 K
'R209547106 K
IR-209547-107 K
- R209547111 K
PR2095-47108
-K P.209547110K iR.209547109
-K 203VA lR209564731 P SP SPIL 4
4 4
4 4.
4 4
4 4
MILE P
13 13 13 13 13 SUPV P OMW1 OMWI OMW1 OMW1 NDE4 OMWI SWIN 187 PC PC PC PC PC PC Activity Description BAY 11 SET-UP, STAGE TOOLS, AND EQUIP BAY 11 FIREWATCH FOP. PLUG REMOVED BAY 11 CSP ACTIVITY BAY 11 REMOVE SHIELD BAGS PROMTUNNEL BAY 11 NDE PERFORM VT INSPECTIONS OF AREA BAY 11 COATING REAPAIR(CONTINGENCY) 187 (CM-i) PERFORM UIT IN BAY
- 11 BAY I1I REINSTALL SHIELD B3AGS SAY 11 REINSTALL FLOOR PLUG BAY 11 DEMOB & RESTOW TOOLS AND EQUIP TORUS DOP TEST NEPA UNITS org Early Our Start 16 27OCT08 211:00*
92 28OCTO8 01:00
- 60.
28OCT08 01:00 8
28OCTO0 01:00 5 28OCT08 09:00 24 2SOCT08 14:00 20 28OCT08 14:00 Early Finish 28OCT08 12:59 1C-8 20:59 30OCT08 12:59 28OCT08 08:59 28OCT08 13:59 29OCT08 13:59 29OCT08.
09:59 Total
-Float1.
o1 202_
296 216 248 248 255 271 255 25 q4.. 72q.2W1 21 13 {NDE4' 13 {OMW1 13 ~OMWI 14 1
4 JOMW.
ý4 P
IOIMM3 PC 187 12 29OCT08 29OCT08 1 255 10:00 21:59 8
29OCT08 30OCT08 255 22:00 05:59 8
30OCT08 30OCT08 2864 06:00 13:59 8 26JUN08 28JUN08 7688 08:00 15:59 8
04SEP08 04SEP08 368 08:00 15:599 12 06OCT08 07OCT08 1688 I08:00-11:59 4
13OCT08 13OCT08 460 8:OO" 111:59 MBAY 11 SET-UP, STAGE TOOLS. AND EQUIP
ý BAY 11 FIREWATCH FOR PLUG REMOVED 8AYl 1 CSPACTIVITY EBAY 11 REMOVE SHIELD BAGS FROM TUNNEL EBAY 11 NDE PERFORM VT INSPECTIONS OF AREA IBAY 11 COATING REAPAIR(CONTINGENCY) inB87 (CM-1) PERFORM UT IN BAY #11 mO1AY II REINSTALL SHIELD BAGS EBAY 11 REINSTALL FLOOR PLUG EBAY 11 DEMOB & RESTOW TOOLS AND EQUIP 1TORUS REMOVE NORTH FLOOR PLUGS P.
P.
P.
209564729 P
6 P
OMVS 187 TORUS MOBE&
20954723 P
6 P
0vS 187 RAMP UP FABRIC PROTEC. COVERI 209564703 P 6
P OMVS 187 NORTH TORUS P1 ERECT HANDRAIl 2095647D4 P
8 P
OMVS 187 SOUTHTORUS-P ERECT HANDRAIl 209564701 T
4 13 OMVC 310 PC TORUS REMOVE PLUGS 209564717 T
4 14 OMVC 330 PC TORUS PROVIDE 209564705 iT 4
13 OMVM1 31N PC TORUS REMOVE MANWAY COVER Z209564720 T
4 13 OMVM 330 P OU EMT 1209594702 T 4
13 OMVC 310 PC TORUS REMOVE M209564707 iT 4
13 OMVS 310 PC TORUSPROPER HANDRAIL 20564725 T 4
13' OMWi 310 PC TORUS INSTALL POWER R209564708 T
4 13 OMVS 310 PC TORUSPROPER HANDRAIL R20
.9584709 T
4 13 ROVi 330 PC TORUS INSPECT SET UP GANTRY GATE FLANGE LUG CB-1258 L
UG C8.1259 NORTH FLOOR FIRE WATCH 6
4 186 13OCTO8 08:00*
72OCT08 117;i00o 13OCT08 13:59 127OCT08 20:59 04NOV08 10:59 458 274 147 NORTH TORUS 4
ACTIVITY 32-27OCT08 27OCTO8 19:00 27OCT08 21:00 27OCT08 22:59 29OCT08 02:59 304 274 ORUS ITORUS REMOVE NORTH TORUS MAAMWAY COVER TORUS PERMIT ACTIVITY PROVIDE FIRE WATCH SOUTH PLUGS 1 4 28ORCT08B 2-96 00:59 C8-126 TEMPC C8-126 SPEC.
0 ERECT 6
270CT08 28OCT08 306 21:00 02:59 RF RARY -
4 27CT08 28OCT08 274 21:00 00:59
._I I ERECT 4
28OCT08 280CT08 1. 296 101:00 04:59 WATER B
28OCT08 28OCT08 282 01:00 08:59 ITORUS REMOVE SOUTH PLUGS UTORUS PROPER G8-1260 ERECT HANDRAIL ITORUS INSTALL TEMPORARY POWER IrTORUS PROPER CZ-1261 ERECT HANDRAIL OTORUS INSPECT. BELOW WATER LINE CAMERA INSPEC.
ETORUS COATING INSPECTION 1TORUS REMOVE TEMP POWER EQUIP UTORUS REMOVE SOUTH TORUS MANWAY COVER ISOUTH TORUS PLUG REMOVE HANDRAIL C8-1259 S
FiP209564722 T
IRP209564727 T
R209564706
!R209564714 P
LINE CAMERA IN 4
13 NDE4 1320 F4ý3{MW f311-PC TORUS COATING INSPECTION 8
28OCT08 PC TORUS REMOVE TEMP POWER 8
28OCT08 EQUIP 101:00 PC TORUS REMOVE SOUTH TORUS 4
28OCT08 MAN WAY COVER 07:00 187 SOUTH TORUS PLUG REMOVE 3
28OCT08 HANDRAIL C8-1259 09:00 28OCT08 274 08:59 28OCT08 282 08:59 28OCT08 296 10:59 28OCT08
.373 10:59 4
6 13 P
OMVS 31S
~Data Date 26JUN08 08:00 LFV Opening Layout Sheet 8 of 16 Run Date 26JUN08 15:58 License Renewal Actvies Oyster Creek Reision (9© Primavera Systems, Inc.
1R22
Ac64Vtty DISP SPL MILE SUPV P4
,WID Activity D
Oug Early Early Total ID j 1
Description Dur Start Finish Float R20956-7 T
4 13 OMW3 320 PC TORUS COATING REPAIR 8
28OCT08 28OCT08 274 09:00 16:59 R2095647"28 T
4 13 OMM3 PC TORUS VENT HEADER INTERNAL 35 28OCT08 29OCT08 263 INSPECTION 09:00 19:59 R209564710 T
4 13 0MWM 3XI PC TORUS CLOSE OUT INSPECTION 4
28OCT08 28OCT08 274
_17:00 20:59 R209564721 T
4 13 SSVS 3X1 PC TORUS TORUS CLOSE-OUT 2
28OCT08 28OCT08 274 INSPECTION 19:00 20:59 R209564712 T
4 13 OMVM 3X1 PC TORUS INSTALLS. MANWAY 6
28OCT08 29OCT08 274 COVER 21:00 02:59 R209564711 T
4 113 OMVM 3XI PC TORUS INSTALL N. MANWAY 6
29OCT08 29OCT08 274
/COVER 03:00 08:59 R209504713 P
6 iP OMVS 187 NORTH TORUS PLUG C8-1258 4
29OCT08 29OCT08 363 REMOVE HANDRAIL 09:00 12:59 R209564718 T
4 14 OMVS 3X1 PC TORUS HATCH C8-1260 REMOVE 3
29OCT08 29OCT08 282 HANDRAIL 09:00 11:59 R209564724 T
4 14 0vll 3X1 PC TORUS MAINWAYS LLRT DOUBLE I
29OCT08 29OCT08 284 SEAL 665.5.006 09:00 09:59 R209564715 T
4 14 OMVC 3X1 PC TORUS INSTALL NORTH FLOOR 4
29OCT08 29OCT08 282 PLUG 12:00 15:59 R209564719 T
4 14 OMVS 3X1 PC TORUS HATCH CB-1261 REMOVE 4
04NOV08 04NOV08 147 HANDRAIL 03:00*
06:59 R209564716 T
4 14 OMVS 3X1 PC TORUS INSTALL SOUTH FLOOR 4
04NOV08 04NOV08 147 PLUG 07:00' 10:59
_R209564735 K
4 16 OMVC PC TORUS DEMOBE & STORE 8
04NOV08 04NOV08 261
-____ I I.
GANTRY 11:00 18:599 R209579001
ýT 14 11T2 OMM:3 1 RR IRECIRC PUMP MONO RAIL HOIST -
8 I 28OCT08 28OCT08 L 279
~
REFUEL OUTAGE 07:00 14:59 i-05O752-T-4 1 2
.164
-RR M-262-1 NDE MTHOISTHOOK 2
128OCT08 28OCT08 27 20960101 K 4
ll 3 NDE4 ýEL IS*
_SIB NOE UITEON WHELLIN 1024 J01T J2OCT08 T283 JSANDBED REGION 109:00 108:59
- 1::
.V>u.
t<.mJ:
.IL.i8~10.L8 11 12 22 14 212 OTORUS COATING REPAIR IM TORUS VENT HEADER INTERNAL INSPECTION ITORUS CLOSE OUT INSPECTION (TORUS TORUS CLOSE-OUT INSPECTION ETORUS INSTALL S. MANWAY COVER ITORUS INSTALL N. hMOAWAY COVER INORTH TORUS PLUG C8-1258 REMOVE HANDRAIL lTORUS HATCH C8-1260 REMOVE HANDRAIL TORUS MANWAYS LLRT DOUBLE SEAL 665.5.006 ITORUS INSTALL NORTH FLOOR PLUG ITORUS HATCH CB-1261 REMOVE HANDRAIL STORUS INSTALL SOUTH FLOOR PLUG ETORUS DEMOBE & STORE GANTRY IIRECIRC PUMP MONO RAIL HOIST - REFUEL OUTAGE IM-262-1 NDE MT HOIST HOOK 5IIS-187 SB6D NDE UT OW SHELL IN SANDBED REGION i1187 C8-1262 ERECT UT EXAM i
187 NDE UT OF UPPER DRYWELL OUT INSPECT. C8-1262 REMOVE SCAFFOLD
ý INSPECT TiJRBINE PEDESTAL HOW SHIELD WALLS STRUCTURAL INSPECTION I
HEATER BAY STRUCTURAL INSPECTION DRY WELL STRUCTURAL INSPECTION MTORUS STRUCTURAL INSPECTION VBIO-SHIELD C8-1269 ERECT SCAFFOLD 10 128OCT08 28OCT08 263 12:00 21:59 1
'C 187 NOE UT OF UPPER 24 128OCT08 129OCT08 263 DRYWELL 22:00 121:59 PC UT INSPECT. C8-1262 REMOVE 5
1 06NOV08 07NOV08 205
- SCAFFOLD
_2200 0259 6
INSPECT TURBINE PEDESTAL 481265CT08 27OCT08 330 12200 21:59 M
OW SHIELD WALLS STRUCTURAL 1 4 131OCT08 21OCT06 221 JINSPECTION 111:00 14:59 24 125OCT08 126OCT08I 371 03:00 02:59 DRY WELL STRUCTURAL 32 27OCT08 29OCT08 155 INSPECTION 17:00 00:9 TORUS STRUCTURAL INSPECTION 12 27OCT08 26OCTD8 175 17:00 04:599 8
128OCT08 129OCT08 [ 160 20:00" 03:59 1
Run Date 26JUN08 88:00ILFV Opening Layout 26JUN08 15:58ILJcense Renewal Activites Oyster Creek 1R22 S
Darte 1
Revision i
Checked I
Approved Sheet 9 of 18!
U Pnrmavera Systems, Inc.
Actiity DISP SPL MILE SUIPV P4 SWIN Actaity Ong Early Early Total ID l
Descdption Dur Start Finish Flat R209732105 K
4 13 OMVS PC 810-SHIELD C8-1268 REMOVE 12 29OCT08 29OCT08 155 I/01:00 12:59 R209732104 K
4 13 OM(VS PC 187 C8-1268 ERECT BIO-SHIELO 24 30OCT08~ 31OCT08 136 4
04:00 03:59 R209732107 K
4 18 OMVS PC 187 REMOVE SCAFFOLD C8-1269 1
09NOV08 T09NOV08 1 147 1 /
__________12:00 112:59 l____
R209868306 1
K 12 16 OMW3 DV 221 PREPARE AREAS AND 32 27OCT08 28OCT08 424 APPLY CAVITY COATING 15:00 22:59
____oo __
114..
j 22 00*
10: 59.::
R210072902 IT 1
[SSV5{
1M1 OR-814-14 FIRE WATCH 8
27OCT08 28OCT08 320
-l/
5 I ]
M I.
f
- 00 05:5!
2102*6S5 R210269505 K
2 XX OEPP RV 187 ENGINEERING SUPPORT 8
26JUN08 26JUN08 4,516 ACTIVITY 10:00 17:59 R210269503 P
6 P
OMVS 187 CAVITY DRAIN C8-1275 ERECT 1
22SEP08I 22SEP08 279 SCAFFOLD 08:00° 08:59 R210269501 P
6 P
OMM3 187 PRE-OUTAGE INSP. OF RX CAVITY 4
06OCT08 08OCT08 195 DRAIN LINE.
09:00*
12:59 R210269504 P
6 P
OMVS 187 CAVITY DRAIN C8-1275 REMOVE 4
28OCT08 28OCT08 372 08:00 11:59 R2102695 T
12 OMM3 RV DURING OUTAGE INSP. OF RX I
29OCT08 29OCT08 245 CAVITY DRAIN LINE.
02:00 02:59 R210269506 T
12 12 OEPP RV 187 ACTIVITY 02 ENGINEERING 1
29OCT08 29OCT08 282 I
(
SUPPORT 02:00 02:59 R210517903 P
4 P
OMW1 PC BAY 5 SET-UP. STAGE TOOLS. AND 16 26JUN08 27JUN08 760 I
EQUIP 08:00 15:59 R210517901 K
4 13 OMW1i PC BAY5 REMOVE FLOOR PLUG 8
27OCT08 28OCT08 224 17:00 00:59 R210517902 K
4 13 OMW1 i PC RSAY 5 IREWATCH FOR PLUG 92 27OCT08 131OCT08 224 REMOVED 17:00 112:59 R210517912 K
4 13 NDE4 PC 187 (CM-1) PERFORMUT 33 270CT08 29OCT08 283 INSPECTIONS 17:00 01:59 R210517904 K
4 13 OMW1 PC BAY 5 CSP ACTIVITY 60 02NOV08 04NOV08 125 04:00 15:59 R210517905 K
4 13 OMWI PC BAYS REMOVE SHIELD BAGS 8
02NOV08 02NOV08 I 125 FROM TUNNEL 04:00 11:59 R210517906 K
4 13 NDE4 PC BAY5 NDE PERFORMIVT 8
02NOV08 02NOV08 157 INSPECTIONS OF AREA 04:00 11:59 R210517907 K
4 16 OMW1 PC BAY 5 COATING 24 02NOV06 03NOV08 300
____REAPAIR(CONTINGENCY) 04:00 03:59 R210517908 K
4 13 OMW1 PC BAY 5 REINSTALL SHIELD BAGS 12 02NOV08 02NOV08 157 1
112:00 23:59 R210517910 K
4 13 OMW1 PC BAY 5 REINSTALL FLOOR PLUG 8
03NOV08 03NOV08 157 00:00 07:59 R210517909 K
14 1P BAY 5 DEMOB & RESTOW TOOLS 8
03NOV08 03NOV08 288 AND EQUIP
'08:00 15:59 21105W
-,::*:!:.S:;*,..*,';.:"
- -:ii 22 25.24
§nBIO-SHIELD C8-1268 REMOVE 1=r187 C8-1268 ERECT BI0-SHIELD 1187 REMOVE SCAFFOLD C8-1269 1
221 PREPARE AREAS AND APPLY CAVITY COATING
- DR-814-14 FIRE WATCH ICAVITY DRAIN C8-1275 REMOVE IDURING OUTAGE INSP. OF RX CAVITY DRAIN LINE.
1187 ACTIVITY 02 ENGINEERING SUPPORT EBAY 5 REMOVE FLOOR PLUG
ý BAY 5 FIREWATCH FOR PLUG REMOVED
ý187 (CM-1) PERFORM UT INSPECTIONS MBAY 5 COP ACTIVITY UBAY 5 REMOVE SHIELD BAGS FROM TUNNEL UBAY 5 NDE PERFORM VT INSPECTIONS OF AREA IBAY 5 COATING REAPAIR(CONTINGENCY)
BAY 5 REINSTALL SHIELD BAGS EBAY 5 REINSTALL FLOOR PLUG EBAY 5 DEMOB & RESTOW TOOLS AND EQUIP
- BAY 13 REMOVE FLOOR PLUG EBAY 13 FIREWATCH FOR PLUG REMOVED
ýBAY 13 CSP ACTIVITY R210547703 P
4 IP OMWMJ PC I BAY 13 SET-UP, STAGE TOOLS, lAND EQUIP R210547701 K
4 13 OMW1 PC BAY 13 REMOVE FLOOR PLUG iR210547702 K
4 13 OMW1 PC BAY 13 FIREWATCH FOR PLUG REMOVED R210547704 K
4 13 OMW1 PC BAY 13 CSP ACTIVITY 16 26JUN08 08:00 8
27OCT08 17:00 92 27OCT08 17:00 60 28OCT08 27JUN08 760 15:S9 28OCT08 224 00:S9 31OCT08 224 12:59 30OCT08 240 Data Date 26JUN08 08:00FLFV Opening Layout Sheet 10 of 16 Run Date 26JUN08 15:58 License Renewal Activties Oyster Creek Date I Revision Checked Approved (0 Primavera Systems, Inc.
IR22
Activity Dl ID R210547705 K
R210547706 K
R2105,47712 K
R210947707 K
R210547708 K
R210547710 K
R.10547709 K
- 1OS, SP SPL MILE 4
13 4
13 1--3 SUPV OMW1 P4
+--1 NDE4 NDE4 OMWl1 OMWl 5WIh PC PC PC PC PC Oesvptn BAY 13 REMOVE SHIELD BAGS FROM TUNNEL BAY 13 NOE PERFORM VT INSPECTIONS OF AREA 187 (CM-i) PERFORM UT OR THE SHELL BAY 13 COATING REPAIR(CONTINGENCY)
BAY 13 REINSTALL SHIELD BAGS 04g 8
24 12 Early Start 28OCT08 09:00 28OCT08 17:00 29OCT08 01:00 29OCT08 13:00 29OCT08 13:00 Early 28OCT08 16:59 29OCT08 00:59 29OCT08 12:59 300CTOB 12:59 30OCT08 00:59 I
Total Float 248 249 248 252 4
13 OMW1I PC
[4 14 OMWlI PC BAY 13 REINSTALL FLOOR PLUG 8
30OCT08 130OCT08 t 252 01:00 108:59 1
BAY 13 DEMOB & RESTOW TOOLS 8
30OCT08 130OCT08 1 261 AND EQUIP 09:00 16:58
.?,
- 1 *=
- .;:,::i '
4R21057903 P 4
P OMW1 jPC BAY 15 SET-UP. STAGE TOOLS.
18 28JUN08 127JUNOII 760 I
I AND EQUIP 08:00 115:59 4210547901 KREMOVE FLOOR PLUG 8
27OCT08 28OCT08 224 17:00 00:599 2105902 K
4 13 OMWI PC BAY 15 FIREWATCH FOR PLUG 92 27OCT08 31 C*:08 224 REMOVED
.17:00 12:59 4Z210547904 K BAY 15 CSP ACTIVITY 60 28OCT08 31 OCT08 232 4517:00 04:59 4210547905 K
4 13 OMW PC BAY 15 REMOVE SHIELD B S
2OCT08 29OCT08 232 FROM TUNNEL 1 :00
, 00:58 21054706 E
29OCT08 29OCT08 237 INSPECTIONS OF AREA 01:00 08:59 8210547907 K
4 13 OMW1 PC BAY 15 COATING 24 29OCT08 30OCT08 292 REAPAIR(CONTINGENCY) 09:00 08:59 R210547912 K
4 13 NOE4 PC 187 (CM-1) PERFORM UT 19 29OCT08 30OCT08 237 INSPECTIONS 09:00 03:58.
R210547908 K
4 13 P
BAY 15 REINSTALL SHIELD BAGS 12 30OCT08 30OCT08 237 R210*7910
T08 04:00 15:59 8210547810PL K. T 0C0 0CT08 23 R2104 790 K
BAY 15 REINSTALL FLOOR PLUG 8
31:OCT08 0 OCT08 23 3
AND EQUIP "jOO:00 30 8
36 R2051503 P 4 p
7..CBA STUP TAETOL. AND 18 T261UN08 27JUN081 76
____________EQUIP 108:00 15:599 8210551501 K
13 PC.
BAY3 REMOVE FLOOR PLUG 8
27OCT08 28OCT08 224
________________________________________________17:00 0 0 :58 82109951502 K
4 130 1
PC BAY 3 FIREWATCH FOR PLUG 92 27OCT08 31OCT08 224
___REMOVED
~17:00 12:59 R210551004 K
4 123 OMW PC BAY 3 CSP ACTIVITY 60 28OCT08 30OCT08 248 01:00 12:59 EBAY 13 REMOVE SHIELD BAGS FROM TUNNEL EBAY 13 NOE PERFORM VT INSPECTIONS OF AREA W187 (CM-i) PERFORM UT ON THE SHELL IiBAY 13 COATING REPAIR(CONTINGENCY) 01BAY 13 REINSTALL SHIELD BAGS U1BAY 13 REINSTALL FLOOR PLUG WBAY 13 DEMOB 8 RESTOW TOOLS AND EQUIP IBAY 15 REMOVE FLOOR PLUG BAY 15 FIREWATCH FOR PLUG REMOVED BAY 15 CSP ACTIVITY EBAY 10 REMOVE SHIELD BAGS FROM TUNNEL EBAY 15 NOE PERFORM VT INSPECTIONS OF AREA 0
BAY 15 COATING REAPAIR(CONTINGENCY) 011187 (CM-) PERFORM UT INSPECTIONS MBAY 15 REINSTALL SHIELD BAGS UBAY IS REINSTALL FLOOR PLUG WBAY 15 DEMOB & RESTOW TOOLS AND EQUIP WBAY 3 REMOVE FLOOR PLUG IBAY 3 FIREWATCH FOR PLUG REMOVED BAY 3 CSP ACTIVITY ABAY 3 REMOVE SHIELD BAGS FROM TUNNEL
@BAY 3 NOE PERFORM Vr INSPECTIONS OF AREA in187 (CM-1) PERFORM T IN BAY #3 0
BAY 3 COATING REAPAIR)CONTINGENCY)
BAY 3 REINSTALL SHIELD BAGS 8210551505 R210551508 8210551511 8210551507 R210551508 K-4$13 OMw1 PC
- I I K
K 4 1 3 7NDE4 6ý_01ý PC PC BAY 3 REMOVE SHIELD BAGS FROM TUNNEL BAY3 NOE PERFORM VT INSPECTIONS OF AREA 187 (CM-i) PERFORM UT IN BAY
- 3 BAY 3 COATING REAPAIR(CONTINGENCY)
BAY 3 REINSTALL SHIELD BAGS 8
21 28OCT08 01:00 28OCT08 09:08 28OCT08 14:00 2WOCT08 08:59 28OCT08 13:59 29OCT08 10:59 248 250 250 24 12 29OCT08 11:00 29OCT08 11:00 30CT08 j 250 10:59 29OCT08 l254 K
4 113 DM51 PC Data Date 28JUNO08 00j0LFV Opening Layot Sheet I I of 18 Run Date 26JUNG8 15:58 Licene Renewal Actiurfes Oyster Creek Date Revision Checked proved a Primavera Systems. Inc.
18R22 I
Acily 01SF SPL MILE SUPV P4 SWIN Activity Ori Early Early Total IDDe!!?ap!ton Oe S.ar F.Ish FRost R2105515i) ~K 4 13 OMW1 PC BAY 3 REINSTALL FLOOR PLUG 2
TOCT0 30OCT08 254 R21 05515 19 EO&ETWOL 8 23:00C 08:59 38 0 9-K 4
1C AY'3D 30OCT08 P3 OCT08 385 18 C
AND EQUIP 07:00 14:59 2105516-R210551603 P
4 P
OMWI PC IBAY 19 SET-UP. STAGE TOOLS, 16 26JUN08 27JUN08 760 AND EQUIP 08:00 15:59 R210551601 K
4 13 OMW1 PC BAY 19 REMOVE FLOOR PLUG 8
27OCT08 28OCT08 224 4
[17:00 00:59 R210551602 K
4 13 OMW1 PC BAY 19 FIREWATCH FOR PLUG 92 27OCT08 31OCT08 224 REMOVED 17:00 12:59 R210551605 K
4 13 OMW1 PC BAY 19 REMOVE SHIELD BAGS 8
28OCT08 28OCT08 240 FROM TUNNEL 01:00 08:59 R210551604 K
4 13 OMW1 PC BAY 19 CSP ACTIVITY 60 28OCT08 30OCT08 O
240 08:00 20:59 R210551r06 K
4 13 NDE4 PC BAY19 NDE PERFORM VT 8
28OCT08 28OCT08 260 INSPECTIONS OF AREA 08:00 16:59 R
"210551607 K
4 13 OW1 PC BAY 19 COATING 24 28OCT08 29OCT08 268 REAPAIR(CONTINGENCY) 17:00 16:59 R210551612 K
4 13 NDE4 PC 187 (CM-1) PERFORM UT 12 28OCT08 29OCT08 260 INSPECTIONS 17:00 04:59 R20551608 K
4 13 OMWI PC BAY 19 REINSTALL SHIELD BAGS 12 28OCT08 29OCT08 260 05:00 16:58 R210551610 K
4 13 0141 PC BAY 19 REINSTALL FLOOR PLUG 8
29OCT08 30OCT08 260 17:00 00:59 R210551609 K
4 16 OMWI PC BAY 19 DEM01&RESTOW TOOLS 8 30OCT08 30OCT08 391 AND EQUIP 81:00 0
R210551611 K 4
13 OMVS PC 187 MODIFY GRATING PLATFORM 8
02NOV08 02NOV08 177 (CONT.)
04:00" 11:59 i
i 2M8 2IlAY 3 REINSTALL FLOOR PLUG CBSAY 3 DEMOS & RESTOW TOOLS AND EQUIP WBAY 19 REMOVE FLOOR PLUG EMýBAY 19 FIREWATCH FOR PLUG REMOVED ESAY 19 REMOVE SHIELD BAGS FROM TUNNEL BAY 1* CSP ACTIVITY IBAY 19 NDE PERFORM VT INSPECTIONS OF AREA 1
BAY 19 COATING REAPAFRfCONTINGENCY) 1n87 (CM-1) PERFORM LIT INSPECTIONS 111BAY 19 REINSTALL SHIELD BAGS UBAY 19 REINSTALL FLOOR PLUG 111Ay 19 DEMOB & RESTOW TOOLS AND EQUIP 0187 MODIFY GRATING PLATFORM (CONT.)
ýINSPECT TURBINE BLO. COND BAY STRUCTURES URBINE BLDG. PERFORM STRUCTURAL INSPECTIONS
=INTAKE NORTH RAMP-UP FOR DIVERS
- INTAKE STRUCTURE EAST OF SCREENS DESILT AND INS I
INTAKE STRUCTURE DUMPSTER SUPPORT
ýINTAKE STRUCTURE SUPPORT TO REMOVE DECK PLATES IMNTAKE STRUCTURE 1-1 DESILT AND INSPECT I
INTAKE STRUCTURE SUPPORT FOR VACUUM TRUCK NINTAKE STRUCTURE 1-3 DESILT AND INSPECT UINTAKE STRUCTURE 1-2 DESILT AND INSPECT
ýINTAKE STRUCTURE INSPECT WEST OF GRATES UINTAKE STRUCTURE ENGINEER TO EVALUATE RESULTS
- INTAKE STRUCTURE SAMPLE DUMPSTER 2105603.
R2051T 5
14 OBM I
INSPECT TURBINE BLD, COND BAY 4
5C0 6C0 5
STRUCTURES i
030°° 18.59 j
1R ED IISTRUCTTURALINESPECTICONS 18:0 0
1859G 5
R210556302 T
5 14 OE-M MI TURBINE BLDG. PERFORM 96 126OCT08 130OCT08 1259 K
8 1
0 W
NTKESTRUCTURAL INSPECTIONS EA:.O8 0C 8:59 O 80 R211381101 K
6 10 MW CWI INTAKE NORTH RAMPSUPTOR 16 30OCT08 301OCT08 90 DIVERS_
1 22:0 159 R211381107 K
6 10 0MW CW INTAKE STRUCTURE EAST OF 8
31OCT08 31OCTOB 50 SCREENS DESILT AND INS 07:00 14:59 K
6 10 0
- M CW INTAKE STRUCTUREs1 DUMPSTER 48 0NOV08 01NOV08 50 I _____AN ISUPECRT 00:00 07:59 R21138110 K
10 OMVM CW INTAKE STRUCTURE SUPPORTTO 24 31OCT08 312OCT08 90 REMOVE DECK PLATESR 00:00 12359 R211381106 K
8 10 0MW CW INTAKE STRUCTURE 1-1 DESILT 8
0 0NOV08 01NOV08 90 AND INSPECT 00:00 207:59 K 6 1
C;W INTAKE STRUCTURE SUPPORT 4001NOV08 102NOV06 90
, FOR VACUUM TRUCK 00:00 115.'59 L
R213114 6
1 CW IINTAKE STRUCTURE 1-3 DESILT 8
02NOV06 t02NOV08 90 1121310 K
0ý AND INSPECT
'_1_-00
.... 59 R211381105 K
6 10 OMVM R211381103 K
R211381110 K
iR211381112 K
6 10 6
14
-6 1_
4 OMVM OEPB O6PCE CW INTAKE STRUCTURE 1-2 DESILT B
AND INSPECT CW INTAKE STRUCTURE INSPECT 24 WEST OF GRATES CW INTAKE STRUCTURE ENGINEER TO EVALUATE RESULTS CW INTAKE STRUCTURE SAMPLE 8
DUMPSTER 03NOVO 03NOVO8VI 90 00:00 07:59 03NOV08 04NOV08 To 90 08:00 07:59 04NOV08 04NOV08 I127 08:00 15:59 04NOV08 05NOV08 f 127 19:00 02:59 Data Date 26JUN08 08:00 LFV Opening Layout Sheet 12 of 16 Run Date 26JUN08 15:5 8 Liese Renewal Actirities Oyster Creek Date Reotsion Checked ed 0 Primavera Systems, Inc.
1 R22
Actirity DISP SPL MILE SUPV P4 WINI Activity I Od9 I Early Early Total ID Dascription I Our j Start Finish Float r
o3o 06 9 2113837 R211383705 K
6 10 OMW3 CW Y-3-15 APPLY COATINGS 1
28OCT08 28CT08 123 T.
22:00 22:59 R211383708 K
6 14 OMMM CW Y-3-15 INITIAL SERVICE LEAK TEST 2
31OCT08 31OCT08 188 10:00 11:59 R211383709 K
6 14 OMVw CW Y-3-15 INTERNAL INSPECT 72" 6
31OCT08 31OCT08 219 EX-JOINT 10:00 1 5:59 211326 21338 VM C -
ANSPEC72 E
31C 08 31O C.T08 1"4
_EX-J°INT 10:00 15:59 2113093
?"
