Inspection / Activity Plan Page 1 of 2 03/04/2009 10:28:54 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Harris PSB1EP
- EMERGENCY PREPAREDNESS EXERCISE 4
1 IP Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 2515/175 03/02/2009 03/06/2009 1
IP Exercise Evaluation 7111401 03/02/2009 03/06/2009 1
IP Emergency Action Level and Emergency Plan Changes 7111404 03/02/2009 03/06/2009 1
IP Performance Indicator Verification 71151 03/02/2009 03/06/2009 OL EXAM
- INITIAL EXAM WEEK 1 3
1 HARRIS/MARCH 2009 EXAM AT POWER FACILITIES V23298 03/09/2009 03/13/2009 AUDIT
- 805 AUDIT 5
1 HARRIS 1 - License Amendment to Transition to NFPA-805 Performance Based Standard for Fire Protectio MD8807 03/16/2009 03/20/2009 OL EXAM
- INITIAL EXAM WEEK 2 2
1 HARRIS/MARCH 2009 EXAM AT POWER FACILITIES V23298 03/16/2009 03/20/2009 PSB1-RP
- RP OCCUPATIONAL BASELINE WK1 (OUTAGE) 2 1
IP Access Control to Radiologically Significant Areas 7112101 04/20/2009 04/24/2009 1
IP ALARA Planning and Controls 7112102 04/20/2009 04/24/2009 1
IP Radioactive Material Processing and Transportation 7112202 04/20/2009 04/24/2009 1
IP Performance Indicator Verification 71151 04/20/2009 04/24/2009 EB3ISI
- INSERVICE INSPECTION 2
1 IP Inservice Inspection Activities - PWR 7111108P 04/27/2009 05/01/2009 EB3TI172
1 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 04/27/2009 05/01/2009 PSB1-RP
- RP OCCUPATIONAL BASELINE WK2(OUTAGE) 2 1
IP Access Control to Radiologically Significant Areas 7112101 04/27/2009 05/01/2009 1
IP ALARA Planning and Controls 7112102 04/27/2009 05/01/2009 1
IP Radioactive Material Processing and Transportation 7112202 04/27/2009 05/01/2009 1
IP Performance Indicator Verification 71151 04/27/2009 05/01/2009 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION 6
1 IP Identification and Resolution of Problems 71152B 09/14/2009 09/18/2009 1
IP Identification and Resolution of Problems 71152B 09/28/2009 10/02/2009 OL EXAM
- INITIAL EXAM PREP 4
1 HARRIS/NOVEMBER 2009 EXAM AT POWER FACILITIES V23321 11/02/2009 11/06/2009 OL EXAM
- INITIAL EXAM - WEEK 1 2
1 HARRIS/NOVEMBER 2009 EXAM AT POWER FACILITIES V23321 11/30/2009 12/04/2009 OL EXAM
- INITIAL EXAM - WEEK 2 2
1 HARRIS/NOVEMBER 2009 EXAM AT POWER FACILITIES V23321 12/14/2009 12/18/2009 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Inspection / Activity Plan Page 2 of 2 03/04/2009 10:28:54 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Harris EB3 HS
- HEAT SINK INSPECTION 1
1 IP Heat Sink Performance 7111107T 02/08/2010 02/12/2010 PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 1
1 IP Alert and Notification System Testing 7111402 03/01/2010 03/05/2010 1
IP Emergency Response Organization Augmentation Testing 7111403 03/01/2010 03/05/2010 1
IP Emergency Action Level and Emergency Plan Changes 7111404 03/01/2010 03/05/2010 1
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/01/2010 03/05/2010 1
IP Performance Indicator Verification 71151 03/01/2010 03/05/2010 EB1-MODS
- MODIFICATION - 10 CFR50.59 3
1 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/19/2010 04/23/2010 1
IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 05/03/2010 05/07/2010 PSB1-RP
- RP GROUNDWATER PROTECTION 1
1 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 05/03/2010 05/07/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.