UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 17, 2009 Mr. Timothy J. OConnor Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANT NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. OConnor:
On March 23, 2009, the NRC will begin the Baseline Inservice Inspection (NRC Inspection Procedure (IP) 71111.08) at the Monticello Nuclear Generating Plant. This inspection is scheduled to be performed March 23 through April 3, 2009.
Experience has shown that this inspection is resource intensive both for the NRC inspector and your staff. In order to minimize the impact to your resources and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group identifies information necessary to ensure that the inspector is adequately prepared. The second group identifies the information the inspector will need upon arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. R. Loeffler, of your organization. If there are any questions about this inspection or the material requested, please contact the inspector Mr. T. Bilik at (630) 829-9744.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's
INSERVICE INSPECTION DOCUMENT REQUEST T. OConnor Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
David Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-263 License No. DPR-22
Enclosure:
INSERVICE INSPECTION DOCUMENT REQUEST cc w/encl:
D. Koehl, Chief Nuclear Officer Manager, Nuclear Safety Assessment P. Glass, Assistant General Counsel Nuclear Asset Manager, Xcel Energy, Inc.
J. Stine, State Liaison Officer, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA)
Commissioner, Minnesota Pollution Control Agency R. Hiivala, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office
T. OConnor Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
David Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-263 License No. DPR-22
Enclosure:
INSERVICE INSPECTION DOCUMENT REQUEST cc w/encl:
D. Koehl, Chief Nuclear Officer Manager, Nuclear Safety Assessment P. Glass, Assistant General Counsel Nuclear Asset Manager, Xcel Energy, Inc.
J. Stine, State Liaison Officer, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA)
Commissioner, Minnesota Pollution Control Agency R. Hiivala, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office DISTRIBUTION:
Tamara Bloomer RidsNrrDorlLpl3-1 RidsNrrPMMonticello RidsNrrDirsIrib Resource Mark Satorius Kenneth Obrien Jared Heck Carole Ariano Linda Linn Gary Shear DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\\DRS\\WORK IN PROGRESS\\LTR 021709 MONTICELLO RFI.DOC 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy OFFICE RIII C RIII N
RIII N
NAME TBilik:ls DHills DATE 02/13/09 02/17/09 OFFICIAL RECORD COPY
INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 1
Inspection Dates:
March 23 through April 3, 2009 Inspection Procedure:
IP 71111.08, Inservice Inspection (ISI) Activities Inspector:
Thomas Bilik (630) 829-9744 I.
ISI/Welding Programs and Schedule Information The following information (electronic copy - CD ROM if possible) is requested by March 9, 2009, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The inspector will select specific items from the information requested below and request a list of additional documents needed on-site to your staff. We request that the specific items selected from the lists be available and ready for review on the first day of inspection. If you have any questions regarding this information, please call the inspector as soon as possible.
- 1.
A detailed schedule (including preliminary dates) of:
- a.
Nondestructive examinations (NDEs) planned for Class 1 and 2 Systems and containment, performed as part of your ASME Section XI, Risk Informed (if applicable), and augmented ISI Programs during the upcoming outage.
- b.
A copy of the NDE procedures used to perform the examinations identified in above (including calibration procedures). For ultrasonic examination procedures qualified in accordance with Appendix VIII, of Section XI of the ASME Code, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets).
- c.
Welding activities that are scheduled to be completed during the upcoming outage (ASME Class 1, 2, or 3 structures, systems, or components (SSCs).
- d.
A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above.
- e.
A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant, visual VT-1, VT-2, and VT-3), which have identified recordable indications (geometric or flaw) on Code Class 1 and 2 Systems, since the beginning of the last refueling outage. The list of NDE reports should include a brief description of the SSC where the recordable indication was identified.
INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 2
- f.
A list with a brief description (e.g., system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1 and 2 Systems, which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage.
- g.
If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to be examined, and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.
- h.
Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.
- i.
A list of any temporary non-code repairs in service (e.g., pinhole leaks).
- j.
Provide copies of the most recent self-assessments for the ISI, Welding, and Augmented ISI Programs.
- 2.
Additional information related to all ISI activities.
A list with a brief description of ISI related issues (e.g., condition reports) entered into your corrective action program since the beginning of the last refueling outage. For example, a list based upon data base searches using key words related to piping such as: ISI, ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, or errors in piping.
II.
Information to be provided to the inspector at the entrance meeting:
- 1.
ISI/Welding Programs and Schedule Information.
- a.
Updated schedules for ISI/NDE activities, including planned welding activities, and schedule showing contingency repair plans, if available.
- b.
For ASME Class 1 and 2 welds selected by the inspector from the lists provided from Section A of this enclosure, please provide copies of the following documentation for each subject weld:
Weld data sheet (traveler);
Weld configuration and system location; Applicable Code Edition and Addenda for weldment; Applicable Code Edition and Addenda for welding procedures; Applicable weld procedures (WPS) used to fabricate the welds;
INSERVICE INSPECTION DOCUMENT REQUEST Enclosure 3
Copies of procedure qualification records (PQRs) supporting the WPS; Copies of the nonconformance reports for the selected welds (if applicable);
Radiographs of the selected welds and access to equipment to allow viewing radiographs (if RT was performed);
Copies of the pre-service examination records for the selected welds; Copies of welder performance qualifications records applicable to WPS, including documentation that welder maintained proficiency in the applicable welding processes specified in the WPS (at least six months prior to date subject work); and Copies of NDE personnel qualifications (MT, VT, PT, UT, and RT). As applicable.
- c.
For the ISI-related corrective action issues selected by the inspector from Section A of this enclosure, provide a copy of the corrective actions and supporting documentation.
- d.
For the NDE reports with recordable indications on Code Class 1 and 2 Systems selected by the inspector from Section A and above, provide a copy of the examination records, examiner qualification records, and associated corrective action documents.
- e.
A copy of (or ready access to) most current revision of the ISI Program Manual and Plan for the current Interval.
- f.
Provide documentation that the ISI Program Manager has reviewed NDE personnel certification records for personnel performing NDE during the current refueling outage. Also, for each NDE UT examiner qualified to Appendix VII and VIII, of Section XI, provide the records (with dates) for the most recent completion of their practical hands on training.
- g.
Copy of the most recently completed Section XI reactor coolant system pressure test, documenting the results of VT-2 inspections.
- 2.
Codes and Standards.
- a.
Applicable editions of the ASME Code (Sections V, IX and XI) for the inservice inspection program and the repair/replacement program.