Page 1 of 2 McGuire 03/04/2009 07:17:08 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISFSI - ISFSI ROUTING LOADING 2 1, 2 01/01/2009 03/30/2009 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants TFPI 805 - TRIENNIEL FIRE PROTECTION INSPECTION 7 1, 2 03/09/2009 03/13/2009 IP 7111105T Fire Protection [Triennial]

1, 2 03/23/2009 03/27/2009 IP 7111105T Fire Protection [Triennial]

EB3HS - HEAT SINK 1 1, 2 04/20/2009 04/24/2009 IP 7111107T Heat Sink Performance OL EXAM - INITIAL EXAM PREP 7 1 04/20/2009 04/24/2009 V23306 MCGUIRE/MAY 2009 EXAM AT POWER FACILITIES EB1-CDBI - COMPONENT DESIGN BASES INSPECTION 9 1, 2 05/04/2009 05/08/2009 IP 7111121 Component Design Bases Inspection 1, 2 05/18/2009 05/22/2009 IP 7111121 Component Design Bases Inspection 1, 2 06/01/2009 06/05/2009 IP 7111121 Component Design Bases Inspection 1, 2 06/15/2009 06/19/2009 IP 7111121 Component Design Bases Inspection OL EXAM - INITIAL EXAM - WEEK 1 7 1 05/11/2009 05/15/2009 V23306 MCGUIRE/MAY 2009 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 7 1 05/18/2009 05/22/2009 V23306 MCGUIRE/MAY 2009 EXAM AT POWER FACILITIES PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE INS 4 1, 2 07/27/2009 07/31/2009 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1, 2 07/27/2009 07/31/2009 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 07/27/2009 07/31/2009 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 1, 2 07/27/2009 07/31/2009 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1, 2 07/27/2009 07/31/2009 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1, 2 07/27/2009 07/31/2009 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 08/17/2009 08/21/2009 IP 7111401 Exercise Evaluation 1, 2 08/17/2009 08/21/2009 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 08/17/2009 08/21/2009 IP 71151 Performance Indicator Verification EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 09/14/2009 09/18/2009 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - TI-172 RCS DM BUTT WELDS 1 2 09/14/2009 09/18/2009 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds EB3SGISI - U2 STEAM GENERATOR ISI 1 2 09/21/2009 09/25/2009 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 McGuire 03/04/2009 07:17:08 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP GROUNDWATER PROTECTION 1 1, 2 02/22/2010 02/26/2010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 1 2 1, 2 03/29/2010 04/02/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 03/29/2010 04/02/2010 IP 7112102-7112102R ALARA - Required 1, 2 03/29/2010 04/02/2010 IP 7112202 Radioactive Material Processing and Transportation 1, 2 03/29/2010 04/02/2010 IP 71151 Performance Indicator Verification PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 2 2 1, 2 04/12/2010 04/16/2010 IP 7112101 Access Control to Radiologically Significant Areas 1 04/12/2010 04/16/2010 IP 7112102-7112102R ALARA - Required 1, 2 04/12/2010 04/16/2010 IP 7112202 Radioactive Material Processing and Transportation 1, 2 04/12/2010 04/16/2010 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSPECTION 2 1, 2 06/07/2010 06/11/2010 IP 7111111B Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.