From: John Boska Sent: Tuesday, November 18, 2008 3:44 PM To:
'Dorman, Eugene'
Subject:
TAC MD9782, FitzPatrick Licensee Name Change, Acceptance Review By letter dated September 30, 2008 (ML082770069), Entergy submitted a license amendment for the James A. FitzPatrick Nuclear Power Plant. The proposed amendment would revise the names on the plant license as follows:
Old Name New Name Entergy Nuclear FitzPatrick, LLC Enexus Nuclear FitzPatrick, LLC Entergy Nuclear Operations, Inc.
EquaGen Nuclear LLC This is an administrative change which would reflect the creation of new companies as approved by the NRC Order dated July 28, 2008 (ML080940553). The amendment would not be implemented until the restructuring transactions have been completed.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested and follow, as far as applicable, the form prescribed for original applications.
Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact Bhalchandra Vaidya at 301-415-3308.
John Boska Indian Point Project Manager, DORL U.S. Nuclear Regulatory Commission 301-415-2901 email: john.boska@nrc.gov E-mail Properties Mail Envelope Properties ()
Subject:
TAC MD9782, FitzPatrick Licensee Name Change, Acceptance Review Sent Date:
11/18/2008 3:30:45 PM Received Date:
11/18/2008 3:43:00 PM From:
John Boska Created By:
John.Boska@nrc.gov Recipients:
EDorman@entergy.com ('Dorman, Eugene')
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 7444 11/18/2008 Options Expiration Date:
Priority:
olImportanceNormal ReplyRequested:
False Return Notification:
False Sensitivity:
olNormal Recipients received: