Feb. 12, 2009 Page 1
of 2
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2009-7216 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#:
0363 Address: NUCSA2 Phone#:
254-3194 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSE M 02/12/2009 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION:
"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 -
TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 01/06/2009 ADD MANUAL TABLE OF CONTENTS DATE: 02/11/2009 CATEGORY:
DOCUMENTS TYPE: TRM2 AOD /
Feb. 12, 2009 Page 2
of 2
ID:
TEXT B3.3.10 REPLACE:
REV:I ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE. WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL
- USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES M~ANUJAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Dat Procedure TEXT LOES
Title:
TEXT TOC
Title:
e:
C)2/11/2009 Name Rev Issue Date 48 12/18/2008 LIST OF EFFECTIVE SECTIONS Change ID Change Number 13 01/31/2008 TABLE OF CONTENTS TEXT 1.1 0
11/19/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1
Title:
TEXT 2.2
Title:
TEXT 3.0
Title:
1 02/04/2005, PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS/
7
',05/23/2008 PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE 4 \\
\\05/23/2008 APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO),APPLICABILITY TEXT 3.1.1
>1 11/09/2007
Title:
REACTIVITYCONTROL'SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWSjiARI)
INSTRUMENTATION TEXT 3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT 3.1.3 3
04/09/2007
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 7
04/19/2007
Title:
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
Page 1 of 15 Report Date: 02/12/09 Page I of
.15 Report Date: 02/12/09
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0
11/19/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 2
11/09/2007
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2
11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 5
05/23/2008
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0
11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 2
10/19/2005
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1
11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1
10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9
Title:
INSTRUMENTATION 2
04/09/2007 LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1
12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1
10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.4.1 1
04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY Page 2 of 15 Report Date: 02/12/09 Page2 of 15 Report Date: 02/12/09
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.2
Title:
REACTOR TEXT 3.4.3
Title:
REACTOR TEXT 3.4.4
Title:
REACTOR TEXT 3.4.5
Title:
REACTOR TEXT 3.5.1 0
11/19/2002 COOLANT SYSTEM STRUCTURAL INTEGRITY 1
11/09/2007 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) 1 12/14/2004 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1
04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1
02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2
'1 11/09/2007
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0
11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0
11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0
11/19/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)
SHUTDOWN Page 3 of
.15 Report Date: 02/12/09
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.2
Title:
PLANT TEXT 3.7.3.1
Title:
PLANT TEXT 3.7.3.2
Title:
PLANT TEXT 3.7.3.3
Title:
PLANT TEXT 3.7.3.4
Title:
PLANT TEXT 3.7.3.5
Title:
PLANT TEXT 3.7.3.6
Title:
PLANT 0
11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)
AND GROUND WATER LEVEL 1
04/26/2006 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 2
04/26/2006 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 2
08/18/2005 SYSTEMS C02 SYSTEMS 1
SYSTEMS HALON SYSTEMS 04/26/2006 1
04/26/2006 SYSTEMS FIRE HOSE STATIONS 1
04/26/2006 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7
Title:
PLANT SYSTEMS 1
04/26/2006 FIRE RATED ASSEMBLIES TEXT 3.7.3.8
Title:
PLANT TEXT 3.7.4
Title:
PLANT 7
11/09/2007 SYSTEMS FIRE DETECTION INSTRUMENTATION 1
04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM TEXT 3.7.5.1
Title:
PLANT SYSTEMS 0
11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2
Title:
PLANT 0
11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE Page 4 of 15 Report Date: 02/12/09 Page 4 of
.15 Report Date: 02/12/09
SSES MANUAL Manual Name:
TRM2 V Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.3
Title:
PLANT TEXT 3.7.6
Title:
PLANT 1
04/26/2006 SYSTEMS LIQUID HOLDUP TANKS 2
SYSTEMS ESSW PUMPHOUSE 06/27/2008 VENTILATION TEXT 3.7.7 2
Title:
PLANT SYSTEMS MAIN CONDENSER MONITORING INSTRUMENTATION 09/05/2008 OFFGAS PRETREATMENT LOGARITHMIC RADIATION TEXT 3.7. 8
Title:
PLANT SYSTEMS SNUBBERS 6
06/21/2007 TEXT 3.7.9 1
