TSTF-509 - NRC Acceptance Review and Milestones Letter to TSTF
ML083370157
Person / Time
Site: Technical Specifications Task Force
Issue date: 12/22/2008
From: Williams J
NRC/NRR/DPR/PSPB
To:
Technical Specifications Task Force
Joseph Williams, 415-1470
References
TAC MD9836
Download: ML083370157 (5)


Text

December 22, 2008 Technical Specifications Task Force (TSTF) 11921 Rockville Pike, Suite 100 Rockville, MD 20852

SUBJECT:

ACCEPTANCE FOR REVIEW AND ESTABLISHMENT OF MILESTONE SCHEDULE FOR TSTF TRAVELER 509, REVISION 0, REFORMAT THE CONDITIONS, REQUIRED ACTIONS, AND SURVEILLANCE FOR 3.2.4, QPT (TAC NO. MD9836)

Dear Members of the TSTF,

By letter dated July 2, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML081850186), the TSTF requested that the U.S. Nuclear Regulatory Commission (NRC) review and approve TSTF Traveler 509, Revision 0, Reformat the Conditions, Required Actions, and Surveillance for 3.2.4, QPT [quadrant power tilt], under the Consolidated Line Item Improvement Process (CLIIP).

The NRC staff has completed a preliminary review of your submission and has determined that it is an appropriate submission in that it contains adequate information in order to initiate a more comprehensive review. The enclosed review milestone schedule for the review of TSTF-509, Revision 0, has been established and Technical Assignment Control (TAC) No. MD9836 has been assigned for this task. Current estimates are that it will take approximately 370 staff-hours for the NRC to process TSTF-509, Revision 0.

Section 170.21 of Title 10 of the Code of Federal Regulations requires that TSTF Travelers are subject to fees based on the full cost of the review. You did not request a fee exemption; therefore, staff hours will be billed as requested to the Pressurized Water Reactor Owners Group (PWROG).

Should circumstances lead to anticipated or actual schedule slippage, the causing party should promptly inform and coordinate with the other party to reach a new agreement and publish an appropriately revised schedule. This is of particular importance in connection with TSTF response to NRC staff requests for additional information (RAIs) as failure to provide a timely responsive reply, in accordance with the agreed schedule, or to successfully negotiate a revised schedule, may result in termination of the review process and closure of the TAC. Early completion of any activity will not necessitate schedule revision. Schedule revisions that change the projected Notice of Availability date by more than 2 weeks will be published by letter similar to this and will remain in effect unless superseded by another published schedule.

TSTF I can be contacted at 301-415-1470 or at joseph.williams@nrc.gov, if you have questions regarding this issue.

Sincerely,

/RA/

Joseph F. Williams, Senior Project Manager Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

Enclosure:

As stated cc: See next page

ML083370157 OFFICE ITSB:DIRS BC:ITSB:DIRS LA:SPSB:DPR PM:SPSB:DPR BC:SPSB:DPR NAME GWaig RElliott DBaxley JWilliams SRosenberg DATE 11/28/08 12/02/08 12/15/2008 12/15/2008 12/22/2008 MILESTONE SCHEDULE FOR TSTF TRAVELER 509, REVISION 0, REFORMAT THE CONDITIONS, REQUIRED ACTIONS, AND SURVEILLANCE FOR QPT MILESTONE SCHEDULE DATE Application 7/2/2008 Request for Additional Information (RAI) if needed 1/30/2009 RAI Response from TSTF 4/24/2009 Issue Notice for Comment on Model Safety 7/24/2009 Evaluation and Model Application Issue Notice of Availability for Model Safety 10/24/2009 Evaluation and Model Application Close Out TAC 10/24/2009 ENCLOSURE

Technical Specifications Task Force Mailing List cc:

Techncial Specifications Task Force Donald R. Hoffman 11921 Rockville, Pike EXCEL Services Corporation Suite 100 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Rockville, MD 20852 donaldh@excelservices.com George G. Yates AmerenUE Callaway Plant Brian Mann Junction Hwy. CC and Hwy. O EXCEL Services Corporation Mail Code CA-460 11921 Rockville Pike, Suite 100 P.O. Box 620 Rockville, MD 20852 Fulton, MO 65251 brianm@excelservices.com gyates@ameren.com John Messina First Energy Nuclear Operating Company 76 South Main Street Mail Sto: Akron-GO-14 Akron, OH 44308 jmessina@firstenergycorp.com David Bice Entergy N-GSB64 Russellville, AR 72802 dbice@entergy.com Reene= V. Gambrell Duke Energy Mailcode: ON03RC 7800 Rochester Highway Seneca, SC 29672 RVGambrell@duke-energy.com