Acceptance Review for TAC ME0784 - Salem Unit No. 2 Relief Request V-07
ML090830046
Person / Time
Site: Salem PSEG icon.png
Issue date: 03/24/2009
From: Richard Ennis
Plant Licensing Branch 1
To: Keenan J
Public Service Enterprise Group
Ennis R, NRR/DORL, 415-1420
References
TAC ME0784
Download: ML090830046 (2)


Text

From:

Rick Ennis Sent:

Tuesday, March 24, 2009 8:06 AM To:

Jeff Keenan Cc:

Paul Duke; William Poertner; Marshall David; Karl Feintuch

Subject:

Acceptance Review for TAC ME0784 - Salem Unit No. 2 Relief Request V-07

Jeff, By letter dated March 5, 2009 (ADAMS Accession No. ML090790206), PSEG Nuclear LLC submitted relief request V-07 to extend the inservice testing (IST) intervals for certain Class 2 and 3 pressure relief valves for Salem Nuclear Generating Station, Unit No. 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Section 50.55a of Title 10 of the Code of Federal Regulations (10 CFR), requires, in part, that IST of certain American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) Class 1, 2, and 3 pumps and valves be performed in accordance with the applicable edition of the ASME Code for Operation and Maintenance of Nuclear Power Plants (ASME OM Code) and applicable addenda, except where alternatives have been authorized or relief granted by the NRC pursuant to paragraphs (a)(3)(i), (a)(3)(ii), or (f)(6)(i) of 10 CFR 50.55a. In proposing alternatives or requesting relief, the licensee must demonstrate that: (1) the proposed alternatives provide an acceptable level of quality and safety; (2) compliance would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety; or (3) conformance is impractical for the facility.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of the applicable regulatory requirements. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1420.

Richard B. Ennis, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation E-mail Properties Mail Envelope Properties (3D27D29AB75BCD4BAE913B63CBFBBEDFC8BFC9C4EB)

Subject:

Acceptance Review for TAC ME0784 - Salem Unit No. 2 Relief Request V-07 Sent Date: 03/24/2009 8:06:28 AM

Received Date: 03/24/2009 8:06:28 AM From: Rick Ennis Created By: Rick.Ennis@nrc.gov Recipients:

Jeff.Keenan@pseg.com (Jeff Keenan)

Tracking Status: None Paul.Duke@pseg.com (Paul Duke)

Tracking Status: None William.Poertner@nrc.gov (William Poertner)

Tracking Status: None Marshall.David@nrc.gov (Marshall David)

Tracking Status: None Karl.Feintuch@nrc.gov (Karl Feintuch)

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 13191 03/24/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: