TAC:MD7707, Control Room Habitability (Approved, Closed) |
|
|
|
---|
Category:Letter type:DCL
MONTHYEARDCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-24-020, Nuclear Material Transaction Report for New Fuel2024-02-21021 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-014, Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage2024-02-12012 February 2024 Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage DCL-24-013, Nuclear Material Transaction Report for New Fuel2024-02-0707 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System 2024-09-09
[Table view] Category:Technical Specifications
MONTHYEARDCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) ML23012A2172023-02-0909 February 2023 Issuance of Amendment Nos. 244 and 245 Revision to Technical Specifications to Adopt TSTF-569, Revision 2, Revise Response Time Testing Definition ML21242A2162022-12-21021 December 2022 Issuance of Amendment Nos. 243 and 244 Technical Specifications and Revised License Conditions for the Permanently Defueled Condition (EPID: L-2020-LLA-0261 DCL-22-059, License Amendment Request 22-03 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2022-07-26026 July 2022 License Amendment Request 22-03 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML21188A3452021-07-0808 July 2021 Issuance of Amendment No. 238 Revision to TS 3.7.8, Auxiliary Saltwater (Asw) System (Emergency Circumstances) ML21188A0372021-07-0707 July 2021 Attachment 1 TS_3_7_8 (Marked Up Pages) ML21188A0352021-07-0707 July 2021 Attachment 2 TS_3_7_8 (Retype Pages) ML21188A0342021-07-0707 July 2021 Attachment 3-TS Bases Section 3_7_8 (Marked-up Pages) DCL-19-094, License Amendment Request 19-02 to Relocate Technical Specification 5.3, Unit Staff Qualifications, to the Updated Final Safety Analysis Report2019-12-0505 December 2019 License Amendment Request 19-02 to Relocate Technical Specification 5.3, Unit Staff Qualifications, to the Updated Final Safety Analysis Report DCL-18-100, License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology2018-12-26026 December 2018 License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology ML16330A6722017-01-0505 January 2017 Issuance of Amendment Nos. 228 and 230, Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML16139A0082016-12-21021 December 2016 Issuance of Amendment Nos. 227 and 229, Digital Replacement of the Process Protection System Portion of the Reactor Protection System and Engineered Safety Features Actuation System ML16035A4412016-04-14014 April 2016 Issuance of Amendment Nos. 225 and 227, Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML16083A5642016-03-23023 March 2016 License Amendment Request 16-02, License Amendment Request to Revise Technical Specification 3.4.12., Low Temperature Overpressure Protection (Ltop) System. DCL-16-028, Technical Specifications B.4.17., Steam Generator (SG) Tube Integrity, LTOP Orifice-Key Design Features, and Additional Information2016-03-23023 March 2016 Technical Specifications B.4.17., Steam Generator (SG) Tube Integrity, LTOP Orifice-Key Design Features, and Additional Information ML16055A3592016-03-0909 March 2016 Issuance of Amendment Nos. 224 and 226, Revise Updated Final Safety Analysis Report for Beacon Power Distribution Monitoring System Methodology and TS 5.6.5 (COLR) Paragon and Nexus Methodologies ML16032A0062016-02-19019 February 2016 Redacted, Issuance of Amendment Nos. 223 and 225, Revise UFSAR Section 15.4.2.2 to Incorporate Pressurizer Filling Analysis for Major Rupture of a Main Feedwater Pipe Accident Into Licensing Basis ML15245A5422015-09-30030 September 2015 Issuance of Amendment Nos. 220 and 222, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone H Full Implementation Date ML15204A2222015-08-27027 August 2015 Issuance of Amendment Nos. 219 and 221, Adopt Technical Specifications Task Force Traveler TSTF-432, Revision 1, Change in Technical Specification End States (WCAP-16294) ML15162A8822015-07-0101 July 2015 Issuance of Amendment Nos. 218 and 220, Revise Surveillance Requirements in TS 3.8.1, AC Sources, Related to Diesel Generator Testing DCL-15-052, Response to NRC Request for Additional Information Regarding License Amendment Request 14-01, Revision to Technical Specification 3.8.1, AC Sources - Operating.2015-04-29029 April 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 14-01, Revision to Technical Specification 3.8.1, AC Sources - Operating. ML14042A1932014-02-27027 February 2014 Issuance of Amendment Nos. 217 and 219, Editorial and Clarifying Changes to Technical Specification (TS) 3.7.10, Control Room Ventilation System (CRVS) and TS 5.6.5, Core Operating Limits Report (COLR) (TAC MF1959-MF1960) ML13130A2252013-05-10010 May 2013 Technical Specification 3.5.2 Safety Injection Pump 2-1 Issue Information ML13267A1352013-01-31031 January 2013 Attachment 6 to DCL-13-016, LTR-RAM-1-13-002 NP-Attachment, Revision 0, Justification for the Application of Technical Specifications Changes in WCAP-14333 and WCAP-15376 to the Tricon/Als Process Protection System at the Diablo Canyon Powe DCL-12-107, Supplement to PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, 'Containment Spray and Cooling Systems,' TS 3.7.5, 'Auxiliary Feedwater (AFW) System,' TS 3.8.1, 'Ac.....2012-11-0101 November 2012 Supplement to PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, 'Containment Spray and Cooling Systems,' TS 3.7.5, 'Auxiliary Feedwater (AFW) System,' TS 3.8.1, 'Ac..... DCL-12-057, Supplement to PG&E Letter DCL-12-017, Response to NRC Request for Additional Information: NRC Question 12012-05-31031 May 2012 Supplement to PG&E Letter DCL-12-017, Response to NRC Request for Additional Information: NRC Question 1 DCL-11-097, License Amendment Request 11-05, Evaluation Process for New Seismic Information and Clarifying the Diablo Canyon Power Plant Safe Shutdown Earthquake2011-10-20020 October 2011 License Amendment Request 11-05, Evaluation Process for New Seismic Information and Clarifying the Diablo Canyon Power Plant Safe Shutdown Earthquake DCL-11-059, Diablo Canyon Units 1 & 2, License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources-Operating, TS 3.8.9, Distribution Sys2011-06-0101 June 2011 Diablo Canyon Units 1 & 2, License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources-Operating, TS 3.8.9, Distribution Syste DCL-11-055, Supplement to License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs).2011-04-21021 April 2011 Supplement to License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs). DCL-11-018, License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs)2011-02-17017 February 2011 License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs) DCL-10-028, Emergency License Amendment Request 10-02, One Time Revision to Technical Specification 3.8.1, AC Sources - Operating.2010-03-11011 March 2010 Emergency License Amendment Request 10-02, One Time Revision to Technical Specification 3.8.1, AC Sources - Operating. DCL-10-028, Diablo Canyon, Units 1 and 2, Emergency License Amendment Request 10-02, One Time Revision to Technical Specification 3.8.1, AC Sources - Operating.2010-03-11011 March 2010 Diablo Canyon, Units 1 and 2, Emergency License Amendment Request 10-02, One Time Revision to Technical Specification 3.8.1, AC Sources - Operating. DCL-10-018, License Amendment Request 10-01, Revision to Technical Specification 3.8.1, AC Sources - Operating.2010-02-24024 February 2010 License Amendment Request 10-01, Revision to Technical Specification 3.8.1, AC Sources - Operating. DCL-09-062, Emergency License Amendment Request 09-04 Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs) for Unit 2 Cycle 15.2009-09-0303 September 2009 Emergency License Amendment Request 09-04 Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs) for Unit 2 Cycle 15. ML0919601772009-07-0303 July 2009 License Amendment Request 09-02, Revision to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, Operability Requirements and Actions for RCS Leakage Detection Instrumentation DCL-09-009, License Amendment Request 09-01 - Revision to Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, Deletion of the High Negative Rate Trip Function2009-02-24024 February 2009 License Amendment Request 09-01 - Revision to Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, Deletion of the High Negative Rate Trip Function DCL-08-100, Supplement to License Amendment Request 07-03, Revision to Technical Specification 3.7.10, Control Room Ventilation System (CRVS)2008-11-25025 November 2008 Supplement to License Amendment Request 07-03, Revision to Technical Specification 3.7.10, Control Room Ventilation System (CRVS) ML0824102622008-10-30030 October 2008 Issuance of Amendment Nos. 200 and 201, Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk-Informed Initiative 5b) DCL-07-097, License Amendment Request 07-04, Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk Informed Technical Specifications Initiative 5b)2007-10-15015 October 2007 License Amendment Request 07-04, Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk Informed Technical Specifications Initiative 5b) DCL-07-075, Supplement to License Amendment Request 07-01, Revision to Technical Specifications to Support Steam Generator Replacement, and Response to Request for Additional Information2007-08-0909 August 2007 Supplement to License Amendment Request 07-01, Revision to Technical Specifications to Support Steam Generator Replacement, and Response to Request for Additional Information ML0713707332007-06-26026 June 2007 Tech Spec Pages for Amendment Nos. 197 and 198 TS 5.5.16, Containment Leakage Rate Testing Program, for Consistency with 10 CFR 50.55a(g)(4) ML0709900742007-06-25025 June 2007 Units, 1 and 2, Tech Spec Page for Amendments 196 and 197 Administrative Changes to the Technical Specification 5.5.8, Inservice Testing Program. ML0703500522007-04-17017 April 2007 Tech Spec Pages for Amendment Nos. 195 and 196 TS 3.4.1 Reactor Coolant System Pressure, Temperature, & Flow Departure from Nucleate Boiling Limits & TS 5.6.5 Core Operating Limits Report. ML0704404942007-03-21021 March 2007 Tech Spec Pages for Amendments 194 and 195 Regarding Steam Generator Tube Integrity Technical Specifications ML0701902142007-01-19019 January 2007 Units, 1 and 2 - Tech Spec Pages for Amendments 192 and 193 Technical Specification 1.1 Definitions and Technical Specification 3.4.16 Reactor Coolant System Specific Activity DCL-06-143, License Amendment Request 06-10 Revision to Technical Specification 5.5.8, Inservice Testing Program2006-12-29029 December 2006 License Amendment Request 06-10 Revision to Technical Specification 5.5.8, Inservice Testing Program DCL-06-136, License Amendment Request 06-05 Revision to Technical Specification 3.4.1, Reactor Coolant System Pressure, Temperature, and Flow Departure from Nucleate Boiling Limits, and Technical Specification 5.6.5, Core Operating....2006-12-29029 December 2006 License Amendment Request 06-05 Revision to Technical Specification 3.4.1, Reactor Coolant System Pressure, Temperature, and Flow Departure from Nucleate Boiling Limits, and Technical Specification 5.6.5, Core Operating.... DCL-06-142, License Amendment Request 06-09, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program (TSTF-343)2006-12-29029 December 2006 License Amendment Request 06-09, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program (TSTF-343) ML0635500312006-12-20020 December 2006 Tech Spec Pages for Amendment 192 Regarding TS 5.6.5, Core Operating Limits Report. DCL-06-129, Special Report 06-03 - 180 Day Report for Steam Generator Technical Specification Task Force 449, Thirteenth Refueling Outage2006-11-17017 November 2006 Special Report 06-03 - 180 Day Report for Steam Generator Technical Specification Task Force 449, Thirteenth Refueling Outage 2024-02-28
[Table view] |
Text
Pacific Gas Electric and Companya John T. Conway Diahlo Canyon Power Plant Senior Vice President & P. 0. Box 56 Chief Nuclear Officer Avila Beach, CA93424 November 25, 2008 805.545.3333 Fax: 805.5,15.6445 PG&E Letter DCL-08-100 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Supplement to License Amendment Request 07-03, Revision to Technical Specification 3.7.10, Control Room Ventilation System (CRVS)
References:
- 1. PG&E Letter DCL-07-114, "License Amendment Request 07-03, Revision to Technical Specification 3.7.10, Control Room Ventilation System (CRVS)," dated December 26, 2007
- 2. Technical Specification Task Force Technical Specification Change Traveler, TSTF-448, Revision 3
Dear Commissioners and Staff:
Pacific Gas and Electric Company (PG&E) submitted Reference 1 to revise Technical Specification (TS) 3.7.10, "Control Room Ventilation System (CRVS),"
to modify TS requirements related to control room envelope habitability in accordance with Technical Specification Task Force (TSTF) Traveler number TSTF-448, Revision 3, consistent with the notice published in the FederalRegister on January 17, 2007, as part of the consolidated line item improvement process.
Subsequent to the Reference 1 submittal, the NRC identified a difference between the DCPP proposed change and the current NUREG-1431 standard TS. This change will make DCPP TS 3.7.10 Condition C consistent with TSTF-448 and NUREG-1431.
Thiletter provides a supplement to the Reference 1 proposed TS 3.7.10 and TS 3.7.10 Bases, to revise Condition C;to state, "Required Action and associated Completion Time of Condition A or B not met in MODE 1, 2, 3, or 4." The current DCPP TS 3.7.10 Condition C only applies if Condition A is not met.
A description of the required change is contained in Enclosure 1.
itv A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway . Comanche Peak
- Diablo Canyon - Palo Verde
- San Onofre 0 South Texas Project - Wolf Creek I'
Document Control Desk PG&E Letter DCL-08-100 November 25, 2008 Page 2 A revised marked-up TS page for TS 3.7.10, page 3.7-18, is contained in Enclosure 2. A revised retyped TS page for TS 3.7.10, page 3.7-18, is contained in Enclosure 3. The revised marked-up and retyped TS Pages supersede those previously provided in Enclosure 2 and Enclosure 3 of Reference 1, respectively.
No changes to the proposed TS 3.7.10 TS Bases pages are required as a result of this change.
This information does not affect the results of the technical evaluation, or the no significant hazards consideration determination, previously transmitted in Reference 1.
PG&E makes no regulatory commitments (as defined by NEI 99-04) in this letter.
This letter includes no revisions.to existing regulatory commitments.
If you have any questions, or require additional information, please contact Stan Ketelsen at (805) 545-4720.
I state under penalty of perjury that the foregoing is true and correct.
Executed on November 25, 2008.
Sincerely, Jo T. Conway Sen or Vice President& Chief Nuclear Officer mjrm/4557/50034939 Enclosures cc: Gary W. Butner, California Department of Public Health Elmo E. Collins, NRC Region IV Michael S. Peck, NRC, Senior Resident Inspector Diablo Distribution cc/enc: Alan B. Wang, NRC Project Manager, NRR A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
Enclosure 1 PG&E Letter DCL-08-100 Revised TS 3.7.10 for License Amendment Request 07-03, "Revision to Technical Specification 3.7.10, Control Room Ventilation System (CRVS)"
Pacific Gas and Electric Company (PG&E) Letter DCL-07-114, "License Amendment Request 07-03, Revision to Technical Specification 3.7.10, 'Control Room Ventilation System (CRVS),"' dated December 26, 2007 (Reference 1), was submitted to modify TS requirements related to control room envelope habitability in accordance with Technical Specification Task Force (TSTF) Traveler number TSTF-448, Revision 3, consistent with the notice published in the FederalRegister on January 17, 2007, as part of the consolidated line item improvement process.
PG&E is providing this supplement to revise the proposed changes in Reference 1 revising TS 3.7.10 Condition C to state, "Required Action and associated Completion Time of Condition A or B not met in MODE 1,'2, 3, or 4." The current DCPP TS 3.7.10 Condition C only applies if Condition A is not met. This change is already present in NUREG-1431. This change will make DCPP TS 3.7.10 Condition C consistent with TSTF-448 and NUREG-1431.
No changes to the proposed TS 3.7.10 TS Bases pages are required as a result of this change.. The proposed TS Bases changes provided in Reference 1 already include the following which discuss Condition C required actions and Completion Times for Condition B Completion Times not met:
"in MODE 1, 2, 3, or 4, if the inoperable CRVS train or the CRE boundary cannot be restored to OPERABLE status within the required Completion Time, the unit must be placed in a MODE that minimizes accident risk. To achieve this status, the unit must be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems."
The TS Bases changes will be implemented pursuant to TS 5.5.14, "Technical Specifications Bases Control Program."
1
Enclosure 2 PG&E Letter DCL-08-100 Proposed Technical Specification Page 3.7-10 (marked-up) 1
CRVS 3.7.10 3.7 PLANT SYSTEMS 3.7.10 Control Room Ventilation System (CRVS)
LCO 3.7.10 Two CRVS trains shall be OPERABLE.
r -------------- !-----------------------------------------------
K I f"* -r I'-
The Gcontrol Rroom envelope (CRE) boundary may be opened intermittently under I administrative controls.
APPLICABILITY: MODES 1, 2, 3, 4, 5, and 6.
During movement of recently irradiated fuel assemblies.
ACTIONS
NOTE ------------------------------
ACTIONS apply simultaneously to both units.
CONDITION REQUIRED ACTION COMPLETION TIME A. One CRVS train inoperable A.1 Restore CRVS train to 7 days for reasons other than OPERABLE status.
Condition B.
B. T-wo-One or more CRVS B.1 Initiate action to 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s[mmediately trains inoperable due to implement mitigating inoperable GGnt-l actions.
-eemCRE boundary in AND MODE 1, 2, 3, or 4.
B.2 Verify mitigating actions 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ensure CRE occupant exposures to radiological hazards will not exceed limits, and CRE.
occupants are protected from smoke and chemical hazards.
AND B.34-_ Restore GentFol 90 days
-eemCRE boundary to OPERABLE status.
C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion AND Time of Condition A or B not met in MODE 1, 2, 3, or C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> 4.
(continued) 3.7-18 Unit 1 - Amendment No. 4-35,4-63,484*,
Unit 2 - Amendment No. 5,,46-5,4-86&
Enclosure 3 PG&E Letter DCL-08-100 Proposed Technical Specification Page 3.7-10 (retyped)
Remove Page Insert Page 3.7-18 3.7-18 1
CRVS 3.7.10 3.7 PLANT SYSTEMS 3.7.10 Control Room Ventilation System (CRVS)
LCO 3.7.10 Two CRVS trains shall be OPERABLE.
..................-------------------------------------- NOTE -------------------------------------------------------------
The control room envelope (CRE) boundary may be opened intermittently under administrative controls.
APPLICABILITY: MODES 1, 2, 3, 4, 5, and 6.
.- During movement of recently irradiated fuel assemblies.
ACTIONS
NOTE ------------------------------
ACTIONS apply simultaneously to both units.
CONDITION, REQUIRED ACTION COMPLETION TIME A. One CRVS train inoperable A.1 Restore CRVS train to 7 days for reasons other than OPERABLE status.
Condition B.
B. One or more CRVS trains B.1 Initiate action to Immediately inoperable due to implement mitigating inoperable CRE boundary actions.
in MODE 1, 2, 3, or 4. AND B.2 Verify mitigating actions 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ensure CRE occupant exposures to radiological hazards will not exceed limits, and CRE occupants are protected from smoke and chemical hazards.
AND 8.3 Restore CRE boundary 90 days to OPERABLE status.
C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion AND Time of Condition A or B not met in MODE 1, 2, 3, or C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> 4.
(continued) 3.7-18 Unit 1 - Amendment No. 4-35,463,-849, Unit 2 - Amendment No. 4-35,4-65,486-,