08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1
12/14'/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3. 8. 1
Title:
ELECTRICAL PROTECTIVE TEXT 3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT 3.8.2.2
Title:
ELECTRICAL AUTOMATIC 2
02/04/2005 POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 2
11/09/2007 POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 2
12/14/2004 POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION PROTECTION TEXT 3.8.3 0
11/19/2002
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES TEXT 3.8.4 1
02/04/2005
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 0
11/19/2002
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION Page 5 of 15 Report Date: 02/12/09 Page 5 of
.15 Report Date: 02/12/09
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.6 0
11/19/2002
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 0
12/14/2006
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1
04/26/2006
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1
04/09/2007
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 1
04/26/2006
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 1
08/28/2006
Title:
MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)
TEXT 3.11.1.1 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM Page 6 of 15 Report Date: 02/12/09 Page 6 of
.15 Report Date: 02/12/09
SSES MANUIAL Manual Name:
TRM2
.Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.4
Title:
RADIOACTIVE TEXT 3.11.1.5
Title:
RADIOACTIVE TEXT 3.11.2.1
Title:
RADIOACTIVE TEXT 3.11.2.2
Title:
RADIOACTIVE TEXT 3.11.2.3
Title:
RADIOACTIVE FORM TEXT 3.11.2.4
Title:
RADIOACTIVE TEXT 3.11.2.5
Title:
RADIOACTIVE TEXT 3.11.2.6
Title:
RADIOACTIVE TEXT 3.11.3
Title:
RADIOACTIVE TEXT 3.11.4.1
Title:
RADIOACTIVE TEXT 3.11.4.2
Title:
RADIOACTIVE TEXT 3.11.4.3
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1
12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2
05/02/2007 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3
Q4/26/2006 DOSE RATE 1
04/26/2006 DOSE -
NOBLE GASES 1
04/26/2006 DOSE -
11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM EFFLUENTS EFFLUENTS 3
11/14/2006 VENTILATION EXHAUST 3
05/02/2007 RADIOACTIVE GASEOUS TREATMENT SYSTEM EFFLUENT MONITORING INSTRUMENTATION EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1
04/26/2006 TOTAL DOSE 3
04/26/2006 MONITORING PROGRAM 2
04/26/2006 LAND USE CENSUS 1
04/26/2006 INTERLABORATORY COMPARISON PROGRAM Page 7 of 15 Report Date: 02/12/09 Page 7 of
.__55 Report Date: 02/12/09
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.12.1 0
11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4
04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT B3.0 4
05/23/2008
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)
APPLICABILITY TEXT B3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT B3.1.3 3
04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0
11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 0
11/19/2002
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 1
11/09/2007
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 2
11/09/2007
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION Pae.
f 5.eor.at:.2120 Page 8 of 15 Report Date: 02/12/09
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.4
Title:
INSTRUMENTATION TEXT B3.3.5
Title:
INSTRUMENTATION TEXT B3.3.6
Title:
INSTRUMENTATION TEXT B3.3.7
Title:
INSTRUMENTATION TEXT B3.3.8
Title:
INSTRUMENTATION TEXT B3.3.9
Title:
INSTRUMENTATION TEXT B3.3.10
Title:
INSTRUMENTATION TEXT B3.3.11
Title:
INSTRUMENTATION TEXT B3.4.1
Title:
11/09/2007 BASES TRM POST ACCIDENT MONITORING (PAM)
INSTRUMENTATION 2
11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK 3
10/19/2005 BASES TRM ISOLATION ACTUATION INSTRUmENTATION 1
11/09/2007 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1
10/22/2003 BASES TRM RPS INSTRUMENTATION 2
04/10/2007 BASES LPRM UPSCALE ALARM INSTRUMENTATION 1
12/18/2008 BASES REACTOR RECIRCULATION PUMP MG SET STOPS 1
10/22/2003 BASES MVP ISOLATION INSTRUMENTATION 0
11/19/2002 SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1
11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT Page9 of.15 Report Date: 02/12/09
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 6
TEXT B3.4.5 0
11/19/2002
Title:
REACTOR COOLANT.SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.5.1 0
11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1
11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1
11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0
11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0
11/19/2002 I
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1
04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1
12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0
11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0
11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS)
GROUND WATER LEVEL TEXT B3.7.3.1 2
01/07/2008
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2
04/26/2006
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 10 of
.15 Report Date: 02/12/09
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.3
Title:
PLANT TEXT B3.7.3.4
Title:
PLANT TEXT B3.7.3.5
Title:
PLANT TEXT B3.7.3.6
Title:
PLANT TEXT B3.7.3.7
Title:
PLANT TEXT B3.7.3.8
Title:
PLANT TEXT B3.7.4
Title:
PLANT TEXT B3.7.5.1
Title:
PLANT TEXT B3.7.5.2
Title:
PLANT TEXT B3.7.5.3
Title:
PLANT TEXT B3.7.6
Title:
PLANT TEXT B3.7.7
Title:
PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 C02 SYSTEMS 1
04/26/2006 HALON SYSTEMS 1
04/26/2006 FIRE HOSE STATIONS 1
04/26/2006 YARD FIRE HYDRANTS AND 0
11/19/2002 FIRE RATED ASSEMBLIES SYSTEMS BASES HYDRANT HOSE HOUSES SYSTEMS BASES 1
01/12/2004 SYSTEMS BASES FIRE DETECTION INSTRUMENTATION 0
11/19/2002 SYSTEMS BASES SOLID RADWASTE SYSTEM 0
11/19/2002 SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0
11/19/2002 LIQUID HOLDUP TANKS 2
06/27/2008 ESSW PUMPHOUSE VENTILATION 2
01/31/2008 SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Page 11 of 15 Report Date: 02/12/09 Page 11 of
.15 Report Date: 02/12/09
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.8 3
06/21/2007
Title:
PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 1
12/14/2004
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.8.1
Title:
ELECTRICAL PROTECTIVE 1
02/04/2005 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES TEXT B3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT B3.8.2.2
Title:
ELECTRICAL AUTOMATIC TEXT B3.8.3
Title:
ELECTRICAL TEXT B3.8.4
Title:
ELECTRICAL TEXT B3.8.5
Title:
ELECTRICAL TEXT B3.8.6
Title:
ELECTRICAL TEXT B3.8.7 0
11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 1
09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 0
11/19/2002 POWER BASES DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 0
11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 0
11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION 1
02/04/2005 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 0
12/14/2006 PROTECTION I
PROTECTION
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME Page 12 of 15 Report Date: 02/12/09 Page 12 of
.15 Report Date: 02/12/09
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0
Title:
REFUELING OPERATIONS BASES TEXT B3.9.3 0
Title:
REFUELING OPERATIONS BASES 11/19/2002 COMMUNICATIONS 11/19/2002 REFUELING PLATFORM 11/19/2002 SOURCE CONTAMINATION TEXT B3..10.1
Title:
MISCELLANEOUS 0
BASES SEALED TEXT B3.10.2 1
04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0
11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.10.4 0
11/19/2002
Title:
MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)
TEXT B3.11.1.1
Title:
RADIOACTIVE TEXT B3.11.1.2
Title:
RADIOACTIVE TEXT B3.11.1.3
Title:
RADIOACTIVE TEXT B3.11.1.4
Title:
RADIOACTIVE 0
11/19/2002 BASES LIQUID EFFLUENTS CONCENTRATION EFFLUENTS 0
11/19/2002 EFFLUENTS BASES LIQUID EFFLUENTS DOSE EFFLUENTS EFFLUENTS 0
BASES 0
BASES 0
BASES 11/19/2002 LIQUID WASTE TREATMENT SYSTEM 11/19/2002 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5
Title:
RADIOACTIVE EFFLUENTS 11/19/2002 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1
12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE Page 13 of 15 Report Date: 02/12/09 Page 13 of
.15 Report Date: 02/12/09
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.2
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.3
Title:
RADIOACTIVE EFFLUENTS PARTICULATES FORM TEXT B3.11.2.4
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.5
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.6
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION 0
11/19/2002 BASES DOSE -
NOBLE GASES 0
11/19/2002 BASES DOSE -
11/19/2002 BASES GASEOUS RADWASTE TREATMENT SYSTEM 4
11/14/2006 BASES VENTILATION EXHAUST TREATMENT SYSTEM 1
01/27/2004 BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING TEXT B3.11.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 2
01/06/2006
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0
Title:
RADIOACTIVE EFFLUENTS BASES TEXT B3.12.1 1
Title:
LOADS CONTROL PROGRAM BASES 11/19/2002 INTERLABORATORY COMPARISON PROGRAM 10/04/2007 CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0
11/19/2002
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 14 of 15 Report Date: 02/12/09 Page 14 of
.15 Report Date: 02/12/09
SSES MANUAL Manual Namee:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 4.1
Title:
TEXT 4.2
Title:
TEXT 4.3
Title:
TEXT 4.4
Title:
TEXT 4.5
Title:
TEXT 4.6
Title:
TEXT 4.7
Title:
ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0
09/27/2003 CONTROLS ORGANIZATION 0
09/27/2003 CONTROLS REPORTABLE EVENT ACTION 0
09/27/2003 CONTROLS SAFETY LIMIT VIOLATION 1
12/18/2008 CONTROLS PROCEDURES & PROGRAMS 0
09/27/2003.
CONTROLS REPORTING REQUIREMENTS 0
09/27/2003 CONTROLS RADIATION PROTECTION PROGRAM 0
09/27/2003 CONTROLS TRAINING Page 15 of Ii Report Date: 02/12/09 Page 15 o f Li Report Date: 02/12/09
Reactor Recirculation Pump MG Set Stops PPL Rev. 1 B 3.3.10 B 3.3.10 Reactor Recirculation Pump MG Set Stops BASES TRO In the case of recirculation control system failures (e.g., transistors, resistors, etc.) causing upscale signal failure, the reactor is protected by high pressure or high flux scram. Such faults have been analyzed in Chapter 15 and include both MG sets going to full speed simultaneously.
For this analysis, the master flow controller is assumed to fail such that it causes a speed increase for both recirculation pumps.
Pump overspeed occurs during the course of a LOCA due to blowdown through the broken loop pump. Design studies determined that rotating component failure missiles caused by the overspeed was not sufficient to cause damage to the containment or to vital equipment, consequently no protective or preventative provision is made for this pump overspeed condition.
No credit is taken for electrical or mechanical stops to limit the speed of the recirculation pumps in these analyzed events.
Normally, operator implementation or procedural controls maintains the recirculation system within the system design limits and initial conditions of analyzed events. The reactor recirculation pump MG set stops are set with some operating margin above these limits. As such, the stops serve as backups to the operator control over normal operation. Additionally, in the event of a fault that results in inadvertent MG set speed increases above the normal operating limits, the stops can provide protection from the automatic reactor scram that terminate the analyzed worse case events. Therefore, the MG set stops also serve to provide additional plant reliability protection.
The electrical stop is the primary means for backing up procedural controls and for automatically limiting recirculation flow. The electrical stop is the MG Set Positioner Controller Program Stop. The mechanical stop provides a diverse and redundant automatic backup to the electrical stop flow limiting mechanism.
ACTIONS The Actions are modified by a Note allowing separate Condition entry for each recirculation pump. The Required Actions provide appropriate compensatory measures for each recirculation loop independent of the other loop.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.3-20 EFFECTIVE DATE 12/11/2008
Reactor Recirculation Pump MG Set Stops PPL Rev. 1 B 3.3.10 B 3.3.10 Reactor Recirculation Pump MG Set Stops BASES ACTIONS A.1 (continued)
Either the electrical or the mechanical stop can provide backup protection to the procedural controls in place to maintain recirculation pump operation within the system design limits and initial conditions of analyzed events. In the event one of these un-creditied backup features is inoperable it is reasonable to extend the restoration time (in the event conditions do not permit more timely corrective action) until the next scheduled required calibration. With the backup protection of the electrical or mechanical stop remaining OPERABLE, backup protection remains and allows time to schedule and plan appropriate repairs. Since there is no assumed credit for either backup function, this Completion Time is considered appropriate.
B.1 With both the electrical and mechanical stops inoperable for any recirculation pump MG set, the automatic backup protection is not available.
In this case, the scoop tube is locked in place to protect against unintended /
inadvertent speed increases. This action conservatively compensates for lack of backup protection and allows continued operation until at least one MG set stop function (electrical or mechanical) is restored to operable status. The Required Action is modified by a Note allowing intermittent unlocking of the scoop tube. This may be required for power reductions or other power level adjustments. The administrative control consists of stationing a dedicated operator at the controls while the scoop tube is unlocked and the duration should be limited to the time necessary to complete the change in core flow.
TRS The TRS assures that the stops are demonstrated OPERABLE at least once per cycle. Normal scoop tube positioner calibration is performed after each refueling outage. Inoperable stops are detectable on line during scoop tube positioner calibration.
REFERENCES
- 1. FSAR Section 5.4.1.4.
- 2. FSAR Section 7.7.2.3.1.
- 3. FSAR Section 15.4.5.
SUSQUEHANNA - UNIT 2 TRM / B 3.3-21 EFFECTIVE DATE 05/16/2003