E-mail Limerick Units 1 and 2 - Acceptance Review for Third IST Interval Relief Requests
ML090710883
Person / Time
Site: Crane, Limerick  Constellation icon.png
Issue date: 03/12/2009
From: Peter Bamford
Plant Licensing Branch 1
To: Tom Loomis
Exelon Corp
Bamford, Peter J., NRR/DORL 415-2833
References
Download: ML090710883 (1)


Text

From:

Peter Bamford Sent:

Thursday, March 12, 2009 3:43 PM To:

'thomas.loomis@exeloncorp.com'

Subject:

Limerick Third Interval IST Relief Requests By letter dated February 18, 2009, Exelon Generation Company, LLC submitted five relief requests associated with the Third Inservice Inspection Interval at Limerick Generating Station.

The relief requests are titled as follows:

Use of Code Case OMN-6, Alternative Rules for Digital Instruments Use of Code Case OMN-9, ESW Pump Test Using Pump Curves Installed Pump Instrumentation Greater than 2%

Series-Parallel Check Valve Testing Control Rod Drive Scram Valves and Check Valves The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of each of the the proposed relief requests in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

Peter Bamford NRR/DORL/LPL 1-2 Limerick & TMI-1 Project Manager 301-415-2833 E-mail Properties Mail Envelope Properties ()

Subject:

Limerick Third Interval IST Relief Requests Sent Date: 3/12/2009 3:25:42 PM Received Date: 3/12/2009 3:42:00 PM From: Peter Bamford Created By: Peter.Bamford@nrc.gov Recipients:

thomas.loomis@exeloncorp.com ('thomas.loomis@exeloncorp.com')

Tracking Status: None John.McHale@nrc.gov (John McHale)

Tracking Status: None Marshall.David@nrc.gov (Marshall David)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 11294 3/12/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: