UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 April 8, 2009 LICENSEE:
Entergy Operations, Inc.
FACILITIES: Grand Gulf Nuclear Station, Unit 1 James A. FitzPatrick Nuclear Power Plant Palisades Nuclear Plant
SUBJECT:
SUMMARY
OF MEETING ON MARCH 31, 2009, TO DISCUSS LICENSEE PLANS TO SUBMIT POWER UPRATE APPLICATIONS (TAC NOS. ME0922, ME0923, AND ME0924)
On March 31, 2009, members of the U.S. Nuclear Regulatory Commission (NRC) staff met with representatives from Entergy Operations, Inc. (Entergy, the licensee), at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, MD. The licensee was accompanied by representatives from its contractor, General Electric Hitachi Nuclear Energy (GEH). The meeting was a Category 1 public meeting.
The meeting was requested by the licensee to discuss its plans to submit extended power uprate applications for Grand Gulf Nuclear Station, Unit 1 (GGNS) and James A. FitzPatrick Nuclear Power Plant and a stretch power uprate application for Palisades Nuclear Plant.
Currently, the licensee expects its earliest application to be in July 2010 for GGNS.
The licensee presented an overview of its licensing and engineering organization for the power uprate project, followed by a discussion of its objectives for the uprates and its projected submittal schedules for the applications. In addition to the uprate submittals, the licensee's plan includes related submittals; for example, at GGNS, Entergy is planning to move to 2-year fuel cycles, to implement a new power range neutron monitoring system, and to request the use of GEH's maximum extended load line limit analysis (MELLLA+) topical report to provide an expanded power-flow map. In addition, Entergy has also considered its plans to apply for license renewal. The licensee discussed these related submittals for each plant and its plans to submit the applications so that they would not be "linked" to one another, in accordance with the guidance of the NRC Office of Nuclear Reactor Regulation (NRR) Office Instruction L1C-109, "Acceptance Review Procedures." The licensee also briefly addressed other topics of interest, including containment overpressure credit, large transient testing, and steam dryers.
The NRC staff provided comments for consideration by the licensee in the preparation of its applications.
- 2 No regulatory decisions were made at the meeting. The meeting agenda was provided with the meeting notice (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090690502). The licensee's presentation slides were placed in ADAMS following the meeting (ADAMS Accession No. ML090910063). A list of attendees is enclosed.
Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-333, 50-416, and 50-255
Enclosure:
Attendance List cc w/encl: Distribution via Listserv
ATTENDANCE LIST NRC MEETING WITH ENTERGY OPERATIONS, INC.
POWER UPRATE APPLICATIONS FOR GRAND GULF NUCLEAR STATION, UNIT 1, JAMES A. FITZPATRICK NUCLEAR POWER PLANT, AND PALISADES NUCLEAR PLANT MARCH 31, 2009 S. Saunders, Entergy L. Ward, NRR J. Burford, Entergy F. Lyon, NRR L. King, GEH G. Cranston, NRR G. Paptzun, GEH B. Heida, NRR J. McCann, Entergy M. Panicker, NRR H. Goodman, Entergy F. Saba, NRR G. Broadbent, Entergy R. Lobel, NRR J. Richardson, Entergy B. Vaidya, NRR
- 1. Rogers, GEH R. Pettis, NRR M. James, GEH J. Parillo, NRR D. Johnson, Entergy P. Yarsky, NRR D. Raleigh, Scientech-Curtis Wright M. Chawla, NRR K. Wilson, Progress Energy C. Basavaraju, NRR Jay Patel, NRO
- 1. Alexion, NRR A. Russell, NRR M. Reisi-Fard, NRR N. Karipineni, NRR S. Sun, NRR L. Benton, NRR Jigar Patel, NRR
- 2 No regulatory decisions were made at the meeting. The meeting agenda was provided with the meeting notice (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090690502). The licensee's presentation slides were placed in ADAMS following the meeting (ADAMS Accession No. ML090910063). A list of attendees is enclosed.
IRAJ Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket 1\\1os. 50-333, 50-416, and 50-255
Enclosure:
Attendance List cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC Ridsl\\lrrDraApla Resource LPLIV r/f RidsNrrDssScvb Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDssSnpb Resource RidsNroDnrlNarp Resource RidsNrrDssSrxb Resource RidsNrrDeEeeb Resource RidsNrrLAJBurkhardt Resource RidsNrrDeEmcb Resource RidsNrrPMBVaidya Resource RidsNrrDeEqvb Resource RidsNrrPMGrandGulf Resource RidsNrrDorlLpl1-1 Resource RidsNrrPMPalisades Resource RidsNrrDorlLpl3-1 Resource RidsOgcRp Resource RidsNrrDorlLpl4 Resource RidsRgn4MailCenter Resource RidsNrrDprPgcb Resource TAlexion, NRR RidsNrrDraAadb Resource EGuthrie, EDO RIV ADAMS Accession No. ML090910162 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LP4/BC NRR/LPL4/PM NAME FLyon JBurkhardt MMarkley FLyon DATE 4/7109 4/7109 4/8/09 4/8/09 OFFICIAL RECORD COpy