FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESTORE AFW FLOW TO THE 2A SG USING 2C AFWPUMP NRC S-1 Developed/Revised by: ___
La_rry-,,---Ric_h __
4/01/08 Date Training Management APproval:~tb~.
JPM NRC S-1 Rev 0 SIMULATOR Page 1 of 10
JOB PERFORMANCE MEASURE Task: Start the 2C AFW pump and feed the 2A SG.
~~,
(' ')
(pt
~(1, Faulted JPM?
"No /
."~~,-~.-:'"'
Facility JPM #:
N/A KIA Rating(s):
008 A2.01 3.3/3.6 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is completed when the 2C AFW pump electrical overs peed trip is reset and the 2C AFW pump is feeding the 2A SG.
Evaluation Location:
Simulator X
References:
In Plant Lab Other 2-0NP-09.02 AUXILIARY FEEDWATER 2-NOP-09.02 AUXILIARY FEEDWATER Validation Time: 20 minutes Tools/Equipment/Procedures Needed:
2-0NP-09.02 AUXILIARY FEEDWATER.
2-NOP-09.02 AUXILIARY FEEDWATER Performance Level:
Perform X
Simulate Time Critical:
Discuss Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC S-1 Rev 0 SIMULATOR Page 2 of 10
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is: Start the 2C AFW Pump and feed the 2A SG.
The performance level to be used for this JPM is PERFORM.
This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
The Unit is in Mode 3 NaP/NOT. The 2A AFW tripped. The 2C AFW pump is ready to be started to feed the 2A SG.
INITIATING CUES:
The US directs you to start the 2C AFW using 2-NOP-09.02 Auxiliary Feedwater step 6.4.5 and feed the 2A SG.
JPM NRC S-1 Rev 0 SIMULATOR Page 3 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: ___
2-NOP-09.02 Auxiliary Feedwater STEP 1:
START the 2C Auxiliary Feedwater Pump STANDARD:
OPEN MV-08-12, B MS to 2C AFW Pump Isol.
AND/OR OPEN MV-08-13, A MS to 2C AFW Pump Isol.
EXAMINERS NOTE: 2C AFW will trip on electrical overspeed COMMENTS:
STEP 2:
ENSURE turbine speed is stable between 3700 and 3800 rpm and the governor is not hunting / oscillating.
STANDARD:
RECOGNIZE 2C AFW pump has tripped on electrical overspeed.
EXAMINERS NOTE: Candidate should recognize electrical overspeed by:
MV-08-3 in closed position AND annunciator G-46 resetting.
FAULTED STEP
__ SAT
__ UNSAT
__ SAT
__ UNSAT EXAMINERS CUE: If Candidate asks US permission to feed the 2A SG with the 2B AFW via crosstie valves, state you want him to use AFW ONP and attempt to use 2C AFW pump to feed the 2A SG.
COMMENTS:
JPM NRC S-1 Rev 0 Simulator Page 4 of 10
STEP 3:
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST IMPLEMENT 2-0NP-09.02 and reset the 2C AFW pump electrical overs peed by:
CLOSE if opened, MV-08-12 SG 2B Stem to AFW Pp 2C.
EXAMINERS CUE:
COMMENTS:
STEP 4:
RESET 2C AFW Pp electrical overspeed STANDARD:
CLOSE if opened, MV-08-13 SG 2A Stem to AFW Pp 2C.
EXAMINERS CUE:
COMMENTS:
CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT STEP 5:
PERFORM the following to reset and open MV-08-3, 2C Pump on RTGB-CRITICAL 202 STANDARD:
PLACE MV-08-3 2C Pump Key 78, key switch to CLOSE.
EXAMINERS CUE:
COMMENTS:
STEP SAT UNSAT JPM NRC S-1 Rev 0 Simulator Page 5 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6:
PERFORM the following to reset and open MV-08-3, 2C Pump on RTGB-CRITICAL 202 STEP SAT STANDARD:
RETURN MV-08-3 Brk2C Pump Key 78, key switch to OPEN EXAMINERS CUE:
UNSAT COMMENTS:
STEP 7:
PERFORM the following to reset and open MV-08-3, 2C Pump on RTGB-202 STANDARD:
VERIFY MV-08-3 Throttle / Trip Valve for AFW Pump 2C OPEN.
EXAMINERS CUE:
COMMENTS:
STEP 8:
VERIFY the pump has stopped rotating.
STANDARD:
CONTACT the NOP to determine if pump has stopped rotating.
EXAMINERS CUE: Inform the Candidate the Pump has stopped rotating.
COMMENTS:
SAT UNSAT SAT UNSAT JPM NRC S-1 Rev 0 Simulator Page 6 of 10
STEP 9:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST PERFORM ONE of the following to drain oil from the underside of the governor main speed piston STANDARD:
WAIT 3 minutes after the pump stops rotating OR A. PLACE manual control knob on the side of the turbine governor FULL Y COUNTER CLOCKWISE B. RETURN manual control knob on turbine governor FULL CLOCKWISE EXAMINERS CUE: It has been three minutes since pump has stopped rotating COMMENTS:
STEP 10:
ENSURE MV-09-11, Pump 2C to S/G 2A is CLOSED STANDARD:
VERIFY MV-09-11, Pump 2C to S/G 2A is CLOSED.
EXAMINERS CUE:
COMMENTS:
STEP 11:
ENSURE MV-09-12, Pump 2C to S/G 28 is CLOSED STANDARD:
VERIFY MV-09-12, Pump 2C to S/G 28 is CLOSED EXAMINERS CUE:
COMMENTS:
SAT UNSAT SAT UNSAT SAT UNSAT JPM NRC S-1 Rev 0 Simulator Page 7 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 12: IF BOTH Steam Generators are intact and NOT faulted, THEN OPEN the CRITIAL following SIMULTANEOUSLY STEP STANDARD:
OPEN MV-08-13, SG 2A Steam to AFW Pp 2C OPEN MV-08-12, SG 2B Steam to AFW Pp 2C EXAMINERS CUE:
COMMENTS:
__ SAT
__ UNSAT CRITICAL STEP 13: IF flow is to be restored to the 2A S/G THEN ENSURE OPEN SE-09-4 2C Pump STEP Disch to 2A S/G Vlv Key 85 STANDARD:
OPEN SE-09-4 2C Pump Disch to 2A S/G Vlv Key 85 EXAMINERS CUE:
COMMENTS:
CAUTION Excessive Feedwater to a Steam Generator following a Total Loss of Feedwater can result in water hammer and thermal shock. Following a Total Loss of Feedwater, initial Feedwater flow should be controlled as follows:
If using Auxiliary Feedwater, 150 gpm for 5 minutes OR until SG level has risen If using Main Feedwater OR Condensate, 'As low as possible' for the first 5 minutes OR until SG level has risen.
STEP 14: To restore flow to the 2A S/G THROTTLE MV-09-11, Pump 2C to S/G to desired flowrate.
STANDARD:
THROTTLE MV-09-11, Pump 2C to S/G to 150 gpm.
EXAMINERS CUE: Terminate JPM when candidate has established flow to the 2A SG from the 2C AFW pump.
COMMENTS:
STOP TIME: ____
__ SAT
__ UNSAT CRITICAL STEP
__ SAT
__ UNSAT JPM NRC S-1 Rev 0 Simulator Page 8 of 10
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
The Unit is in Mode 3 NaP/NOT. The 2A AFW tripped. The 2C AFW pump is ready to be started to feed the 2A SG.
INITIATING CUES:
The US directs you to start the 2C AFW using 2-NOP-09.02 Auxiliary Feedwater step 6.4.5 and feed the 2A SG.
9 of 10
JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET
- 1. IC #6 File S-5 Afw.lsn Mode 3 NOP/NOT
- 2.
Scenario triggers electrical overspeed of the 2C AFW pump 30 seconds after start
- 3.
Ensure 2C steam admission valves are closed and 2C AFW pump is NOT running
- 4.
Place 2A AFW pump to stop and close associated valves 10 of 10
REVISION NO.:
PROCEDURE TITLE:
PAGE:
1A PROCEDURE NO.:
AUXILIARY FEEDWATER SYSTEM OPERATION 2-NOP-09.02 ST. LUCIE UNIT 2 6.4 2C AFW Pump to 2A 12B S/G (continued)
- 5.
START 2C Auxiliary Feedwater Pump by performing the following:
OPEN MV-08-12, B MS to 2C AFW Pump Isol.
ANDIOR OPEN MV-08-13, A MS to 2C AFW Pump Isol.
- 6.
ENSURE turbine speed is stable between 3700 and 3800 rpm and the governor valve is not hunting 1 oscillating.
- 7.
OPEN the solenoid valve in the header to the S/G requiring feed (SE-09-4 for 2A S/G, SE-09-5 for 2B S/G).
- 8.
THROTTLE MV-09-11 1 MV-09-12 as necessary to establish and maintain desired flow to 2A 1 2B S/Gs.
- 9.
WHEN the 2C Auxiliary Feedwater Pump is no longer being used for feed and it is desired to secure, PERFORM the following:
A.
ENSURE closed MV-09-11, Pump 2C to S/G 2A.
B.
ENSURE closed MV-09-12, Pump 2C to S/G 2B.
C.
PLACE keyswitch for SE-09-4, 2C Pump Disch to 2A S/G, 13 of 52 CHECK NPO to AUTO.
_1_
RCO IIV D.
ENSURE closed SE-09-4, 2C Pump Disch to 2A S/G.
E.
PLACE keyswitch for SE-09-5, 2C Pump Disch to 2B S/G to AUTO.
1 RCO IIV F.
ENSURE closed SE-09-5, 2C Pump Disch to 2B S/G.
REVISION NO.:
PROCEDURE TITLE:
PAGE:
1A AUXILIARY FEEDWATER SYSTEM OPERATION 14 of 52 PROCEDURE NO.:
2-NOP-09.02 ST. LUCIE UNIT 2 6.4 2C AFW Pump to 2A / 2B S/G (continued)
CHECK
- 9.
(continued)
NOTE The 2C Auxiliary Feedwater turbine can be tripped three ways:
- 1) Placing the Key switch for MV-08-3 to CLOSE
- 2) Depressing the trip pushbutton on the Local Control Panel, or
- 3) Locally actuating the mechanical tripping device.
G.
STOP the 2C AFW Pump by PERFORMING any of the following:
CLOSE MV-08-3 with Keyswitch #78 on RTGB -
202.
DEPRESS the Local trip Pushbutton located in the local control panel.
Locally STOP the 2C Auxiliary Feedwater Pump by tripping the mechanical overspeed trip lever.
H.
VERIFY 2C Auxiliary Feedwater Pump turbine is slowing by observing reduction of speed indication on 2C AFW Pump control panel.
NOTE An Electrical overspeed trip results in closed indication for MV-08-3, and alarm and reset for Annunciator G-46.
A Mechanical Overspeed trip results in closed indication for MV-08-3, and locked in alarm for Annunciator G-46.
CLOSING MV-08-3 alone will result in closed indication for MV-08-3 with NO alarm for Annunciator G-46.
I.
1f applicable, Then VERIFY annunciator G-46, 2C AFW Pump Turbine failure/trip/OVRLD/SS Isol, Alarms.
J.
VERIFY the 2C Auxiliary Feedwarter Pump is NOT rotating.
REVISION NO.:
PROCEDURE TITLE:
PAGE:
1A AUXILIARY FEEDWATER SYSTEM PROCEDURE NO.:
OPERATION 2-NOP-09.02 ST. LUCIE UNIT 2 6.4 2C AFW Pump to 2A 12B S/G (continued)
- 9.
(continued)
K.
ENSURE MV-08-3, 2C AFW Pump ThrottlelTrip, is reset by placing the key switch on RTGB 202 in the close position.
NOTE 15 of 52 CHECK REFER to Figure 1 for correct Mechanical Overspeed mechanism latching.
L.
1f the 2C Auxiliary Feedwater Pump was tripped using the Mechanical Overspeed trip lever, Then PERFORM the following:
- 1.
RESET the 2C Auxiliary Feedwater Pump mechanical overspeed linkage.
- 2.
VERIFY top surface of trip tappet nut is inline with the line marked on the head lever to ensure full engagement.
M.
ENSURE MV-08-12, B MS to 2C AFW Pump Isol CLOSED.
N.
ENSURE MV-08-13, A MS to 2C AFW Pump Isol CLOSED.
O.
ENSURE the manual speed control knob on the side of governor is fully CLOCKWISE.
P.
OPEN MV-08-3, 2C AFW Pump Throttle I Trip, by placing the key switch on RTGB 202 in the Open position.
RCOIIV
REVISION NO.:
PROCEDURE TITLE:
PAGE:
1A AUXILIARY FEEDWATER SYSTEM 16 of 52 PROCEDURE NO.:
OPERATION 2-NOP-09.02 ST. LUCIE UNIT 2 6.4 2C AFW Pump to 2A / 28 S/G (continued)
CHECK
- 9.
(continued)
Q.
if the 2C Auxiliary Feedwater Pump is rotating, Then PERFOM the following:
- 1.
UNLOCK and CLOSE V08884, SE-08-2 Inlet 1501.
- 2.
When the 2C Aux Feedwater Pump stops rotating, Then slowly reopen V08884, SE-08-2 Inlet 1501.
- 3.
if the 2C Aux Feedwater Pump does NOT stop rotating, Then PERFORM Appendix C, Step 2.
- 4.
LOCK OPEN V08884, SE-08-2 Inlet 1501.
/
NPO / IV R.
ENSURE MV-08-12, SG 28 Stm to AFW PP 2C, switch is in AUTO
/
RCO/ IV S.
ENSURE MV-08-13, SG 2A Stm to AFW PP 2C, control switch is in AUTO.
/
RCO/IV END OF SECTION 6.4
NO.:
PROCEDURE TITLE:
9 AUXILIARY FEEDWATER 2-0NP-09.02 ST. LUCIE UNIT 2 APPENDIX A RESETTING 2C AFW PUMP FOLLOWING OVERSPEED TRI (Page 1 of 6)
NOTE An electrical overspeed trip results in closed position indication for MV-OB-3 and alarm reset on G-46.
A mechanical overspeed trip results in closed position indication for MV-OB-3 and alarm G-46 locked in.
Refer to Fi ure 2 for correct mechanical overs eed mechanism latchin 11 2C AFW pump tripped due to mechanical overspeed trip, Then PERFORM the following:
A.
CLOSE MV-OB-12, SG 2B Stm to AFW Pp 2C.
B.
CLOSE MV-OB-13, SG, 2A Stm to AFW Pp 2C.
C.
PERFORM the following to reset and OPEN MV-OB-3, 2C Pump, on RTGB-202:
- 1.
PLACE MV-OB-3, 2C Pump Key 7B, key-switch to CLOSE.
- 2.
RESET the 2C Auxiliary Feedwater Pump mechanical overspeed linkage.
- 3.
VERIFY top surface of trip tappet nut is inline with the line marked on the head lever to ensure full engagement.
- 4.
RETURN MV-OB-3, 2C Pump Key 7B, key-switch to OPEN.
- 5.
VERIFY MV-OB-3, Throttle / Trip Valve for AFW Pump 2C, OPEN.
D.
VERIFY pump has stopped rotating. 1f pump is rotating, Then PERFORM the following:
- 1.
CLOSE VOBBB4.
- 2.
When the 2C Aux Feedwater Pump stops rotating, Then slowly REOPEN VOBBB4.
INITIAL
9 AUXILIARY FEEDWATER PROCEDURE NO.:
- 1.
2-0NP-09.02 ST. LUCIE UNIT 2 APPENDIX A (Page 2 of 6)
(continued)
D.
(continued)
- 3.
!f the 2C Aux Feedwater Pump does NOT stop rotating, Then PERFORM Appendix C, Step 2 of 2-NOP-09.02, Auxiliary Feedwater System Operation.
- 4.
LOCK OPEN V08884.
E.
PERFORM ONE of the following to drain oil from the underside of the governor main speed piston:
- 1.
Wait 3 minutes after pump stops rotating.
- 2.
PERFORM the following:
- a.
PLACE manual control knob on the side of the turbine governor FULLY COUNTER-CLOCKWISE (idle speed).
- b.
RETURN manual control knob on turbine governor FULLY CLOCKWISE (normal speed).
F.
ENSURE MV-09-11, Pump 2C to S/G 2A is CLOSED.
G.
ENSURE MV-09-12, Pump 2C to S/G 2B is CLOSED.
H.
!f BOTH Steam Generators are intact and NOT faulted, Then OPEN the following valves SIMULTANEOUSLY:
- 1.
MV-08-13, SG 2A Stem to AFW Pp 2C
- 2.
MV-08-12, SG 2B Stem to AFW Pp 2C I.
!f EITHER Steam Generator is faulted, Then OPEN the steam supply valve from the NON-FAULTED SG (initial valve opened).
- 1.
MV-08-13, SG 2A Stem to AFW Pp 2C OR
- 2.
MV-08-12, SG 2B Stem to AFW Pp 2C INITIAL
REVISION NO.:
PROCEDURE TITLE:
9 AUXILIARY FEEDWATER PROCEDURE NO.:
- 1.
2-0NP-09.02 ST. LUCIE UNIT 2 APPENDIX A RESETTING 2C AFW PUMP FOLLOWING OVERSPEED TRI (Page 3 of 6)
(continued)
J.
!f flow is to be restored to the 2A S/G, Then ENSURE OPEN SE-09-4, 2C Pump Disch to 2A S/G Vlv Key 85.
K.
!f flow is to be restored to the 2B S/G, Then ENSURE OPEN SE-09-5 2C Pump Disch to 2B S/G Vlv Key 86.
CAUTION Excessive Feedwater to a Steam Generator following a Total Loss of Feedwater can result in water hammer and thermal shock. Following a Total Loss of Feedwater, initial Feedwater flow should be controlled as follows:
If using Auxiliary Feedwater, 150 gpm for 5 minutes OR until SG level has risen.
If using Main Feedwater OR Condensate, "As low as possible" for the first 5 minutes OR until SG level has risen.
L.
To restore flow to the 2A S/G, THROTTLE MV-09-11, Pump 2C to S/G 2A to establish desired flowrate.
M.
To restore flow to the 2B S/G, THROTTLE MV-09-12, Pump 2C to S/G 2B to establish desired flowrate.
N.
PERFORM Independent Verification of the following:
INITIAL COMPONENT POSITION IV INITIAL MV-08-12, SG 2B Stm To AFW Pp 2C OPEN
- Manual Control Knob on AFW Pp 2C Turbine Governor FULLY CLOCKWISE MV-08-3, 2C Pump Key 78 OPEN V08884, Isol. Valve for SE-08-2 Inlet OPEN
- !f valve is not used, then mark initial block N/A.
- 2.
!f 2C AFW pump tripped due to electrical overspeed trip, Then PERFORM the following:
A.
CLOSE MV-08-12, SG 2B Stm To AFW Pp 2C.
B.
CLOSE MV-08-13, SG 2A Stm To AFW Pp 2C.
9 AUXILIARY FEEDWATER PROCEDURE NO.:
2-0NP-09.02 ST. LUCIE UNIT 2 APPENDIX A RESETTING 2C AFW PUMP FOLLOWING OVERSPEED TRI (Page 4 of 6)
(continued)
C.
PERFORM the following to reset and open MV-08-3, 2C Pump, on RTGB-202:
- 1.
PLACE MV-08-3, 2C Pump Key 78, key-switch to CLOSE.
- 2.
RETURN MV-08-3, 2C Pump Key 78, key-switch to OPEN.
- 3.
VERIFY MV-08-3, Throttle I Trip Valve for AFW Pump 2C OPEN.
D.
VERIFY pump has stopped rotating. 11 pump is rotating, Then PERFORM the following:
- 1.
CLOSE V08884.
- 2.
When the 2C Aux Feedwater Pump stops rotating, Then slowly REOPEN V08884.
- 3.
11 the 2C Aux Feedwater Pump does NOT stop rotating, Then PERFORM Appendix C, Step 2 of 2-NOP-09.02, Auxiliary Feedwater System Operation.
- 4.
LOCK OPEN V08884.
E.
PERFORM ONE of the following to drain oil from the underside of the governor main speed piston:
- 1.
Wait 3 minutes after pump stops rotating.
- 2.
PERFORM the following:
- a.
PLACE manual control knob on the side of the turbine governor FULLY COUNTER-CLOCKWISE (idle speed).
- b.
RETURN manual control knob on turbine governor FULLY CLOCKWISE (normal speed).
F.
ENSURE MV-09-11, Pump 2C to S/G 2A is CLOSED.
G.
ENSURE MV-09-12, Pump 2C to S/G 2B is CLOSED.
INITIAL
9 AUXILIARY FEEDWATER PROCEDURE NO.:
- 2.
2-0NP-09.02 ST. LUCIE UNIT 2 (Page 5 of 6)
(continued)
H.
If BOTH Steam Generators are intact and NOT faulted, Then OPEN the following valves SIMULTANEOUSLY:
- 1.
MV-08-13, SG 2A Stem to AFW Pp 2C
- 2.
MV-08-12, SG 2B Stem to AFW Pp 2C I.
If EITHER Steam Generator is faulted, Then OPEN the steam supply valve from the NON-FAULTED SG (initial valve opened).
- 1.
MV-08-13, SG 2A Stem to AFW Pp 2C
- 2.
MV-08-12, SG 2B Stem to AFW Pp 2C J.
If flow is to be restored to the 2A S/G, Then ENSURE OPEN SE-09-4, 2C Pump Disch to 2A S/G Vlv Key 85.
K.
If flow is to be restored to the 2B S/G, Then ENSURE OPEN SE-09-5, 2C Pump Disch to 2B S/G Vlv Key 86.
CAUTION Excessive Feedwater to a Steam Generator following a Total Loss of Feedwater can result in water hammer and thermal shock. Following a Total Loss of Feedwater, initial Feedwater flow should be controlled as follows:
If using Auxiliary Feedwater, 150 gpm for 5 minutes OR until SG level has risen.
If using Main Feedwater OR Condensate, "As low as possible" for the first 5 minutes OR until SG level has risen.
L.
To restore flow to the 2A S/G, THROTTLE MV-09-11, Pump 2C to S/G 2A to establish desired flowrate.
M.
To restore flow to the 2B S/G, THROTTLE MV-09-12, Pump 2C to S/G 2B to establish desired flowrate.
INITIAL
REVISION NO.:
PROCEDURE TITLE:
9 AUXILIARY FEEDWATER PROCEDURE NO.:
- 2.
2-0NP-09.02 ST. LUCIE UNIT 2 APPENDIX A RESETTING 2C AFW PUMP FOLLOWING OVERSPEED TRI (Page 6 of 6)
(continued)
N.
PERFORM Independent Verification of the following:
COMPONENT POSITION MV-08-12, SG 2B Stm To AFW Pp 2C OPEN
- Manual Control Knob on AFW Pp 2C Turbine Governor FULL Y CLOCKWISE MV-08-3, 2C Pump Key 78 OPEN V08884, 1501. Valve for SE-08-2 Inlet OPEN
- !f valve is not used, then mark initial block N/A.
Reviewed by: __________ _
US END OF APPENDIX A INITIAL IV INITIAL
ISION NO.:
9 PROCEDURE NO.:
2-0NP-09.02 PROCEDURE TITLE:
AUXILIARY FEEDWATER ST. LUCIE UNIT 2 APPENDIX B LOCAL OPERATION OF 2C AFW PUMP (Page 1 of 4)
NOTE Communications must be maintained with the Control Room at ill[ times while maintaining steam generator level with this method.
- 1.
If 2C AFW Pump is to be started up locally, Then PERFORM the following:
A.
OPEN breaker 2-60320, AFW Pp 2C Stm Vlv MV-08-3 & AFW Pp 2C Turb Ctrl Pnl, on 125V DC Bus 2AB.
B.
ENSURE 2C AFW Pump discharge valves are aligned as follows:
COMPONENT POSITION MV-09-11, 2C AFW Pump Disch To 2A S/G CLOSED MV-09-12, 2C AFW Pump Disch To 28 S/G CLOSED C.
Locally CLOSE MV-08-3, 2C AFW Pump Throttle / Trip.
D.
ENSURE ONE of the following valves is OPEN.
- 1.
MV-08-12, 2B SG Stm To 2C AFW Pump.
- 2.
MV-08-13, 2A SG Stm To 2C AFW Pump.
E.
ENSURE feedwater solenoid valves to the affected S/G(s) are aligned as follows:
COMPONENT POSITION I-SE-09-4, 2C Pump Disch To 2A S/G Vlv Key 85 OPEN I-SE-09-5, 2C Pump Disch To 28 S/G Vlv Key 86 OPEN F.
ESTABLISH direct communications between the Control Room and AFW Pump local station.
G.
Locally THROTTLE MV-08-3, 2C AFW Pump Throttle / Trip, to establish greater than or equal to 100 psi above S/G pressure, as indicated on PI-09-7C, 2C AFW Pump Disch Press.
REVISION NO.:
9 PROCEDURE NO.:
2-0NP-09.02
- 1.
(continued)
PROCEDURE TITLE:
AUXILIARY FEEDWATER ST. LUCIE UNIT 2 APPENDIX B LOCAL OPERATION OF 2C AFW PUMP (Page 2 of 4)
H.
J1 S/G levels are to be controlled locally, Then THROTTLE the following valves, as directed by the Control Room:
- 1.
MV-09-11, 2C AFW Pump Disch To 2A S/G.
- 2.
MV-09-12, 2C AFW Pump Disch To 2B S/G.
- 2.
J12C AFW Pump is already operating but is to be controlled locally, Then PERFORM the following:
A.
ESTABLISH direct communications between the Control Room and AFW Pump local station.
B.
J1 MV-08-3, 2C AFW Pump Throttle 1 Trip, is to be controlled locally, Then PERFORM the following:
- 1.
OPEN breaker 2-60320, AFW Pp 2C Stm Vlv MV-08-3 & AFW Pp 2C Turb Ctrl Pnl, on 125V DC Bus 2AB.
- 2.
Locally THROTTLE MV-08-3, 2C AFW Pump Throttle 1 Trip, to establish greater than or equal to 100 psi above S/G pressure, as indicated on PI-09-7C, 2C AFW Pump Disch Press.
C.
J1 S/G levels are to be controlled locally, Then THROTTLE the following valves, as directed by the Control Room:
- 1.
MV-09-11, 2C AFW Pump Disch To 2A S/G.
- 2.
MV-09-12, 2C AFW Pump Disch To 2B S/G.
- 3.
When 2C AFW Pump is to be shutdown, Then PERFORM the following:
A.
ALIGN the following valves:
COMPONENT POSITION INITIAL MV-09-11, 2C AFW Pump Disch To 2A S/G CLOSED MV-09-12, 2C AFW Pump Disch To 2B S/G CLOSED I-SE-09-4, 2C Pump Disch To 2A S/G Vlv Key 85 CLOSED I-SE-09-5, 2C Pump Disch To 2B S/G Vlv Key 86 CLOSED
FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO LOSS OF RCP CONTROLLED BLEEDOFF AND FAILED RCP SEALS ON THE 2B1 RCP NRC S-2 Developed/Revised by: __
L_8--Lrry_R_ich __
Training Management APproval:~~l;:'~
4/01/08 Date bit/Dry I Delte JPM NRC S-2 Rev 0 SIMULATOR Page 1 of 8
JOB PERFORMANCE MEASURE Task: Respond to loss of RCP controlled bleedoff and failed RCP seals on the 2B1 RCP Faulted JPM?
~
Facility JPM #:
N/A KIA Rating(s):
003 A2.01 3.5/3.9 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when RCP Bleedoff flow has been established to the QT, the Reactor has been tripped and the 2B1 RCP has been stopped.
Evaluation Location:
Simulator X
References:
In Plant Lab 2-0120034 Reactor Coolant Pump Validation Time: 10 minutes Tools/Equipment/Procedures Needed:
2-0120034 Reactor Coolant Pump Other Performance Level:
Perform X
Simulate Time Critical:
Discuss Specific Safety Rules. Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC S-2 Rev 0 SIMULATOR Page 2 of 8
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is: Re-establish RCP bleedoff flow.
The performance level to be used for this JPM is PERFORM.
This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished.the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
The Unit is at 100%. Rep controlled bleedoff flow has been lost.
INITIATING CUES:
The US directs you to investigate the loss of RCP controlled bleedoff, in accordance with 2-0120034 Reactor Coolant Pump.
JPM NRC S-2 Rev 0 SIMULATOR Page 3 of 8
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: ___
2-0120034 Reactor Coolant Pump STEP 1:
IF Controlled Bleedoff flow is Lost or Low, Then ENSURE:
V2505 RCP Bleedoff Cntmt Isol. Is open.
STANDARD:
OPEN V2505 RCP Bleedoff Cntmt Isol.
EXAMINERS NOTE: V2505 will not open COMMENTS:
STEP 2:
IE Controlled Bleedoff flow is Lost or Low, Then ENSURE:
V2524 RCP Bleedoff Cntmt Isol. Is open.
STANDARD:
OPEN V2524 RCP Bleedoff Cntmt Isol.
EXAMINERS CUE:
COMMENTS:
FAULTED STEP SAT UNSAT SAT UNSAT JPM NRC S-2 Rev 0 Simulator Page 4 of 8
STEP 3:
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST IE normal Controlled Bleedoff can NOT be VERIFIED, Then open V2507 RCP Bleedoff Relief Stop Vlv.
OPEN V2507 RCP Bleedoff Relief Stop Vlv.
EXAMINERS NOTE: Upon opening V2507, three seals fail on 2B1 RCP EXAMINERS CUE:
COMMENTS:
STEP 4:
IE three seals have failed Then TRIP the Reactor TRIP the Reactor STANDARD:
TRIP the Reactor EXAMINERS CUE:
COMMENTS:
STEP 5:
IF three seals have failed Then: TRIP the Turbine STANDARD:
TRIP the Turbine EXAMINERS CUE:
COMMENTS:
CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT SAT UNSAT JPM NRC S-2 Rev 0 Simulator Page 5 of 8
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6:
STOP the affected RCP(s)
STANDARD:
STOP the 281 RCP EXAMINERS CUE: The JPM is complete when the 281 RCP has been stopped.
COMMENTS:
STOP TIME: ____
CRITICAL STEP SAT UNSAT JPM NRC S-2 Rev 0 Simulator Page 6 of 8
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
The Unit is at 100%. RCP controlled bleedoff flow has been lost.
INITIATING CUES:
The US directs you to investigate the loss of RCP controlled bleedoff, in accordance with 2-0120034 Reactor Coolant Pump.
70fa
- 1. Trigger S-3 Rep.Isn JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET 8 of 8
REVISION NO.:
PROCEDURE TITLE:
32B REACTOR COOLANT PUMP PROCEDURE NO.:
2-0120034 ST. LUCIE UNIT 2 6.3 Rep Seal Problems/Anomalies (continued)
- 5.
INSTRUCTIONS liControlied Bleedoff flow is Lost or Low, Then ENSURE the following:
A.
V2505, RCP Bleedoff Cntmt Isol, is OPEN.
B.
V2524, RCP Bleedoff Cntmt Isol, is OPEN.
C.
Normal Bleedoff Flow for affected RCP(s) has been established.
- 6.
- If CBO flow can NOT be reestablished within 30 minutes, Then PERFORM the following:
A.
TRIP the Reactor.
B.
TRIP the Turbine.
C.
STOP all RCPs.
D.
IMPLEMENT 2-EOP- 01, Standard Post Trip Actions.
- 7.
11 any seal has failed, as indicated by a loss of differential pressure across the seal, Then TAKE 30 minute readings on controlled bleed off flow and cavity pressures, using Data Sheet 1, until it is determined that additional seal degradation is NOT occurring.
- 8.
If two seals have failed, Then:
A.
NOTIFY the system dispatcher.
B.
BEGIN a unit shutdown.
C.
When CEA TCBs are open, Then STOP the affected RCP.
CONTINGENCY ACTIONS 5.1 If normal Controlled Bleedoff can NOT be VERIFIED, Then OPEN V2507, RCP Bleedoff Relief Stop Vlv.
32B REACTOR COOLANT PUMP PROCEDURE NO.:
2-0120034 ST. LUCIE UNIT 2 6.3 RCP Seal Problems/Anomalies (continued)
INSTRUCTIONS
- 9.
1f three seals have failed, Then:
A.
TRIP the reactor.
B.
TRI P the turbine.
C.
STOP the affected RCP(s).
D.
IMPLEMENT 2-EOP- 01, Standard Post Trip Actions.
NOTE CONTINGENCY ACTIONS Annunciator R-8, SIAS Channel AlB Actuation Block Permissive, alarms at a setpoint of 1836 psia.
- 10.
- 1f a RCP has been Stopped while in Hot Standby or Mode 1 conditions and a reactor plant cooldown is not to be performed, Then DEPRESSURIZE the RCS to between 1800 pSia to 1850 psia to maintain RCP lower seal cavity temperature less than 300°F.
END OF SECTION 6.3
FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE ALIGN THE ECCS FOR SIMULTANEOUS HOT AND COLD LEG INJECTION - UNIT 2 NRC 5-3 Developed/Revised by: __
L_a----"rry_R_ich __
Training Management APproval:'~ n ~
DR FT 4/01/08 Date raliloK ate JPM NRC S-3 Rev 0 Simulator Page 1 of 9
JOB PERFORMANCE MEASURE 07003110, ALIGN SAFETY INJECTION FOR HOT AND COLD LEG INJECTION Faulted JPM?
No Facility JPM #:
0821158 (Modified for NRC exam)
KIA Rating(s):
006 A4.02 4.0 I 3.8 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when the US is informed that 2B Hot and Cold leg injection is aligned.
Evaluation Location:
Simulator X
References:
In Plant Lab Other Performance Level:
Perform X
Simulate Discuss 2-EOP-99, Appendix 0, "Simultaneous Hot and Cold Leg Injection" Validation Time: 15 minutes Tools/Equipment/Procedures Needed:
None Time Critical:
Specific Safety Rules. Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC S-3 Rev 0 Simulator Page 2 of9
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is: Align the 28 HPSI to Provide Hot and Cold Leg Injection - Unit 2 The performance level to be used for this JPM is Perform This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
A loss of coolant accident has occurred and has been diagnosed in Unit 2. It is four and a half (4.5) hours post-trip, and Shutdown Cooling can NOT be established. 2A and 28 HPSI pumps are running.
INITIATING CUES:
You are the RCO. The US has directed you to complete Section 2, Simultaneous Hot and Cold Leg Injection lAW 2-EOP-99, Appendix 0, for 8 side ONLY.
JPM NRC S-3 Rev 0 Simulator Page 3 of9
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: ___
Section 2: Aligning 28 HPSI for Hot Leg Injection:
STEP 1:
OPEN V3551, To Hot Leg 2B Valve.
STANDARD:
POSITION V3551 control switch to OPEN.
EXAMINER'S CUE:
COMMENTS:
STEP 2:
OPEN V3523, To Hot Leg 2B Valve.
STANDARD:
POSITION V3523 control switch to OPEN.
EXAMINERS NOTE: V3523 will not open SAT UNSAT FAULTED STEP SAT EXAMINER'S CUE: When Candidate recognizes V3523 will not open, inform him as US to align the A side for Hot and Cold Leg Injection
-- UNSAT EXAMINERS NOTE: Although not procedurely driven, Candidate should go back and close V3551, to Hot Leg 28 Valve COMMENTS:
Section 1: Aligning 2A HPSI for Hot Leg Injection STEP 3:
OPEN V3550, To Hot Leg 2A Valve.
STANDARD:
POSITION V3550 control switch to OPEN.
EXAMINER'S CUE:
COMMENTS:
CRITICAL STEP SAT UNSAT JPM NRCS-3 RevO Simulator Page 4 of 9
STEP 4:
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST OPEN V3540, To Hot Leg Valve.
POSITION V3540 control switch to OPEN EXAMINER'S CUE:
COMMENTS:
STEP 5:
CLOSE V3656, Pump 2A Discharge Valve.
STANDARD:
POSITION V3656 control switch to CLOSE EXAMINER'S CUE:
COMMENTS:
CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT STEP 6:
VERIFY flow to the 2A Hot Leg is greater than or equal to 250 gpm on ANY of the following instruments:
FI-3315 HPSI to Hot Leg FR-3317 HPSI to Hot leg 2A Flow STANDARD:
OBSERVE FI-3315 or FR-3317 EXAMINER'S CUE:
COMMENTS:
SAT UNSAT JPM NRCS-3 RevO Simulator Page 50f9
PROCEDURE TITLE:
APPENDICES I FIGURES I TABLES I DATA SHEETS 2-EOP-99 ST. LUCIE UNIT 2 APPENDIX 0 SIMULTANEOUS HOT AND COLD LEG INJECTION (Page 1 of 4)
NOTE If a HPSI Pump has been throttled post-RAS due to excessive flow, the HPSI pump that is NOT throttled should be used for simultaneous hot and cold Ie in*ection.
ction 1: Aligning 2A HPSI for Hot Leg Injection
- 1. OPEN V3550, To Hot Leg 2A Valve.
o 2. OPEN V3540, To Hot Leg 2A Valve.
o 3. CLOSE V3656, Pump 2A Discharge Valve.
- 4. VERIFY flow to the 2A Hot Leg is greater than or equal to 250 gpm on ANY of the following instruments:
o FI-3315, HPSI To Hot Leg o FR-3317, HPSI To Hot Leg 2A Flow o 5. 1f ONE HPSI Pump is RUNNING, Then ENSURE flow to the Cold Legs is greater than or equal to 250 gpm by the TOTAL of all FOUR of the following instruments:
o FI-3321, HPSI Loop 2A1 Flow o FI-3311, HPSI Loop 2A2 Flow o FI-3331, HPSI Loop 2B1 Flow o FI-3341, HPSI Loop 2B2 Flow OR o FR-3313 13323, HPSI Loop 2A2 & 2A1 Flow o FR-3333 13343, HPSI Loop 2B2 & 2B1 Flow
STEP 7:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST IF ONE HPSI Pump is running, THEN ENSURE flow to the Cold Legs is greater than or equal to 250 gpm by the TOTAL of all FOUR of the following instruments:
FI-3321 HPSI Loop 2A1 Flow SAT FI-3311 HPSI Loop 2A2 Flow FI-3331 HPSI Loop 2B1 Flow FI-3341 HPSI Loop 2B2 Flow
-- UNSAT STANDARD:
DETERMINE that two HPSI Pumps are running and this step is N/A EXAMINER'S CUE:
COMMENTS:
STEP 8:
IF TWO HPSI Pump is running, THEN ENSURE flow to the Cold Legs is greater than or equal to 440 gpm by the TOTAL of all FOUR of the following instruments:
FI-3321 HPSI Loop 2A1 Flow FI-3311 HPSI Loop 2A2 Flow FI-3331 HPSI Loop 2B1 Flow FI-3341 HPSI Loop 2B2 Flow OR FR-3313 I 3323 HPSI Loop 2A2 & 2A1 Flow FR-3333 I 3343 HPSI Loop 2B2 & 2B1 Flow STANDARD:
OBSERVE Flow instruments listed above EXAMINER'S CUE:
COMMENTS:
SAT UNSAT JPM NRCS-3 RevO Simulator Page 6 of9
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 9:
Notify the US that the 2A HPSI train is Aligned for simultaneous Hot and Cold Leg injection.
STANDARD:
NOTIFY the US that simultaneous Hot and Cold Leg injection is ALIGNED __ SAT to the 2A HPSI train.
EXAMINER'S CUE:
US ACKNOWLEDGES.
COMMENTS:
END OF TASK STOP TIME: ___
UNSAT JPM NRCS-3 RevO Simulator Page 7 of9
- 1.
RESTORE File XR021.Dat.
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP
- 2.
V3523 is failed closed in Ie set.
- 3.
UNFREEZE the Simulator when the student is ready.
JPM NRC S-3 RevO Simulator Page 8of9
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
A loss of coolant accident has occurred and has been diagnosed in Unit 2. It is four and a half (4.5) hours post-trip, and Shutdown Cooling can NOT be established. 2A and 2B HPSI pumps are running.
INITIATING CUES:
You are the RCO. The US has directed you to complete Section 2 Simultaneous Hot and Cold Leg Injection lAW 2-EOP-99, Appendix 0, for B side ONLY.
Page 9 of 9
REVISION NO.:
35 PROCEDURE NO.:
2-EOP-99 PROCEDURE TITLE:
APPENDICES I FIGURES I TABLES I DATA SHEETS ST. LUCIE UNIT 2 APPENDIX 0 SIMULTANEOUS HOT AND COLD LEG INJECTION (Page 2 of 4)
Section 1: Aligning 2A HPSI for Hot Leg Injection (continued)
D 6. 1f TWO HPSI Pumps are RUNNING, Then ENSURE flow to the Cold Legs is greater than or equal to 440 gpm by the TOTAL of all FOUR of the following instruments:
D FI-3321, HPSI Loop 2A 1 Flow D FI-3311, HPSI Loop 2A2 Flow D FI-3331, HPSI Loop 2B1 Flow D FI-3341, H PSI Loop 2B2 Flow OR D FR-3313 13323, HPSI Loop 2A2 & 2A1 Flow D FR-3333 13343, HPSI Loop 2B2 & 2B1 Flow End of Section 1
35 PROCEDURE NO.:
2-EOP-99 APPENDICES I FIGURES I TABLES I DATA SHEETS ST. LUCIE UNIT 2 APPENDIX 0 SIMULTANEOUS HOT AND COLD LEG INJECTION (Page 3 of 4) on 2: Aligning 28 HPSI for Hot Leg Injection D 1. OPEN V3551, To Hot Leg 2B Valve.
D 2. OPEN V3523, To Hot Leg 2B Valve.
D 3. CLOSE V3654, Pump 2B Discharge Valve.
D 4. VERIFY flow to the 2B Hot Leg is greater than or equal to 250 gpm on ANY of the following instruments:
D FI-3325, HPSI To Hot Leg 2B Flow D FR-3327, HPSI To Hot Leg 2B Flow D 5. J1 ONE HPSI Pump is RUNNING, Then ENSURE flow to the Cold Legs is greater than or equal to 250 gpm by the TOTAL of all FOUR of the following instruments:
D FI-3321, HPSI Loop 2A1 Flow D FI-3311, HPSI Loop 2A2 Flow D FI-3331, HPSI Loop 2B1 Flow D FI-3341, HPSI Loop 2B2 Flow OR D FR-3313 13323, HPSI Loop 2A2 & 2A1 Flow D FR-3333 13343, HPSI Loop 2B2 & 2B1 Flow
35 PROCEDURE NO.:
2-EOP-99 APPENDICES / FIGURES / TABLES / DATA SHEETS ST. LUCIE UNIT 2 APPENDIX 0 SIMULTANEOUS HOT AND COLD LEG INJECTION (Page 4 of 4) on 2: Aligning 28 HPSI for Hot Leg Injection (continued) o 6. !f TWO HPSI Pumps are RUNNING, Then ENSURE flow to the Cold Legs is greater than or equal to 440 gpm by the TOTAL of all FOUR of the following instruments:
o FI-3321, HPSI Loop 2A1 Flow o FI-3311, HPSI Loop 2A2 Flow o FI-3331, HPSI Loop 2B1 Flow o FI-3341, HPSI Loop 2B2 Flow OR o FR-3313 / 3323, HPSI Loop 2A2 & 2A1 Flow o FR-3333 / 3343, HPSI Loop 2B2 & 2B1 Flow End of Section 2 END OF APPENDIX 0
FPL DRAFT Reminder to the TPE Evaluator Refer to the OJT/TPE Procedure and follow the instructions.
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE ESTABLISH ALTERNATE CHARGING FLOWPATH TO RCS THROUGH 'A' HPSI HEADER - UNIT 2 Bank JPM 0821115/R11 Simulator NRC S-4 Developed/Revised by: __
J_.W_"_W_ee_k-,--s __
Training Management Approval: ~'~JJP'J'v{U... a~ +1 Lt-R FT 4/25/07 Date
~
~y Date JPM 0821115/R11 Simulator or U2 Control Room Page 1 of9
JPM 0821115/R11 Simulator or U2 Control Room Page 2 of9
Task:
Faulted JPM?
Facility JPM #:
K/A Rating(s):
JOB PERFORMANCE MEASURE 05002180, Respond to a Loss of Charging 07002130, ALIGN ALTERNATE CHARGING FLOW PATH 07002610, VERIFY BORATION FLOW PATH 07002650, EMERGENCY BORATE THE RCS No 0821115 A.15.03 A.15.14(3.6)
Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when the US is notified that emergency boration has been established through the
'A' High Pressure Safety Injection Header.
Evaluation Location:
Simulator X
References:
In Plant X
Lab Other Performance Level:
Perform X
Simulate X
Discuss 2-EOP-99, Appendix T, "Alternate Charging Flow Path to RCS Through 'A' HPSI Header" Validation Time: 5 minutes Time Critical:
Tools/Equipment/Procedures Needed:
2-EOP-99, Appendix T, "Alternate Charging Flow Path to RCS Through 'A' HPSI Header" Specific Safety Rules. Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM 0821115/R11 Simulator or U2 Control Room Page 30f9
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is:
Establish Alternate Charging Flow Path through 'A' HPSI Header - Unit 2 The performance level to be used for this JPM is Perform, or Simulate.
(Circle the performance level being used for this implementation of the JPM)
This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 2 was tripped from 100% power due to a problem with the Feedwater Regulating System.
Subsequent to the trip it was discovered that two CEAs had stuck out and emergency boration was begun. The SNPO reported a pipe break in the charging header between V2429 and V2523, and the emergency boration line-up was secured. With the loss of the Reactivity Control safety function, it was decided to enter 2-EOP-15.
INITIATING CUES:
You are the Desk RCO. The US has directed you to emergency borate using 'A' HPSI header and the 2A Charging Pump per 2-EOP-99, Appendix T, "Alternate Charging Flow Path to RCS Through
JPM 0821115/R11 Simulator or U2 Control Room Page 4 of9
START TIME: ___ _
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST 2-EOP-99, Appendix T, "Alternate Charging Flow Path to RCS Through 'A' HPSI Header."
STEP 1:
ENSURE letdown is ISOLATED.
STANDARD:
Verify all letdown Isolation Valves CLOSED.
- EXAMINER'S CUE:
All letdown isolation valves closed, Green light ON, Red light OFF.
COMMENTS:
STEP 2:
PLACE ALL Charging Pump in STOP.
STANDARD:
VERIFY ALL Charging Pump control switches to STOP.
- EXAMINER'S CUE:
ALL charging Pumps are in STOP, Green light ON, Red light OFF.
COMMENTS:
STEP 3:
PLACE 2A HPSI Pump in STOP.
STANDARD:
POSITION 2A HPSI Pump switch in STOP.
- EXAMINER'S CUE:
2A HPSI pump switch in STOP, Green light ON, Red light OFF.
COMMENTS:
STEP 4:
CLOSE V3656, HPSI Pump 2A Discharge Valve.
STANDARD:
OBTAIN key #67, POSITION V3656 to CLOSED.
- EXAMINER'S CUE:
V3656 indicates Green light ON, Red light OFF Q-33 Alarms.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
__ SAT
__ UNSAT
__ SAT
__ UNSAT
__ SAT
__ UNSAT CRITICAL STEP
__ SAT
__ UNSAT JPM 0821115/R11 Simulator or U2 Control Room Page 50f9
STEP 5:
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST Locally OPEN V2340, Charging Pump Discharge to 'A' HPSI Header Isolation. (located in 2C Charging Pump Room).
DIRECT SNPO to OPEN V2340.
- EXAMINER'S CUE:
The SNPO Reports V2340 is OPEN.
COMMENTS:
STEP 6:
if desired to use ANY combination of Charging Pump, Then locally LOCK CLOSED V2429, Charging Pump Discharge Isolation.
STANDARD:
DIRECT THE SNPO to locally LOCK CLOSED V2429.
- EXAMINER'S CUE:
The SNPO REPORTS that V2429 is LOCK CLOSED.
EXAMINER'S NOTE:
Break is downstream of V2429 per the cue therefore V2429 is to be closed. Located in pipe penetration room at Penetration Number 27.
COMMENTS:
STEP 7:
Locally OPEN V3519, Charging Pump to 'A' HPSI Hdr Isol (Located in "A" HPSI pump room).
STANDARD:
DIRECT THE SNPO to locally OPEN V3519.
- EXAMINER'S CUE:
The SNPO REPORTS that V3519 is OPEN.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT JPM 0821115/R11 Simulator or U2 Control Room Page 6 of 9
STEP 8:
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST ENSURE Charging Pump(s) have a suction flowpath from ONE of the following sources:
Boric Acid Makeup Tank Refueling Water Tank Volume Control Tank Verify Charging Pump Suction Flowpath.
- EXAMINER'S CUE:
Charging Pump Suction is from the Boric Acid Makeup Tank.
COMMENTS:
STEP 9:
ENSURE Charging Pump(s) have a discharge flowpath by OPENING at least ONE 'A' HPSI Header Loop Isolation Valve:
HCV-3617 2A2 Cold Leg HCV-3627 2A 1 Cold Leg HCV-3637 2B1 Cold Leg HCV-3647 2B2 Cold Leg STANDARD:
POSITION Anyone of the four valves to OPEN.
- EXAMINER'S CUE:
As anyone of the four Valves is OPENED, indicate the Green light is OFF, Red light is ON.
COMMENTS:
STEP 10:
START Charging Pump(s) AS NECESSARY.
STANDARD:
POSITION the 2A Charging Pump to START.
- EXAMINER'S CUE:
2A Charging Pump indicates Green light OFF and Red light ON. Recirc Valve Indicates BOTH lights ON. After 3 minutes Recirc Indicates Green light ON and Red light OFF.
EXAMINER'S CUE:
As Recirc Valve closes, depending on which SI Header Valve is opened, R-46, 47, 56 or 57 Alarms and Loop Pressure PIA-3329, 3319, 3339 or 3349 Indicates -1980 psig.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
SAT UNSAT CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT JPM 0821115/R11 Simulator or U2 Control Room Page 70f9
STEP 11:
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST VERIFY flow to the RCS by ANY of the following:
Pressurizer level rising Indicated flow on applicable HPSI Loop Flow Indicator OBSERVE Pressurizer Level and HPSI flow for PROPER indication.
- EXAMINER'S CUE:
Pressurizer Level is slowly RISING and applicable HPSI Loop Flow Indicates 44 gpm.
COMMENTS:
STEP 12:
VERIFY emergency boration suction flowpath to charging pump(s).
STANDARD:
OBSERVE charging pump suction from Boric Acid Makeup Tank.
- EXAMINER'S CUE:
BAM Tank supplying Charging Pump suction.
EXAMINER'S NOTE:
Per Initial Conditions, emergency boration flow path pre-existed the loss of charging header.
COMMENTS:
STEP (done}:
NOTIFY the US that emergency boration and charging flow has been established through the 'A' High Pressure Safety Injection Header using the 2A Charging Pump.
STANDARD:
NOTIFY the US that emergency boration and charging flow has been ESTABLISHED through the 'A' High Pressure Safety Injection Header using the 2A Charging Pump.
EXAMINER'S CUE:
US ACKNOWLEDGES COMMENTS:
END OF TASK STOP TIME: ___
- Cues are to be used only if JPM performance is being simulated in the plant.
SAT UNSAT SAT UNSAT JPM 0821115/R11 Simulator or U2 Control Room Page 8 of9
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP
- 1.
RESTORE IC-1. UNFREEZE the Simulator.
- 2.
SELECT the Lesson File Folder for JPM.
- 3.
OPEN the Lesson File for 0821115 and EXECUTE the Lesson.
- 4.
TRIGGER STEP 1.
- 5.
After Letdown isolates on high temperature, CLOSE all three Letdown valves and PLACE all Charging pumps in STOP.
- 6.
Line up Emergency Boration by performing the following steps:
~ START 2A or 2B BA Pump.
~ CLOSE V2650, Tank 2A Recirc. Valve.
~ CLOSE V2651, Tank 2B Recirc Valve.
~ OPEN V2514, Emergency Borate.
- 7.
The Simulator will automatically FREEZE after about 5 minutes. All SPTAs are performed by the scenario.
- 8.
STORE a temporary IC set if more than one student is to take the JPM. Note: The lesson will have to be stopped and then re-executed each time the temporary IC set is restored.
- 9.
UNFREEZE the simulator when the student is ready.
- 10.
TRIGGER STEP 'Open V2340' when directed to do so by the student.
- 11.
TRIGGER STEP 'Close V2429' when directed to do so by the student.
- 12.
TRIGGER STEP 'Open V3519' when directed to do so by the student.
JPM 0821115/R10 Simulator or U2 Control Room Page 9 of9
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 2 was tripped from 100% power due to a problem with the Feedwater Regulating System.
Subsequent to the trip it was discovered that two CEAs had stuck out and emergency boration was begun. The SNPO reported a pipe break in the charging header between V2429 and V2523, and the emergency boration line-up was secured. With the loss of the Reactivity Control safety function, it was decided to enter 2-EOP-15.
INITIATING CUES:
You are the Desk RCO. The US has directed you to emergency borate using 'A' HPSI header and the 2A Charging Pump per 2-EOP-99, Appendix T, "Alternate Charging Flow Path to RCS Through
REVISION NO.:
PROCEDURE TITLE:
35 PROCEDURE NO.:
APPENDICES / FIGURES / TABLES / DATA SHEETS 2-EOP-99 ST. LUCIE UNIT 2 APPENDIX T ALTERNATE CHARGING FLOW PATH TO RCS THROUGH 'A' HPSI H (Page 1 of 2)
CAUTION Use of this Appendix indicates a condition where the normal charging flowpath to the RCS has become unavailable due to a component or piping failure. This lineup will render the 2A HPSI Pump inoperable and letdown will not be possible due to loss of cooling flow through the Regenerative Heat Exchanger.
D 1. ENSURE letdown is ISOLATED.
D 2. PLACE ALL Charging Pumps in STOP.
D 3. PLACE 2A HPSI Pump in STOP.
D 4. CLOSE V3656, HPSI Pump 2A Discharge Valve.
D 5. DISPATCH an operator to perform the following valve alignment:
D A. Locally OPEN V2340, Charging Pump Discharge to 'A' HPSI Header Isolation. (located in 2C Charging Pump Room)
D B. !f desired to use ANY combination of Charging Pumps, Then locally LOCK CLOSED V2429, Charging Pump Discharge Isolation.
D C. !f desired to use ONLY the 2C Charging Pump, Then locally LOCK CLOSED V2338, 2C Charging Pump Disch. to Common Disch. Header Isolation.
D D. Locally OPEN V3519, Charging Pump to "A" HPSI Hdr Isol (Located in "A" HPSI pump room).
D 6. ENSURE Charging Pump(s) have a suction flowpath from ONE of the following sources.
D Boric Acid Makeup Tank D Refueling Water Tank D Volume Control Tank
REVISION NO.:
PROCEDURE TITLE:
35 PROCEDURE NO.:
APPENDICES I FIGURES I TABLES I DATA SHEETS 2-EOP-99 ST. LUCIE UNIT 2 APPENDIX T ALTERNATE CHARGING FLOW PATH TO RCS THROUGH 'A' HPSI HEAD (Page 2 of 2)
D 7. ENSURE Charging Pump(s) have a discharge flowpath by OPENING at least ONE 'A' HPSI Header Loop Isolation Valve.
D HCV-3617 (2A2 Cold Leg)
D HCV-3627 (2A 1 Cold Leg)
D HCV-3637 (2B1 Cold Leg)
D HCV-3647 (2B2 Cold Leg)
D 8. START Charging Pump(s) AS NECESSARY.
D 9. VERIFY flow to the RCS by ANY of the following:
D Pressurizer level rising D Indicated flow on applicable HPSI Loop Flow Indicator END OF APPENDIX T
FPL DRAFT Reminder to the TPE Evaluator Refer to the OJTITPE Procedure and follow the instructions.
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO HIGH RADIATION ALARM ON SPENT FUEL MONITORS - UNIT 2 Bank JPM 0821117A/R07 Simulator NRC S-5 Developed/Revised by: __
..:....:.J. W.:....:....:.... W--,--e"-'.e,,-,-,=ks __
Training Management Approval: ~ (:, UA)"J'\\AN--
6'".......
..(,~
DRAFT 4/26/07 Date
~/ (" /l.Il oJ
\\ Date JPM 0821117 AfR07 Simulator or U2 Control Room Page 1 of 11
JOB PERFORMANCE MEASURE 07025090, ALIGN SFP VENTILATION TRAINS 07067430, RESPOND TO FUEL HANDLING ACCIDENT (DROPPED/DAMAGED FUEL)
Faulted JPM?
Yes Facility JPM #:
0821117A K/A Rating(s):
3.1 B.01.05 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when the US has been notified that the Fuel Handling Building ventilation line-up has been verified including contingency actions in accordance with 2-0NP-26.02.
Evaluation Location:
Simulator X
References:
In Plant X
Lab 2-0NP-26.02, Area Radiation Monitors Validation Time: 10 minutes Tools/Equipment/Procedures Needed:
Other 2-0NP-26.02, "Area Radiation Monitors" Performance Level:
Perform X
Simulate X
Time Critical:
Discuss Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM 0821117 NR07 Simulator or U2 Control Room Page 2 of 11
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is:
Respond to high radiation alarm on Spent Fuel Monitors - Unit 2 The performance level to be used for this JPM is Perform, or Simulate.
(Circle the performance level being used for this implementation of the JPM)
This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 2 is at 100% power. Refueling preparations are being made in the Fuel Handling Building with spent fuel movement in the spent fuel pool. Spent Fuel Pool Radiation Monitors, GAG007, GAG009, GAG011, and GAG012 are in High Alarm and GAG008 and GAG010 are in Alert Alarm.
2-0NP-26.02 is being implemented. The alarms have been verified valid. The fuel movement has been suspended and the FHB has been evacuated.
INITIATING CUES:
You are the Desk RCO. The US has directed you to verify proper Fuel Handling Building ventilation line-up in accordance with 2-0NP-26.02, "Area Radiation Monitors," step 4.2.2.0.
JPM 0821117 AfR07 Simulator or U2 Control Room Page 3 of 11
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: ___ _
VERIFY the following fans are OFF:
STEP 1:
HVS-6, Fuel Pool Supply Fan.
STANDARD:
ENSURE HVS-6 is OFF.
- EXAMINER'S CUE:
HVS-6 indicates Green light ON, Red light OFF.
COMMENTS:
STEP 2:
HVS-7, Fuel Handling Bldg Supply Fan.
STANDARD:
ENSURE HVS-7 is OFF.
- EXAMINER'S CUE:
HVS-7 indicates Green light ON, Red light OFF.
COMMENTS:
STEP 3:
HVE-15, Fuel Handling Bldg Exhaust Fan.
STANDARD:
ENSURE HVE-15 is OFF.
- EXAMINER'S CUE:
HVE-15 indicates Green light ON, Red light OFF.
COMMENTS:
STEP 4:
HVE-16A, Fuel Pool Exhaust Fan.
STANDARD:
ENSURE HVE-16A is OFF.
- EXAMINER'S CUE:
HVE-16A indicates Green light ON, Red light OFF.
COMMENTS:
,i
- Cues are to be used only if JPM performance is being simulated in the plant.
SAT UNSAT SAT UNSAT SAT UNSAT SAT UNSAT JPM 0821117AJR07 Simulator or U2 Control Room Page 4 of 11
STEP 5:
STANDARD:
~
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST HVE-16B, Fuel Pool Exhaust Fan.
ENSURE HVE-16B is OFF.
- EXAMINER'S CUE:
HVE-168 indicates Green lights ON, Red lights OFF COMMENTS:
STEP 6:
HVE-17, Fuel Bldg Swgr Area Exhaust Fan (local indication only).
STANDARD:
DIRECT the SNPO to locally STOP HVE-17.
- EXAMINER'S CUE:
SNPO reports that HVE-17 is STOPPED.
COMMENTS:
STEP 7:
VERIFY the following FHB dampers are CLOSED:
0-33, Fuel Hdlg Bldg Inlet Damper 0-35, Fuel Hdlg Bldg Outlet Damper 0-29, Fuel Pool Inlet Damper 0-31, Fuel Pool Outlet Damper 0-34, Fuel Hdlg Bldg Inlet Damper 0-36, Fuel Hdlg Bldg Outlet Damper 0-30, Fuel Pool Inlet Damper 0-32, Fuel Pool Outlet Damper STANDARD:
VERIFY Dampers 0-29 through 0-36 are CLOSED.
- EXAMINER'S CUE:
Dampers D-29 through D-36 indicate Green light ON, Red light OFF as each damper is verified.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
SAT UNSAT SAT UNSAT SAT UNSAT JPM 0821117A1R07 Simulator or U2 Control Room Page 5 of 11
STEP 8:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST VERIFY the following components are aligned as indicated:
FCV-25-30, Fuel Handling Emerg Vent VI v, is OPEN.
STANDARD:
OBSERVE FCV-25-30 CLOSED.
- EXAMINER'S CUE:
FCV-25-30 indicates Green light ON, Red Light OFF.
EVALUATOR'S NOTE: Faulted Step FCV-25-30 failed to auto OPEN.
COMMENTS:
CONTINGENCY ACTION:
STEP 9:
PERFORM the following on the HVCB:
OPEN FCV-25-30 at the HVAC panel.
STANDARD:
POSITION FCV-25-30 control switch to OPEN.
- EXAMINER'S CUE:
FCV-25-30 indicates Green light OFF, Red Light ON.
X-4 Alarms as delta-P lowers.
COMMENTS:
STEP 10:
FCV-25-32, SBVS Isolation Valve, is CLOSED.
STANDARD:
OBSERVE FCV-25-32 OPEN.
- EXAMINER'S CUE:
FCV-25-32 indicates Green light OFF, Red Light ON.
EVALUATOR'S NOTE: Faulted Step FCV-25-32 failed to auto CLOSE.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
FAULTED STEP
__ SAT
__ UNSAT CRITICAL STEP
__ SAT
__ UNSAT FAULTED STEP
__ SAT
__ UNSAT JPM 0821117A1R07 Simulator or U2 Control Room Page 6 of 11
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CONTINGENCY ACTION:
STEP 11:
PERFORM the following on the HVCB:
CLOSE FCV-25-32 at the HVAC panel.
STANDARD:
POSITION FCV-25-32 control switch to CLOSE.
- EXAMINER'S CUE:
FCV-2S-32 indicates Green light ON, Red Light OFF.
V-20 Alarms.
COMMENTS:
STEP 12:
HVE-6A, SBVS Exhaust Fan, is ON.
STANDARD:
ENSURE HVE-6A is ON.
- EXAMINER'S CUE:
HVE-6A indicates Green light OFF, Red light ON.
COMMENTS:
STEP 13:
FCV-25-31, Fuel Handling Emerg Vent Vlv., is OPEN.
STANDARD:
OBSERVE FCV-25-31 CLOSED.
- EXAMINER'S CUE:
FCV-2S-31 indicates Green light ON, Red Light OFF.
EVALUATOR'S NOTE: Faulted Step FCV-2S-31 failed to auto OPEN.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
CRITICAL STEP SAT UNSAT SAT UNSAT FAULTED STEP SAT UNSAT JPM 0821117A/R07 Simulator or U2 Control Room Page 7 of 11
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CONTINGENCY ACTION:
STEP 14:
PERFORM the following on the HVCB:
OPEN FCV-25-31 at the HVAC panel.
STANDARD:
POSITION FCV-25-31 control switch to OPEN.
- EXAMINER'S CUE:
FCV-2S-31 indicates Green light OFF, Red Light ON.
COMMENTS:
STEP 15:
FCV-25-33, SBVS Isolation Valve, is CLOSED.
STANDARD:
OBSERVE FCV-25-33 OPEN.
- EXAMINER'S CUE:
FCV-2S-33 indicates Green light OFF, Red Light ON.
EVALUATOR'S NOTE: Faulted Step FCV-2S-33 failed to auto CLOSE.
COMMENTS:
CONTINGENCY ACTION:
STEP 16:
PERFORM the following on the HVCB:
CLOSE FCV-25-33 at the HVAC panel.
STANDARD:
POSITION FCV-25-33 control switch to CLOSE.
- EXAMINER'S CUE:
FCV-2S-33 indicates Green light ON, Red Light OFF.
V-21 Alarms.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
CRITICAL STEP SAT UNSAT FAULTED STEP SAT UNSAT CRITICAL STEP SAT UNSAT JPM 0821117A1R07 Simulator or U2 Control Room Page 8 of 11
STEP 17:
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST HVE-6B, SBVS Exhaust Fan, is ON.
ENSURE HVE-6B is ON.
- EXAMINER'S CUE:
HVE-68 indicates Green light OFF, Red light ON.
COMMENTS:
STEP (done):
NOTIFY the US that the Fuel Handling Building ventilation line-up has been verified in accordance with 2-0NP-26.02 and FCV-25-30 and FCV-25-31 had to be manually opened, FCV-25-32 and FCV-25-33 had to be manually closed.
STANDARD:
NOTIFY the US that the Fuel Handling Building ventilation line-up has been VERIFIED and FCV-25-30 and FCV-25-31 had to be manually OPENED and FCV-25-32 and FCV-25-33 had to be manually CLOSED.
EXAMINER'S CUE:
US ACKNOWLEDGES.
COMMENTS:
END OF TASK STOP TIME: ___ _
- Cues are to be used only if JPM performance is being simulated in the plant.
SAT UNSAT SAT UNSAT JPM 0821117A1R07 Simulator or U2 Control Room Page 9 of 11
- 1.
RESTORE IC-1.
- 2.
UNFREEZE the Simulator.
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP
- 3. SELECT the JPM Lesson File Folder.
- 4.
OPEN and EXECUTE the lesson for 0821117A. ACKNOWLEDGE the PC-11 alarm.
- 5.
FREEZE the Simulator.
- 6.
STORE a Temporary IC set if more than one student will be performing the JPM. UNFREEZE the Simulator for a few seconds and then FREEZE the Simulator. ACKNOWLEDGE the PC-11 alarm.
Note: The lesson will have to be stopped and then re-executed each time the temporary IC set is restored.
- 7.
UNFREEZE the Simulator when the student is ready to begin.
JPM 0821117A/R07 Simulator or U2 Control Room Page 10 of 11
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 2 is at 100% power. Refueling preparations are being made in the Fuel Handling Building with spent fuel movement in the spent fuel pool. Spent Fuel Pool Radiation Monitors, GAGOO?,
GAG009, GAG011, and GAG012 are in High Alarm and GAG008 and GAG01 0 are in Alert Alarm.
2-0NP-26.02 is being implemented. The alarms have been verified valid. The fuel movement has been suspended and the FHB has been evacuated.
INITIATING CUES:
You are the Desk RCO. The US has directed you to verify proper Fuel Handling Building ventilation line-up in accordance with 2-0NP-26.02, "Area Radiation Monitors," step 4.2.2.0.
ION NO.:
PROCEDURE TITLE:
6 AREA RADIATION MONITORS 2-0NP-26.02 ST. LUCIE UNIT 2 Fuel Handling Building Radiation Monitors INSTRUCTIONS
- 1. DETERMINE alarm validity:
A. VERIFY PC-11 channel display for the affected channel is NOT blue (indicating system or equipment failure) or magenta (indicating PC-11 communications failure)
B. VERIFY PC-11 channel indication agrees with indication on the Control Room monitor for the affected channel (i.e.,
alert or high alarm):
RC-26-7, Spent Fuel RC-26-8, Spent Fuel RC-26-9, Spent Fuel RC-26-10, Spent Fuel RC-26-11, Spent Fuel RC-26-12, Spent Fuel C. VERIFY increased or increasing trend for the affected channel:
RR-26-1, (Channels 17, 18,
- 19) Spent Fuel RR-26-2, (Channels 17, 18,
- 19) Spent Fuel D. 1f only one FHB monitor is alarmed, Then CHECK the other FHB monitors for increasing radiation levels.
- 2. 1f a valid alarm exists, Then PERFORM the following:
A. 1f fuel movement is in progress, Then SUSPEND fuel movement.
CONTINGENCY ACTIONS 1.1 1f the alarm is NOT valid, Then GO TO Appendix A, Inoperable Monitor.
1.2 If PC-11 Driver hang alarm appears refer to Appendix C.
6 AREA RADIATION MONITORS PROCEDURE NO.:
2-0NP-26.02 ST. LUCIE UNIT 2 Fuel Handling Building Radiation Monitors (continued)
INSTRUCTIONS
- 2.
(continued)
B. EVACUATE the fuel pool area and INSTRUCT personnel to remain on the landing outside the Fuel Handling Building door until monitored for contamination.
- c. CONTACT Security to ensure all personnel have exited the FHB.
NOTE CONTINGENCY ACTIONS There are a total 6 Spent Fuel Pool Area monitors divided into 2 groups.
Two out of three HIGH alarms on either train will initiate all actions.
SA Train SB Train RC-26-7 (GAG-OO?)
RC-26-8 (GAG-008)
RC-26-9 (GAG-009)
RC-26-10 (GAG-010)
RC-26-11 (GAG-011)
RC-26-12 (GAG-012)
D. 1f EITHER of the following conditions exists:
Two or more SA Train FHB monitors are in HIGH alarm condition Two or more SB Train FHB monitors are in HIGH alarm condition Then PERFORM the following:
TITLE:
6 AREA RADIATION MONITORS NO.:
2-0NP-26.02 ST. LUCIE UNIT 2 Fuel Handling Building Radiation Monitors (continued)
INSTRUCTIONS CONTINGENCY ACTIONS
- 2.
D.
(continued)
- 1. VERIFY the following fans 1.1 STOP the following fans at are OFF:
the HVAC panel or locally as HVS-6, Fuel Pool Supply conditions allow:
Fan
- HVS-6, Fuel Pool Supply HVS-7, Fuel Handling Fan Bldg Supply Fan
- HVS-7, Fuel Handling HVE-15, Fuel Handling Bldg Supply Fan Bldg Exhaust Fan
- HVE-15, Fuel Handling HVE-16A, Fuel Pool Bldg Exhaust Fan Exhaust Fan
- HVE-16A, Fuel Pool HVE-16B, Fuel Pool Exhaust Fan Exhaust Fan
- HVE-16B, Fuel Pool HVE-17, Fuel Bldg Swgr Exhaust Fan Area Exhaust Fan
- HVE-17, Fuel Bldg Swgr (local indication only)
Area Exhaust Fan
- 2. VERIFY the following FHB 2.1 PULL the following fuses to dampers are CLOSED:
FAIL CLOSED the applicable 0-33, Fuel Hdlg Bldg dampers (located behind the Inlet Damper HVAC panel):
0-35, Fuel Hdlg Bldg 120V AC SA F-21 Outlet Damper (0-29/0-31 )
0-29, Fuel Pool Inlet 120V AC SA F-80 Damper (0-33/0-35) 0-31, Fuel Pool Outlet Damper 120V AC SB F-21 0-34, Fuel Hdlg Bldg (0-30/0-32)
Inlet Damper 120V AC SB F-80 0-36, Fuel Hdlg Bldg (0-34/0-36)
Outlet Damper 0-30, Fuel Pool Inlet Damper 0-32, Fuel Pool Outlet Damper
NO.:
PROCEDURE TITLE:
6 AREA RADIATION MONITORS IPRO'CEDIURE NO.:
2-0NP-26.02 ST. LUCIE UNIT 2 2 Fuel Handling Building Radiation Monitors (continued)
INSTRUCTIONS
- 2.
D. (continued)
- 3. VERI FY the following components are aligned as indicated:
FCV-25-30, Fuel Handling Emerg Vent Vlv, is OPEN.
FCV-25-32, SBVS Isolation Valve, is CLOSED.
HVE-6A, SBVS Exhaust Fan, is ON.
FCV-25-31, Fuel Handling Emerg Vent Vlv., is OPEN.
FCV-25-33, SBVS Isolation Valve, is CLOSED.
HVE-6B, SBVS Exhaust Fan, is ON.
CONTINGENCY ACTIONS 3.1 PERFORM the following on the HVCB:
OPEN FCV-25-30 at the HVAC panel CLOSE FCV-25-32 at the HVAC panel START HVE-6A at the HVAC panel OPEN FCV-25-31 at the HVAC panel.
CLOSE FCV-25-33 at the HVAC panel.
START HVE-6B at the HVAC panel.
6 AREA RADIATION MONITORS PROCEDURE NO.:
2-0NP-26.02 ST. LUCIE UNIT 2 Fuel Handling Building Radiation Monitors (continued)
INSTRUCTIONS
- 2.
(continued)
E. NOTIFY Health Physics to perform applicable surveys.
F. ATTEMPT to identify and isolate the source of increased activity.
G. REFER TO EPIP-OO, Discovery
& Identification of an Emergency Condition (Including Chemical, Fire and Natural Emergencies).
H. 11 alarm is due to fuel handling accident, Then GO TO ONOP 2-1600030, Accidents Involving New or Spent Fuel.
- 3.
11 the following conditions exist:
FHB alarm condition has been corrected Affected FHB monitors are NOT in a HIGH alarm condition Then PERFORM Appendix B, Fuel Pool Ventilation Restoration.
CONTINGENCY ACTIONS END OF SECTION 4.2
G FPL DRAfT Reminder to the TPE Evaluator Refer to the OJTITPE Procedure and follow the instructions.
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE Bank JPM 0821021/Rev 12 PLACE L TOP IN SERVICE - UNIT 1 Unit 1 Control Room NRC C-6 Developed/Revised by:
J. D. Carpenter Ow.r, L.
~------
Date Training Management Approval: '>", ~jJ.JjiW'-
() rJ
(:, L... ~
DRAFT
\\
Date l JPM0821021/Rev 12 Unit 1 Control Room Page 1 of 8
JOB PERFORMANCE MEASURE Place Low Temperature Overpressure Protection in Service on Unit 1.
Faulted JPM?
No Facility JPM #:
0821021 KIA Rating(s):
A03.05 A04.05 A08.16 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when L TOP has been placed in service.
Evaluation Location:
Simulator
References:
In Plant X
Lab Other (3.7 Average)
Performance Level:
Perform Simulate X
1-GOP-305, "Reactor Plant Cooldown - Hot Standby to Cold Shutdown" Validation Time: 10 minutes Time Critical:
Tools/Equipment/Procedures Needed:
1-GOP-305, "Reactor Plant Cooldown - Hot Standby to Cold Shutdown" Discuss Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM0821021/Rev 12 Unit 1 Control Room Page 2 of 8
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is: Place Low Temperature Overpressure Protection in Service on Unit 1.
The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 1 experienced a LOCA from a full power condition. 1-EOP-3 is being implemented. RCS temperature is 290°F and Pressurizer pressure is 500 psia. Annunciator H-15, PORV LOW RANGE CONDITION SELECT LOW, is in alarm.
INITIATING CUES:
You are the Desk RCO. The US has directed you to place L TOP in service in accordance with 1-GOP-305, "Reactor Plant Cooldown - Hot Standby to Cold Shutdown."
JPM0821021/Rev 12 Unit 1 Control Room Page 3 of 8
START TIME: ___ _
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST 1-GOP-305, Step 6.34 When RCS temperature is less than 304°F, but greater than 281°F, Then place L TOP in service as follows:
STEP 1:
STANDARD:
Verify Annunciator H-15, PORV Low Range Condition Select Low, is in alarm.
VERIFY Annunciator H-15 is in ALARM (per Initial Condition)
EXAMINER'S CUE:
Annunciator H-15 is in ALARM COMMENTS:
STEP 2:
STANDARD:
Verify Annunciator H-21, Przr Relief Valve Anticipatory Alarm, is NOT in alarm.
VERIFY Annunciator H-21 is NOT in ALARM EXAMINER'S CUE:
Annunciator H-21 is CLEAR COMMENTS:
STEP 3:
Perform the following for V1402, PORV:
A. CLOSE V1403, PORV Block Vlv.
STANDARD:
POSITION V1403 to CLOSED EXAMINER'S CUE:
V1403 indicates Green light ON, Red light OFF COMMENTS:
__ UNSAT
__ SAT
__ UNSAT CRITICAL STEP
__ SAT
__ UNSAT
- Cues are to be used only if JPM performance is being simulated in the plant.
JPM0821021/Rev 12 Unit 1 Control Room Page 4 of 8
STEP 4:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST Perform the following for V1402, PORV:
CRITICAL STEP B. PLACE the selector switch for PORV V1402 in the LOW RANGE position.
__ SAT STANDARD:
POSITION HS-1402 mode selector switch to LOW RANGE EXAMINER'S CUE:
HS-1402 mode switch is in LOW RANGE COMMENTS:
STEP 5:
Perform the following for V1402, PORV:
C. Verify PORV V1402 did NOT open.
STANDARD:
VERIFY that PORV V1402 remains CLOSED EXAMINER'S CUE:
V1402 indicates Green light ON, Red light OFF COMMENTS:
STEP 6:
Perform the following for V1402, PORV:
D. OPEN V1403, PORV Block Vlv.
STANDARD:
POSITION V1403 to OPEN EXAMINER'S CUE:
V1403 indicates Green light OFF, Red light ON COMMENTS:
STEP 7:
Perform the following for V1404, PORV:
A. CLOSE V1405, PORV Block Vlv.
STANDARD:
POSITION V1405 to CLOSED EXAMINER'S CUE:
V1405 indicates Green light ON, Red light OFF COMMENTS:
__ UNSAT
__ SAT
__ UNSAT CRITICAL STEP
__ SAT
__ UNSAT CRITICAL STEP
__ SAT
__ UNSAT
- Cues are to be used only if JPM performance is being simulated in the plant.
JPM0821021/Rev 12 Unit 1 Control Room Page 5 of 8
STEP 8:
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST Perform the following for V1404, PORV:
B. PLACE the selector switch for PORV V1404 in the position.
POSITION HS-1404 mode selector switch to LOW RANGE EXAMINER'S CUE:
HS-1404 mode switch is in LOW RANGE COMMENTS:
STEP 9:
Perform the following for V1404, PORV:
C. Verify PORV V1404 did NOT open.
STANDARD:
VERIFY that PORV V1404 remains CLOSED LOW EXAMINER'S CUE:
V1404 indicates Green light ON, Red light OFF COMMENTS:
STEP 10:
Perform the following for V1404, PORV:
D. OPEN V1405, PORV Block Vlv.
STANDARD:
POSITION V1405 to OPEN EXAMINER'S CUE:
V1405 indicates Green light OFF, Red light ON H-15 Clears COMMENTS:
CRITICAL STEP RANGE SAT UNSAT SAT UNSAT CRITICAL STEP SAT UNSAT
- Cues are to be used only if JPM performance is being simulated in the plant.
JPM0821021/Rev 12 Unit 1 Control Room Page 6 of 8
STEP 11:
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST Perform testing of PORVs V1402 and V1403 in accordance with Data Sheet 24, Valve Testing Procedures, of OP-1-001012SA, Surveillance Data Sheets.
DETERMINE PORV testing will be PERFORMED later EXAMINER'S CUE:
PORV testing will be PERFORMED later COMMENTS:
STEP (done):
NOTIFY the US that LTOP has been placed in service.
STANDARD:
NOTIFY the US that L TOP has been placed IN SERVICE.
EXAMINER'S CUE:
US ACKNOWLEDGES COMMENTS:
END OF TASK STOP TIME: ___ _
- Cues are to be used only if JPM performance is being simulated in the plant.
JPM0821021fRev 12 Unit 1 Control Room Page 7 of 8
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 1 experienced a LOCA from a full power condition. 1-EOP-3 is being implemented. RCS temperature is 290°F and Pressurizer pressure is 500 psia. Annunciator H-15, PORV LOW RANGE CONDITION SELECT LOW, is in alarm.
INITIATING CUES:
You are the Desk RCO. The US has directed you to place L TOP in service in accordance with 1-GOP-305, "Reactor Plant Cooldown - Hot Standby to Cold Shutdown."
Page 8 of 8
CVI<"VI~ NO.:
PROCEDURE TITLE:
LOSS OF COOLANT ACCIDENT NO.:
1-EOP-03 ST. LUCIE UNIT 1 OPERATOR ACTIONS (continued)
INSTRUCTIONS
~ 42. Containment Spray Termination if CS pump(s) are operating and ALL of the following conditions are satisfied, Containment pressure is less than 5 psig and stable or lowering Containment Spray is NOT required for Containment cooling Containment Spray is NOT required for HPSI subcooling Containment Spray is NOT required for iodine removal Then TERMINATE Containment Spray ONE train at a time.
REFER TO Appendix P, Restoration of Components Actuated by ESFAS.
~ 43. SIT IsolationNenting When RCS pressure is less than 325 psia and controlled, Then ISOLATE the SITs as necessary to prevent SIT injection.
REFER TO 1-GOP-305, Reactor Plant Cooldown - Hot Standby to Cold Shutdown.
~ 44. L TOP Initiation PRIOR to cooling RCS T COLD to less than 281°F, INITIATE low temperature over-pressurization protection.
REFER TO 1-GOP-305, Reactor Plant Cooldown - Hot Standby to Cold Shutdown.
CONTINGENCY ACTIONS 43.1 if isolation of ONE OR MORE SITs is NOT possible, Then DEPRESSURIZE the affected SIT(s) by Venting.
REFER TO 1-GOP-305, Reactor Plant Cooldown - Hot Standby to Cold Shutdown.
16 PROCEDURE NO.:
REACTOR PLANT COOLDOWN - HOT STANDBY TO COLD SHUTDOWN 1-GOP-305 ST. LUCIE UNIT 1 CAUTION
- 114 The amount of time the SOC System is operated with RCS temperature above 300°F should be minimized. Prolonged operation at elevated temperatures may result in undesirable rates of LPSI Pump seal degradation.
L TOP is required to be placed in service with a setpoint of 530 psia prior to lowering RCS temperature to less than or equal to 281°F. Ref: Tech Spec 3.4.13.
NOTE If common train ECCS work is required, the following step may be bypassed until the completion of the work. The cooldown may continue usin the ADVs or SBCS.
6.30 Place the SOC System in service in accordance with 1-NOP-03.05, Shutdown Cooling.
6.31 Direct ENG / CSI to perform the applicable portion of Appendix B, RCS /
Pressurizer Nozzle Penetration Checks, of OP 1-0120022, Reactor Coolant System Leak Test, as soon as practical.
6.32 if continued RCP operation is desired, Then MAINTAIN RCS pressure between 265 psia and the minimum RCS pressure for RCP operation as determined from 1-NOP-01.02, Appendix B.
CAUTION Motor Stator Temperatures of the operating RCPs should be closely monitored as RCS temperature decreases. Stator temperature shall be maintained below 311°F.
6.33 Continue to operate the RCPs to cool down the Steam Generators.
6.34 When RCS temperature is less than 304°F, but greater than 281°F, Then place L TOP in service as follows:
- 1.
Verify Annunciator H-15, PORV Low Range Condition Select Low, is in alarm.
- 2.
Verify Annunciator H-21, Przr Relief Valve Anticipatory Alarm, is NOT in alarm.
US
REVISION NO.:
16 PROCEDURE NO.:
PROCEDURE TITLE:
REACTOR PLANT COOLDOWN - HOT STANDBY TO COLD SHUTDOWN 1-GOP-305 ST. LUCIE UNIT 1 6.34 (continued)
- 3.
Perform the following for V1402, PORV:
A.
CLOSE V1403, PORV Block Vlv.
B.
PLACE the selector switch for PORV V1402 in the LOW RANGE position.
C.
Verify PORV V1402 did NOT open.
D.
OPEN V1403, PORV Block Vlv.
- 4.
Perform the following for V1404, PORV:
A.
CLOSE V1405, PORV Block Vlv.
B.
PLACE the selector switch for PORV V1404 in the LOW RANGE position.
C.
Verify PORV V1404 did NOT open.
D.
OPEN V1405, PORV Block Vlv.
- 5.
Perform testing of PORVs V1402 and V1403 in accordance with Data Sheet 24, Valve Testing Procedures, of OP-1-0010125A, Surveillance Data Sheets.
6.35
§1 Prior to decreasing RCS temperature below 270°F, remove one HPSI Pump from service for compliance with Technical Specification 3.5.3.b as follows:
- 1.
!f the 1A HPSI Pump is to be removed from service, Then perform the following:
A.
LOCK CLOSED V3656, HPSI Pump 1A Discharge.
B.
Perform Section 3A: 1A HPSI Pump of Appendix D, Cooldown Configuration Control.
/
IV
FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE ALIGN 2C CCW PUMP TO SUPPLY THE 'B' CCW HEADER - UNIT 2 NRC S-7 Developed/Revised by: __
-,--La_rry~Ri~ch,----_
Training Management APproval:~ r~
4/01/08 Date C,HJ05
)
~ Date JPM NRC S*7 Rev 0 SIMULATOR Page 1 of 10
JOB PERFORMANCE MEASURE Task: Align the 2C CCW pump to the 'B' CCW header in accordance with 2-0310030 COMPONENET COOLING WATER OFF-NORMAL OPERATION.
Faulted JPM?
No Facility JPM #:
N/A KIA Rating(s):
008 A2.01 3.3/3.6 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is completed when the 2C CCW pump is operating on the 'B' CCW header and the 2AB 4.16 KV bus is aligned to the 'B' side.
Evaluation Location:
Performance Level:
Simulator X
In Plant Lab Other Perform X
Simulate Discuss
References:
2-0310030 COMPONENET COOLING WATER OFF-NORMAL OPERATION.
2-NOP-52.02 ALIGNMENT OF 2AB BUSES AND COMPONENTS Validation Time: 15 minutes Time Critical:
Tools/Equipment/Procedures Needed:
2-0310030 COMPONENET COOLING WATER OFF-NORMAL OPERATION.
2-NOP-52.02 ALIGNMENT OF 2AB BUSES AND COMPONENTS Specific Safety Rules. Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC S-7 Rev 0 SIMULATOR Page 2 of 10
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is: Start the 2C CCW pump on the 'B side and align the 2AB 4.16KV bus to the 'B' side.
The performance level to be used for this JPM is SIMULATE.
This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
The Unit is at 100% power. The 2B CCW pump has tripped and cannot be started. The 2C CCW pump is available to be aligned and started on the 2B CCW header.
INITIATING CUES:
The US directs you to align and start the 2C CCW on the 2B header in accordance with 2-0310030 COMPONENET COOLING WATER OFF-NORMAL OPERATION.
JPM NRC S-7 Rev 0 SIMULATOR Page 3 of 10
START TIME: ___
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST 2-0310030 COMPONENET COOLING WATER OFF-NORMAL OPERATION.
STEP 1:
ENSURE Closed MV-14-1 2C CCW Pump Discharge to A Header.
STANDARD:
CLOSE MV-14-1 2C CCW Pump Discharge to A Header.
EXAMINERS CUE:
COMMENTS:
STEP 2:
ENSURE Closed MV-14-3 2C CCW Pump Suction from A Header:
STANDARD:
CLOSE MV-14-3 2C CCW Pump Suction from A Header EXAMINERS CUE:
COMMENTS:
CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT JPM NRC S-7 Rev 0 Simulator Page 4 of 10
STEP 3:
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST ENSURE open MV-14-2 2C CCW Pump Discharge to B Header:
OPEN MV-14-2 2C CCW Pump Discharge to B Header.
EXAMINERS CUE:
COMMENTS:
STEP 4:
ENSURE open MV-14-4 2C CCW Pump Suction from B Header STANDARD:
OPEN MV-14-4 2C CCW Pump Suction from B Header EXAMINERS CUE:
COMMENTS:
STEP 5:
REALIGN the 2AB 4. 16KV Bus to the B Side per 2-NOP-52.02 PRIOR to starting the 2C CCW Pump on the 2B CCW Header STANDARD:
VERIFY Brk. 1-20501, 4.16KV Bus 1AB SBO X-Tie is OPEN EXAMINERS CUE:
COMMENTS:
CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT SAT UNSAT JPM NRC S-7 Rev 0 Simulator Page 5 of 10
STEP 6:
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST REALIGN the 2AB 4.16KV Bus to the B Side per 2-NOP-52.02 PRIOR to starting the 2C CCW Pump on the 2B CCW Header VERIFY Brk. 2-20501, 4.16KV Bus 2AB SBO X-Tie is open.
EXAMINERS CUE:
COMMENTS:
SAT UNSAT STEP 7 REALIGN the 2AB 4.16KV Bus to the B Side per 2-NOP-52.02 PRIOR to CRITICAL starting the 2C CCW Pump on the 2B CCW Header STANDARD:
OPEN Brk 2-20505 2AB - 2A3 Tie EXAMINERS CUE:
COMMENTS:
STEP 6:
REALIGN the 2AB 4.16KV Bus to the B Side per 2-NOP-52.02 PRIOR to starting the 2C CCW Pump on the 2B CCW Header STANDARD:
OPEN Brk. 2-20208, 4.16KV Bus 2A3 - 2AB Tie EXAMINERS CUE:
COMMENTS:
STEP SAT UNSAT CRITICAL STEP SAT UNSAT JPM NRC S-7 Rev 0 Simulator Page 6 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 7 REALIGN the 2AB 4.16KV Bus to the B Side per 2-NOP-52.02 PRIOR to CRITICAL starting the 2C CCW Pump on the 2B CCW Header STANDARD:
CLOSE Brk 2-20409 2B3 - 2AB Tie EXAMINERS CUE:
COMMENTS:
STEP 8:
REALIGN the 2AB 4.16KV Bus to the B Side per 2-NOP-52.02 PRIOR to starting the 2C CCW Pump on the 2B CCW Header STANDARD:
CLOSE Brk. 2-20504 2AB - 2B3 Tie.
EXAMINERS CUE:
COMMENTS:
STEP 6:
Start the 2C CCW pump STANDARD:
START 2C CCW pump EXAMINERS CUE:
COMMENTS:
STEP SAT UNSAT CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT JPM NRC S-7 Rev 0 Simulator Page 7 of 10
STEP 7 JOB PERFORMANCE MEASURE PERFORMANCECHECKUST Start the 2C CCW Pump
__ SAT STANDARD:
VERIFY the annunciators associated with CCW flows and pressures are __ UNSAT clear and indications return to normal.
EXAMINERS CUE:
COMMENTS:
STEP 8:
Place the 28 CCW pump control switch in the PULL TO LOCK position STANDARD:
PLACES control switch in PULL TO LOCK.
CRITICAL STEP
__ SAT
__ UNSAT EXAMINERS CUE: Inform the Candidate JPM is complete if Candidate continues with remainder of AS electrical lineup.
COMMENTS:
STOP TIME: ____ _
JPM NRC S-7 Rev 0 Simulator Page 8 of 10
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
The Unit is at 100% power. The 2B CCW pump has tripped and cannot be started. The 2C CCW pump is available to be aligned and started on the 2B CCW header.
INITIATING CUES:
The US directs you to align and start the 2C CCW on the 2B header in accordance with 2-0310030 COMPONENET COOLING WATER OFF-NORMAL OPERATION.
9 of 10
- 1. IC #1 JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET
- 2.
Ensure AB 4.16KV bus aligned to A side
- 3.
Ensure 2C CCW pump aligned to A side
- 4. Stop (do not place in pull to lock) 2B CCW pump 10 of 10
REVISION NO.:
36 PROCEDURE NO.:
2-0310030 PROCEDURE TITLE:
COMPONENT COOLING WATER-OFF-NORMAL OPERATION ST. LUCIE UNIT 2 6.2 Subsequent Action (continued)
- 3.
A.
(continued)
CAUTION
!f 2AB AC and DC Busses are not all completely powered from the A side, Then do NOT take Technical Specification Credit for the 2C CCW pump until alignment has been completed.
- 6.
VERI FY the pressures and flows return to normal.
- 7.
PLACE the 2A CCW pump control switch to the PULL TO LOCK position.
- 8.
!f the 480V Load Center 2AB and DC bus 2AB are NOT completely aligned to the A side, Then REALIGN the 480V Load Center 2AB and DC bus 2AB to the A side per 2-NOP-52.02, Alignment of 2AB Busses and Components.
B.
Loss of the 2B CCW Pump.
- 1.
ENSURE Closed:
II MV-14-1, 2C CCW Pump Discharge to A Header AND MV-14-3, 2C CCW Pump Suction from A Header
- 2.
ENSURE Open:
MV-14-2, 2C CCW Pump Discharge to B Header AND MV-14-4, 2C CCW Pump Suction from B Header
- 3.
!f SOC is in service and CCW is completely lost to an SOC Heat Exchanger, Then SOC flow must be terminated to the affected heat exchanger prior to restoring CCW flow. REFER to ONOP 2-0440030, Shutdown Cooling Off-Normal.
- 4.
112 If the 2C CCW Pump is NOT electrically aligned to the B Electrical Bus AND the Unit is in Modes 1-4, Then REALIGN the 2AB 4.16KV Bus to the B Side per 2-NOP-52.02 PRIOR to starting the 2C CCW Pump on the 2B CCW Header.
REVISION NO.:
36 PROCEDURE NO.:
2-0310030 PROCEDURE TITLE:
COMPONENT COOLING WATER -
OFF-NORMAL OPERATION ST. LUCIE UNIT 2 6.2 Subsequent Action (continued)
- 3.
B.
(continued)
- 5.
START the 2C CCW Pump.
CAUTION
!f 2AB AC and DC Busses are not all completely powered from the B side, Then do NOT take Technical Specification Credit for the 2C CCW pump until alignment has been complete.
- 6.
VERIFY the pressures and flows return to normal.
- 7.
PLACE the 2B CCW pump control switch in the PULL TO LOCK position.
- 8.
~2!f the 480V Load Center 2AB and DC bus 2AB are NOT completely aligned to the B side, Then REALIGN the 480V Load Center 2AB and DC bus 2AB to the B side per 2-NOP-52.02, Alignment of 2AB Busses and Components.
C.
Loss of two (2) CCW Pumps CAUTION REFER to off-normal operating procedure 2-0NP-25.01, Loss of RCB Cooling Fans, for appropriate direction.
§1,2 Sufficient Containment Fan Coolers (HVS-1A, HVS-1B, HVS-1C or HVS-1 D) are required to be in operation to maintain Containment air temperature less than or equal to 120°F. This is necessary to maintain the reactor vessel support structure within design basis.
Operator action is required within 45 minutes, to restore air temperature to less than or equal to 120°F or initiate reactor trip cooldown to at least Hot Shutdown.
- 1.
~3!f the health and safety of the public is in jeopardy, Then ATTEMPT ONLY ONE restart.
FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE LOCAL OPERATION OF BORON CONCENTRATION CONTROL - UNIT 2 NRC P-1 Developed/Revised by: ___
La_rry Ri_ch __
Training Management Approval: ~
~ ~
4/01/08 Date 0LyJ08
. te JPM NRC P-1 Rev 0 Plant Page 1 of 8
JOB PERFORMANCE MEASURE Task: Perform local blend to the VCT in accordance with 2-0NP-02.01 Boron Concentration Control.
Faulted JPM?
No Facility JPM #:
N/A K/A Rating(s):
004 A4.07 3.9/3.7 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is completed when the VCT is blended to the normal band.
Evaluation Location:
Simulator
References:
In Plant X
Lab Other 2-0NP-02.01 Boron Concentration Control Validation Time: 20 minutes Tools/Equipment/Procedures Needed:
2-0NP-02.01 Boron Concentration Control Performance Level:
Perform Simulate X
Time Critical:
Discuss Specific Safety Rules. Personal Protective Equipment and Hazards associated with the task.
Standard in plant PPE Radiological Protection and RWP Requirements:
General entry RWP requirements JPM NRC P-1 Rev 0 Plant Page 2 of 8
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is: Locally operate the Boron Concentration Control system to blend to the VCT in accordance with Appendix A of 2-0NP-02.01 Boron Concentration Control.
The performance level to be used for this JPM is SIMULATE.
This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 2 Control Room is not able to verify proper Boric Acid and Primary water flow on FR-2210Y and FR-221OX to blend to the VCT. The crew has implemented 2-0NP-02.01 Boron Concentration Control.
INITIATING CUES:
The US directs you to locally blend to the VCT using Appendix A from 2-0NP-02.01 Boron Concentration Control. The blend ratio is 10: 1.
JPM NRC P-1 Rev 0 Plant Page 3 of 8
START TIME: ___
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST Appendix A of 2-0NP-02.01 Boron Concentration Control STEP 1:
Establish communication with the Control Room.