R2*1K1399301 ýK 5
1 EOM CC ýRBCCW PIPE INSPECTION IN 16 03NOV08 0ý4NOV08
ý82 DRYWELL 19:00 10:59 2114281 R214210 K
1 OM3 PC UNDER INSUFLATION PIPE 36 01CT00 12:9OC0 8
INSPECTION IN DW 01:00 12:90 2114262 R211426204 P
6 P
OMVS 1100 100 ERECT TENT/RIGGING C8-1373 8
26JUN08 26JUN*8 1.670 IMT 08:00 15:59 R1 1426215 P 6
1P OPCE 100 100 NOTIFICATION OF WASTE 1
25AUG0 25AUG08 441 DISPOSAL 08:00 08:59 R211428202 P
6 P
OMVM 100 100 MOBILIZE 8
22OCT08 230CT08 97 IF 1)V 09:00*
08:59 R211426205 K
6 10 OMM3 CW 100 REMOVE MANWAYS 12 25OCT08 26OCT08 5
19:00 06:59 R211428209 K
6 14 OMVM CW 100 CONFINED SPACE PERMIT 201 25OCT08 103NOV08 174 19:00 03:59 R211428206 K
6 10 OMM3 CW 100 INSTALL PUMPS FOR 13 26OCT0826OCT08 S
DE-WATERING 0700 11:9 R211426207 K
6 10 OMW1 CW 100 INSTALL LIGHTS& POWER 24 26OCT08 27OCT08 5
PUMPSJ 20:00 19:59 211426208 K
6 10 V
1100 CLEAN INTAKE TUNNEL 98 27OCT0831OCT08 5
R211426208 K
20:00 21:59 R10 OMM3 K
CW INSIDE INTAKE TUNNEL 72 29OCT08 01NOV08 INSPECTION 20:00 19:59 R211426214 K
+6 100M CW 100 CONTINGENCY REPAIR 48 30OCT08 01NOV08 5
COATINGS I JOINTS 20:00 19:59 F
-2 K 6
10 OMW1 CW 100 REMOVE LIGHTS& POWER 4
01NOV08 0I1NOV08 5
I 20:00 23:59 R211428211 IK 6
10 OMVM Y10 CW 100 INSTALL MANWAYS 2
02NOV08 02NOV08 5.
I 00:00 0159 R211426212 K
6 10 OMVM CW 100 PMT INSPECTION ON 2
02NOV08 02NOV08 190 3 MANOWAYS 02:00 03:59
'R211426213 K
6 14 OMVS CW 100 REMOVE TENT CB-1373 MT 4
02NOV08 02NOV08 190 S1426203 K
6 14 0M 100 DEMOBILIZE 8
02NOV08 02NOV08 190 08:00 15:59 21.14299 R211429902 4-13 OINS PC V-1-7,-8
- 353 REMV INSL-V-1-7.-6 8
28OCT08 28OCT08I 228 109:00 16:59 jR211429901 K
4 13 OMM3 PC LICENSE RENEWAL MAINSTEAM 20 28OCT08 29OCT08 272 I
LINE PIPING INSP 17:00 12:59 1 R211429903 K
4 14 GINS PC V-1-7-8
- 353 INST1ISL -V1-7-8 8
09NOV08 09NOV08 18 I
~~12:00 15 20D3 UINTAKE STRUCTURE DEMOBILIZE iY-3-1 5 APPLY COATINGS ItY-3-15 INITIAL SERVICE LEAK TEST UY-3-15 INTERNAL INSPECT 72* EX-JOINT 3Y-3-30 INTERNAL INSPECT 72" EX-JOINT MRBCCW PIPE INSPECTION IN DRYWELL I
UNDER INSULATION PIPE INSPECTION IN OW I10 0 MOBILIZE
=100 REMOVE MANWAYS 100 CONFINED SPACE PERMIT it100 INSTALL PUMPS FOR DE-WATERING 1
100 INSTALL LIGHTS & POWER PUMPS I
100 CLEAN INTAKE TUNNEL INSIDE INTAKE TUNNEL INSPECTION ii100 CONTINGENCY REPAIR COATINGS / JOINTS 1100 REMOVE LIGHTS & POWER 1100 INSTALL MANWAYS 1100 PMT INSPECTION ON MANWAYS 1100 REMOVE TENT C8-1373 ME 0I00 DEMOBILIZE UV-i-7,-8 #353 REMV INSL -V-1-7.-8 I
LICENSE RENEWAL MAIN STEAM LINE PIPING INSP IV-1-7,-8
- 353 INSTINSL-Vo-7,-B Oata Data 26JUN08 08:00 LFV Op*ning Layout Sheet 13 of 16 Date1Revision i
Checked Run Date 26JUN08 15:58 License Renewal Activities Oyster Creek Date Revision hecked ved Q Pnimanera Systems. Inc.
I R22-
Avity 01S PL "ILESUP 4
W"ill Orig Ea"y I
Early Total
-ID
_LPecnption IOur
_Sat_j__.FnihfFlowt 2114300 "_"_"_"_
R211430002 K
]4 13 jOINS F
V-2-73,-74 #354 REMVINSL-
[5 28OCTO08 28OCT08 222 V-2-73,-74 09:00 j13:59 R211430001 K
4 13 OMM3 PC INSPECT WATER LINE IN2 24 28OCT08 29OCT08 268 I
13 4 DRYWELL 14:00 13:59 R211430003 K
14 13 1OINS V-2-73 -74 #34INSTIS-5 29OCT8:29OC0 222 V-2-73:-74 14:00 18:59 t
2117W0 R211738702 K
4 13 OMM3 PC r187 BAY,5 REMOVE SEALANT INI 8
]280CT08 28OCT08 272 TRENCH 09:00 16:59 R211738703 K
4 13 OMM3 PC 1187 BAY#17 REMOVE SEALANT 8
28OCT08 28OCT08 272 IN TRENCH 09:00 16:59 R211738706 K
4 13 OMM3 PC 187 PREPTRENCHE SFORUT I8 28OCT08 29OCT08 272 I INSP.(CONTINGENCY)
[
17:00 00:59 R211738701 K
4 13 NDE4 PC 1187 BAY#5. #17 PERFORM VISUAL 8 29OCT08 29OCT08 272 INSPECTION 01:00 08:59 R211738704 K
4 13 OMWP PC 1187 BAY#5 INSTALL SEALANT IN 4
29OCT08 29OCT08 272 TRENCH 09:00 12:59 R211738705 K
4 13 OMNP PC 1187 BAY #17 INSTALL SEALANT IN 4
29OCT08 29OCT08 272 2
ITRENCH 09:00 12:59 R212122002 K
6 o0VC[
]CW V-3"13 PERFORM FAC PREP OF 1
28OCT08 28OCT08 279 I
PIPNG 20:00' 120:59 R212122001 K
6 1
NDE4 CW V-13 NOB INSPECT 46 29OCT08 29OCT08 I
i I
UNCOATED CS PIPE IN CW 06:00 11:59
.1
- 10.
