Text
o~knuegy, BRUCE H HAMILTON Vice President McGuire Nuclear Station Duke Energy Corporation MG01VP / 12700 Hagers Ferry Road Huntersviyle, NC 28078 704-875-5333 704-875-4809 fax bhhamilton@duke-energy. com March 16, 2009 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
Duke Energy Carolinas, LLC (Duke)
McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Annual Commitment Change Report Attached is a summary report of commitment changes for McGuire Nuclear Station completed during the 2008 calendar year. These changes were made per the guidance defined in NEI 99-04, "Guidelines for Managing NRC Commitments" and have no adverse effect on compliance with NRC rules or regulations.
Questions regarding this submittal should be directed to Kay Crane, McGuire Regulatory Compliance at (704) 875-4306.
Bruce H. Hamilton Acwei www. duke-energy. corn
U. S. Nuclear Regulatory Commission March 16, 2009 Page 2 xc:
Mr. Luis Reyes U. S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. Jon Thompson U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, DC 20555-0001 Mr. Joe Brady NRC Senior Resident Inspector McGuire Nuclear Station
1-T1 CCEF Source Commitment Description New Commitment Number Document 2008-M-001 LER 369/2007-Changes were made to The Gamma-Metrics shutdown 03, Inoperable procedures, the Technical monitors high flux alarm Source Range Specification Action Item function is not required for Neutron Flux Log, (TSAIL), and the operability of the monitor in Monitors During Control Room Board to Mode 6. Alarm switches may Mode 6 and clarify that Gamma-Metrics be placed in "BYPASS" versus Core shutdown monitor alarm "NORMAL" in Mode 6.
Alterations.
switches must be placed in "NORMAL" when crediting these monitors as operable per Technical Specification 3.9.3.
2008-M-002 Duke letter Dimensional testing, visual Liquid Penetrant and Magnetic dated August 17, inspection, and Particle examinations are 1984, NUREG-nondestructive testing of performed by personnel 0612, Control of major load-carrying welds qualified in accordance with the Heavy Loads.
and critical areas is rules in the edition of performed in accordance ANSI/ASNT CP-189 adopted with Section 5.5 as by the NRC approved McGuire permitted by Section 5.3.1 Inservice Inspection Plan.
part (2) of ANSI N14.6-1978.
2008-M-003 Duke letter to In an SBO event, HVAC is In an SBO event, HVAC is NRC dated available to maintain the available to maintain the control April 4, 1990, control room below 120 room below 120 degrees F.
10 CFR 50.63, degrees F within 45 minutes.
Requirements for Station Blackout (SBO).
2008-M-004 Duke letter to
- 1. Use existing fire
- 1. Valves designed for NRC dated hose stations in the makeup to the Spent February 23, fuel building to Fuel Pool (SFP) from the
- 2007, supply 200 gpm to fire header will be used Implementation the Spent Fuel Pool instead of using fire hose Details for the (SFP).
stations.
Phase 1, 2 and 3
- 2. Use local fire
- 2. Supply of the alternate Mitigation department apparatus water source will be Strategies, Table to supply Lake from a location A.2-4.
Norman water, using designated on Lake the intake structure Norman.
of the circulating water discharge canal to the SFP.