Containment Overpressure Credit LAR Acceptance Review Results (ME0098)
ML090070501
Person / Time
Site: Beaver Valley
Issue date: 11/24/2008
From: Nadiyah Morgan
Plant Licensing Branch 1
To: Beatty G
FirstEnergy Corp
References
TAC ME0098
Download: ML090070501 (1)


Text

From: Nadiyah Morgan Sent: Monday, November 24, 2008 3:35 PM To: beattyg@firstenergycorp.com Cc: 'sarvers@firstenergycorp.com'

Subject:

Beaver Valley 2 - Containment Overpressure LAR Acceptance Review (ME0098)

Gary, By letter dated November 7, 2008, FirstEnergy Nuclear Operating Company submitted a license amendment for Beaver Valley Power Station, Unit No. 2. The proposed amendment would modify the method used to calculate the available net positive suction head for the recirculation spray pumps, as described in the Updated Final Safety Analysis Report. The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.

Thanks, Dee Nadiyah S. Morgan Beaver Valley Project Manager Nuclear Regulatory Commission (301) 415-1016 Nadiyah.Morgan@NRC.GOV E-mail Properties Mail Envelope Properties ()

Subject:

Beaver Valley 2 - Containment Overpressure LAR Acceptance Review

(ME0098)

Sent Date: 11/24/2008 2:55:06 PM Received Date: 11/24/2008 3:35:00 PM From: Nadiyah Morgan Created By: Nadiyah.Morgan@nrc.gov Recipients:

beattyg@firstenergycorp.com (beattyg@firstenergycorp.com)

Tracking Status: None sarvers@firstenergycorp.com ('sarvers@firstenergycorp.com')

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 10477 11/24/2008 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: