Letter Sequence Other |
---|
|
|
MONTHYEARML0912701622009-05-0101 May 2009 Relief Request (PRR)-19, Jet Pump Instrumentation Nozzle Weld, RPV-N9A-1 Repair Plan Project stage: Request ML0913206562009-05-0707 May 2009 Response to NRC Request for Additional Information (RAI) Dated May 7, 2009, Regarding Pilgrim Relief Request (PRR)-19, Jet Pump Instrumentation Nozzle Weld, RPV-N9A-1 Repair Plan Project stage: Response to RAI ML0912704392009-05-0707 May 2009 E-mail from R. Guzman to W. Lobo RAI for Jet Pump Instrumentation Nozzle Weld Repair Plan Project stage: RAI ML0913100732009-05-11011 May 2009 E-mail Pilgrim Verbal Authorization for Relief Request PRR-19 Project stage: Other ML0914701522009-05-15015 May 2009 Results of UT Examination of Jet Pump Instrumentation Nozzle RPV-N9A-1 Weld Overlay Project stage: Other ML0923201242009-08-13013 August 2009 Stress Analysis Reports for Reactor Pressure Vessel (RPV) Jet Pump Instrumentation Nozzle Weld, RPV-N9A-1 Overlay Repair (Pilgrim Relief Request (PRR) -19) Project stage: Request ML0923705492009-09-11011 September 2009 Relief Request (PRR)19, Install a Weld Overlay on Jet Pump Instrumentation Nozzle Weld RPV-N9A-1- Pilgrim Nuclear Power Station Project stage: Acceptance Review ML1107400392011-03-0404 March 2011 Relief Request PRR-21, Application of NRC Approved In-Service Inspection of Pilgrim Relief Request PRR-19, (Jet Pump Instrumentation Nozzle Weld RPV-N9A-1 Repair Plan) for Reactor Pressure Vessel N14-1, N14-NV.. Project stage: Request ML11230A9192011-08-0505 August 2011 Revised Relief Request (PRR)-21, Contingency Repair Plan for Reactor Pressure Vessel (RPV) Standby Liquid Control Nozzle Weld, RPV-N14-1 Project stage: Request 2009-05-07
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. O'Brien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] |
Text
From: James Kim Sent: Monday, May 11, 2009 9:22 AM To: 'Lynch, Joseph R'; Lobo, Walter
Subject:
RE: Verbal Authorization Script for Pilgrim PRR-19 The script for verbal authorization is shown below.
Thanks Jim Kim By letter dated May 1, 2009, as superseded by letter dated May 7, 2009, Entergy Nuclear Operations, Inc., the licensee for Pilgrim Nuclear Power Station, submitted Request for Alternative PRR-19 from certain American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) requirements under the provisions of Title 10 of the Code of Federal Regulations 50.55a(a)(3)(i).
Specifically, the licensee requested permission to implement a weld overlay repair on the Pilgrim RPV-N9A-1 Jet Pump Instrumentation Nozzle weld. The weld overlay being implemented during the units spring 2009 refueling outage is a modification to an existing weld overlay on RPV-N9A-1 which was installed in September 1984. The current weld overlay repair is being implemented in accordance with the provisions of ASME Code Cases N-504-3, Alternate Rules for Repair of Classes 1, 2, and 3 Austenitic Stainless Steel Piping, and N-638-1, Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique, as amended by the licensees requested alternative in PRR-19. ASME Code Cases N-504-3 and N-638-1 have been approved for licensee use by the NRC in NRC Regulatory Guide 1.147, Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1, with one condition on the use of ASME Code Case N-504-3, which was also addressed in the licensees submittal.
The licensees proposed alternative with regard to the implementation of the weld overlay repair and the nondestructive examination of the weld overlay were documented in the licensees May 1, 2009, letter as superseded by the licensees letter dated May 7, 2009. Specifically, this included information on:
- 1. the materials with which the weld overlay will be manufactured
- 2. the materials to which the overlay will be applied
- 3. the temper bead welding process to be used for the overlay
- 4. the design requirements the overlay will meet
- 5. the preservice examination and testing that will be performed on the overlay, and
- 6. the inservice inspection plan for the repaired location.
Hence, in accordance with 10 CFR 50.55a(a)(3)(i), the licensee provided information to demonstrate that the proposed alternative would maintain an acceptable level of quality and safety with regard to ensuring the integrity of the subject Pilgrim Nuclear Power Station reactor coolant pressure boundary weld under all licensing basis conditions of operation.
The NRC has completed its review of the information provided in the licensees submittal. The NRC has concluded that the licensee provided adequate information regarding the design features, preservice inspection, and inservice inspection plan for the weld overlay to substantiate its implementation as an acceptable repair. Hence, as Chief of the Office of Nuclear Reactor Regulations Vessel and Internals Integrity Branch, I hereby recommend authorization of the licensees implementation of the proposed alternative in accordance with the information provided in the licensees letter dated May 7, 2009.
E-mail Properties Mail Envelope Properties ()
Subject:
RE: Verbal Authorization Script for Pilgrim PRR-19 Sent Date: 05/11/2009 9:19:59 AM Received Date: 05/11/2009 9:22:00 AM From: James Kim Created By: James.Kim@nrc.gov Recipients:
jlynch4@entergy.com ('Lynch, Joseph R')
Tracking Status: None wlobo@entergy.com (Lobo, Walter)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 13188 05/11/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: