ML090720038

From kanterella
Jump to navigation Jump to search
2009 Initial Examination 05000327-09-301 and 05000328-09-301, Draft Sim/In-Plant JPMs
ML090720038
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/04/2009
From:
NRC/RGN-II
To:
References
IR-09-301
Download: ML090720038 (107)


See also: IR 05000327/2009301

Text

JPM B.1.a

Page 1 of 12

SEQUOYAH NUCLEAR PLANT

JOB PERFORMANCE MEASURE

JPM B.1.a

Perform 0-SI-OPS-085-011.0

Reactivity Control Systems

Moveable Control Assemblies

JPM B.1.a

Page 2 of 12

NUCLEAR TRAINING

REVISION/USAGE LOG

REVISION

NUMBER

DESCRIPTION OF

REVISION

V

DATE

PAGES

AFFECTED

PREPARED/

REVISED BY:

0

New JPM

Y

All

V - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

JPM B.1.a

Page 3 of 12

SEQUOYAH NUCLEAR PLANT

RO/SRO

JOB PERFORMANCE MEASURE

Task: Perform 0-SI-OPS-085-011.0 Reactivity Control Systems Moveable Control Assemblies

JA/TA task:

0010010201 (RO)

K/A Ratings:

001 Control Rod Drive System

Ability to (a) predict the impacts of the following malfunction or operations on the CRDS- and (b) based

on those predictions, use procedures to correct, control, or mitigate the consequences of those

malfunctions or operations: (CFR: 41.5/43.5/45.3/45.13)

A2.11 Situations requiring a reactor trip 4.4 /4.7

Task Standard:

1) Perform 0-SI-OPS-085-011.0 Reactivity Control Systems Moveable Control Assemblies starting with

Control Bank Bank C.

2) Following the uncontrolled rod movement, the reactor trip breakers are opened in accordance with

AOP-C.01, Rod Control System Malfunctions.

Evaluation Method :

Simulator ___X_____ In-Plant ________

=======================================================================

Performer:

_______________________________________

NAME

Start Time ________

Performance Rating : SAT _____ UNSAT _____ Performance Time _____

Finish Time _______

Evaluator:

_________________________________/________

SIGNATURE

DATE

=======================================================================

COMMENTS

JPM B.1.a

Page 4 of 12

SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Sequenced steps identified by an "s"

2. Any UNSAT requires comments

3. Place MODE 1 sign on the simulator.

4. This task is to be performed using the simulator in IC 13.

Ensure Rod Control Mode Selector Switch in CBB position.

5. When the candidate begins inserting Control BanK D, insert

Malfunction RD02 (uncontrolled insertion fo Bank D group 2)

6. Ensure operator performs the following required actions for SELF-CHECKING;

a. Identifies the correct unit, train, component, etc.

b. Reviews the intended action and expected response.

c. Compares the actual response to the expected response.

Validation Time: CR. 25 min

Local ____________

Tools/Equipment/Procedures Needed:

0-SI-OPS-085-011.0

References:

Reference

Title

Rev No.

1.

0-SI-OPS-085-011.0

Reactivity Control Systems Moveable Control

Assemblies

28

2.

AOP-C.01

Rod Control System Malfunctions

18

=================================================================

READ TO OPERATOR

Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be

performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed

your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1.

Unit at 48% power with a startup in progress.

2.

0-SI-OPS-085-011.0 is in progress.

INITIATING CUES:

1. You are to perform 0-SI-OPS-085-011.0 to verify rod operability for Control Banks C and D.

2. Notify the SRO when the performance of the sections for Control Banks C and D are complete.

JPM B.1.a

Page 5 of 12

Job Performance Checklist

STEP/STANDARD

SAT/UNSAT

STEP 1.:

Obtain the appropriate procedure.

STANDARD:

Operator obtains 0-SI-OPS-085-011.0 Section 6.1.7

___ SAT

___ UNSAT

Start Time____

CAUTION 1 An RPI position exceeding 12 steps (indicated position) from

its respective group step counter is INOPERABLE.

CAUTION 2 When a demand signal is present the rods may drop if

moving the rod control handswitch from manual or auto to

bank select because a step may be in progress.

STEP 2.: [1] IF [HS-85-5110], Rod Control Mode Selector Switch, is to be

rotated through AUTO position, THEN ENSURE computer points

[T0499A] and [T0496A] are within 1.0°F of each other.

STANDARD: Candidate marks the step as not applicable (N/A) because the switch will

not be rotated through the AUTO position.

COMMENTS:

___ SAT

___ UNSAT

STEP 3.: [2] PLACE [HS-85-5110] Rod Control Mode Selector Switch to Control

Bank C position (CBC).

STANDARD: Candidate places 1-HS-85-5110, Rod Control Mode Selector to the CBC

position.

COMMENTS:

___ SAT

___ UNSAT

JPM B.1.a

Page 6 of 12

Job Performance Checklist

STEP/STANDARD

SAT/UNSAT

CAUTION Insertion of Control Bank C may cause a decrease in RCS

Tavg and RCS pressure resulting in operation of the backup

heaters.

NOTE 1

Window D-4, COMPUTER ALARM ROD DEV AND SEQ NIS

PWR RANGE TILTS will Alarm if Control Bank C position is

inserted lower than the stored Plant Computer All Rods Out

(ARO) position.

NOTE 2

Window A-7, ROD CONTROL BANKS LIMIT LOW should alarm if

Control Bank C position is inserted below the Low Insertion Limit

Alarm Block (225 +/-2 steps) and within 10 steps of the Low - Low

Insertion Limit. (T.S. 3.1.3.6 or ZR-85-5070 Rod Insertion Limit

Recorder may be used to determine Lo-Lo insertion limit.)

NOTE 3

Window B-7, ROD CONTROL LIMIT LOW-LOW, may annunciate

during testing on Control Bank C based on initial rod position and

power level. Refer to Rod Insertion Limits in the COLR.

NOTE 4

Group Step Counter may be required to indicate > 10 step

movement to ensure each Rod Position Indicator has moved a

minimum of 10 steps.

STEP 4.: [3] INSERT Control Bank C a minimum of 10 steps with [HS-85-5111]

Rod Control Switch.

STANDARD: Candidate places 1-HS-85-5111,Rod Control to the IN position until the

Control Bank C rods move in at least 10 steps.

Note - the alarms in NOTE 1 and NOTE 2 above above will come in

after the rods have been inserted several steps

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

JPM B.1.a

Page 7 of 12

Job Performance Checklist

STEP/STANDARD

SAT/UNSAT

STEP 5.: [4] VERIFY the following:

GROUP STEP COUNTER MOVEMENT 10 STEPS

ALL ROD POSITION INDICATORS MOVEMENT 10 STEPS

STANDARD: Candidate verifies step counters 1-XI-85-5105C1 and 1-XI-85-5105C2

decrease by at least 10 steps

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

CAUTION Exercise caution when returning bank to the initial conditions

so as NOT to exceed the fully withdrawn position.

STEP 6.: [5] WITHDRAW Control Bank C to INITIAL position with [HS-85-5111]

Rod Control Switch.

STANDARD: Candidate places 1-HS-85-5111,Rod Control, to the OUT position until

the Control Bank C rods are restored to the original position of 228 steps.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

STEP 7.: [6] IF Rods are withdrawn greater than 231 steps on the group demand

rod position indicator, THEN PERFORM Appendix B to reference

Step Demand Counters

STANDARD: Candidate marks the step as not applicable (N/A) unless rods were

withdrawn greater than 231 steps. If so, then Appendix B must be

performed and the step would become a critical step.

COMMENTS:

___ SAT

___ UNSAT

JPM B.1.a

Page 8 of 12

Job Performance Checklist

STEP/STANDARD

SAT/UNSAT

STEP 8.: [7] IF COMPUTER ALARM ROD DEV AND SEQ NIS PWR RANGE

TILTS and/or ROD CONTROL BANKS LIMIT LOW alarms present

THEN RESET alarms with XS-55-4A Annunciator, RESET-ACK-

TEST switch.

STANDARD: Candidate resets the alarms using 1-XS-55-4A if lit.

COMMENTS:

___ SAT

___ UNSAT

NOTE Insertion of rods below the stored Plant Computer All Rods Out

position will result in an alarm.

STEP 9.: [8] ENSURE plant computer rod deviation alarm has cleared.

STANDARD: Candidate verifies plant computer rod deviation alarm window D-4 on 1-

M-4 overhead annunciator 1-XA-55-4B is not lit. May also check the

alarm clear on ICS alarm screen

COMMENTS:

___ SAT

___ UNSAT

JPM B.1.a

Page 9 of 12

Job Performance Checklist

STEP/STANDARD

SAT/UNSAT

ACCEPTANCE CRITERIA: 1. Each RPI and Demand Indicator indicates a 10 step

movement in the desired direction and in proper

sequence.

2. Group Demand Indicator is returned to original

position and all RPIs are within 12 steps of demand

position.

CAUTION Plant Technical Specification LCO 3.1.3.1 Moveable Control

Assemblies, LCO 3.1.3.2 Position Indicating Systems, and

LCO 3.1.3.6 Control Rod Insertion Limits must be evaluated

if the acceptance criteria are NOT fulfilled. Performance of 0-

SI-NUC-000-038.0 may be required within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

STEP 10.: [9] VERIFY Acceptance Criteria for operability of Control Bank C

Group Demand Position Indicators (step counters) and RPIs are

FULFILLED.

STANDARD: Candidate determines the Acceptance Criteria for operability is met.

COMMENTS:

___ SAT

___ UNSAT

STEP 11.: [10] IF Acceptance Criteria for operability of Control Bank C Group

Demand Position Indicators (step counters) and RPIs are NOT

FULFILLED,THEN NOTIFY the Unit Supervisor and comply with

Technical Specifications.

STANDARD: Candidate marks the step as not applicable (N/A).

COMMENTS:

___ SAT

___ UNSAT

STEP 12.: [11] IF performance of another bank is desired, THEN CONTINUE

instruction to next subsection in accordance with Section 6.1.

STANDARD: Candidate continues to section 6.1.8 to perform test on Control Bank D.

___ SAT

___ UNSAT

JPM B.1.a

Page 10 of 12

Job Performance Checklist

STEP/STANDARD

SAT/UNSAT

STEP 13.: [12] IF performance of another bank is NOT desired, THEN GO TO

Section 7.2, Restoration.

STANDARD: Candidate marks the step as not applicable (N/A). Step may or may not

be addressed.

COMMENTS:

___ SAT

___ UNSAT

The following steps are contained in Section 6.1.8 of 0-SI-OPS-085-011.0.

CAUTION 1 An RPI position exceeding 12 steps (indicated position) from

its respective group step counter is INOPERABLE.

CAUTION 2 When a demand signal is present the rods may drop if

moving the rod control handswitch from manual or auto to

bank select because a step may be in progress.

STEP 14.: [1] IF [HS-85-5110], Rod Control Mode Selector Switch, is to be

rotated through AUTO position, THEN ENSURE computer points

[T0499A] and [T0496A] are within 1.0°F of each other.

STANDARD: Candidate determines 1-HS -85-5110 will not be rotated through AUTO

and marks the step as not applicable (N/A)

COMMENTS:

___ SAT

___ UNSAT

STEP 15.: [2] PLACE [HS-85-5110] Rod Control Mode Selector Switch to

Control Bank D position (CBD).

STANDARD: Candidate places 1-HS-85-5110, Rod Control Mode Selector to the CBD

position.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

Console Operator: INSERT MALFUNCTION RD02 when the Control Bank D Rods are

being inserted.

JPM B.1.a

Page 11 of 12

Job Performance Checklist

STEP/STANDARD

SAT/UNSAT

CAUTION Insertion of Control Bank D may cause a decrease in RCS

Tavg and RCS pressure resulting in operation of the backup

heaters.

NOTE 1

Window A-7, ROD CONTROL BANKS LIMIT LOW will alarm if

Control Bank D position is within 10 steps of the Low - Low

Insertion Limit. (T.S. 3.1.3.6 or ZR-85-5070 Rod Insertion Limit

Recorder may be used to determine Lo-Lo insertion limit.)

NOTE 2

Group Step Counter may be required to indicate > 10 step

movement to ensure each Rod Position Indicator has moved a

minimum of 10 steps.

NOTE 3

Window C-11, BANK D AUTO ROD WITHDRAWAL BLOCKED,

will clear and reinitiate during testing if Bank D is above 220 steps

prior to testing.

STEP 16.: [3] INSERT Control Bank D a minimum of 10 steps with [HS-85-5111]

Rod Control Switch.

STANDARD: Candidate places 1-HS-85-5111,Rod Control to the IN position.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

The following step is contained in AOP-C.01, section 2.1.

STEP 17.: [1] STOP uncontrolled rod motion

[a] PLACE rod control in MAN.

[b] CHECK rod motion stopped.

RNO b. TRIP the reactor, and GO TO E-0,

Reactor Trip or Safety Injection

Cue: After the reactor trip breakers have been opened state We will stop here

STANDARD: Candidate determines that uncontrolled bank movement in occurring and

opens the reactor trip breakers in accordance with AOP-C.01. May not

open the AOP prior to tripping the re3actor

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

Stop Time____

End of JPM

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

1.

Unit at 48% power with a startup in progress.

2.

0-SI-OPS-085-011.0 is in progress.

INITIATING CUES:

1. You are to perform 0-SI-OPS-085-011.0 to verify rod operability for Control Banks C

and D.

2. Notify the SRO when the performance of the sections for Control Banks C and D are

complete.

B.1.b JPM 182-AP

Page 1 of 11

SEQUOYAH NUCLEAR PLANT

JOB PERFORMANCE MEASURE

B.1.b

JPM 182-AP

Start #1 RCP in Mode 3

B.1.b JPM 182-AP

Page 2 of 11

NUCLEAR TRAINING

REVISION/USAGE LOG

Revision

Number

Description

Of Revision

V

Date

Pages

Affected

Prepared/

Revised By:

0

Initial Issue; 07 ILT Audit Exam

Y

02/03/07

All

M Reese

V - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

B.1.b JPM 182-AP

Page 3 of 11

SEQUOYAH NUCLEAR PLANT

RO/SRO

JOB PERFORMANCE MEASURE

Task:

Start a Reactor Coolant Pump

Monitor the operation of the reactor coolant pumps

JA/TA task # : 0030010101

0030020101

K/A Ratings: 003 A1.02

2.9/2.9

015/017 AA1.03

3.7/3.8

Task Standard:

Determine RCP meets trip criteria and trip RCP #1

Evaluation Method :

Simulator ___X_____ In-Plant ________

========================================================================

Performer:

_______________________________________

NAME

Start Time ________

Performance Rating : SAT _____ UNSAT _____ Performance Time _____

Finish Time _______

Evaluator:

_______________________________/__________

SIGNATURE DATE

========================================================================

COMMENTS

B.1.b JPM 182-AP

Page 4 of 11

SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Sequenced steps identified by an "s".

2. Any UNSAT requires comments.

3. Initialize the simulator in IC-179. If not available, initialize to IC#7, Stop the #1 RCP.

Have RCP data screen on ICS.

Set NR-45 to display one3 SRM and one IRM

Freeze the simulator.

Hand the marked up procedure (Section 5.1 through step 10) to the candidate

4. Place the Simulator in RUN when the operator assumes the task.

5. Booth operator will be required to Insert the SCN File RCPHEATUP.scn during the JPM

6. Insure operator performs the following required actions for SELF-CHECKING;

a. Identifies the correct unit, train, component, etc.

b. Reviews the intended action and expected response.

c. Compares the actual response to the expected response.

Validation Time: CR. 13 minutes

Local ____________

Tools/Equipment/Procedures Needed:

1-SO-68-2

References:

Reference

Title

Rev No.

1.

1-SO-68-2

Reactor Coolant Pumps

30

========================================================================

READ TO OPERATOR

DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be

performed for this JPM. I will provide initiating cues and reports on other actions when directed by

you. When you complete the task successfully, the objective for this job performance measure will be

satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you

have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is in Mode 3

2. Preparations are being made to start #1 RCP.

3. All precautions and prerequisites are complete.

4. 1-SO-68-2 Section 5.1, steps 1 through 10 are complete

INITIATING CUES:

1. You have been directed to start the Loop 1 RCP in accordance with 1-SO-68-2, Reactor Coolant

Pumps.

2. Notify the US when the procedure is complete.

B.1.b JPM 182-AP

Page 5 of 11

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

REAC COOL PMPS OIL LIFT PRESS LOW annunciation will come in and clear during

performance of the next step.

STEP 1.:

[11] PLACE [1-HS-68-84A] No. 1 RCP Lift Oil Pump in the START position.

STANDARD: Places 1-HS-68-84A in start.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

Start

Time_______

STEP 2.:

[12] WHEN Lift Oil Pump for No. 1 RCP has run 2 minutes,

THEN ANNOUNCE No. 1 RCP start on the P/A system.

STANDARD: Makes announcement over PA system

COMMENTS:

___ SAT

___ UNSAT

STEP 3.:

[13] IF no RCPs are running AND RCP No. 1 is the first RCP to be started,

THEN MONITOR the SRMs during startup of the RCP.

STANDARD:

Operator determines other 3 RCPs are running and N/As this step

COMMENTS:

___ SAT

___ UNSAT

VIBRATION & LOOSE PARTS MONITORING ALM alarm will come in when RCP is Started,

Operator may dispatch AUO and Predictive Maintenance personnel to check. If so,

acknowledge the direction.

STEP 4.:

[14] PLACE [1-HS-68-8A] No. 1 RCP in the START position.

STANDARD: Places 1-HS-68-8A in start

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

Booth Instructor Note: Insert the SCN File RCPHEATUP.scn here

The motor will start heating up and result in the REAC COOL PMPS MOTOR STATOR

TEMPERATURE HIGH alarm on 1-M-5, Window E-1 on 1-XA-55-5B. While the next steps (5-7)

are being performed

B.1.b JPM 182-AP

Page 6 of 11

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 5.:

[15] ENSURE No. 1 RCP motor and pump are operating within the parameters

listed in Appendix D.

STANDARD: References Appendix D and observes parameters

COMMENTS:

___ SAT

___ UNSAT

STEP 6.:

[16] ENSURE [1-TCV-67-86] RCP Motor Cooler 1A is OPEN (1-HS-67-86 red

light illuminated).

STANDARD: Verifies 1-TCV-67-86 is open

COMMENTS:

___ SAT

___ UNSAT

STEP 7.:

[17] WHEN Lift Oil Pump has run greater than 1 minute after RCP start, THEN

PLACE [1-HS-68-84A] No. 1 RCP Lift Oil Pump in the STOP position.

STANDARD: Places 1-HS-68-84A in STOP position

COMMENTS:

___ SAT

___ UNSAT

The following step applies after the REAC COOL PMPS MOTOR STATOR TEMPERATURE

HIGH alarms on Window E-1 on 1-XA-55-5B.

STEP 8.:

Responds to the alarm and/or observes rise in RCP motor stator temperatures.

STANDARD: Determines that RCP operating parameters are not normal. May determine

the 1-SO-68-5 Appendix D limit is exceeded and stopping the RCP is

necessary or may implement the annunciator respond procedure.

COMMENTS:

___ SAT

___ UNSAT

If the actions contained in the Annunciator Response Procedure(ARP) are implemented, JPM

steps 10-20 cover the actions directed by the ARP and AOP to stop the RCP. If RCP is

stopped without implementing the ARP, JPM 9 step will end the JPM

B.1.b JPM 182-AP

Page 7 of 11

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 9.:

STOP Loop 1 RCP

STANDARD: Places 1-HS-68-8A to the STOP position.

Cue: If the RCP is stopped, State Well Stop Here

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

unless step 20 is

performed

The following steps are from the Annunciator Response Procedure

STEP 10.:

STANDARD: Determines RCP #1 is in alarm from the ICS display.

COMMENTS:

___ SAT

___ UNSAT

STEP 11.:

STANDARD: Contacts Tech support for assistance..

Cue: If Tech Support contacted, Acknowledge the request.

COMMENTS:

___ SAT

___ UNSAT

STEP 12.:

STANDARD: Monitors the listed parameters and determines each is normal.

COMMENTS:

___ SAT

___ UNSAT

STEP 13.:

STANDARD: Determines ERCW aligned to pump cooler.

Checks Red light lit 1-HS-67-86 to on 0-M-27A

COMMENTS:

___ SAT

___ UNSAT

B.1.b JPM 182-AP

Page 8 of 11

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 14.:

STANDARD:

Determines ERCW system normal using indications on 0-M-27A.

COMMENTS:

___ SAT

___ UNSAT

STEP 15.:

STANDARD:

Determines lower compartment air temperature normal using indications on 1-

M-6 or the ICS.

COMMENTS:

___ SAT

___ UNSAT

STEP 16.:

STANDARD:

Refers to 1-SO-68-2 Appendix D for the operating limits.

Note: If the RCP is stopped after determining the 311°F motor winding temperature limit

exceeded using Appendix D, then go back to JPM step 9

COMMENTS:

___ SAT

___ UNSAT

STEP 17.:

STANDARD: Determines motor amps are normal.

Cue: If Ops or Engineering contacted, state, The alarm is valid.

COMMENTS:

___ SAT

___ UNSAT

B.1.b JPM 182-AP

Page 9 of 11

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 18.:

STANDARD:

Determines the motor winding temperature is greater than 311°F using the ICS

and Goes to AOP-R.04.

Cue: If Ops or Engineering contacted, state, The alarm is valid.

COMMENTS:

___ SAT

___ UNSAT

The following 2 steps are AOP-R.06, Section 2.6 Step 1 and Section 2.1 Step 1-3 respectively

STEP 19.:

STANDARD:

Determines the motor winding temperature is greater than 311°F using the ICS

and Goes to AOP-R.04.

Cue: If Ops or Engineering contacted, state, The alarm is valid.

COMMENTS:

___ SAT

___ UNSAT

B.1.b JPM 182-AP

Page 10 of 11

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 20.:

STANDARD:

Determines plant not in Mode 3, goes to step 3 in accordance with the RNO

and stops and Locks out the RCP.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

unless RCP

stopped in JPM

Step 9.

END of JPM

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

READ TO OPERATOR

DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM. I will provide initiating cues and reports

on other actions when directed by you. When you complete the task successfully,

the objective for this job performance measure will be satisfied. Ensure you indicate

to me when you understand your assigned task. To indicate that you have completed

your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is in Mode 3

2. Preparations are being made to start #1 RCP.

3. All precautions and prerequisites are complete.

4. 1-SO-68-2 Section 5.1, steps 1 through 10 are complete.

INITIATING CUES:

1. You have been directed to start the Loop 1 RCP in accordance with 1-SO-68-2,

Reactor Coolant Pumps.

2. Notify the US when the procedure is complete.

JPM B.1.c -

  1. 027AP

Page 1 of 9

SEQUOYAH NUCLEAR PLANT

JOB PERFORMANCE MEASURE

JPM B.1.c

(#027AP)

Modified

Terminate SI and Re-Establish

Charging Flow

JPM B.1.c -

  1. 027AP

Page 2 of 9

NUCLEAR TRAINING

REVISION/USAGE LOG

Revision

Number

Description

Of Revision

V

Date

Pages

Affected

Prepared/

Revised By:

V - Specify if the JPM change will require another Validation (Y or N).

See cover sheet for criteria.

JPM B.1.c -

  1. 027AP

Page 3 of 9

SEQUOYAH NUCLEAR PLANT

RO/SRO

JOB PERFORMANCE MEASURE

Task:

Terminate SI and Re-Establish Charging Flow

JA/TA task # : 0001000501

(RO)

0040010101

(RO)

0060180101

(RO)

K/A Ratings:

006050 K4.01 (3.9 - 4.2)

006050 A1.01 (4.0 - 4.3)

006050 A1.02 (4.0 - 4.4)

006050 A4.01 (4.2 - 4.2)

006050 A2.01 (3.9 - 4.2)

006030 A4.01 (4.4 - 4.4)

004010 A4.01 [3.6/3.1]

004010 A4.02 [3.6/3.1]

004010 A3.06 [3.9/3.9]

004010 A4.04 [3.8/3.4]

004010 A3.07 [3.6/3.4]

Task Standard:

Safety Injection is terminated in accordance with ES-1.1 resulting in one of the CCPs in Pull- to-Lock

due to the loss of offsite power and the alternate charging supply valve open due to the failure of the

normal charging supply valve.

Evaluation Method :

Simulator ___X_____ In-Plant ________

=======================================================================

Performer:

_______________________________________

NAME

Start Time ________

Performance Rating : SAT _____ UNSAT _____ Performance Time _____

Finish Time _______

Evaluator:

_________________________________/________

SIGNATURE

DATE

======================================================================

COMMENTS

JPM B.1.c -

  1. 027AP

Page 4 of 9

SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Sequenced steps identified by an "S"

2. Any UNSAT requires comments

3. Acknowledge any associated alarms.

4. Snapshot taken to IC 192 (5 and 6 below not required unless snapshot unavailable)

5. Initialize Simulator in 16 and activate IMF RP04B f:1 [False Auto SIS, Hi Cntmt Press.]

Then insert IMF ED01 to cause a loss of offsite power and allow DGs to recover the

shutdown boards. Insert override ZDIHS6286A to F:0 to override normal charging valve closed.

6. FREEZE simulator after performing E-0 (including ES-0.5) through step #14.

7. An extra operator can be used to acknowledge alarms not associated with the JPM.

8. Insure operator performs the following required actions for SELF-CHECKING;

a. Identifies the correct unit, train, component, etc.

b. Reviews the intended action and expected response.

c. Compares the actual response to the expected response.

Validation Time: CR. _14 mins

Local _________

Tools/Equipment/Procedures Needed:

ES-1.1

References:

Reference

Title

Rev No.

1

ES-1.1

SI Termination

10

============================================================================

==

READ TO OPERATOR

DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed

for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete

the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me

when you understand your assigned task. To indicate that you have completed your assigned task return the

handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 has experienced a spurious Safety Injection followed by a loss of off site power.

All equipment operated as expected.

INITIATING CUES:

1. The crew entered E-0, Reactor Trip or Safety Injection and transitioned to ES-1.1, SI Termination.

2. The US directs you to complete ES-1.1 through the point of establishing charging flow.

3. Notify the Unit Supervisor when the steps to establish charging flow have been completed.

JPM B.1.c -

027AP2

Page 5 of 9

Job Performance Checklist

STEP/STANDARD

SAT/UNSAT

STEP 1:

Obtain a copy of the procedure.

STANDARD: Operator obtains a copy of ES-1.1, SI Termination.

COMMENTS:

___ SAT

___ UNSAT

Start Time____

NOTE This procedure has a foldout page.

STEP 2:

[1] MONITOR if containment spray should be stopped:

a. CHECK any containment spray pump RUNNING.

STANDARD: Candidate determines NO Spray Pump is running and proceeds to the RNO.

COMMENTS:

___ SAT

___ UNSAT

The following step is the RNO for the step above

STEP 3:

a. GO TO Step 3 .

STANDARD: Candidate to step 3 in the procedure.

COMMENTS:

___ SAT

___ UNSAT

STEP 4:

[3] RESET SI signal

STANDARD: Operator depresses SI Reset pushbuttons 1-HS-63-134A and 1-HS-63-134B

on 1-M-6 [and checks that the "SI ACTUATED" permissive is DARK and that

the "AUTO SI BLOCKED" permissive is lit (panel 1-M-4 XA-55-4A)]

information inside [ ] not critical

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

JPM B.1.c -

027AP2

Page 6 of 9

Job Performance Checklist

STEP/STANDARD

SAT/UNSAT

STEP 5:

[4] MONITOR shutdown boards continuously energized.

Cue:

The CRO will monitor the shutdown boards energized.

STANDARD: Operator addresses monitoring the SD Bds continuously energized.

COMMENTS:

___ SAT

___ UNSAT

STEP 6:

[5] ENSURE only 1 CCP Running

a. Check off-site power supplying shutdown boards.

STANDARD: Operator determines that off-site power is not aligned to shutdown boards by

noting the boards energized from the diesel generators and goes to the RNO.

COMMENTS:

___ SAT

___ UNSAT

The following step is the RNO for the step above

STEP 7:

a. ENSURE one CCP in PULL TO LOCK.

GO TO Step 6

STANDARD: Operator determines both CCPs running, places the control switch for one of

the charging pumps in the STOP position, (1-HS-63-108 or 1-HS-63-104),

[verifies pump stops - green light comes "on", amps go to zero,] and then pulls

to handswitch to the Pull-to-Lock position.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

STEP 8:

[6] CHECK the RCS pressure stable or rising

STANDARD: Operator verifies RCS pressure - stable or rising from RCS pressure indicators

on control boards

COMMENTS:

___ SAT

___ UNSAT

JPM B.1.c -

027AP2

Page 7 of 9

Job Performance Checklist

STEP/STANDARD

SAT/UNSAT

STEP 9:

[7] ISOLATE CCPIT:

a. CLOSE CCPIT inlet isolation valves FCV-63-39 and FCV-63-40.

STANDARD: Operator closes FCV-63-39 and FCV-63-40 as indicated by green light only lit

by placing 1-HS-63-39A and 1-HS-63-40A to close on 1-M-6.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

STEP10:

b. CLOSE CCPIT outlet isolation valves FCV-63-25 and FCV-63-26

STANDARD: Operator closes FCV-63-25 and FCV-63-26 as indicated by green light only lit

by placing 1-HS-63-25A and 1-HS-63-26A to close on 1-M-6.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

STEP 11:

[8] ESTABLISH charging flow:

a. CLOSE seal water flow control valve FCV-62-89.

STANDARD: Operator closes FCV-62-89 by dialing 1-HIC-62-89A to 100% [CLOSED]

on 1-M-5.

COMMENTS:

___ SAT

___ UNSAT

STEP 12:

b. OPEN charging flow isolation valves FCV-62-90 and 91.

STANDARD: Operator opens both FCV-62-90 and 91 as indicated by red light only lit by

placing 1-HS-62-90A and 1-HS-63-91A to open on 1-M-6.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

STEP 13:

c. ENSURE normal charging isolation valve FCV-62-86 OPEN.

STANDARD: Operator verifies FCV-62-86 is closed and cannot be opened by green light lit

on 1-HS-62-86A on 1-M-6 and goes to the RNO.

COMMENTS:

___ SAT

___ UNSAT

The following step is the RNO for the step above

JPM B.1.c -

027AP2

Page 8 of 9

Job Performance Checklist

STEP/STANDARD

SAT/UNSAT

STEP 14:

c. ENSURE alternate charging isolation valve FCV-62-85 OPEN.

STANDARD: Operator places 1-HS-62-85 to OPEN to open FCV-62-85 [ valve can be

verified open by RED light lit and, GREEN light out on handswitch 1-M-6

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

STEP 15:

d. ESTABLISH desired charging flow USING seal water and charging flow

control valves FCV-62-89 and FCV-62-93.

STANDARD:

Operator adjusts 1-HIC-62-89A & 1-HIC-62-93A to establish Seal injection

flow 6-12 gpm on FIs-62-1, 14, 27, 40

COMMENTS:

___ SAT

___ UNSAT

STEP 16:

[9] CONTROL charging flow to maintain pressurizer level.

STANDARD: Operator determines that pressurizer level is not dropping and is rising until

letdown is restored

COMMENTS:

___ SAT

___ UNSAT

STEP 18: Operator notifies the Unit Supervisor that charging flow is established.

STANDARD:

Operator makes notification to the Unit Supervisor that charging flow has been

established.

CUE:

State Well stop here.

COMMENTS:

___ SAT

___ UNSAT

Stop Time____

END OF JPM

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps

shall be performed for this JPM. I will provide initiating cues and reports on other actions when

directed by you. When you complete the task successfully, the objective for this job

performance measure will be satisfied. Ensure you indicate to me when you understand your

assigned task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

Unit 1 has experienced a spurious Safety Injection followed by a loss of off site power.

All equipment operated as expected.

INITIATING CUES:

1. The crew entered E-0, Reactor Trip or Safety Injection and transitioned to ES-1.1, SI

Termination.

2. The US directs you to complete ES-1.1 through the point of establishing charging

flow.

3. Notify the Unit Supervisor when the steps to establish charging flow have been

completed.

B.1.d

Page 1 of 9

SEQUOYAH NUCLEAR PLANT

JOB PERFORMANCE MEASURE

B.1.d

JPM # 58AP-2

modified

FAULTED STEAM GENERATOR ISOLATION

WITH MSIV STUCK OPEN

B.1.d

Page 2 of 9

NUCLEAR TRAINING

REVISION/USAGE LOG

REVISION

NUMBER

DESCRIPTION OF

REVISION

V

DATE

PAGES

AFFECTED

PREPARED/

REVISED BY:

0

V - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

B.1.d

Page 3 of 9

SEQUOYAH NUCLEAR PLANT

RO/SRO

JOB PERFORMANCE MEASURE

Task:

Faulted Steam Generator Isolation With MSIV Stuck OPEN

Note: This JPM satisfies Simulator Manipulation "Z".

JA/TA task # : 0001060501

(RO)

K/A Rating:

040 Steam Line Rupture

Ability to determine and interpret the following as they apply to the Steam Line Rupture:

(CFR: 43.5 / 45.13)

AA2.01 Occurrence and location of a steam line rupture from pressure and flow indications.

4.2 / 4.7

Task Standard:

Faulted S/G (#1) is isolated in accordance with E-2.

Evaluation Method :

Simulator ___X_____ In-Plant ________

=======================================================================

Performer:

_______________________________________

NAME

Start Time ________

Performance Rating : SAT _____ UNSAT _____ Performance Time _____

Finish Time _______

Evaluator:

________________________________/_________

SIGNATURE

DATE

=======================================================================

COMMENTS

B.1.d

Page 4 of 9

SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Sequenced steps identified by an "s"

2. Any UNSAT requires comments

3. Snapshot taken to IC-191. IF snapshot not available then perform step 4, 5, and 6

4. Initialize the simulator to IC # 16 THEN activate MF # MS04B (to fail #2 MSIV OPEN) and insert MF #

TH01D at 5%.

5. Manually trip Rx and initiate SI. Perform actions to place the crew in E-1, Loss of Reactor or

Secondary Coolant. When in E-1 insert malfunction insert MF # MS12B to 100% (to fail #2

Atmospheric Relief valve open.)

6. Change scale on Audio Count Rate

7. FREEZE simulator until the operator has been briefed.

8. Ensure operator performs the following required actions for SELF-CHECKING;

a. Identifies the correct unit, train, component, etc.

b. Reviews the intended action and expected response.

c. Compares the actual response to the expected response.

Validation Time: CR. 8 mins

Local ____________

Tools/Equipment/Procedures Needed:

E-2, Faulted Steam Generator Isolation

References:

Reference

Title

Rev No.

1.

E-2

Faulted Steam Generator Isolation

12

=================================================================

READ TO OPERATOR

Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall

be performed for this JPM. I will provide initiating cues and reports on other actions when

directed by you. When you complete the task successfully, the objective for this job performance

measure will be satisfied. Ensure you indicate to me when you understand your assigned task.

To indicate that you have completed your assigned task return the handout sheet I provided you

and to indicate completion of your answer to a knowledge question return the written copy of the

question to me.

INITIAL CONDITIONS:

Unit 1 was at 100 % RTP when a Reactor Trip and Safety injection actuated due to an RCS leak.

After entering E-1, Loss of Reactor or Secondary Coolant, the crew determined a steam

generator was faulted and transitioned to E-2 from the foldout page.

INITIATING CUES:

1. The US directs the Unit 1 CRO to implement E-2 and identify and isolate the faulted S/G.

2. Inform the US/SRO when all actions to isolate the faulted S/G have been performed.

B.1.d

Page 5 of 9

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 1.:

Obtain a copy of the required procedure.

STANDARD: Operator obtains a copy of E-2.

COMMENTS:

___ SAT

___ UNSAT

Start Time____

CAUTION Unisolating a faulted S/G or secondary break should

NOT be considered UNLESS needed for RCS cooldown.

STEP 2.:

1. CHECK MSIV's and MSIV bypass valves CLOSED.

RNO: CLOSE valves.

NOTE:

MSIV 1-FCV-1-11 will NOT close.

STANDARD: Operator places HSs-1-4, 11, 22, 29 in the closed position and

verifies green (& blue) lights ON, verifies HSs-1- 147, 148, 149,

150 are in the closed position with green lights ON. Recognizes

FCV-1-11 will NOT close as indicated by RED light on

handswitch ON.

COMMENTS:

___ SAT

___ UNSAT

The following step is the RNO for step above.

STEP 3.:

CLOSE valves.

IF any MSIV OR MSIV bypass valve CANNOT be closed,

THEN CLOSE valve USING EA-1-1, Closing MSIVs Locally.

CUE:

Acknowledge the direction to implement EA-1-1 for Loop 2.

STANDARD: Operator dispatched to close loop 2 MSIV using EA-1-1.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

STEP 4.:

2. CHECK ANY S/G pressureBoundary INTACT:

  • Any S/G pressure CONTROLLED or RISING.

NOTE:

The other steam generators are NOT faulted.

STANDARD: Operator checks all S/G pressures using PI-1-2A & B, 9A & B ,

20 A & B, 27 A & B OR PR-1-2 and determines that only SG #2

pressure is decreasing uncontrolled and continues with E-2.

COMMENTS:

___ SAT

___ UNSAT

B.1.d

Page 6 of 9

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 5.:

3. IDENTFY Faulted S/G(s):

a. CHECK S/G pressure:

Any S/G pressure DROPPING in an uncontrolled

manner.

OR

Any S/G pressure less than 140 psig.

NOTE: Critical ONLY If a wrong S/G is identified as faulted.

STANDARD: Operator correctly identifies S/G #2 as the faulted S/G.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

CAUTIONS * Secondary heat sink requires at least one S/G

available.

  • Isolating both steam supplies to the TD AFW pump

when it is the only source of feed flow will result in

loss of secondary heat sink.

STEP 6.:

4. ISOLATE Faulted S/G(s)

STANDARD: Operator verifies FCV-3-48 & 48A, and 47 closed by green light

lit on 1-XX-3-35 and on 1-HS 3-47.

COMMENTS:

___ SAT

___ UNSAT

STEP 7.:

STANDARD: Operator depresses pushbutton controls for LCV-3-158/158A to

accident reset THEN places the control switch in the manual or

the manual-bypass position, [verifies amber light on XX-3-148

ON] and places the valve position switch to by turning switch to

the closed position [and verifies the green lights on for each

valve].

Places 1-HS-3-173 to the CLOSE position [HS may be placed in the

PTL position] and [verifies valve closed by green light on XX-3-148].

[ ] not critical.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

B.1.d

Page 7 of 9

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 8.:

  • CLOSE TD AFW pump steam supply from faulted S/G

FCV-1-15 (SG#1) or FCV-1-15 (SG#4).

STANDARD: Operator recognizes SG #2 does not supply the TDAFW pump

and the step is not applicable

COMMENTS:

___ SAT

___ UNSAT

STEP 9.:

  • VERIFY S/G blowdown valves CLOSED.

STANDARD: Operator verifies FCV-1-7 and 181 closed as indicated by green

light "ON" for respective valves on 1-HS -1-14/182.

COMMENTS:

___ SAT

___ UNSAT

STEP 10.:

  • VERIFY atmospheric relief CLOSED.

STANDARD: Operator recognizes that SG #2 Atmospheric relief valve is open

by red light lit on 1-HS-1-13

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

The following 2 steps are the RNO for the step above

STEP 11.:

  • CLOSE atmospheric relief.

STANDARD: Operator attempts to close using 1-HS -1-13 (may place

controller 1-PIC-1-13A to manual and set to 0 output.

COMMENTS:

___ SAT

___ UNSAT

B.1.d

Page 8 of 9

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 12.:

IF Faulted S/G(s) atmospheric relief CANNOT be closed, THEN

DISPATCH personnel to close atmospheric USING EA-1-2, Local

Control of S/G PORV.

CUE:

Acknowledge the direction to implement EA-1-2 for S/G #2

PORV.

STANDARD: Operator directs personnel to close SG #2 Atmospheric Relief

Valve 1-RLV-1-13 using EA-1-2, Local control of S/G PORVs.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

STEP 13.:

[5] CHECK CST level greater than 5%.

Cue:

When operator start to check CST level, state Well Stop Here.

STANDARD: Operator begins to initiate action to check CST level.

COMMENTS:

___ SAT

___ UNSAT

Stop Time____

End of JPM

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps

shall be performed for this JPM. I will provide initiating cues and reports on other actions when

directed by you. When you complete the task successfully, the objective for this job

performance measure will be satisfied. Ensure you indicate to me when you understand your

assigned task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 was at 100 % RTP when a Reactor Trip and Safety injection actuated due

to an RCS leak.

  • After entering E-1, Loss of Reactor or Secondary Coolant, the crew determined a

steam generator was faulted and transitioned to E-2 from the foldout page.

INITIATING CUES:

1. The US directs the Unit 1 CRO to implement E-2 and identify and isolate the

faulted S/G.

2. Inform the US/SRO when all actions to isolate the faulted S/G have been

performed.

JPM B.1.e - #77

Page 1 of 16

SEQUOYAH NUCLEAR PLANT

JOB PERFORMANCE MEASURE

JPM B.1.e

(#77)

Perform D/G Load Test on 1B-B D/G

JPM B.1.e - #77

Page 2 of 16

NUCLEAR TRAINING

REVISION/USAGE LOG

REVISION

NUMBER

DESCRIPTION OF

REVISION

V

DATE

PAGES

AFFECTE

D

PREPARED/

REVISED BY:

13

Revised to reflect revision changes in SI-

7B, changed critical steps for consistency

with JPM 77-5AP reviewed/approved

4/20/99, corrected typos and incorporated

comments from 1999 cycle 5 requal

performances of JPM 77-2AP

N

10/14/99

All

SR Taylor

pen/ink

minor change to step 6, and Revision

update

N

8/16/00

4,7

SR Taylor

pen/ink

Procedure rev. Update, changed SI steps

referenced in JPM step 18

N

12/4/01

4, 9

L. Pauley

pen/ink

minor enhancement changes and

1-SI-OPS-082-007.B Revision update

N

03/21/02

ALL

WR Ramsey

14

Incorporated pen/ink changes; revised

per recent revisions to 1-SI-OPS-082-

007.B; No impact on JPM flow

N

8/20/02

All

J P Kearney

15

Updated references

N

12/10/2003

4

JJ Tricoglou

Changed remote function configuration to

match new simulator

N

8

16

Updated to current procedure and IC.

N

8/11/04

All

MG Croteau

17

Updated to current procedure. Minor step

changes.

N

9/19/05

All

SR Taylor

18

Updated to current procedure.

Note: Unable to locate Revs. 16 & 17

N

06/05/07

All

John Addison

19

Update Ref. Enhance step 5, Made a

separate JPM step to record stop watch

time as per proced.

N

5/20/08

4, 6, 7

H J Birch

V - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

JPM B.1.e - #77

Page 3 of 16

SEQUOYAH NUCLEAR PLANT

RO/SRO

JOB PERFORMANCE MEASURE

Task:

Perform D/G Load Test on 1B-B D/G

JA/TA task # : 0640020101

0640040101

0640060101

(RO)

K/A Ratings:

064A4.01 (4.0/4.3)

064A 2.09 (3.1/3.3)

064A4.02 (3.3/3.4)

064A 2.03(3.1/3.1)

064A4.03 (3.2/3.3)

064A2.05 (3.1/3.2)

Task Standard:

Perform D/G Operability Test per 1-SI-OPS-082-007.B. Manually start, load the D/G and verify loading.

Evaluation Method :

Simulator ___X_____ In-Plant ________

=======================================================================

Performer:

_______________________________________

NAME

Start Time _________

Performance Rating : SAT _____ UNSAT _____ Performance Time _____

Finish Time _________

Evaluator:

____________________________________/________

SIGNATURE

DATE

========================================================================

COMMENTS

JPM B.1.e - #77

Page 4 of 16

SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Sequenced steps identified by an "s"

2. Any UNSAT requires comments

3. Acknowledge any associated alarms.

4. Initialize Simulator in IC: #16.

5. This JPM will require a console operator to reset 86 LOR at JPM step 10 (IRF EG08 f:1)

6. Operator will need assistance during D/G start and loading. An extra simulator operator or the

console operator needs to be present to perform this timing.

7. Ensure operator performs the following required actions for SELF-CHECKING;

a. Identifies the correct unit, train, component, etc.

b. Reviews the intended action and expected response.

c. Compares the actual response to the expected response.

Validation Time: CR 40 minutes

Local ____________

Tools/Equipment/Procedures Needed:

1. 1-SI-OPS-082-007.B, through Section 6.1, Appendix "C", and Attachment 1 (Optional).

2. "Signed off" copy of Section 4 and Section 6.1 through Step 6.

References:

Reference

Title

Rev No.

1.

1-SI-OPS-082-007.B

Electrical Power System Diesel Generator 1B-B

47

JPM B.1.e - #77

Page 5 of 16

READ TO OPERATOR

Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be

performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed

your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1.

Both units are at 100% RTP.

2.

All systems are OPERABLE, except for the 1B-B D/G. 0-GO-16, System Operability Checklists

has been completed on all Train A equipment.

3.

Maintenance has been completed on the 1B-B D/G and the clearance has been removed.

4.

The D/G has been rolled and is in standby alignment using 0-SO-82-2, Diesel Generator 1B-B.

5.

The AUO at the D/G building has completed 1-SI-OPS-082-007.B, Appendix A and all

parameters are within limits.

6.

The U1 Control Room AUO has verified breaker 1934 is in the Disconnect position.

7.

DG-DAQ has been installed.

8.

Room fire protection is in service.

9.

Section 4.0 of 1-SI-OPS-082-007.B is complete.

10.

Section 6.1 of 1-SI-OPS-082-007.B is complete through Step 6.

INITIATING CUES:

1.

The U1 US/SRO has reviewed the completed work package for the 1B-B D/G, all that remains is

to perform 1-SI-OPS-082-007.B for the PMT. All other periodic testing requirements have been

completed.

2.

As the extra Unit Operator you have been assigned to perform the SI on 1B-B D/G.

3.

The PMT requires the AMBIENT MANUAL START method for testing.

4.

Notify the US when the test is complete.

JPM B.1.e - #77

Page 6 of 16

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 1.:

Operator obtains a copy of the appropriate procedure.

STANDARD: Operator obtains a copy of 1-SI-OPS-082-007.B. Performance of task will

start at Section 6.1 Step [7].

Note: Initial conditions cover steps through Section 6.1 step 6 which

directs the use of App "C".

COMMENTS:

___ SAT

___ UNSAT

Start

Time____

The following step is Section 6.1 Step [7]. A caution and note precede the step.

STEP 2.:

[7] IF any of the following conditions exist:

A. Calendar date is January or July, and this is the first performance

during the month,

OR

B. Performance is to satisfy a PMT ONLY and a manual start is required,

OR

C. Performance is to satisfy a PMT AND Periodic Testing Requirements

and a manual start is required,

THEN

PERFORM Appendix C, Ambient Manual Start Method.

.

STANDARD: Appendix C is selected as the appropriate appendix.

COMMENTS:

___ SAT

___ UNSAT

The following step starts use of Appendix C

NOTE All steps in this Appendix refer to 1B-B Diesel Generator (D/G) and

are performed from Main Control Room Panel 0-M-26B unless

otherwise specifically noted.

STEP 3.:

[1] ENSURE 0-HS-82-48 1B-B D/G mode selector switch in the UNIT

position.

STANDARD: 0-HS-82-48 in UNIT position on 0-M-26. Green light ON.

COMMENTS:

___ SAT

___ UNSAT

JPM B.1.e - #77

Page 7 of 16

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 4.:

[2] PLACE 1-HS-57-74 D/G 1B-B Synchronize Switch in the SYN position.

STANDARD: Operator places 1-HS-57-74 in "SYN" position on 0-M-26.

Note: 0-EI-82-35 and 0-XI-82-33 will indicate running voltage &

frequency.

COMMENTS:

___ SAT

___ UNSAT

Critical Step

Note: 4 procedure NOTES precede the step

STEP 5.

[3] PERFORM the following to initiate the D/G start signal:

a. IF the D/G DAQ is to be used, THEN

NOTIFY D/G-DAQ Operator to START the D/G-DAQ

NOTE:

Operator should coordinate the start of the D/G-DAQ just prior to D/G

start actuation.

Cue

Console operator Play role of D/G-DAQ operator: D/G-DAQ

computer is running.

STANDARD: Operator notifies the D/G-DAQ operator to start the D/G-DAQ.

COMMENTS:

___ SAT

___ UNSAT

NOTE:

The operator will NOT be able to manipulate switches and stop watch

alone, allow the console operator to time the D/G.

Start stopwatch when HS depressed

Stop when >6800 V & >58.8 HZ

[Time will be 9.4 sec - to Approx the Dac time in step 12]

STEP 6.:

b. PROCEED with the countdown: 3,2,1, START,

c. DEPRESS 0-HS-82-46A, DG 1B-B Emergency Start Switch AND

START Stopwatch.

d. When voltage >6800 volts AND frequency > 58.8 Hz, THEN STOP

stopwatch

STANDARD: 0-HS-82-46A momentarily depressed. Green light will go "out" and red

light will come "on" above D/G mimic. [Not critical: D/G running alarm will

annunciate to indicate D/G > 40 rpm. Incoming voltage and frequency are

verified on 0-EI-82-34 and 0-XI-82-32.]

COMMENTS:

___ SAT

___ UNSAT

Critical Step

JPM B.1.e - #77

Page 8 of 16

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 7.:

[4] ENSURE 1-FCV-67-67, ERCW cooling water supply valve is OPEN.

STANDARD: ERCW valve 1-FCV-67-67 red light comes "on" and green light goes "out"

on 0-M-27A panel.

COMMENTS:

___ SAT

___ UNSAT

STEP 8.:

[5] RECORD the Time from the stopwatch(es)

Acceptance Criteria

D/G 1B-B starts from ambient condition and achieves,

in less than or equal to 10 seconds, generator voltage

6800 volts and frequency of 58.8 Hz

Cue:

Stopwatch time is 9.4 sec

STANDARD: Operator obtains and records the stopwatch time.

COMMENTS:

___ SAT

___ UNSAT

STEP 9.:

[6] RECORD the steady state values for the following:

A. 0-EI-82-34, DG 1B-B incoming Voltage.

B. 0-XI-82-32, DG 1B-B incoming Frequency.

STANDARD: Operator determines D/G voltage (as indicated on INC Voltage Gen 1B-B

0-EI-34) is > 6800 but < 7260 volts and frequency (as indicated on INC

Freq Gen 1B-B 0-XI-82-32) is > 59.9 Hz and < 60.1 Hz

COMMENTS:

___ SAT

___ UNSAT

JPM B.1.e - #77

Page 9 of 16

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 10.:

[7] RECORD Voltage Regulator Control Current. [Pnl 1 of Exciter Cab]

ACCEPTANCE CRITERIA: Voltage Regulator Control Current between

1.0 - 2.5 dc amps. The Voltage regulator card must be functioning

properly to consider DG operable.

Cue:

Voltage Regulator Control Current is 1.8 dc amps.

STANDARD: Operator records Voltage Regulator Control Current.

COMMENTS:

___ SAT

___ UNSAT

STEP 11.:

[8] ENSURE D/G 1B-B 86 LOR red light NOT ILLUMINATED, at D/G local

relay panel.

Cue:

Role play as D/G operator - 86 LOR local red light is not illuminated.

STANDARD

Operator verifies red light on 86 LOR at D/G is not illuminated.

COMMENTS:

___ SAT

___ UNSAT

STEP 12.:

[9] RESET 86 LOR lockout relay, on D/G local relay panel and VERIFY

reset by amber light 0-XI-82-49 illuminated on 0-M-26.

Cue:

When the D/G AUO is requested to reset 86LOR, the Console

operator should insert IRF EGR08 f:1 (RESET) to reset 86LOR and

then notify operator that 86 LOR is reset.

STANDARD: 86 LOR is reset and amber light on 0-M-26 is verified lit.

COMMENTS:

___ SAT

___ UNSAT

Critical Step

STEP 13.:

[10] VERIFY [86LOR] is reset by amber light [0-XI-82-49]

ILLUMINATED on 0-M-26B.

STANDARD: Operator ensures the DG accelerates to at least 900 rpm and Voltage and

Frequency are within limit within the required 10 seconds.

COMMENTS:

___ SAT

___ UNSAT

JPM B.1.e - #77

Page 10 of 16

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 14.:

[11] IF the D/G-DAQ was used, THEN

RECORD the time required to achieve 59.9 HZ and 6800 Volts

from the D/G-DAQ computer.

Cue:

Time was 9.5 seconds for D/G-DAQ.

STANDARD: Operator ensures the DG accelerates to at least 900 rpm and Voltage and

Frequency are within limit within the required 10 seconds. (Evaluator can

sign for Tech Support)

COMMENTS:

___ SAT

___ UNSAT

STEP 15.:

[12] IF step [6] frequency is , 59.9 hz or > 60.1 Hz, THEN

INITIATE a PER.

STANDARD: Operator determines frequency was within range and marks the step N/A.

COMMENTS:

___ SAT

___ UNSAT

STEP 16.:

[13] RECORD start as ambient in 0-SI-OPS-082-007.M.

CUE: State that the start will be recorded by another operator.

STANDARD: Operator addresses logging the start in 0-SI-OPS-082-007.M.

Note: This SI is NOT available on the simulator,

COMMENTS:

___ SAT

___ UNSAT

STEP 17.:

[14] RETURN to Section 6.1, Step 10.

STANDARD: Operator returns to the appropriate section and step of the procedure.

(Exits Appendix C)

COMMENTS:

___ SAT

___ UNSAT

The following steps are contained in Section 6.1 of the SO.

JPM B.1.e - #77

Page 11 of 16

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 18.:

[10] Perform the following to wipe the Automatic Voltage Control Rheostat

[a] RECORD voltage from 0-EI-82-34.

STANDARD: Operator record voltage from 0-EI-82-34

COMMENTS:

___ SAT

___ UNSAT

STEP 19.:

[b] ENSURE 0-HS-82-42 is in PULL-P-AUTO position.

STANDARD: Operator ensures that 0-HS-82-42 is in the PULL-P-AUTO position.

COMMENTS:

___ SAT

___ UNSAT

STEP 20.:

[c] DECREASE voltage to 6700 volts on 0-EI-82-34 using 0-HS-82-42.

STANDARD: Operator lowers voltage to 6700 volts using 0-HS-82-42 while observing

0-EI-82-34.

COMMENTS:

___ SAT

___ UNSAT

STEP 21.:

[d] INCREASE voltage to 7300 volts on 0-EI-82-34 using 0-HS-82-42.

STANDARD: Operator raises voltage to 7300 volts using 0-HS-82-42 while observing

0-EI-82-34.

COMMENTS:

___ SAT

___ UNSAT

STEP 22.:

[e] RETURN voltage to value recorded in [10][a].

STANDARD: Operator lowers voltage to previously recorded value using 0-HS-82-42

while observing 0-EI-82-34.

COMMENTS:

___ SAT

___ UNSAT

JPM B.1.e - #77

Page 12 of 16

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 23.:

[11] PLACE [0-HS-82-48], DG 1B-B Mode Selector Switch, in PARALLEL

position.

STANDARD: Operator places 0-HS-82-48 to the PARALLEL position. Red light "on" &

green light "off".

COMMENTS:

___ SAT

___ UNSAT

Critical Step

STEP 24.:

[12] ADJUST [0-HS-82-43] DG 1B-B Speed Control Switch to obtain a

synchroscope indication of slowly rotating in the [FAST] direction.

STANDARD: Operator adjusts speed control hand switch 0-HS-82-43 such that

synchroscope (0-XI-82-31) is moving slowly in the fast direction (slowly

clockwise).

COMMENTS:

___ SAT

___ UNSAT

Several notes and a table are located prior to the next step.

Note 5 addresses the CSST A LTC X, Tap Position Indication on 0-ECB-5 which is not

simulated. It states the tap changer indication should be observed prior to and during

paralleling to the 6.9 kv Shutdown Board because the Tap changer operation

during this time can cause a D/G voltage change.

Cue: When addressed, state another operator will monitor the tap changer

STEP 25.:

[13] ENSURE [0-HS-82-42] DG 1B-B Voltage Regulator Switch in the

PULL-P-AUTO position, AND

ADJUST to match incoming voltage with running voltage.

STANDARD: Operator places HS-82-42 in PULL-P-AUTO and adjusts D/G voltage such

that incoming voltage (0-EI-82-34) and running voltage (0-EI-82-35) are

approximately equal.

COMMENTS:

___ SAT

___ UNSAT

Critical Step

JPM B.1.e - #77

Page 13 of 16

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 26.:

[14] WHEN synchroscope DG 1B-B 0-XI-82-31 indicates 12 O'clock

position, THEN

CLOSE breaker 1914 via 1-HS-57-73A, 1914 DG 1B-B to SD BD 1B-B,

AND

START Stopwatch.

STANDARD: Breaker 1914 Closes and remains closed as indicated by red light "on" &

green light "off' above 1-HS-57-73A.

(Operator should close D/G 1B-B breaker 1914 when synchroscope

indicates 12:00 (o'clock) position)

NOTE: The operator will NOT be able to manipulate switches and

stop watch alone, allow the console operator to time the loading of

the D/G.

COMMENTS:

___ SAT

___ UNSAT

Critical Step

The next 2 steps must be completed within 60 seconds. Start Time __________

NOTE:

SI steps 15 and 16 must be completed within 60 seconds to satisfy

the SI acceptance criteria.

STEP 27.:

[15] IMMEDIATELY LOAD D/G to > 1 MW by performing the following:

a. PLACE [0-HS-82-43] in RAISE and obtain 1MW on 0-EI-82-40A.

b. ADJUST 0-HS-82-42 to 0.75 MVARS outgoing as indicated on

[0-EI-82-41A], DG 1B-B Megavars.

c. ENSURE DG indications match the expected indications of Table in

NOTE 4.

d. IF DG indications NOT as expected, THEN

NOTIFY US.

STANDARD: Operator raises DG speed adjust and adjusts MVARS to achieve 1MW

on 0-EI-82-40A and 0.75 MVARS outgoing as indicated on 0-EI-82-41A.

[Not Critical] Operator ensures MW and amps are as expected for MW

load per table in Note 4 of section 6.1 of 1-SI-OPS-082-007.B.

COMMENTS:

___ SAT

___ UNSAT

Critical Step

JPM B.1.e - #77

Page 14 of 16

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 28.:

[16] IMMEDIATELY LOAD D/G to > 3.96 and < 4.4 MW.

[a] PLACE 0-HS-82-43 in RAISE and obtain > 3.96 and < 4.4 MW

within 60 seconds on 0-EI-82-40A.

[b] ADJUST 0-HS-82-42 to 0.75 MVARS and < 2.37 MVARS

outgoing as indicated on 0-EI-82-41A.

[c] STOP stopwatch

NOTE:

The operator will NOT be able to manipulate switches and stop watch

alone, allow the console operator to time the loading of the D/G.

STANDARD: Operator loads D/G to > 3.96 MW in < 60 seconds as indicated on EI-82-

40A. [Not Critical] Operator ensures MVARS and AMPS are as expected

for MW load per table in Note 4 of section 6.1 of 1-SI-OPS-082-007.B.

Stop Time __________

COMMENTS:

___ SAT

___ UNSAT

Critical Step

Time < 60

seconds

STEP 29.:

[17] RECORD the following:

A) loading time

B) load achieved [0-EI-82-40A]

C) time load achieved.

STANDARD: Operator records the required data.

COMMENTS:

___ SAT

___ UNSAT

STEP 30.:

[18] NOTIFY the AUO at the D/G bldg to PERFORM Appendix B AND

PROVIDE D/G Bldg AUO time D/G achieved final load. (Step[17])

Cue:

Acknowledge load time. Inform UO that the first set of readings for

Appendix B is in progress.

STANDARD: Operator contacts the AUO and instructs him/her to perform Appendix B of

1-SI-OPS-082-007.B.

COMMENTS:

___ SAT

___ UNSAT

JPM B.1.e - #77

Page 15 of 16

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 31.:

[19] MAINTAIN load at predetermined test value for > 60 minutes by

adjusting [0-HS-82-43], DG 1B-B Speed Control Switch as needed.

Cue:

After the operator checks load stable state: The US informs you that

the unit 2 CRO will shut down the D/G at the end of the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> run.

STANDARD: Operator checks load to ensure stable between 3.96 & 4.4 MW.

COMMENTS:

___ SAT

___ UNSAT

Stop

Time____

End of JPM

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

READ TO OPERATOR

Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room

steps shall be performed for this JPM. I will provide initiating cues and reports on other

actions when directed by you. When you complete the task successfully, the objective

for this job performance measure will be satisfied. Ensure you indicate to me when you

understand your assigned task. To indicate that you have completed your assigned task

return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Both units are at 100% RTP.

2. All systems are OPERABLE, except for the 1B-B D/G. 0-GO-16, System Operability

Checklists has been completed on all Train A equipment.

3. Maintenance has been completed on the 1B-B D/G and the clearance has been

removed.

4. The D/G has been rolled and is in standby alignment using 0-SO-82-2, Diesel

Generator 1B-B.

5. The AUO at the D/G building has completed 1-SI-OPS-082-007.B, Appendix A and

all parameters are within limits.

6. The U1 Control Room AUO has verified breaker 1934 is in the Disconnect position.

7. DG-DAQ has been installed.

8. Room fire protection is in service.

9. Section 4.0 of 1-SI-OPS-082-007.B is complete.

10. Section 6.1 of 1-SI-OPS-082-007.B is complete through Step 6.

INITIATING CUES:

1. The U1 US/SRO has reviewed the completed work package for the 1B-B D/G, all

that remains is to perform 1-SI-OPS-082-007.B for the PMT. All other periodic

testing requirements have been completed.

2. As the extra Unit Operator you have been assigned to perform the SI on 1B-B D/G.

3. The PMT requires the AMBIENT MANUAL START method for testing.

4. Notify the US when the test is complete.

JPM B.1.f

Page 1 of 11

SEQUOYAH NUCLEAR PLANT

JOB PERFORMANCE MEASURE

B.1.f

JPM # 100-2

Place 1B H2 Analyzer in Service

JPM B.1.f

Page 2 of 11

NUCLEAR TRAINING

REVISION/USAGE LOG

REVISION

NUMBER

DESCRIPTION OF

REVISION

V

DATE

PAGES

AFFECTED

PREPARED/

REVISED BY:

0

New, copied from JPM 100, changed to B

train

Y

9/23/94

All

HJ Birch

pen/ink

Correct typos and Minor changes for

clarification. Updated for 0-SO-43-4 Rev.

4. Validation N/A based on JPM 21.

N

12/18/01

All

L. Pauley

1

Incorporated pen/ink changes; revised to

latest revision of 0-SO-43-4

N

8/21/02

All

J P Kearney

2

Updated to current IC. Made minor

wording changes.

N

8/12/04

All

MG Croteau

V - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

JPM B.1.f

Page 3 of 11

SEQUOYAH NUCLEAR PLANT

RO/SRO

JOB PERFORMANCE MEASURE

Task:

Place 1B H2 Analyzer In Service

JA/TA TASK #: 0280030101

(RO)

K/A Ratings:

028A4.01 (4.0/4.0)

028A4.03 (3.1/3.3)

Task Standard:

Place U1 B Train H2 Analyzer in service for a post maintenance test.

Evaluation Method :

Simulator X In-Plant _______

========================================================================

Performer:

_______________________________________

NAME

Start Time __________

Performance Rating : SAT _____ UNSAT _____ Performance Time _____

Finish Time _________

Evaluator:

_________________________________/______________

SIGNATURE DATE

========================================================================

COMMENTS

JPM B.1.f

Page 4 of 11

SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Sequenced steps identified by an "s"

2. Any UNSAT requires comments

3. Initialize the Simulator in IC # 16.

4. PLACE the following switches in the CLOSED or OFF position:

1-HS-43-210A, 207, 208.

5. Ensure operator performs the following required actions for SELF-CHECKING;

a. Identifies the correct unit, train, component, etc.

b. Reviews the intended action and expected response.

c. Compares the actual response to the expected response.

Validation Time: CR. 11 min

Local ________

Tools/Equipment/Procedures Needed:

0-SO-43-4 Section 5.2 & 5.4

References:

Reference

Title

Rev No.

1.

0-SO-43-4

Hydrogen Analyzer

5

=======================================================================

READ TO OPERATOR

Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this

JPM. I will provide initiating cues and indicate any steps to be discussed. When you complete the task

successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me

when you understand your assigned task. To indicate that you have completed your assigned task return

the handout sheet I provided you.

INITIAL CONDITIONS:

1.

Unit 1 is in Mode 1 with all systems normal and operable except for the Train B H2 Analyzer.

2.

The Train B H2 Analyzer remote panel had been damaged, repairs have recently been

completed.

3.

The clearance has been released and the power availability and valve checklists have been

completed.

4.

Post maintenance test requires placing the analyzer in service for a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

INITIATING CUES:

1.

You are the U1 CRO. The US/SRO has directed you to place the Train B H2 Analyzer in service

for the PMT using 0-SO-43-4.

2.

When the analyzer has been aligned for standby and then placed in service inform the U1

US/SRO.

JPM B.1.f

Page 5 of 11

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 1.:

Operator obtains a copy of the procedure.

STANDARD: Operator obtains a copy of 0-SO-43-4, to perform Sections 5.2 and 5.4.

COMMENTS:

___ SAT

___ UNSAT

Start Time____

NOTE:

The following actions are in Section 5.2 of the SO.

NOTE:

The Hydrogen Analyzers should normally be in STANDBY. They are only

required to be operable in modes 1 and 2.

STEP 2.:

[1] IF placing U1 H2 analyzer in STANDBY, THEN VERIFY 480V Rx

MOV Bds 1A2-A and 1B2-B are energized.

Cue:

Both Rx MOV Bds are energized.

NOTE: The initial conditions stated all systems normal and operable except the

H2 analyzer, provide CUE to expedite JPM.

STANDARD: Operator checks both Rx MOV Bds 1A2-A and 1B2-B energized.

(can check by absence of alarms)

COMMENTS:

___ SAT

___ UNSAT

STEP 3.:

[2] IF placing Unit 2 Hydrogen Analyzer in STANDBY, THEN VERIFY

480V Rx MOV Bds 2A2-A and 2B2-B are energized.

STANDARD: Operator N/As this step.

COMMENTS:

___ SAT

___ UNSAT

NOTE:

Power Checklist not performed in steps [3] and [4] may be N/Ad.

STEP 4.:

[3] ENSURE Power Checklist complete for the appropriate unit.

A. Unit 1 Power Checklist 0-43-4.01

B. Unit 2 Power Checklist 0-43-4.02

Cue:

The checklist is complete with NO deviations.

STANDARD: Operator verifies checklist complete for Unit 1 and N/As for Unit 2.

COMMENTS:

___ SAT

___ UNSAT

JPM B.1.f

Page 6 of 11

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 5.:

[4] ENSURE Valve Checklist complete for the appropriate unit.

A. Unit 1 Valve Checklist 0-43-4.03

B. Unit 2 Valve Checklist 0-43-4.04

Cue:

The checklist is complete with NO deviations.

STANDARD: Operator verifies checklist complete for Unit 1 and N/As for Unit 2..

COMMENTS:

___ SAT

___ UNSAT

STEP 6.:

[5] ENSURE Cntmt H2 Analyzer Fan B inlet valve [FSV-43-207] in the

P-AUTO position. (Located on M-10).

STANDARD: Operator places 1-HS-43-207 in the P-AUTO position.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

STEP 7.:

[6] IF placing Unit 1 Hydrogen Analyzer in STANDBY, THEN PLACE

Analyzer inlet valve handswitch [1-HS-43-452] for [1-FSV-43-452]

and [1-FSV-43-453] in the P-AUTO position (located in 480v

Shutdown Boardroom 1A2 near Hydrogen Analyzer).

Cue:

AUO reports 1-HS-43-452 in the P-AUTO position.

STANDARD: Operator directs AUO to place 1-HS-43-452 in the P-AUTO position at

the panel in 480V SD Bd Rm 1A2.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

STEP 8.:

[7] ENSURE Hydrogen Analyzer outlet valve [FSV-43-208] in the

P-AUTO position. (Located on M-10).

STANDARD: Operator places 1-HS-43-208 in the P-AUTO position.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

JPM B.1.f

Page 7 of 11

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 9.:

[8] VERIFY "Low Analyzer Temperature" light on remote panel goes out.

Cue:

Play AUO: The "Low Analyzer Temperature" light is OUT.

STANDARD: Operator directs the AUO to verify the "Low Analyzer Temperature" light

is OUT.

COMMENTS:

___ SAT

___ UNSAT

STEP 10.:

[9] ENSURE Cntmt H2 Analyzer Fan B control switch [1-HS-43-210A] in

the STANDBY position. (Located on M-10).

STANDARD: Operator places 1-HS-43-210A in the STANDBY position.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

STEP 11.:

[10] PERFORM Independent Verification for the following:

A. H2 Analyzer inlet valve [FSV-43-207] in P-

B. H2 Analyzer outlet valve [FSV-43-208] in P-AUTO

C. Analyzer inlet valve handswitch [1-HS-43-452] in P-AUTO.

D. Cntmt H2 Analyzer Fan A Control Switch [HS-43-210A] in

STANDBY.

Cue:

An IV will be been performed.

STANDARD: Operator obtains an IV for the listed switch positions.

COMMENTS:

___ SAT

___ UNSAT

NOTE: The following actions are in Section 5.4 of the SO.

The first 3 steps were addressed in Section 5.2. The operator should sign

these. IF he/she asks to check the step again, Cue as appropriate.

JPM B.1.f

Page 8 of 11

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

NOTE:

Power Checklist not performed in steps [1] and [2] may be N/Ad.

STEP 12.:

[1] ENSURE Power Checklist complete for the appropriate unit.

A. Unit 1 Power Checklist 0-43.01

B. Unit 2 Power Checklist 0-43.02

Cue:

The checklist is complete with NO deviations.

STANDARD: Operator verifies checklist complete for Unit 1 and N/As for Unit 2.

COMMENTS:

___ SAT

___ UNSAT

STEP 13.:

[2] ENSURE Valve Checklist complete for the appropriate unit.

A. Unit 1 Valve Checklist 0-43-4.03

B. Unit 2 Valve Checklist 0-43-4.04

Cue:

The checklist is complete with NO deviations.

STANDARD: Operator verifies checklist complete for Unit 1 and N/As for Unit 2..

COMMENTS:

___ SAT

___ UNSAT

STEP 14.:

[3] VERIFY "Low Analyzer Temperature" light on remote panel NOT

ILLUMINATED.

Cue:

Play AUO: The "Low Analyzer Temperature" light is OUT.

STANDARD: Operator directs the AUO to verify the "Low Analyzer Temperature" light

is OUT.

COMMENTS:

___ SAT

___ UNSAT

JPM B.1.f

Page 9 of 11

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

CAUTION The Analyzer Cell Failure Alarm may be caused by exceeding the range

of the analyzer. All Alarms except high hydrogen concentration must be

reset by the alarm reset pushbutton on the remote panel.

NOTE5

The High-Hydrogen Alarm on remote panel will come in at 4% Hydrogen

reading. If any other alarms come in, the analyzer should be considered

malfunctioning and the other placed in service. (Reference 1-AR-M6-D for Unit

1or 2-AR-M6-D for Unit 2).

STEP 15.:

[4] IF the unit is in Modes 1-4, THEN NOTIFY the SRO that LCO 3.6.3 is

applicable when the Hydrogen Analyzer valves are open. The

implementation of the administrative controls of LCO 3.6.3 may be

utilized.

Cue:

SRO acknowledges and states the admin controls of LCO 3.6.3

have been implemented.

STANDARD: Operator notifies SRO of LCO requirements.

COMMENTS:

___ SAT

___ UNSAT

STEP 16.:

[5] PLACE Cntmt H2 Analyzer Fan B control switch [1-HS-43-210A ] in

the ANALYZE position. (Located on M-10).

NOTE:

IF Operator did not perform section 5.1 first, then HS-43-452 has not

yet been placed in P-Auto. This will cause annunciator window E5

on 1-XA-5-6D to alarm on low flow.

Cue:

(Use only if low flow alarm received.) A MCR alarm has just

sounded. If he goes to investigate or asks the CRO for the alarm,

point out that the above alarm is LIT.

STANDARD: Operator places 1-HS-210A in the ANALYZE position.

COMMENTS:

___ SAT

___ UNSAT

Critical step

JPM B.1.f

Page 10 of 11

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 17.:

[6] VERIFY the following valves OPEN on M-10.

STANDARD: Operator verifies FSV-43-207 and 208 OPEN by red lights on respective

HSs ON.

COMMENTS:

___ SAT

___ UNSAT

STEP 18.:

[7] Verify the following valves OPEN on M-6 on XX-55-6L windows 25

and 51 [or locally in 480V SD Bd Rm]. (This step may be N/A for Unit

2.)

NOTE:

If operator did not perform section 5.1 first, then HS-43-452 has not

yet been placed in P-Auto. Verbally change board indication.

Cue:

(Use only if section 5.1 not performed.) FSV-43-452 & 453 are

showing green light only.

STANDARD: Operator verifies FSV-43-452 and 453 OPEN by red lights LIT on panel

6L. Windows 25 and 51

COMMENTS:

___ SAT

___ UNSAT

STEP 19.:

Inform the US/SRO that the B Train H2 Analyzer is in service for the

PMT.

STANDARD: Operator informs the US/SRO that the B Train H2 Analyzer is in service

for the PMT.

COMMENTS:

___ SAT

___ UNSAT

Stop Time____

End of JPM

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

READ TO OPERATOR

Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps shall be

simulated for this JPM. I will provide initiating cues and indicate any steps to be

discussed. When you complete the task successfully, the objective for this job

performance measure will be satisfied. Ensure you indicate to me when you understand

your assigned task. To indicate that you have completed your assigned task return the

handout sheet I provided you.

INITIAL CONDITIONS:

1.

Unit 1 is in Mode 1 with all systems normal and operable except for the Train B

H2 Analyzer.

2.

The Train B H2 Analyzer remote panel had been damaged, repairs have recently

been completed.

3.

The clearance has been released and the power availability and valve checklists

have been completed.

4.

Post maintenance test requires placing the analyzer in service for a period of 24

hours.

INITIATING CUES:

1.

You are the U1 CRO. The US/SRO has directed you to place the Train B H2

Analyzer in service for the PMT using 0-SO-43-4.

2.

When the analyzer has been aligned for standby and then placed in service

inform the U1 US/SRO.

JPM B.1.g

Page 1 of 8

SEQUOYAH NUCLEAR PLANT

JOB PERFORMANCE MEASURE

JPM B.1.g

SWAP THERMAL BARRIER

BOOSTER PUMPS

JPM B.1.g

Page 2 of 8

NUCLEAR TRAINING

REVISION/USAGE LOG

REVISION

NUMBER

DESCRIPTION OF

REVISION

V

DATE

PAGES

AFFECTED

PREPARED/

REVISED BY:

0

New

Y

12/10/07

All

J Roden

V - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

JPM B.1.g

Page 3 of 8

SEQUOYAH NUCLEAR PLANT

RO/SRO

JOB PERFORMANCE MEASURE

Task:

Swap Thermal Barrier Booster Pumps

JA/TA task:

  1. 0080060101 (RO)

K/A Ratings:

008 A4.08 3.2 / 2.8

Task Standard:

1. 1A-A TBBP is placed in service and 1B-B TBBP is stopped.

2. Both 1A-A and 1B-B TBBP handswitches are placed in A-P AUTO.

Evaluation Method :

Simulator ___X_____ In-Plant ________

=======================================================================

Performer:

_______________________________________

NAME

Start Time ________

Performance Rating : SAT _____ UNSAT _____ Performance Time _____

Finish Time _______

Evaluator:

_________________________________/________

SIGNATURE

DATE

=======================================================================

COMMENTS

JPM B.1.g

Page 4 of 8

SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Sequenced steps identified by an "s"

2. Any UNSAT requires comments

3. This task is to be performed using the simulator in IC 16.

4. After resetting, START 1B-B TBBP and place the handswitch in A-P-AUTO, Place the 1A-A TBBP

handswitch 1-HS-70-131A in PULL TO LOCK

5. Ensure operator performs the following required actions for SELF-CHECKING:

a. Identifies the correct unit, train, component, etc.

b. Reviews the intended action and expected response.

c. Compares the actual response to the expected response.

Validation Time: CR. 9 min

Local ____________

Tools/Equipment/Procedures Needed:

1-SO-70-1, Component Cooling Water System A Train

References:

Reference

Title

Rev No.

1.

1-SO-70-1

Component Cooling Water System A Train

40

=================================================================

READ TO OPERATOR

Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be

performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed

your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is at 100% power.

2. Thermal Barrier Booster Pump 1B-B is currently in service.

3. The Thermal Barrier Booster Pump 1A-A was removed from service in accordance with 1-SO-70-1

section 7.2.1 to take an oil sample and is now ready to be returned to service.

INITIATING CUES:

1. The Unit Supervisor has directed you to place the 1A-A Thermal Barrier Booster Pump in service,

shutdown the 1B-B pump, and leave both pumps in a normal alignment.

JPM B.1.g

Page 5 of 8

Job

Performance Checklist:

STEP/STANDARD

SAT/UNSAT

NOTE

Any CCS component sto be placed in service must be properly filled and

vented. If CCS piping is removed from service, it will be filled and vented

under the clearance procedure.

STEP 1.:

Obtain the appropriate procedure.

CUE: When procedure is determined, state All Prerequisites are complete.

STANDARD: Operator identifies 1-SO-70-1, Section 8.7 is the procedure to be used.

Start Time____

___ SAT

___ UNSAT

STEP 2.: [1] ENSURE selected pump available for service.

STANDARD: Candidate verifies the 1A-A pump is available for service using

information on the turnover sheet.

COMMENTS:

___ SAT

___ UNSAT

STEP 3.: [2] PERFORM local inspection on selected Thermal Barrier Booster Pump.

CUE: When directed to inspect pump, acknowledge the direction and report

back Thermal Barrier Booster Pump 1A-A is ready for service.

STANDARD: Candidate directs AUO to perform local inspection on the 1A-A pump

COMMENTS:

___ SAT

___ UNSAT

JPM B.1.g

Page 6 of 8

Job

Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 4.: [3] START selected Thermal Barrier Booster Pump

(N/A pump not started):

CUE: If AUO directed to inspect pump after the pump is started pump,

acknowledge the direction and report back Thermal Barrier Booster

Pump 1A-A is has a good start and looks normal.

STANDARD:

Candidate places 1-HS-70-131A to the start position. May place the

handswitch in A-P Auto after starting. The handswitch must be placed

in A-P AUTO prior to completion of the JPM

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

STEP 5.: [4] STOP selected pump (N/A pump not stopped):

STANDARD: Candidate places 1-HS-70-130A to Stop position. May pull switch to A-P

AUTO after going to stop

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

JPM B.1.g

Page 7 of 8

Job

Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 6.: [5] IF CCS Thermal Barrier Booster Pump is to be removed from service,

THEN PLACE selected handswitch in PULL-TO-LOCK

(N/A the other):

STANDARD: Candidate does not place 1-HS-70-130A to the PULL-TO-LOCK

position due to the pump being left in service. The IF/THEN conditions

does not exist, so the step is N/Ad. Neither pump handswitch is placed

to the Pull-to-lock position.

COMMENTS:

___ SAT

___ UNSAT

STEP 7.: [6] IF CCS Thermal Barrier Booster Pump is to be returned to normal, THEN

ENSURE Control switch for CCS Booster Pump in A-P AUTO:

(N/A pump not returned to normal):

STANDARD: Both 1-HS-70-130A and 1-HS-70-131A are placed in the A-P AUTO

position since both are being returned to normal.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

Stop Time____

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control

room steps shall be performed for this JPM, including any required

communications. I will provide initiating cues and reports on other actions when

directed by you. Ensure you indicate to me when you understand your assigned

task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

4. Unit 1 is at 100% power.

5. Thermal Barrier Booster Pump 1B-B is currently in service.

6. The Thermal Barrier Booster Pump 1A-A was removed from service in accordance

with 1-SO-70-1 section 7.2.1 to take an oil sample and is now ready to be returned

to service.

INITIATING CUES:

1. The Unit Supervisor has directed you to place the 1A-A Thermal Barrier Booster

Pump in service, shutdown the 1B-B pump, and leave both pumps in a normal

alignment.

JPM B.1.h - #119AP

Page 1 of 7

SEQUOYAH NUCLEAR PLANT

JOB PERFORMANCE MEASURE

JPM B.1.h

(#119AP)

Reinstate Source Range Detectors

Following a Reactor Trip

JPM B.1.h - #119AP

Page 2 of 7

NUCLEAR TRAINING

REVISION/USAGE LOG

REVISION

NUMBER

DESCRIPTION OF

REVISION

V

DATE

PAGES

AFFECTED

PREPARED/

REVISED BY:

0

Transfer from WP. Minor enhancements.

N

1994

All

HJ Birch

1

Incorporate Rev B changes.

N

9/23/95

All

HJ Birch

pen/ink

Minor enhancements based on validation

performance. Chgd time.

N

11/15/95

4,5,6

pen/ink

ES-0.1 revision had no impact. Revised

K/A ratings. Reformatted critical steps

N

9/23/98

All

JP Kearney

pen/ink

ES-0.1 Rev update only

N

9/27/99

4

SR Taylor

pen/ink

ES-0.1 Rev update only

N

09/06/01

4

WR Ramsey

2

Incorporated pen/ink changes

N

8/22/02

All

J P Kearney

3

Updated to latest revision of EOPs.

N

9/15/03

All

MG Croteau

4

Updated to current IC and revision. Minor

enhancements.

N

8/16/04

All

MG Croteau

5

Updated references, updated setup.

N

11/30/05

4

JJ Tricoglou

6

Updated references, updated setup.

Revised format and added candidate cue

sheet.

N

11/13/07

All

R Putnam

V - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

JPM B.1.h - #119AP

Page 3 of 7

SEQUOYAH NUCLEAR PLANT

RO/SRO

JOB PERFORMANCE MEASURE

Task:

Reinstate source range detectors following a reactor trip.

JA/TA task # : 0000910501

(RO)

K/A Ratings:

015K4.07 (3.7/3.8)

015A3.01 (3.8/3.8)

015K6.04 (3.1/3.2)

015A3.03 (3.9/3.9)

015A4.02 (3.9/3.9)

007EA1.05 (4.0/4.1)

Task Standard:

Source range detectors are manually reinstated following a reactor trip.

Evaluation Method :

Simulator ___X_____ In-Plant ________

========================================================================

Performer:

_______________________________________

NAME

Start Time ________

Performance Rating : SAT _____ UNSAT _____ Performance Time _____

Finish Time _______

Evaluator:

_________________________________/________

SIGNATURE

DATE

========================================================================

COMMENTS

JPM B.1.h - #119AP

Page 4 of 7

SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Sequenced steps identified by an "s"

2. Any UNSAT requires comments

3. Snaphot taken - Initialize simulator to IC-190. If unavailable then perform 7-11 below.

4. Initialize simulator in IC-16 or 61, initiate a reactor trip.

5. Insert malfunction IMF NI04A f:40.

6. Once plant has stabilized, place steam dumps in the pressure mode.

7. Allow simulator to run until channel 2 IRM has decreased to <10-5 % power then freeze simulator until

operator has been briefed.

8. Ensure operator performs the following required actions for SELF-CHECKING;

a. Identifies the correct unit, train, component, etc.

b. Reviews the intended action and expected response.

c. Compares the actual response to the expected response.

Validation Time: CR. 8 mins Local ____________

Tools/Equipment/Procedures Needed:

ES-0.1, Reactor Trip Response

References:

Reference

Title

Rev No.

1.

ES-0.1

Reactor Trip Response

31

=================================================================

READ TO OPERATOR

Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be

performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed

your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit was inadvertently tripped from 100% power ~20 minutes ago.

2. ES-0.1, Reactor Trip Response was entered and the crew just completed Step 13.

INITIATING CUES:

1. The US directs you as the OATC to ensure source range monitors are reinstated per ES-0.1, Step 14.

2. Inform the US when the source range monitors have been reinstated and all functions of the source

range monitors are in service.

JPM B.1.h - #119AP

Page 5 of 7

Job Performance Checklist

STEP/STANDARD

SAT/UNSAT

STEP 1:

Operator obtains copy of appropriate procedure.

STANDARD: Operator obtains a copy of ES-0.1, Reactor Trip Response.

COMMENTS:

Start Time____

___ SAT

___ UNSAT

STEP 2:

a. CHECK intermediate range flux less than 10-4% power.

NOTE:

Since one is less than 10-4% power, operator should continue.

CUE:

If operator recommends transitioning to AOP-I.01 for IR NI failure,

respond that another operator will perform that procedure and

continue restoring the SRNI.

STANDARD: Operator identifies N-35 at approx. 10-4% power and N-36 at less than

10-5% power.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

STEP 3:

b. CHECK source range detectors REINSTATED.

RNO: REINSTATE source range channels by simultaneously placing

both SRM TRIP RESET-BLOCK switches to RESET position [M-4]

NOTE:

Both source range detectors will be indicating down scale prior

to being reinstated and will indicate upscale after being

reinstated.

STANDARD: Operator confirms source range detectors not reinstated (indication down

scale), goes to RNO and reinstates by simultaneously placing 1-HS-92-

5001 AND 1-HS-92-5002 momentarily to the reset position, and confirms

indication on Source Range indicators are up scale.

COMMENTS:

___ SAT

___ UNSAT

Critical Step

STEP 4:

c. SELECT one SRM and one IRM on NR-45 Recorder.

STANDARD: One SRM and IRM 36 selected to record on NR-45 by using the touch

screen on the recorder.

COMMENTS:

___ SAT

___ UNSAT

JPM B.1.h - #119AP

Page 6 of 7

Job Performance Checklist

STEP/STANDARD

SAT/UNSAT

STEP 5:

d. ENSURE Audio Count Rate operations.

STANDARD: At Audio Count Rate Drawer, 1-XX-92-5039, on 1-M-13 operator selects

setting on Audio Multiplexer for a slow continuous beeping and adjusts

volume as desired.

COMMENTS:

___ SAT

___ UNSAT

STEP 6:

RESET shutdown monitor alarm setpoints [M-13]

STANDARD: At 1-XIS-92-5001 and 1-XIS-92-5002, the Operator depresses reset

buttons to right of alarm setpoint and verifies alarm lights at the lower

left corner go out.

COMMENTS:

___ SAT

___ UNSAT

STEP 7:

WHEN shutdown monitor ALARM LEDs dark and HIGH FLUX AT

SHUTDOWN bistable lights dark, THEN PLACE HI FLUX AT

SHUTDOWN alarm block switches in normal.[M-13]

STANDARD: Operator verifies alarm LEDs dark on 1-XIS-92-5001 & 1-XIS-92-5002

and the Hi flux at shutdown bistables dark on SR monitors. Then places

hi flux at shutdown alarm block switches to normal on 1-XX-92-5001 (CH-

1) and 1-XX-92-5002 (CH 2) on 1-M-13.

COMMENTS:

___ SAT

___ UNSAT

Critical

Step

STEP 8:

Inform US that source range detectors have been placed in service.

STANDARD: US informed source range detectors have been placed in service

manually due to IRM Channel 1 not being below 10-4% power.

COMMENTS:

___ SAT

___ UNSAT

Stop Time____

END OF JPM

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps

shall be performed for this JPM. I will provide initiating cues and reports on other actions when

directed by you. When you complete the task successfully, the objective for this job

performance measure will be satisfied. Ensure you indicate to me when you understand your

assigned task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

1. Unit was inadvertently tripped from 100% power ~20 minutes ago.

2. ES-0.1, Reactor Trip Response was entered and the crew just completed Step 13.

INITIATING CUES:

1. You are the OATC and have been instructed by the US to ensure source range monitors are

reinstated per ES-0.1, Step 14.

2. Inform the US when the source range monitors have been reinstated and all functions of the source

range monitors are in service.

JPM B.1.i - #006

Page 1 of 6

SEQUOYAH NUCLEAR PLANT

JOB PERFORMANCE MEASURE

In-plant

JPM B.1.i

(#006)

Perform Boration of the RCS From

Outside the Main Control Room

JPM B.1.i - #006

Page 2 of 6

NUCLEAR TRAINING

REVISION/USAGE LOG

REVISION

NUMBER

DESCRIPTION OF

REVISION

V

DATE

PAGES

AFFECTED

PREPARED/

REVISED BY:

9

Transfer from WP. Minor enhancements.

N

7/26/94

All

HJ Birch

10

AOI-27 Rev changed steps

N

9/10/94

All

HJ Birch

11

Added dates to cover sheep. corrected

task number. Made step 4 critical, since

task is to borate 250 gal.

N

10/4/95

1,3,6

HJ Birch

12

AOI-27 chgd to AOP-C.04. Chgd

initiating cues and made minor step chgs

to match new procedure.

N

3/12/96

All

HJ Birch

pen/ink

Revision to AOP-C.04 had no impact.

Revised K/A ratings. Reformatted critical

steps.

N

9/22/98

All

JP Kearney

pen/ink

AOP-C.04 rev update only changed AOI-

27 to AOP-C.04

N

8/29/00

4

SR Taylor

pen/ink

AOP-C.04 rev update only

N

6/14/01

4

WR Ramsey

13

Incorporated pen/ink changes and recent

revisions to AOP-C.04; Changes did not

affect the overall flow of the JPM.

N

8/15/02

All

J P Kearney

14

Incorporated review comments and

updated references

N

9/10/03

All

G S Poteet

15

Updated to current revision.

N

9/1/04

All

MG Croteau

16

Updated to current revision.

N

10/30/05

All

MG Croteau

pen/ink

AOP-C.04 rev update only

N

04/04/06

4

MD Lackey

17

Updated to current revision.

N

10/2/06

4

MD Lackey

18

Update Proced Rev level only

N

06/15/07

4

SR Taylor

Update Proced Rev level only - removed

separate Handout page only

N

6/4/08

4

H J Birch

V - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

JPM B.1.i - #006

Page 3 of 6

SEQUOYAH NUCLEAR PLANT

AUO/RO/SRO

JOB PERFORMANCE MEASURE

Task:

Perform Boration of the RCS From Outside the Main Control Room

JA/TA task # : 0040070101 (RO)

K/A Ratings:

068AK3.17 (3.7/4.0)

068AK3.18 (4.2/4.5)

068AA1.08 (4.2/4.2)

Task Standard: 250 gallons of boric acid added to the RCS.

Evaluation Method : Simulator ________ In-Plant ___X_____

=====================================================================

Performer:

_______________________________________

NAME

Start Time _______

Performance Rating : SAT _____ UNSAT _____ Performance Time ______

Finish Time _______

Evaluator:

__________________________________/________

SIGNATURE

DATE

==================================================================

COMMENTS

JPM B.1.i - #006

Page 4 of 6

SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Sequenced steps identified by an "s"

2. Any UNSAT requires comments

3. Task should begin at the Unit 1 Blender El 690.

4. Supply the operator with a copy of AOP-C.04 (appropriate section), when he is given initial conditions and

cues.

5. Ensure operator performs the following required actions for SELF-CHECKING;

a. Identifies the correct unit, train, component, etc.

b. Reviews the intended action and expected response.

c. Compares the actual response to the expected response.

Validation Time: CR. ____________ Local 12 mins _

Tools/Equipment/Procedures Needed:

AOP-C.04, Control Room Inaccessibility, Appendix H

References:

Reference

Title

Rev No.

A.

AOP-C.04

Control Room Inaccessibility

15

=====================================================================

READ TO THE OPERATOR

Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this

JPM. I will provide initiating cues and indicate any steps to be discussed. When you complete the task

successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me

when you understand your assigned task. To indicate that you have completed your assigned task return

the handout sheet I provided you.

INITIAL CONDITIONS:

1. The Control Room has been abandoned due to a fire in the Spreader Room.

2. The Shift Technical Advisor has calculated a need to borate 250 gallons to adequately borate the

RCS for 450°F conditions.

3. Operators have placed the Boric Acid Transfer Pumps in Fast speed per AOP-C.04, Appendix H,

Step 2.b.

4. FCV-62-138, Emergency Borate valve will NOT open from the 480V Rx MOV BD.

INITIATING CUES:

1. As the Auxiliary Building AUO you are assigned to the U-1 blender and the UO has instructed you to

borate the RCS 250 gallons using 1-FCV-62-138 per AOP-C.04 Appendix H, starting at Step 2.d.

2. Boration flow rate is to be approximately 50 gpm.

JPM B.1.i - #006

Page 5 of 6

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 1.:

Operator obtains appropriate instruction.

STANDARD: Operator obtains a copy AOP-C.04 Appendix H and begins at step 2.d.

___ SAT

___ UNSAT

Start Time____

STEP 2.:

Open FCV-62-138 emergency boration valve (LOCALLY).

Cue:

If the operator attempts using local pushbutton, cue him/her the

motor failed to operate or heard no motor operation.

Cue:

After the operator simulates manually engaging clutch and turning

handwheel CCW, inform operator that "valve stem is traveling

upwards"

If UO is contacted: State 50 gpm is indicated on FI-62-137C in the

ACR.

If operator references FI-62-137B: State 50 gpm is indicated.

STANDARD: The emergency boration valve FCV-62-138 is opened by manually

engaging the clutch and turning HW in CCW direction and indicated flow

on FI-62-137C in the ACR or FI-62-137B.

___ SAT

___ UNSAT

Critical Step

STEP 3.:

DETERMINE the time required to inject the amount of boric acid

determined in step 1 based on the established flowrate

___________ minutes.

NOTE:

Operator must indicate a time sufficient to get 250 gallons of boric

acid into the RCS, then inform him/her that the stated time has

elapsed.

STANDARD: Operator determines the time required to be 5 minutes. (Must inject at

least 250 gallons if different than 50 gpm is used).

___ SAT

___ UNSAT

Critical Step

STEP 4.:

When the required amount of boron added, THEN CLOSE FCV-62-138.

Cue:

Stated time has elapsed. HW turned in CW direction until snug,

flow indication is 0 gpm.

STANDARD: FCV-62-138 is closed by manually engaging clutch and turning HW in

CW direction, verified via 0 gpm flow indicated on FI-62-137C in ACR or

FI-62-137B, after borating for 5 minutes.

___ SAT

___ UNSAT

Critical Step

STEP 5.:

Inform the UO in the ACR that boration to 250 gallons has been

completed and can return the boric acid transfer switches to slow.

STANDARD: Operator informs the UO in the ACR that boration of 250 gallons has

been completed and he can return the boric acid transfer pumps to slow.

___ SAT

___ UNSAT

Stop Time____

End of JPM

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM.

I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully,

the objective for this job performance measure will be satisfied. Ensure you indicate to me when you

understand your assigned task. To indicate that you have completed your assigned task return the handout

sheet I provided you.

INITIAL CONDITIONS:

1. The Control Room has been abandoned due to a fire in the Spreader Room.

2. The Shift Technical Advisor has calculated a need to borate 250 gallons to adequately borate the RCS for

450°F conditions.

3. Operators have placed the Boric Acid Transfer Pumps in Fast speed per AOP-C.04, Appendix H, Step

2.b.

4. FCV-62-138, Emergency Borate valve will NOT open from the 480V Rx MOV BD.

INITIATING CUES:

1. As the Auxiliary Building AUO you are assigned to the U-1 blender and the UO has instructed you to

borate the RCS 250 gallons using 1-FCV-62-138 per AOP-C.04 Appendix H, starting at Step 2.d.

2. Boration flow rate is to be approximately 50 gpm.

B.1.j JPM400

Page 1 of 11

Rev 6

SEQUOYAH NUCLEAR PLANT

JOB PERFORMANCE MEASURE

In-plant

B.1.j

JPM # 400

Installation of Temporary Cooling (HPFP)

to CCP 1A-A or 1B-B Oil Coolers

(AOP-M.01 Appendix I)

B.1.j JPM400

Page 2 of 11

Rev 6

NUCLEAR TRAINING

REVISION/USAGE LOG

REVISION

NUMBER

V

DATE

PAGES

AFFECTED

PREPARED/

REVISED BY:

0

Initial Issue

Y

3/31/04

ALL

G. S. Poteet

Pen/ink

Incorporated validation comments

N

4/6/04

ALL

G.S. Poteet

1

Incorporate validation comments and to

make JPM

Y

5/19/04

ALL

G.S. Poteet

2

Updated to current revision.

N

9/1/04

All

MG Croteau

3

Updated to current revision.

N

11/3/05

All

MG Croteau

4

Updated to current revision, changed

location of AOP-M.01 Aux Bldg storage

locker and made minor editorial changes.

N

10/19/06

All

A. F. Roddy

5

Updated based on current procedure

revision. Corrected Numbering error and

included 2 additional minor procedure

steps.

N

06/15/07

All

SR Taylor

6

Added candidate cue sheet. Updated

based on current procedure revision.

N

11/05/07

11

R Putnam

Unable to locate R5

Review only. Removed attached handout

pg. H3 button will produce this handout.

N

7/16/08

none

H J Birch

V - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

B.1.j JPM400

Page 3 of 11

Rev 6

SEQUOYAH NUCLEAR PLANT

AUO/RO/SRO

JOB PERFORMANCE MEASURE

Task: Installation of Temporary Cooling (HPFP) to CCP 1A-A or 1B-B Oil Coolers

JA/TA TASK #: 0001000504

K/A Ratings:

076 A2.01 (3.5/3.7)

076 K3.07 (3.7/3.9)

062 AK3.03 (4.0/4.2)

Task Standard:

Operator locates components and makes necessary connections to supply HPFP to the 1A-A or 1B-B

CCP Oil Cooler.

Evaluation Method :

Simulator ___ _____ In-Plant ___ X _____

=======================================================================

Performer:

_______________________________________

NAME

Start Time ________

Performance Rating : SAT _____ UNSAT _____ Performance Time _____

Finish Time _______

Evaluator:

________________________________/________

SIGNATURE

DATE

=======================================================================

COMMENTS

B.1.j JPM400

Page 4 of 11

Rev 6

SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps identified by Critical Step in Bold type

2. Sequenced steps identified by an "s"

3. Any UNSAT requires comments

4. Determine which CCP is operating and then run the JPM on the CCP which is OUT OF

SERVICE. This will help safeguard running equipment, minimize dose, and exposure to

noble gas radioactivity from the running CCP. The JPM is written to address either

pump. The B pump related valves are in parentheses.

5. This JPM provides the option of opening the sealed storage locker. IF the seal on the

storage locker is broken, THEN ENSURE a conditional performance of

1-PI-OPS-000-002.0 Appendix D, Monitoring of EOI support items is perfomed and

storage box is sealed after the last performance of the JPM.

6. Ensure operator performs the following required actions for SELF-CHECKING;

a. Identifies the correct unit, train, component, etc.

b. Reviews the intended action and expected response.

c. Compares the actual response to the expected response.

Validation Time: CR. _______

Local 40 min.

Tools/Equipment/Procedures Needed

AOP-M.01, Appendix I Installation of Temporary Cooling (HPFP) to CCP Oil Coolers.

Fire hoses (two 50 ft sections), 4 ft rubber hose, tee connections and tools from EOI/AOP

Storage Locker [Unit 1 PD pump room, AB el. 669]

References:

Reference

Title

Rev No.

A.

AOP-M.01

Loss of Component Cooling Water

19

=================================================================

READ TO OPERATOR

Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated

for this JPM. I will provide initiating cues and indicate any steps to be discussed. When you

complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1.

A complete loss of ERCW has occurred.

2.

The operating crew is performing AOP-M.01, Section 2.11, Loss of All ERCW Flow.

3.

RCPs and CCPs have been placed in STOP/PULL TO LOCK.

INITIATING CUES:

1.

The Unit 1 UO has determined that temporary cooling will be established to the designated CCP

1A-A using AOP-M.01, Appendix I.

2.

You are the Rad Waste AUO and have been directed to perform Appendix I, Installation of

Temporary Cooling (HPFP) to CCP Oil Coolers.

3.

Inform Unit 1 UO when temporary cooling has been established to the designated CCP 1A-A.

B.1.j JPM400

Page 5 of 11

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 1.:

Obtain a copy of the appropriate procedure.

STANDARD: The operator obtains a copy of AOP-M.01, Appendix I.

___ SAT

___ UNSAT

Start Time____

Note: The procedure has a CAUTION and 3 NOTES before the next step

STEP 2.:

[1] DETERMINE which CCP to connect temporary cooling: (N/A

pump not connected)

A-A CCP

B-B CCP

STANDARD:

Operator determines from Initiating Cues that the 1A-A CCP will be

connected.

___ SAT

___ UNSAT

STEP 3.:

[2] OBTAIN fire hoses (two 50 ft sections), 4 ft red rubber hose, tee

connections and tools from EOI/AOP Storage Locker. [outside of

B HUT room, AB el.669]

Cue:

If desired for operator to open the locker, then cue the operator

to open EOI/AOP storage locker if sealed.

NOTE:

The following materials are located in the sealed EOI/AOP

Locker [for both units]:

Valve wrenches

2 fire hoses (in bag)

Red rubber Hose

Tee connections

Gated wye connection

STANDARD

Operator locates fire hoses, tee connections and tools.

___ SAT

___ UNSAT

NOTE:

All manipulated valves are located in the associated CCP Room.

STEP 4.:

[3] CLOSE ERCW Supply Valve to CCP Oil Cooler. (NA valve not

operated

Cue:

When valve 1-VLV-67-704A and direction of movement are

identified, tell the operator the valve handwheel rotates

clockwise and eventually will not rotate any further. Stem went

down.

STANDARD

Operator locates and closes VLV-67-704Afor 1A-A CCP. Operator

N/As valve not operated.

___ SAT

___ UNSAT

Critical Step

B.1.j JPM400

Page 6 of 11

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 5.:

[4] CLOSE ERCW Return Valve to CCP Oil Cooler. (NA valve not

operated

Cue:

When valve 1-VLV-67-705A and direction of movement are

identified, tell the operator the valve handwheel rotates

clockwise and eventually will not rotate any further.

STANDARD: Operator locates and closes VLV-67-705Afor 1A-A CCP by turning in

the CW direction. Operator N/As valve not operated.

___ SAT

___ UNSAT

Critical Step

STEP 6.:

[5] REMOVE Drain Plug and OPEN ERCW Drain Valve to CCP Oil

Cooler. (NA valve not operated

Cue:

When drain plug is identified, tell the operator he has removed it.

When valve 1-VLV-67-1547A(1A-A CCP) and direction of

movement are identified, tell the operator the valve handwheel

rotates counter-clockwise and eventually will not rotate any

further. Some water is seen coming from the drain.

STANDARD:

Operator locates and opens valve 1-VLV-67-1547A (1A-A CCP) by

turning in the CCW direction. Operator N/As valve not operated.

___ SAT

___ UNSAT

Critical Step

NOTE:

Piping is identified with ID tags at disconnect points.

STEP 7.:

[6] DISCONNECT ERCW INLET (Supply) piping at the compression

Fittings (two places) shown in Figure 2 of this Appendix and

REMOVE piping section.

Cue:

Once the fittings are identified, tell the operator they can be

disconnected and the piping removed.

STANDARD:

Operator uses Figure 2 to locate, disconnect, and remove piping.

___ SAT

___ UNSAT

Critical Step

B.1.j JPM400

Page 7 of 11

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 8.:

[7] CONNECT temporary hose compression fittings to Oil Cooler and

ERCW inlet valve as shown in Figure 3.

  • Compression fitting connected to Oil Cooler (6 hard tubing

with compression nut from tee connection)

  • Compression fitting connected to ERCW inlet valve (4 foot red

rubber hose with compression nut)

Cue:

Once the fitting locations are identified, tell the operator the

stated hose can be connected to the respective fitting.

STANDARD:

Operator uses Figure 3 to install temporary hose connections at

proper points.

___ SAT

___ UNSAT

Critical Step

STEP 9.:

[8] CONNECT gated WYE hose connection to the nearest HPFP

hose connection:

  • 1-26-668 (near Waste Gas Decay Tank Gallery)
  • 2-26-668 (Between Boric Acid Evaporator control panels)
  • 0-26-662 (near elevator)

Cue:

Valve 1-26-668 should be used. When identified, tell the operator

that the fitting may be hooked up to the connection on the valve.

STANDARD: Operator locates appropriate hose connection point and connects

hose.

___ SAT

___ UNSAT

Critical Step

STEP 10.:

[9] ENSURE valves on Gated WYE are CLOSED.

Cue:

When asked, inform the operator that the valves on the gated

wye are closed.

STANDARD: Operator ensures valves are closed.

___ SAT

___ UNSAT

STEP 11.:

[10] ROLL out fire hose (with female end at gated wye and male

connection in pump room) and CONNECT two 50 ft. lengths

together.

Cue:

When the operator correctly reports the location and method of

placement of the hoses, inform them that the hoses are rolled

out and connected.

STANDARD: Operator properly positions and connects fire hose sections together.

___ SAT

___ UNSAT

Critical Step

B.1.j JPM400

Page 8 of 11

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 12.:

[11] CONNECT Fire hose to gate wye.

Cue:

When asked, inform the operator that the hose can be connected

to the gated wye at the fire valve.

STANDARD: Operator connects fire hose to gated wye.

___ SAT

___ UNSAT

Critical Step

STEP 13.:

[12] CONNECT Fire hose to tee connection.

Cue:

When asked, inform the operator that the hose can be connected

to the tee connection near the charging pump.

STANDARD: Operator connects fire hose to tee connection.

___ SAT

___ UNSAT

Critical Step

STEP 14.:

[13] CHECK all hose connections are complete and hose not kinked.

Cue:

When asked, tell the operator the status of the connections and

hose (as long as the stated manipulations were correct,

conditions are as expected).

STANDARD: The operator checks connections are complete and inspects hose for

kinks.

___ SAT

___ UNSAT

STEP 15.:

[14] CLOSE ERCW Drain Valve to CCP Oil Cooler. (NA valve not

operated

Cue:

When valve 1-VLV-67-1547A(1A-A CCP) and direction of

movement is identified, tell the operator the valve handwheel

rotates clockwise and eventually will not rotate any further

STANDARD: Operator locates and closes valve 1-VLV-67-1547A (1A-A CCP)).

___ SAT

___ UNSAT

Critical Step

STEP 16.:

[15] ENSURE ERCW Isolation Valves to CCP Oil Coolers OPEN. (NA

valve not operated

Cue:

When valve 1-VLV-67-1545A is identified, tell the operator cues

consistent with the valves being open (if asked, valve moves

freely in clockwise but not counter-clockwise direction, etc.).

STANDARD: Operator locates and ensures open VLV-67-1545A ERCW Supply to

Gear Oil Cooler for A-A CCP.

___ SAT

___ UNSAT

B.1.j JPM400

Page 9 of 11

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 17.:

[16] OPEN ERCW Return Valve from CCP Oil Cooler. (NA valve not

operated

Cue:

When valve 1-VLV-67-705A and direction of movement are

identified, tell the operator the valve handwheel rotates counter-

clockwise and eventually will not rotate any further.

STANDARD: Operator locates and opens 1-VLV-67-705A for A-A CCP.

___ SAT

___ UNSAT

Critical Step

STEP 18.:

[17] OPEN Gated Wye routing valve that supplies the hose

connection.

Cue:

When location at hose station and direction of motion are

identified, tell the operator that the identified valve on gated wye

opens.

STANDARD: Operator locates and opens Gated Wye routing valve that supplies the

hose connection.

___ SAT

___ UNSAT

Critical Step

STEP 19.:

[18] OPEN Hose Station valve to provide HPFP to CCP Oil Coolers.

Cue:

When the proper hose station valve (1-26-668) and direction of

movement are identified, tell the operator the valve handwheel

rotates counter-clockwise and eventually will not rotate any

further.

STANDARD: Operator opens hose station valve.

___ SAT

___ UNSAT

Critical Step

STEP 20.:

[19] VERIFY fire hose pressurized.

Cue:

If the operator has made proper connections, inform them the

hose is pressurized.

STANDARD: Operator verifies fire hose is pressurized.

___ SAT

___ UNSAT

STEP 21.:

[20] NOTIFY UO that temporary cooling water connection to CCP is

Complete.

Cue:

Acknowledge the information as the Unit Operator. Another

operator will complete the procedure section.

STANDARD: Operator notifies UO that temporary cooling has been established to

1A-A (1B-B) CCP.

___ SAT

___ UNSAT

B.1.j JPM400

Page 10 of 11

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

NOTE:

This step is optional since JPM step 21 completes the JPM task

per the initiating cues.

STEP 22.:

[21] BREACH CCP room door OPEN to allow room cooling.

Cue:

When operator address breaching door, cue that door is

breached.

STANDARD: Operator addresses breaching CCP room door for cooling.

___ SAT

___ UNSAT

NOTE:

This step is optional JPM step 21 completes the JPM task per the

initiating cues.

STEP 23.:

[22] COORDINATE with Maintenance or Fire Ops to install smoke

removal

fan to circulate air through CCP room.

Cue:

When Operator addresses contacting Maintenance or Fire OPS,

acknowledge request and report that the fan will be installed as

soon as possible.

STANDARD: Operator addresses installation of smoke removal fan.

___ SAT

___ UNSAT

NOTE

IF AOP-M.01 storage box seal was broken then a conditional

performance of 1-PI-OPS-000-002.0 Appendix D, Monitoring of EOI

support items must be perfomed and the storage box sealed after

the last performance of the JPM.

End of JPM

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps

shall be simulated for this JPM. I will provide initiating cues and indicate any

steps to be discussed. When you complete the task successfully, the objective

for this job performance measure will be satisfied. Ensure you indicate to me

when you understand your assigned task. To indicate that you have completed

your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1.

A complete loss of ERCW has occurred.

2.

The operating crew is performing AOP-M.01, Section 2.11, Loss of All ERCW

Flow.

3.

RCPs and CCPs have been placed in STOP/PULL TO LOCK.

INITIATING CUES:

1.

The Unit 1 UO has determined that temporary cooling will be established to the

designated CCP 1A-A using AOP-M.01, Appendix I.

2.

You are the Rad Waste AUO and have been directed to perform Appendix I,

Installation of Temporary Cooling (HPFP) to CCP Oil Coolers.

3.

Inform Unit 1 UO when temporary cooling has been established to the

designated CCP 1A-A.

JPM B.1.k - #23-2

Page 1 of 7

SEQUOYAH NUCLEAR PLANT

JOB PERFORMANCE MEASURE

Inplant

JPM B.1.k

(#23-2)

Align Starting Air For Service

On The 2A-A D/G

JPM B.1.k - #23-2

Page 2 of 7

NUCLEAR TRAINING

REVISION/USAGE LOG

REVISION

NUMBER

DESCRIPTION OF

REVISION

V

DATE

PAGES

AFFECTED

PREPARED/

REVISED BY:

0

New JPM to replace JPM 23 which was

cancelled due to DC/N.

Y

09/21/05

All

MG Croteau

1

Updated format.

N

10/2/06

All

MD Lackey

2

Updated references - no chgs to

Procedure or JPM. Removed separate

handout attachment

N

5/29/08

4, 7

H J Birch

Typo

Reference Number was not actually chgd

in the prev revision.

N

8/05/08

4

H J Birch

V - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

JPM B.1.k - #23-2

Page 3 of 7

SEQUOYAH NUCLEAR PLANT

AUO/RO/SRO

JOB PERFORMANCE MEASURE

Task:

Align Starting Air for Service on the 2A-A D/G

JA/TA task #: 0640010104

(AUO)

K/A Ratings:

064K1.05

(3.4 - 3.9)

064A3.04

(3.1 - 3.5)

064A4.04

(3.2 - 3.2)

Task Standard:

The starting air system is aligned for service to the 2A-A D/G.

Evaluation Method :

Simulator ________ In-Plant X _

=======================================================================

Performer:

_______________________________________

NAME

Start Time ________

Performance Rating : SAT _____ UNSAT _____ Performance Time _____

Finish Time _______

Evaluator:

_________________________________/________

SIGNATURE

DATE

=======================================================================

COMMENTS

JPM B.1.k - #23-2

Page 4 of 7

SPECIAL INSTRUCTIONS TO EVALUATOR:

1.

Critical steps identified by an asterisk (*)

2.

Sequenced steps identified by an "s"

3.

Any UNSAT requires comments.

Validation Time:

Local 20 mins

Tools/Equipment/Procedures Needed:

0-SO-82-7, Diesel Generator 2A-A Support Systems, Section 5.1

References:

Reference

Title

Rev No.

1.

0-SO-82-7

Diesel Generator 2A-A Support Systems

13

==================================================================

READ TO OPERATOR

Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated

for this JPM. I will provide initiating cues and indicate any steps to be discussed. When you

complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have

completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Both Units are at 100% power. All equipment is operable on both Units with the exception of

2A-A Diesel Generator.

Work has been completed on the 2A-A Diesel Starting Air System and the clearance tags

have been removed.

The Starting Air System is ready to be returned to service.

All procedure prerequisites have been completed.

INITIATING CUES:

1. The U2 CRO has directed you as the Control Room AUO to align the Starting Air System for

service on the 2A-A D/G per 0-SO-82-7, Diesel Generator 2A-A Support Systems, Section 5.1.

2. Notify the U2 CRO when starting air has been aligned.

JPM B.1.k - #23-2

Page 5 of 7

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP 1:

Obtain a copy of the appropriate procedure.

STANDARD: Operator obtains a copy of 0-SO-82-7, Section 5.1.

___ SAT

___ UNSAT

Start Time____

STEP 2:

[1] CHECK intake filters clear of obstructions:

Cue:

The intake filters are clear for each filter.

STANDARD: Operator checks the intake filters clear of obstructions.

___ SAT

___ UNSAT

STEP 3:

[2] CHECK lube oil level in crankcase normal:

Cue:

The lube oil level is normal for each crankcase.

STANDARD: Operator locates the compressor crankcase lube oil dipstick and verifies

level normal.

___ SAT

___ UNSAT

STEP *4:

[3] PLACE the air dryer control switches to RUN:

Cue:

Both air dryer control switches are in RUN. (Rotated to the left)

STANDARD: Operator places both air dryer control switches to RUN.

___ SAT

___ UNSAT

Critical Step

STEP *5:

[4] PLACE aftercooler 2A1 controls to the following positions:

Cue:

The 2A1 aftercooler man control is OFF and maint lockout is ON.

STANDARD: Operator places 2A1 aftercooler controls in required position.

___ SAT

___ UNSAT

Critical Step

JPM B.1.k - #23-2

Page 6 of 7

Job Performance Checklist:

STEP/STANDARD

SAT/UNSAT

STEP *6:

[5] PLACE aftercooler 2A2 controls to the following positions:

Cue:

The 2A2 aftercooler man control is OFF and maint lockout is ON.

STANDARD: Operator places 2A2 aftercooler controls in required position.

___ SAT

___ UNSAT

Critical Step

STEP *7:

[6] PLACE Diesel Generator 2A-A starting air compressor selector

switches to AUTO:

Cue:

As each compressor is placed in AUTO, report that the sound of

equipment starting is heard from the vicinity of the compressors. If

checked, report starting air pressure is rising.

STANDARD: Operator places both starting air compressors in AUTO.

___ SAT

___ UNSAT

Critical Step

STEP 8:

Inform the U2 CRO that the starting air system for 2A-A D/G has been

placed in service.

STANDARD: Operator informs the U2 CRO that the starting air system for 2A-A D/G

has been placed in service.

___ SAT

___ UNSAT

Stop Time____

End of JPM

CANDIDATE CUE SHEET

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps

shall be simulated for this JPM. I will provide initiating cues and indicate any

steps to be discussed. When you complete the task successfully, the objective

for this job performance measure will be satisfied. Ensure you indicate to me

when you understand your assigned task. To indicate that you have completed

your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Both Units are at 100% power. All equipment is operable on both Units with

the exception of 2A-A Diesel Generator.

Work has been completed on the 2A-A Diesel Starting Air System and the

clearance tags have been removed.

The Starting Air System is ready to be returned to service.

All procedure prerequisites have been completed.

INITIATING CUES:

1. The U2 CRO has directed you as the Control Room AUO to align the Starting Air

System for service on the 2A-A D/G per 0-SO-82-7, Diesel Generator 2A-A

Support Systems, Section 5.1.

2. Notify the U2 CRO when starting air has been aligned.