-0 I 20 i
R2112122801 K
6 14 NDE4 CW I V-3-12 PERFORM UT INSPECTION I
27OCT08 27OCT08 327 1OF PIPING f
14:00 14:59 R12122802
!K 6
14
.W V.-112 PERFORMFAC PREPO O 1: 30OCT08 30OCT08 255 L
I I
Ir PIPING j
14:00*
14ý:59 UV-2-73.-74 #354 REMVINSL-V-2-73,.74 IIiIINSPECT WATER LINE IN DRYWELL MV-2-73,-74 #354 INST INSL - V-2-73,-74 U187 SAY #5 REMOVE SEALANT IN TRENCH 187 BAY 817 REMOVE SEALANT IN TRENCH I187 PREP TRENCHE S FOR UT INSP.(CONTINGENCY)
Ea187 BAY #5, #17 PERFORM VISUAL INSPECTION 1187 BAY #5 INSTALL SEALANT IN TRENCH 1187 BAY #17 INSTALL SEALANT IN TRENCH IV-3-13 PERFORM FAC PREP OF PIPING 31V-3-13 NOE INSPECT UNCOATED CS PIPE IN CW IV-3-12 PERFORM UT INSPECTION OF PIPING NV-3-12 PERFORM FAC PREP OF PIPING RV-3-58" 359 REMV INSL - V-3-58 EV-3-58 PERFORM FAC PREP OF PIPING EV-3-58 INSPECT COATED CS PIP IN SW SYS 3V-3-58
- 359 INST INSL - V-3-58 IFG-3-380 FLOW GLASS FG-3-380 IFG-3-380 PMT IFG-3-380 PERFORM VISUAL INTERNAL INSP IFG-3-380 PERFORM VT-3 INSP PF1-333-5 REPLACE FI-333.5 tFI-333-5 PERFORM VISUAL INTERNAL INSP IFI-333-5 PMT 0
IFI-333-5 PERFORM VT-3 INSP I 21212300D R22203K 5
10 JOINS CC IV-3-58
- 359 REMVINSL-V-3-5 5
2560 17:IF 59 T0 152 R212123002 5
10 OVC1 CC V-3-58 PERFORM FAC PREP OF 4
25OCT08 2SOCT08 184 R22202K 5
10V-3-58____________________________
_PIPING 18:00 21:59 1
R2123001 K
5 10 NDE4 CC V-3-58 INSPECT COATED CS PIP IN 4
26OCT08 26OCT08 92 SW SYS 06:00 09:59 iR212123004 K
5 14 OINS CC V-3-58
- 359 INST INSL -V-3-18 6
26OCT06 26OCT08 297
.R212140701 K 6
14 OMM30 CW FG-3-380 FLOW GLASS FG-3-380 I
31OCT08 31OCT08 229 12:00 1259 IR212140703 K
02NOV08 02NOV08 177 2200 2259 R212140702 K
6 14 OMM3 CW FG-3-ý380 PERFORM VISUAL 1
03NOV08 03NOV08 176 INTERNAL INSP 04:00 04:59 R212140704 K
6 14 NDE4 CW FG-3-380 PERFORM VT-3 INSP 1
03NOV08 05 R2.12146101 K
6 14 OMM3 CW FI-333-5 REPLACE FT"3-1 29OCT08 29OCT08 114 14RPLC 1
05:00 105:59 A;R2121461o2 K
6 14 OMM3 CW FI-333-5 PERFORM VISUAL 1
02NOV08 02NOV08 182 TM INTERNAL INSP 22:00 22:59 R21214 K 14 0
3 C
1 02NOV08 02NOV08 177
___ -I-....22:00 22:59 1121214 K
6 14 OIM3 I
02NOV08 02NOV08 182 23:00 23:59 Data Dale 26JUN08 08:00 LFV Opening Layout Sheet 14 of 16 Ran Dale 26JUN08 15:58 License Renneal Activities Oyster Creek 1 Prnmavera Systems, Inc.
1 R22 I
hr-kerl I
l
Atvt DISPJI SF1 MLE[7S.8\\,ý It-Activity 10481I Early jEarly Total ID L
-L Oescdption 7Joa Start L Finish Float 2121463 R212146301 K
6 140MM31 CW FI-333-9 REPLACE FI-333-9 1
29OCT08 29OCT08 282
___08:00 08:59 R212146303 K
1 03NOV08 03NOV08 176 01:00 01:59 R212146302 K
6 14 OMM3 CW FI-333-9 PERFORM VISUAL 1
03NOV08 03NOV08 176 INTERNAL INSP 04:00 04:59 R212146304 K
6 14 NDE4 CW F--333-9 PERFORM VT-3 INSP 1
03NOV08 03NOV08 176 05:00 05:59 2121401 K
OM1-311REPLACE F,-333-11 1
31 OCT08 -31OCT08 229
- --_--_____-J-,-
12:00 12:59 R212146503 K
6 14 OMM3 Iw -333-11 PT 1
02NOV08 02NOV08 177
£ 22:00 22:59 R212146502 K
6 14 P13CWF-333-1i PERFORM VISUAL 1 1 03NOV08 040 04803NOV06] 172 R212146504 K
6 14 NDE4 CW IF-333-11 NDE PERFORM VT-3 5
03NOV08 03NOV08 172
______INSP 1
__150 0:599 2121.80
ý. I _I
- ý I
- !s A°:° I°*:9 5
212148006 K
6 14 OMM3 CW LI-52 PERFORM VISUAL INTERNAL 1
27OCT08 27OCT08 318 S INSP180 185 R212148009 K
6 14 NDE4
[CW LI-52 NDE PERFORM VT-3 INSP 5
27OCT08 27OCT08 318 I
________________18:00 23:59 F212148001 K
6 10 OMM3 lCD LI-3 REPLACE LI-3 1
29OCT08 [29OCT08 237 CW 10:00 i10:59 2
R212148007 K
6 CW OMM3 1I-56 PERFORM VISUAL INTERNAL 1
31OCT08 31OCT08 1.471 INSP 10:00 10:59 R212148010 K
6 ZZ NDE4 CW LI-56 NDE PERFORM VT-3 INSP 5
31OCT08 31OCT08 1,471 11:00 15:59 R212148004 K
6 12 OMM3 CD LI-311.-521L1-56 LEAK TEST 1
07NOV08 07NOV08 60 03:00 03:59 R212148008 K
6 15 NDE4 CD LI-3 NDE PERFORM VT-3 INSP 5
07NOV08 07NOV08 655 06:00 10:59 R212148005 K 6
15 OMM3 CD LI-3 PERFORM VISUAL INTERNAL 1
07NOV08 07NOV08 I 1,307 INP11:00 11:59
- z*
- ".? **:
', :*?:
.*"*:*:;.:".*?L,
1R212158701 K
6 10 ioM31 CW V-3-125 REMOVE/REPLACE VALVE I 25OCT0I 125OCT08 T 8 J
I 1
I i
I21:00 21:59
[
R212158702 K
6 10 oEPP CW V-3-125 INSPECTVALVE 1 1 25OCT06 1250CT08 194
_________,INTERNALS 220 29 R212158703 K
02NOV0 02N 8
184 1 II 20:00 120:59Wý R212158704 K
6 14 NDE4 GIN V-3-125 VT-31NSPECTION I
04NOV08_04NOV 148-t*125*01
- 5-0 [MM3YlOsw EPLCEV*
804NOV08 04NOV0 14 C
INPC N
09:00 09:59 R212159005 P
5 P
OMV SW V-3-58 C8-1365 ERECT RIGGING TE 6
29SEP08 029SEP08 194 VS__
SCAFFOLD 06:00*
13:59 R212159001 K
5 10 OMM3 YIO ISW V-3-58 REPLACE V-3-58 8
02NOV08 02NOV08 5
09:00 11:59 R212119012 K
5 16 OEPP SW V-3-58 INSPECT VALVE INTERNALS 8
03NOV08 J04N0V08 69
- _19:00 102:59 IR212159006 P
5 P
OMVS -
CW V-3-58 C8-1365 REMOVE RIGGING 4
0NV804NOV0O8 332
______SCAFFOLD 08:00 211:09 R129o3K 5
14 OMM3 SW V.-SE5 PMTf 8
07NOV08 D
0NV8 59
____19:00 02:59
!R212159004 K
5 16 NDE4 SW V-3-58 VT-3 INSPECTION 8
07NOV08 108NOV08 181 19:0 02:5
.OCT Ja 17. I1 *1 I2 23, 24, 2,
26 I 2_
1 IFI-333-9 REPLACE FI-333-9 IFI-333-9 PMT D
PF[-333a-9 PERFORMWSUAL INTERNAL INSP IFI-333-9 PERFORM VT-3 INSP IFI-333-11 REPLACE FI-333-11 IFI-333-11 PMT IFI-333-11 PERFORM VISUAL INTERNAL INSP OFI-333-11 NDE PERFORM VT-3 INSP ILI52 PERFORM VISUAL INTERNAL INSP 1U-52 NDE PERFORM VT-3 INSP L-3 REPLACE LI-3 IL-56 PERFORM VISUAL INTERNAL INSP ELI-56 NOE PERFORM v-r-3 INSP ILI-3IJ-S2111-56 LEAK TEST I11-3 NDE PERFORM VT-3 INSP 111-3 PERFORM VISUAL INTERNAL INSP IV-3-125 REMOVE/REPLACE VALVE IV-3-125 INSPECT VALVE INTERNALS IV-3-125 PMT IV-3-125 VT-3 INSPECTION IV-3-58 REPLACE V-3-58 UV-3-58 INSPECT VALVE INTERNALS UV-3-58 C8-1365 REMOVE RIGGING SCAFFOLD UV-3-58 PMT UV-3-58 VT-3 INSPECTION a
a e 26JUN08 08:0011FV Opening Layout Sheet 15 of 16 i Dale Run Date 26JUN08 15:58 icense Renwl Actves Oyster Creek Date I
Revisiop I
hcved I
A 0 Primanera Systems, Inc.
1 R22
Acrity DISP SPL MILE SUPV P4 1W,1 Activity.
0 EarlY Early Total 1D Li--------
Description
/Durl Start l
Finish Float 212156i__
R212159201 11 6
10 OMM3 CW V-3-110 REPLACIEVALVE 11 25OCTO8 25OCTO8 190 j
21:00 21:59 R2121"5202 K
6 14 OEPP CW V-3-110 INSPECTTVALVE 1
02NOV08 02NOV8O 18I25
_INTERNALS'-
20:00 20:58 121219582 K
6 14 NDE4 CW V-3-110 VT-3INSPECTION 1
02NOV08 02NOV08 1
._15:00 15:59 I
1121196302 K
68 14 104 1CW V-3-13 VT-3 INSPECTION jj1 127OCT08 27OCT08 I325 16:00 1P16:59 2122300 2122551.
~
IR21225515-10-1 K 6
1 M3 CW S-3-24 REMOVE STRAINER FOR 1
31OCT08 131OCT08 231
!INSPECTION 9_1400 1 59 IR2i22551102 K
8 114 JOMM3 CW I S-3-24 INSPECT ONE COPPER 1 ~02NOV08 02NOV08 183 JALLOY STRNR t22:00 22:59 11222513 1
OM3 CIN S324PT1 02O8 02NOV08 1
77 R2 12 2550.3.
K.......
i
....[2200 1225 9..
I 1 1-R212256501 1K 16 110 OMM3 c
ITE-261NSP WATER SIDE OF 4 CIR 1 125OCT08 25OCT08 193 d__
WTRTHERMOWELLS 22:00 2259 1R212s6502 K I68 h10 OMM3 ECW T-26 SPECIAL PERMIT ACTIVITY 1
25OCT08 25OCT08 195 I
I I
I1 I
22:00 122:59 i
__ __.__I__
NOV IV-3-110 REPLACE VALVE IV-3-110 INSPECT VALVE INTERNALS IV-3-110 VT-3 INSPECTION IV-3-13 INSPECT INTERALS IV-3-13 VT-3 INSPECTION ITORUS INSPECT TORUS IS-3-24 REMOVE STRAINER FOR INSPECTION S'-3-24 INSPECT ONE COPPER ALLOY STRNR LS.3-24 PMT ITE-26 INSP WATER SIDE OF 4 CIRC WTR THERMOWELLS ITE-26 SPECIAL PERMIT ACTIVITY IV-3-1041 PERFORM INTERNAL INSPECTION (LRA)
R222575-0K 1
1o OMM3I CW V-3-1041 PEF t
I I I.
[INSPECTION 2122597.......................".......
R212259701 R
3 JOMM2 MI 775 PERFOR
'1 CONDBAYL "C212259702 ]R 3
OMM2 MI 775 CABLE I I
IROOM ERA 1R12259,703 1 R 1
DM MI 775 CABLE i
LRA RFORM INTERNAL I 1 29OCT08 29CT08 108 (LRA)7:00 07:59
- M~~~ ~~
CAL NPITE 4 2JN8 29 T6JUN 08,52
- M CABLE INS! N H
4 126JUN08 12JUN08 !4,521 RA 09:00 12:59 NSP IN TRUNION 2
26JUN08 26JUNO8 4.523
_ 0+:00 10:59 INSP IN DRWELL 8
26JUN08 26JUNO8 4,517 09:00 116:59 Data Date 26JUN08 08:00jLFV Opeeing Layout Sheet 16 of 161 Run Date 26JUN8B 15:58 License Renevil Actvities Oyster Creek Date Revision Checked Approved Q Primavera Systerns, Inc, 1IR22