SAT UNSAT STANDARD:
ESTABLISH Communications with Unit 2 Control Room using Radio at the Boric Acid station.
EXAMINERS CUE: Unit 2 Control Room acknowledges communications COMMENTS:
STEP 2:
Start 2A or 2B Boric Acid Pump:
STANDARD:
VERIFY Control Room has started 2A or 2B Boric Acid Pump EXAMINERS CUE: Control Room has started 2A Boric Acid Pump COMMENTS:
SAT UNSAT JPM NRC P-1 Rev 0 Plant Page 4 of 8
STEP 3:
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST ENSURE V2514 is CLOSED:
ENSURE Control Room has verified V2514 is CLOSED.
EXAMINERS CUE: Control Room has ensured V2514 is closed.
COMMENTS:
STEP 4:
ENSURE FCV-2210Y is CLOSED STANDARD:
ENSURE Control Room FCV-2210Y is CLOSED EXAMINERS CUE: Control Room has ensured FCV-2210Y is closed.
COMMENTS:
SAT UNSAT SAT UNSAT JPM NRC P-1 Rev 0 Plant Page 5 of 8
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CAUTION V2647 provides a direct Boric Acid flow path to the Charging pump suction at 20 gpm when full open.
With V2647 open, the Boric Acid flow rate can NOT be monitored V2180 provides a direct Primary Water flow path to the Charging pump suction EXAMINERS CUE: Control Room calls to OPEN V2647 EMERG Boration from BAM Pumps Dish Iso I % turn OPEN.
STEP 5:
DIRECT the Operator at the Boric Acid station to throttle V2647, EMERG Boration From BAM Pumps Disch Isol, OPEN Y4 turn.
STANDARD:
OPENS V2647 Y4 turn and communicates to Control Room valve is Y4 turn open.
EXAMINERS CUE: V2647 is turned Counter Clockwise % turn EXAMINERS CUE: Acknowledges as Control Room V2647 is % turn open.
COMMENTS:
CRITICAL STEP
__ SAT
__ UNSAT EXAMINERS CUE: Control Room calls to OPEN V2180 PMW to Charging CRITICAL Pumps Suct Manuallsol1 (one) turn open.
STEP STEP 6:
DIRECT the Operator at the Boric Acid station to throttle V2180, PMW to Charging Pumps Suct Manual Isol, OPEN to the calculated blend ration.
V2180 is located in the 2A Charging Pump Room.
STANDARD:
OPENS V2180, PMW to Charging Pumps Suct Manuallsol, 1 (one) turn open and communicates to Control Room valve is 1 (one) turn open.
__ SAT
__ UNSAT EXAMINERS CUE: V2180 is turned Counter Clockwise 1 (one) turn open.
EXAMINERS CUE: Acknowledges as Control Room V2180 is 1 (one) turn open.
COMMENTS:
JPM NRC P-1 Rev 0 Plant Page 6 of 8
PROCEDURE TITLE:
BORON CONCENTRATION CONTROL 2-0NP-02.01 ST. LUCIE UNIT 2 LO
- 1.
Station an operator at the Boric Acid station and establish communication with the Control Room.
~1 PLACE the Makeup Mode Selector switch in MANUAL.
START 2A or 2B BA pump.
ENSURE V2514 is CLOSED.
ENSURE FCV-2210Y is CLOSED.
CAUTION V2647 provides a direct Boric Acid flow path to the Charging pump suction at 20 gpm when full open.
With V2647 open, the Boric Acid flow rate can NOT be monitored.
V2180 provides a direct Primary Water flow path to the Charging pump suction
- 6.
DIRECT the operator at the Boric Acid station to throttle V2647, EMERG Boration From BAM Pumps Disch Isol, OPEN % turn.
- 7.
DIRECT the operator at the Boric Acid station to throttle V2180, PMW to Charging Pumps Suct Manuallsol, OPEN to the calculated blend ratio. V2180 is located in the 2A Charging Pump Room.
- 8.
MONITOR FRC-221OX for Reactor Makeup Water flow rate and ADJUST V2180 as necessary.
- 9.
If the reactor makeup water flow indication malfunctions, Then DIRECT the operator to OPEN V2180 % turn.
- 10.
MONITOR for any abnormal change in Tave.
- 11.
DIRECT the operator to adjust V2180 and V2647 as required to maintain the VCT in the normal band and plant conditions stable.
END OF APPENDIX A
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST EXAMINERS CUE: Reactor Makeup water flow indication FRC-2210X has CRITICAL malfunctioned. You are to OPEN V2180 1f.J turn.
STEP STEP 7 IF the Reactor Makeup water flow indication malfunctions, Then DIRECT the operator to OPEN V2180 Y4 turn.
STANDARD:
CLOSES V2180 from 1 (one) turn open to Y4 turn open and communicates to control room V2180 is Y4 turn open.
EXAMINERS CUE: V2180 is turned clockwise to 1f.J turn open from 1 (one) turn open EXAMINERS CUE: Acknowledges as control room V2180 is 1f.J turn open COMMENTS:
STEP 8:
MONITOR for any abnormal change in Tave.
EXAMINERS CUE: Control room states Tave is constant. JPM is complete STANDARD:
COMMUNICATES with control room to ensure Tave is not changing.
COMMENTS:
STOP TIME: ____ _
__ SAT
__ UNSAT
__ SAT
__ UNSAT JPM NRC P-1 Rev 0 Plant Page 7 of 8
JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 2 Control Room is not able to verify proper Boric Acid and Primary water flow on FR-2210Y and FR-221OX to blend to the VCT. The crew has implemented 2-0NP-02.01 Boron Concentration Control.
INITIATING CUES:
The US directs you to locally blend to the VCT using Appendix A from 2-0NP-02.01 Boron Concentration Control. The blend ratio is 10:1
fj FPL R
Reminder to the TPE Evaluator Refer to the OJTITPE Procedure and follow the instructions.
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE ALIGN UNIT 2 CST TO SUPPLY 1C AFW PUMP Bank JPM 0821062/Rev 17 Unit 1 and 2 CSTs, 1C AFW PP NRC P-2 Developed/Revised by: ___
R_o_n_L_au_v_e_r __
9/25/2006 Training Management Approval: S) ~tJP ~
0,..;> +1 l-<.
DRAFT
~
Date of Da e JPM 0821062/Rev 17 Unit 1 and 2 CSTs, 1C AFW PP Page 1 of7
JOB PERFORMANCE MEASURE Faulted JPM?
Facility JPM #:
Align Unit 2 CST to Supply the 1 C AFW Pump.
No 0821062 K/A Rating(s):
8.01.01 8.01.03 8.01.05 8.01.02 8.01.04 8.01.06, (3.9)
Duty Area(s):
NA Task Information: NA Task Standard:
This JPM is complete when the candidate has reported to the Unit 1 US that the Unit 2 CST has been lined up to supply the 1 C AFW Pump.
Evaluation Location:
Simulator
References:
In Plant X
Lab Other Performance Level:
Perform Simulate X
Discuss 1-0NP-09.02, "Auxiliary Feedwater," Appendix D, SUPPLYING UNIT 1 AFW PUMPS FROM THE UNIT 2 C.S.T.
Watch Stander Key Ring for Locked Valves Validation Time: 15 minutes Time Critical:
Tools/Equipment/Procedures Needed:
1-0NP-09.02, "Auxiliary Feedwater," Appendix D, SUPPLYING UNIT 1 AFW PUMPS FROM THE UNIT 2 C.S.T.
Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM 0821062/Rev 17 Unit 1 and 2 CSTs, 1 C AFW PP Page 2 of 7
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is:
Align Unit 2 CST to Supply the 1 C AFW Pump.
The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 1 is experiencing a Total Loss of Feedwater event. Unit 1 CST in unavailable, and Unit 2 CST level is 43 feet.
INITIATING CUES:
You are the Unit 1 NPO. The Unit 1 US has directed you to line up the 1C AFW Pump to take a suction from the Unit 2 CST lAW 1-0NP-09.02, "Auxiliary Feedwater," Appendix D.
JPM 0821062/Rev 17 Unit 1 and 2 CSTs, 1 C AFW PP Page 3 of 7
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: ___
1-0NP-09.02, "Auxiliary Feedwater,"
Appendix D, SUPPLYING UNIT 1 AFW PUMPS FROM THE UNIT 2 C.S.T.
STEP 1:
NOTIFY Unit 2 Control Room.
STANDARD:
NOTIFY Unit 2 Control Room that Unit 2 CST will be ALIGNED to supply the 1 C AFW Pump.
- EXAMINER'S CUE:
Unit 2 Control Room ACKNOWLEDGES COMMENTS:
__ SAT
__ UNSAT STEP 2:
At the Unit 2 CST, establish flow from the Unit 2 CST to Unit 1 AFW Pumps CRITICAL by one of the following:
STEP
- 1. if the Unit 2 CST level is greater than 40 feet, Then LOCK OPEN V12803, CST Inlet to / from Unit 1 Isol.
STANDARD:
UNLOCK and POSITION V12803 to OPEN and then RELOCK.
- EXAMINER'S CUE:
V12803 is OPEN and LOCKED.
EVALUATOR'S NOTE: Initiating Cue gives Unit 2 CST level as 43 Feet.
Valve does not have to be re-Iocked to meet the Critical Step.
COMMENTS:
STEP 3:
Lock Open V12805, CST Crosstie to Unit 1 Isol.
STANDARD:
UNLOCK and POSITION V12805 to OPEN and then RELOCK.
- EXAMINER'S CUE:
V12805 is OPEN and LOCKED.
EVALUATOR'S NOTE: Valve does not have to be re-Iocked to meet the Critical Step.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
__ SAT
__ UNSAT CRITICAL STEP
__ SAT
__ UNSAT JPM 0821 062/Rev 17 Unit 1 and 2 CSTs, 1 C AFW PP Page 4 of7
STEP 4:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST To supply 1 C AFW pump, perform the following:
- 1.
Lock closed V12506, Unit 1 CST to 1 C AFW Pump at the Unit 1 CST.
STANDARD:
UNLOCK and POSITION V12506 to CLOSE and then RELOCK.
- EXAMINER'S CUE:
V12506 is CLOSED and LOCKED.
EVALUATOR'S NOTE: Valve does not have to be re-Iocked to meet the Critical Step.
COMMENTS:
STEP 5:
To supply 1C AFW pump, perform the following:
- 2.
Lock open V12175, Unit 2 CST to 1C AFW Pump at the Unit 1 CST.
STANDARD:
UNLOCK and POSITION V12175 to OPEN and then RELOCK.
- EXAMINER'S CUE:
V12175 is OPEN and LOCKED.
EVALUATOR'S NOTE: Valve does not have to be re-Iocked to meet the Critical Step.
COMMENTS:
STEP 6:
STANDARD:
To supply 1C AFW pump, perform the following:
- 3.
Open the PI-12-18C, 1C AFW Pump Suct Press, instrument isolation valve.
POSITION PI-12-18C instrument isolation to OPEN.
- EXAMINER'S CUE:
PI-12-18C instrument isolation valve is OPEN.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
CRITICAL STEP SAT
__ UNSAT CRITICAL STEP SAT UNSAT CRITICAL STEP
__ SAT
__ UNSAT JPM 0821062/Rev 17 Unit 1 and 2 CSTs, 1C AFW PP Page 50f7
STEP 7:
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST To supply 1C AFW pump, perform the following:
- 4.
Verify greater than 3 psig suction pressure on PI-12-18C, 1 C AFW Pump Suction Pressure.
VERIFY GREATER THAN 3 psig on PI-12-18C.
- EXAMINER'S CUE:
PI-12-18C INDICATES 15 psig.
COMMENTS:
STEP 8:
To supply 1 C AFW pump, perform the following:
- 5.
PERFORM the following:
- a.
OPERATE 1 C Auxiliary Feedwater Pump as necessary.
STANDARD:
OPERATE 1C Auxiliary Feedwater Pump as necessary.
- EXAMINER'S CUE:
Contact control room.
COMMENTS:
STEP (done):
NOTIFY Unit 1 US that the task is COMPLETE.
STANDARD:
NOTIFY Unit 1 US that 1 C AFW Pump is LINED UP to take a SUCTION on the Unit 2 CST lAW 1-0NP-09.02,Appendix D.
- EXAMINER'S CUE:
Unit 1 US ACKNOWLEDGES.
EXAMINER'S NOTE:
If candidate continues onward, then inform him "This JPM is complete."
COMMENTS:
END OF TASK STOP TIME: ___ _
- Cues are to be used only if JPM performance is being simulated in the plant.
SAT UNSAT SAT UNSAT SAT UNSAT JPM 0821062/Rev 17 Unit 1 and 2 CSTs, 1C AFW PP Page 6 of 7
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 1 is experiencing a Total Loss of Feedwater event. Unit 1 CST in unavailable, and Unit 2 CST level is 43 feet.
INITIATING CUES:
You are the Unit 1 NPO. The Unit 1 US has directed you to line up the 1 C AFW Pump to take a suction from the Unit 2 CST lAW 1-0NP-09.02, "Auxiliary Feedwater," Appendix D.
REVISION NO.:
PROCEDURE TITLE:
2A AUXILIARY FEEDWATER PROCEDURE NO.:
1-0NP-09.02 ST. LUCIE UNIT 1 APPENDIX D SUPPLYING UNIT 1 AFW PUMPS FROM THE UNIT 2 C.S.T.
(Page 1 of 6)
- 1.
§1 If Unit 1 CST becomes unavailable, Unit 1 AFW pumps can be supplied from Unit 2 CST by performing the following:
~2,3,4 CAUTION During the performance of this Appendix, close communications with the Unit 2 Control Room must be maintained to ensure administrative requirements and safety issues are considered in regards to both units.
In the event the Unit 1 AFW Pump suction pressure decreases to 3 psig during the performance of this appendix, the AFW Pump discharge valves must be throttled to maintain suction pressure.
Performance of this Appendix will require Unit 1 to enter action statement for Tech. Spec. 3.7.1.2 and 3.7.1.3. Unit 2 will be in action statement for Tech. Spec. 3.7.1.3 and possibly 3.7.1.2 depending on valve selection in Step 1 B.
NOTE In the event Unit 2 CST is utilized to supply condensate to Unit 1, a minimum of 182,000 19'6" gallons must be maintained in the Unit 2 CST unless Unit 2 is in Modes 4, 5, or 6. This is to ensure that Unit 2 has the capability to cool the RCS to less than 350 degrees.
erformed with umps off.
A.
Notify Unit 2 Control Room B.
§1 At the Unit 2 CST, establish flow from Unit 2 CST to Unit 1 AFW Pumps by one of the following:
- 1.
!f the Unit 2 CST level is greater than 40 feet, Then LOCK OPEN V12803, CST Inlet to / from Unit 1 Isol.
- 2.
!f the Unit 2 CST level is less than or equal to 40 feet, Then perform one of the following:
- a.
LOCK OPEN V12801, 2C AFW Pump Suct to / from Unit 1 Isol.
- b.
LOCK OPEN V12802, 2A12B AFW Pump Suct to / from Unit 1 Isol.
REVISION NO.:
PROCEDURE TITLE:
2A AUXILIARY FEEDWATER PROCEDURE NO.:
1-0NP-09.02 ST. LUCIE UNIT 1 APPENDIX D SUPPLYING UNIT 1 AFW PUMPS FROM THE UNIT 2 C.S.T.
(Page 2 of 6)
- 1.
(continued)
C.
Lock open V12805, CST Crosstie to Unit 1 Isol.
D.
To supply 1A and 1 B AFW Pumps, perform the following in the order listed:
CAUTION
§2 The internals have been removed from V12176 per PCM 07053.
V12497 must be Locked Closed prior to opening V12177, or water will transfer from Unit 2 CST to Unit 1 CST.
- 1.
Lock closed V12497, Unit 1 CST to 1 Al1 B AFW pumps at the Unit 1 CST.
- 2.
Lock open V12177, Unit 2 CST to 1A11 B AFW Pumps at the Unit 1 CST.
- 3.
Verify greater than 3 psig suction pressure on PI-12-18A and / or PI-12-18B, 1 A and / or 1 B AFW Pumps Suction Pressure.
CAUTION When restoring steam generator level, feed rate should be maintained less than or equal to 150 gpm until a level increase is observed or continuous flow has been maintained for five minutes. Feedwater should NOT be restored to a dry steam generator if another steam generator is available. If both steam generators are dry, feedwater should only be restored to one.
- 4.
,-r2,3,4 PERFORM the following:
- a.
OPERATE 1A and 1 B AFW Pumps as necessary.
CAUTION Performance of the following step terminates AFW Pump recirc flow to the Unit 1 CST.
- b.
CLOSE the operating pump(s) recirc isolation valve to Unit 1 CST.
V091 00, 1A AFW Pump Recirc Isol V091 01, 1 B AFW Pump Recirc Isol
NO.:
PROCEDURE TITLE:
2A AUXILIARY FEEDWATER 1-0NP-09.02 ST. LUCIE UNIT 1 APPENDIX D SUPPLYING UNIT 1 AFW PUMPS FROM THE UNIT 2 C.S.T.
(Page 3 of 6)
D.
(continued)
NOTE With the operating pumps recirc isolation valve closed, flow should not be throttled below 75 pm.
- 5.
,-[2,3,4 If AFW Pump suction pressure decreases to less than 3 psig as indicated on PI-12-18A or PI-12-18B, Then THROTTLE the discharge valve on the running AFW Pump(s).
MV-09-9, 1A AFW Pump Disch to 1A S/G MV-09-10, 1 B AFW Pump Disch to 1 B S/G
- 6.
1f the Unit 2 CST level decreases to less than or equal to 40 feet, and V12803 CST Inlet to I from Unit 1 Isol, was opened in Step 1.B.1, Then perform the following:
- a.
STOP the running AFW Pumps.
- b.
At Unit 2, LOCK CLOSED V12803, CST Inlet to I from Unit 1 Isol.
- c.
At Unit 2, perform one of the following:
- 1.
LOCK OPEN V12801, 2C AFW Pump Suct to I from Unit 1 Isol.
- 2.
LOCK OPEN V12802, 2A12B AFW Pump Suct to I from Unit 1 Isol.
- d.
START the Unit 1 AFW Pumps as necessary.
E.
To supply 1 C AFW pump, perform the following:
- 1.
Lock closed V12506, Unit 1 CST to 1 C AFW Pump at the Unit 1 CST.
- 2.
Lock open V12175, Unit 2 CST to 1C AFW Pump at the Unit 1 CST.
2A AUXILIARY FEEDWATER PROCEDURE NO.:
- 1.
1-0NP-09.02 ST. LUCIE UNIT 1 E.
APPENDIX D SUPPLYING UNIT 1 AFW PUMPS FROM THE UNIT 2 C.S.T.
(Page 4 of 6)
(continued)
- 3.
Open the PI-12-18C, 1 C AFW Pump Suct Press, instrument isolation valve.
- 4.
Verify greater than 3 psig suction pressure on PI-12-18C, 1 C AFW Pump Suction Pressure.
CAUTION When restoring steam generator level, feed rate should be maintained less than or equal to 150 gpm until a level increase is observed or continuous flow has been maintained for five minutes. Feedwater should NOT be restored to a dry steam generator if another steam generator is available. If both steam enerators are d,feedwater should onl be restored to one.
- 5.
~2,3,4 PERFORM the following:
- a.
OPERATE 1C Auxiliary Feedwater Pump as necessary.
CAUTION Performance of the following step terminates AFW Pump recirc flow to the Unit 1 CST.
- b.
CLOSE V09399, 1 C AFW Pump Recirc Isol.
NOTE With the pump recirc valve closed, flow should not be throttled below 100 gpm.
- 6.
~2,3,4!f AFW Pump suction pressure decreases to less than 3 psig as indicated on PI-12-18C, Then THROTTLE the discharge valves on the 1 C AFW Pump.
MV-09-11, 1C AFW Pump Disch to 1A S/G MV-09-12, 1C AFW Pump Disch to 1B S/G
TITLE:
2A AUXILIARY FEEDWATER IPRC)CEDIURE NO.:
- 1.
1-0NP-09.02 ST. LUCIE UNIT 1 E.
F.
APPENDIX D SUPPLYING UNIT 1 AFW PUMPS FROM THE UNIT 2 C.S.T.
(Page 5 of 6)
(continued)
- 7.
§1 1f the Unit 2 CST level decreases to less than or equal to 40 feet, and V12803, CST Inlet to I from Unit 1 1501, was opened in Step 1.B.1, Then perform the following:
- a.
STOP the running Auxiliary Feedwater pumps.
- b.
At Unit 2, LOCK CLOSED V12803, CST Inlet to I from Unit 1 1501.
- c.
At Unit 2, perform one of the following:
- 1.
LOCK OPEN V12801, 2C AFW Pump Suct to I from Unit 1 1501.
- 2.
LOCK OPEN V12802, 2A12B AFW Pump Suct to I from Unit 1 1501.
- d.
START the Unit 1 AFW Pumps as necessary.
Restoration of System Alignment:
- 1.
Supplying 1A and 1 B AFW pumps STOP 1A AFW Pump STOP 1 B AFW Pump Lock OPEN V091 00, 1A AFW Pump Recirc 1501.
Lock OPEN V091 01, 1 B AFW Pump Recirc UNIT 1 UNIT 2 INITIAUIV INITIAUIV I
I I
1501.
I CAUTION
§2 The internals have been removed from V12176 per PCM 07053.
V12177 must be Locked Closed prior to opening V12497, or water will transfer from Unit 2 CST to Unit 1 CST.
Lock CLOSED V12177, Unit 2 CST to 1A11 B AFW Pumps I
REVISION NO.:
PROCEDURE TITLE:
2A AUXILIARY FEEDWATER PROCEDURE NO.:
1-0NP-09.02 ST. LUCIE UNIT 1 APPENDIX D SUPPL YING UNIT 1 AFW PUMPS FROM THE UNIT 2 C.S.T.
(Page 6 of 6)
- 1.
F.
- 1.
(continued)
UNIT 1 UNIT 2 INITIAL/IV INITIAL/IV Lock OPEN V12497, Unit 1 CST to 1A11 B AFW Pumps
/
Lock CLOSED V12805, CST Cross-tie to Unit 1 Isol
/
Lock CLOSED V12801, 2C AFW Pump Suct to / from Unit 1 Isol
/
Lock CLOSED V12802, 2A12B AFW Pump Suct to / from Unit 1 Isol
/
Lock CLOSED V12803, CST Inlet to / from Unit 1 Isol
/
- 2.
Supplying 1 C AFW pump Lock OPEN V09399, 1 C AFW Pump Recirc Isol
/
Lock CLOSEDV12175, Unit2 CST to 1C AFW Pump
/
Lock OPEN V12506, Unit 1 CST to 1 C AFW Pump
/
Lock CLOSED V12805, CST Cross-tie to Unit 1 Isol
/
Lock CLOSED V12803, CST Inlet to / from Unit 1 Isol
/
Close the PI-12-18C, 1C AFW Pump Suct Press, instrument isolation valve
/
END OF APPENDIX D
FPL R FT Reminder to the TPE Evaluator Refer to the OJTITPE Procedure and follow the instructions.
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE DISCONNECT 1B INSTRUMENT INVERTER FROM SERVICE FOR PREVENTIVE MAINTENANCE - UNIT 1 Bank JPM 0821067/Rev 16 1 B Battery Charger Room NRC P-3 Developed/Revised by: s\\ t.,. U4 ~
O"..J +, k Training Management Approval: S) 6-IJA~ Of"' '~'L<.
DRAFT JPM 0821067/Rev 16 1 B Battery Charger Room Page 1 of 8
JOB PERFORMANCE MEASURE Disconnect the 1 B 120V Instrument Inverter from service on Unit 1.
Faulted JPM?
No Facility JPM #:
0821067 KIA Rating(s):
B.01.01 B.01.03 B.01.05 B.01.02 B.01.04 B.01.06, (RO 3.4) (SRO 3.7)
Duty Area(s):
NA Task Information: NA Task Standard:
This JPM is complete when the Control Room has been notified that the 1 B Instrument Inverter has been transferred to the Maintenance Bypass Bus and the 1 B Instrument Inverter is out of service.
Evaluation Location:
Simulator
References:
In Plant X
Lab Other Performance Level:
Perform Simulate X
Discuss OP 1-0970020, "Operation of the 120V Instrument AC System (Class 1 E)"
Validation Time: 1 0 minutes Time Critical:
Tools/Equipment/Procedures Needed:
OP 1-0970020, "Operation of the 120V Instrument AC System (Class 1 E)"
Specific Safety Rules. Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM 0821067/Rev 16 1 B Battery Charger Room Page 2 of 8
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is: Disconnect the 1 B 120V Instrument Inverter from service.
The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 1 is at 100% power and stable with each instrument bus aligned to receive power from its respective inverter. The 1 B Instrument Inverter is to be removed from service for preventive maintenance.
INITIATING CUES:
You are the SNPO. The US has directed you to remove 1 B 120V Instrument Inverter from service by placing it on the Maintenance Bypass Bus in accordance with OP 1-0970020, "Operation of the 120V Instrument AC System (Class 1 E)."
JPM 0821067/Rev 16 1 B Battery Charger Room Page 3 of 8
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: ___ _
STEP 1:
STANDARD:
OP 1-0970020, "Operation of the 120V Instrument AC System (Class 1E),"
Step 8.6 Removing the 1 B Inverter From Service Close the following maintenance bypass bus breaker on the maintenance CRITICAL bypass bus for ALTERNATE feed.
STEP Inverter 1 B:
Maintenance Bypass Bus 1 B CKT 13
__ SAT POSITION Maintenance Bypass Bus 1 B CKT 13 Breaker to ON.
__ UNSAT EXAMINER'S CUE:
CKT 13 Breaker is ON COMMENTS:
STEP 2:
Verify the following maintenance bypass bus power available light in Transfer panel is on.
Transfer Panel 1 B Ll1 01 0-2 Maint. Bypass Bus 1 B Feed to Instr. Bus 1 MB STANDARD:
VERIFY light Ll1010-2 is ON at Transfer Panel1B.
EXAMINER'S CUE:
Light Ll1 01 0-2 is ON COMMENTS:
__ SAT
__ UNSAT JPM 0821067/Rev 16 1 B Battery Charger Room Page 4 of 8
STEP 3:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST Verify the following sync signal breaker on the maintenance bypass bus is closed.
Inverter 1 B:
Maintenance Bypass Bus 1 B CKT 3 STANDARD:
VERIFY Inverter 1B Maintenance Bypass Bus 1B CKT 3 Breaker is CLOSED.
EXAMINER'S CUE:
CKT 3 Breaker is ON.
COMMENTS:
STEP 4:
Verify the "IN SYNC" light is on (on the applicable inverter).
STANDARD:
VERIFY IN SYNC light is "ON" on Inverter 1B EXAMINER'S CUE:
IN SYNC light on Inverter 1 B is ON COMMENTS:
__ SAT
__ UNSAT
__ SAT
__ UNSAT STEP 5:
Place the following Transfer switch in the Maintenance Bypass Bus position. CRITICAL STEP STANDARD:
Transfer Panel 1 B Transfer switch SS-1 01 0-1 1 MB Maintenance Bypass Bus 1B SAT POSITION Transfer switch SS-1010-1 to MAINTENANCE BYPASS BUS 1B
__ UNSAT EXAMINER'S CUE:
Transfer switch SS-1010-1 is in MAINTENANCE BYPASS BUS 1 B POSITION COMMENTS:
JPM 0821067/Rev 16 1 B Battery Charger Room Page 5 of 8
STEP 6:
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST Notify the Control Room the 1 B instrument bus is being powered from the Maintenance Bypass Bus.
NOTIFY Control Room that 1 B Instrument Bus is now being powered from the Maintenance Bypass Bus.
EXAMINER'S CUE:
CONTROL ROOM ACKNOWLEDGES COMMENTS:
STEP 7:
STANDARD:
Open the inverter breakers on the front of the 1 B inverter in the following order:
A. 1 MB-CB-6 (Inverter System Output)
B.
1 MB-CB-4 (Inverter Alternate Source)
C. 1 MB-CB-2 (Inverter Output)
D. 1 MB-CB-1 (DC Input)
POSITION Breakers 1 MB-CB-6, 1 MB-CB-4, 1 MB-CB-2, and 1 MB-CB-1 on Inverter 1 B to OFF in that order EXAMINER'S CUE:
As Student positions these Breakers, cue that the respective breaker is OFF COMMENTS:
STEP 8:
Open the 1 B inverter supply breaker on the 125V DC bus.
Inverter 1 B:
DC Bus 1 B 1-60224 STANDARD:
POSITION DC Bus 1 B Breaker 1-60224 to OFF EXAMINER'S CUE:
Breaker 1-60224 is OFF COMMENTS:
__ SAT
__ UNSAT CRITICAL STEP
__ SAT
__ UNSAT CRITICAL STEP
__ SAT
__ UNSAT JPM 0821067/Rev 16 1 B Battery Charger Room Page 6 of 8
STEP 9:
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST Open the 1 B sync signal breaker on the maintenance bypass bus.
Inverter 1 B:
Maintenance Bypass Bus 1 B CKT 3 POSITION Maintenance Bypass Bus 1 B CKT 3 Breaker to OFF EXAMINER'S CUE:
CKT 3 breaker is OFF COMMENTS:
STEP (done):
Notify the Control Room the 1 B inverter is out of service.
CRITICAL STEP SAT UNSAT STANDARD:
NOTIFY the Control Room that Inverter 1 B has been REMOVED from service EXAMINER'S CUE:
CONTROL ROOM ACKNOWLEDGES COMMENTS:
END OF TASK STOP TIME: ___ _
__ UNSAT JPM 0821067/Rev 16 1 B Battery Charger Room Page 7 of 8
NO.:
19B NO.:
1-0970020 PROCEDURE TITLE:
OPERATION OF THE 120V INSTRUMENT AC SYSTEM (CLASS 1 E)
ST. LUCIE UNIT 1 Removing the 1 B Inverter From Service CAUTION PAG Incorrect execution of this section can result in the actuation of Safeguards equipment and a Reactor Trip. If any discrepancies are noted during the execution of this section, notify the Control Room immediately.
Prior to closing the applicable maintenance bypass bus breaker, verify that the affected maintenance b pass bus is not currentl in use.
NOTE
§1 Re-energize the Instrument Bus from its associated inverter within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the followin 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- 1.
Close the following maintenance bypass bus breaker on the maintenance bypass bus for ALTERNATE feed.
Inverter 1 B:
Maintenance Bypass Bus 1 B CKT 13
- 2.
Verify the following maintenance bypass bus power available light in Transfer panel is on.
Transfer Panel 1 B:
Ll1010-2 Maint. Bypass Bus 1 B Feed to Instr. Bus 1 MB CAUTION The "IN SYNC" light shall be verified to be on prior to removing the instrument inverter from service. If light is not on, stop. Do not continue.
Notify ElM Department.
- 3.
Verify the following sync signal breaker on the maintenance bypass bus is closed.
Inverter 1 B:
Maintenance Bypass Bus 1 B CKT3 A.
Verify the "IN SYNC" light is on (on the applicable inverter).
SNPO
NO.:
19B ENO.:
1-0970020 PROCEDURE TITLE:
OPERATION OF THE 120V INSTRUMENT AC SYSTEM (CLASS 1 E)
ST. LUCIE UNIT 1 Removing the 1 B Inverter From Service (continued)
- 4.
Place the following Transfer switch in the Maintenance Bypass Bus position.
Transfer Panel1B: Transfer switch SS-1010-11MB Maintenance Bypass Bus 1 B
- 5.
Notify the Control Room the 1 B instrument bus is being powered from the Maintenance Bypass Bus.
- 6.
Open the inverter breakers on the front of the 1 B inverter in the following order:
A.
1MB-CB6 (Inverter System Output)
B.
1MB-CB4 (Inverter Alternate Source)
C.
1MB-CB2 (Inverter Output)
D.
- 7.
Open the 1 B inverter supply breaker on the 125V DC bus.
Inverter 1 B:
DC bus 1B 1-60224
- 8.
Open the 1 B sync signal breaker on the maintenance bypass bus.
Inverter 1 B:
Maintenance Bypass Bus 1 B CKT3
- 9.
Notify the Control Room the 1 B inverter is out of service.
END OF SECTION 8.6
~