Inspection / Activity Plan Page 1 of 2 03/04/2009 08:10:14 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Oconee ISFSI
- ISFSI ROUTING LOADING 4
1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 01/01/2009 03/30/2009 OL EXAM
- INITIAL EXAM WEEK 1 4
1 OCONEE/MARCH 2009 EXAM AT POWER FACILITIES V23301 03/02/2009 03/06/2009 PSB1-RP
- RP GROUND WATER PROTECTION 1
1, 2, 3 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 03/09/2009 03/12/2009 1, 2, 3 IP Access Control to Radiologically Significant Areas 7112101 03/09/2009 03/12/2009 OL EXAM
- INITIAL EXAM WEEK 2 4
1 OCONEE/MARCH 2009 EXAM AT POWER FACILITIES V23301 03/09/2009 03/13/2009 OL RQ
- REQUAL INSPECTION 3
1, 2, 3 IP Licensed Operator Requalification Program 7111111B 03/16/2009 03/20/2009 PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 1
1, 2, 3 IP Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 2515/175 03/30/2009 04/03/2009 1, 2, 3 IP Alert and Notification System Testing 7111402 03/30/2009 04/03/2009 1, 2, 3 IP Emergency Response Organization Augmentation Testing 7111403 03/30/2009 04/03/2009 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 03/30/2009 04/03/2009 1, 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/30/2009 04/03/2009 1, 2, 3 IP Performance Indicator Verification 71151 03/30/2009 04/03/2009 EB3ISI
- UNIT 3 INSERVICE INSPECTION 1
3 IP Inservice Inspection Activities - PWR 7111108P 05/04/2009 05/08/2009 EB3TI172
3 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 05/04/2009 05/08/2009 EB3SGISI
- UNIT 3 STEAM GENERATOR INSERVICE INSP 4
3 IP Inservice Inspection Activities - PWR 7111108P 05/11/2009 05/15/2009 ISFSI
- ISFSI OPERATIONAL INSPECTION 2
1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/01/2009 09/15/2009 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION 6
1 IP Identification and Resolution of Problems 71152B 08/10/2009 08/14/2009 1
IP Identification and Resolution of Problems 71152B 08/24/2009 08/28/2009 PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK1 2
1, 2, 3 IP Access Control to Radiologically Significant Areas 7112101 10/12/2009 10/16/2009 1, 2, 3 IP ALARA Planning and Controls 7112102 10/12/2009 10/16/2009 1, 2, 3 IP Radioactive Material Processing and Transportation 7112202 10/12/2009 10/16/2009 1, 2, 3 IP Performance Indicator Verification 71151 10/12/2009 10/16/2009 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Inspection / Activity Plan Page 2 of 2 03/04/2009 08:10:14 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Oconee EB3ISI
- UNIT 1 INSERVICE INSPECTION 1
1 IP Inservice Inspection Activities - PWR 7111108P 10/19/2009 10/23/2009 EB3TI172
1 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/19/2009 10/23/2009 EB3SGISI
- UNIT 1 STEAM GENERATOR INSERVICE INSP 1
1 IP Inservice Inspection Activities - PWR 7111108P 10/26/2009 10/30/2009 PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK2 2
1, 2, 3 IP Access Control to Radiologically Significant Areas 7112101 10/26/2009 10/30/2009 1, 2, 3 IP ALARA Planning and Controls 7112102 10/26/2009 10/30/2009 1, 2, 3 IP Radioactive Material Processing and Transportation 7112202 10/26/2009 10/30/2009 ISFSI
- ISFSI OPERATIONAL INSPECTION 2
1, 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 12/01/2009 12/31/2009 OL EXAM
- INITIAL EXAM PREP 3
1 OCONEE/MARCH 2010 EXAM AT POWER FACILITIES V23286 03/08/2010 03/12/2010 OL EXAM
- INITIAL EXAM WEEK 3
1 OCONEE/MARCH 2010 EXAM AT POWER FACILITIES V23286 03/29/2010 04/02/2010 EB3ISI
- UNIT 2 INSERVICE INSPECTION 1
2 IP Inservice Inspection Activities - PWR 7111108P 04/26/2010 04/30/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Inspection / Activity Plan Page 1 of 1 03/04/2009 08:38:46 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site 07200040 - DUKE ENERGY NU ISFSI
- ISFSI OPERATIONAL INSPECTION 2
1 IP Operation Of An ISFSI 60855 01/19/2009 08/31/2009 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.