Letter Sequence Other |
---|
|
|
MONTHYEARML0824907202008-09-0303 September 2008 SNC Letter to Phil Niebaum Cracked Coupling Project stage: Request ML0832202032008-12-0808 December 2008 Relief Request for Modification to Core Shroud Stabilizer Assemblies Project stage: Other ML0904405782009-02-13013 February 2009 Safety Evaluation and Request for Additional Information, Reactor Core Shroud Relief Request Project stage: Approval ML0903503592009-08-0505 August 2009 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2008-09-03
[Table View] |
Similar Documents at Hatch |
---|
Category:Letter
MONTHYEARML24299A2222024-10-31031 October 2024 Audit Summary for License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components ML24292A1602024-10-22022 October 2024 Request for Withholding Information from Public Disclosure License Amendment Request to Revise Technical Specification Surveillance Requirements to Increase Safety/Relief Valve Setpoints ML24290A0792024-10-18018 October 2024 SLR Environmental Preapplication Meeting Summary ML24303A4102024-10-17017 October 2024 Dir Results Letter to NRC - Hatch - Hurricane Helene IR 05000321/20244012024-10-10010 October 2024 Security Baseline Inspection Report 05000321-2024401 and 05000366-2024401 ML24256A0282024-09-12012 September 2024 2024 Hatch Requal Inspection Corporate Notification Letter NL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc IR 05000321/20240912024-08-27027 August 2024 NRC Investigation Report 2-2023-003 and NOV - NRC Inspection Report 05000321/2024091 and 05000366/2024091 IR 05000321/20240052024-08-26026 August 2024 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 - Report 05000321/2024005 and 05000366/2024005 NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information IR 05000321/20240022024-08-0808 August 2024 Edwin I Hatch Nuclear Plants, Units 1 and 2 – Integrated Inspection Report 05000321-2024002 and 05000366-2024002 NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24198A1252024-07-16016 July 2024 Edwin I Hatch Nuclear Plant Units 1 - 2 Notification of Conduct of Title 10 of the Code of Federal Regulations 50 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-24-0240, Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link2024-07-0303 July 2024 Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link NL-24-0237, Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications2024-07-0303 July 2024 Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 ML24163A0532024-06-14014 June 2024 Audit Plan - Alternative Seismic Method LAR ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations IR 05000321/20240902024-05-15015 May 2024 NRC Inspection Report 05000321-2024090 and 05000366-2024090, Investigation Report 2-2023-003; and Apparent Violation NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0166, Manual Reactor Trip Due to Loss of Feedwater2024-05-0909 May 2024 Manual Reactor Trip Due to Loss of Feedwater NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000032/20240112024-04-25025 April 2024 Notification of Edwin I. Hatch Nuclear Plant - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 0500032/2024011 and 05000366/2024011 NL-24-0157, Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications2024-04-24024 April 2024 Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications IR 05000321/20240012024-04-22022 April 2024 Integrated Inspection Report 05000321/2024001 and 05000366/2024001 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint NL-24-0144, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La)2024-04-0909 April 2024 Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La) NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML24069A0012024-03-0909 March 2024 – Correction of Amendment No. 266 Regarding License Amendment Request Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program (TSTF-425, Revision 3) NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission ML24047A0362024-03-0404 March 2024 Response to Hatch and Vogtle FOF Dates Change Request (2025) NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 IR 05000321/20230062024-02-28028 February 2024 Annual Assessment Letter Edwin I. Hatch Nuclear Plant Units 1 and 2 - Nrc Inspection Report 05000321/2023006 and 05000366/2023006 NL-24-0067, 10 CFR 72.48(d)(2) Biennial Report2024-02-26026 February 2024 10 CFR 72.48(d)(2) Biennial Report NL-24-0051, License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-02-20020 February 2024 License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers 2024-09-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24278A0052024-10-0303 October 2024 Document Request for Hatch Nuclear Plant - IP 92702 Follow-Up Radiation Protection Inspection - Inspection Report 2024-04 ML24211A0162024-07-26026 July 2024 NRR E-mail Capture - Request for Additional Information - Hatch, Units 1 and 2, Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase SRV Setpoints LAR ML24208A1742024-07-26026 July 2024 Request for Additional Information Regarding License Amendment Request to Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase S/Rv Setpoints ML24193A1182024-07-10010 July 2024 Email to SNC with RAI for Hatch Exemption Request ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23250A0472023-09-20020 September 2023 Request for Additional Information Regarding License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts in Technical Specifications Table 1.1-1, Modes ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23018A1872023-01-17017 January 2023 2023 HNP CGD Inspection Information Request ML22355A2082022-12-21021 December 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel 'Rpv Head Studs' LAR ML23026A2372022-11-16016 November 2022 2023001 Hatch RP RFI Final ML22208A1332022-07-26026 July 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR ML22157A3542022-06-0606 June 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR ML22140A1192022-05-20020 May 2022 NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR ML22073A0842022-03-21021 March 2022 an NRC Fire Protection Team Inspection (NRC Inspection Report Nos. 05000321/2022011 and 05000366/2022011) and Request for Information ML22025A2142022-01-21021 January 2022 Plant Hatch 2022001 RP Baseline Inspection Information Request ML21265A3402021-09-22022 September 2021 NRR E-mail Capture - Request for Additional Information - Hatch, Unit 1, Emergency TS 3.7.2 LAR ML21111A3032021-04-21021 April 2021 NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) ML21110A6842021-04-20020 April 2021 NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) ML21013A4112021-01-13013 January 2021 Notification of Edwin I. Hatch Nuclear Plant Design Bases Assurance Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000321/2021010 and 05000366/2021010 ML20293A0752020-10-14014 October 2020 NRR E-mail Capture - RAIs for SNC Fleet EP LAR (L-2020-LLA-0150 and L-2020-LLA-0151) ML20253A2732020-09-0909 September 2020 Requalification Program Inspection Hatch Nuclear Station ML20149K6252020-05-27027 May 2020 NRR E-mail Capture - RAIs for SNC Fleet Fire Protection Exemption Requests NL-19-1532, Units 1 and 2 - Response to Requests for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures. Systems and Components for Nuclear Power Reactors2019-12-18018 December 2019 Units 1 and 2 - Response to Requests for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures. Systems and Components for Nuclear Power Reactors ML19336A0142019-12-0101 December 2019 NRR E-mail Capture - RAI: Hatch Emergency TS 3.7.1 Residual Heat Removal Service Water (RHRSW) System LAR ML19280A0082019-10-0404 October 2019 NRR E-mail Capture - Request for Additional Information (RAI) - Hatch TSTF-51 LAR (L-2019-LLA-0091) ML19224C0552019-08-12012 August 2019 NRR E-mail Capture - RAI - Edwin I. Hatch Nuclear Plant, LAR Regarding Degraded Voltage (L-2019-LLA-0108) ML19220A0362019-08-0808 August 2019 NRR E-mail Capture - RAI - Edwin I. Hatch Nuclear Plant, LAR Regarding Adoption of NFPA 805, Request for Additional Information, EPID L-2018-LLA-0107 ML19164A2582019-06-13013 June 2019 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML19107A4962019-04-17017 April 2019 NRR E-mail Capture - Request for Additional Information - Hatch 1 & 2 Application to Adopt Title 10 of Code of Federal Regulations 50.69 RISK-INFORMED Categorization and Treatment of Structures, Systems and Components for Power Reactors ML19088A0092019-03-29029 March 2019 NRR E-mail Capture - Hatch 1 and 2 - LAR to Adopt NFPA 805 Fire Protection Standard, EPID L-2018-LLA-0107, Request for Additional Information ML19029B3402019-01-23023 January 2019 Southern Nuclear Operating Company, Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 Draft Request for Additional Information for the License Amendment Requests to Adopt the Risk-Informed Provisions of Title 10 of the Code of Federal Regulat ML19016A3422019-01-10010 January 2019 U2 ISI 2019001 RFI - Bcc ML18355A4772019-01-0404 January 2019 Request for Additional Information Revise TS 5.2.2.g and Update Emergency Plan Minimum On-Shift Staff Tables ML18337A4032018-12-0606 December 2018 Request for Additional Information Revise Technical Specification 5.2.2.G and Updating Emergency Plan Minimum On-Shift Staff Tables ML18085A0132018-03-0808 March 2018 Draft Request for Additional Information on Alternative RR-V-11, Proposed Extension to Main Steam Safety Relief Valve Testing Requirements ML18058A0812018-02-27027 February 2018 Enclosurequest for Additional Information(Rai for Review of Southern Nuclear Operating Company'S Decommissioning Funding Plan Updates for Joseph M. Farley,Unit 1 and 2;Edwin I. Hatch,Units 1 and 2; and Vogtle Electric Generating Plant, Unit ML17306A0872017-11-0808 November 2017 Request for Additional Information Regarding the Decommissioning Funding Status Reports (EPID L-LRO-2017-0008) ML17284A3542017-11-0707 November 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools ML17270A1402017-09-27027 September 2017 PIR Notification Letter 2017 ML17290A3172017-09-19019 September 2017 NRR E-mail Capture - Hatch 1 and 2 - Draft Request for Additional Information Request for Alternative No. HNP-ISI-ALT-05-05 ML17111A5792017-04-26026 April 2017 Request for Additional Information, Fourth 10-Year ISI Interval Relief Requests ML17110A2112017-04-24024 April 2017 Request for Additional Information ML16330A1282016-12-0505 December 2016 Request for Additional Information ML16307A1842016-11-0202 November 2016 Request for Additional Information (Non-Proprietary) ML16271A1692016-10-17017 October 2016 Request for Additional Information ML16222A2952016-08-29029 August 2016 Request for Additional Information ML16205A0012016-07-22022 July 2016 Requalification Program Inspection - Plant Hatch 2024-07-26
[Table view] |
Text
December 8, 2008 Mr. M. J. Ajluni Manager, Nuclear Licensing 40 Inverness Center Parkway PO Box 1295 Birmingham, AL 35201
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT, UNIT NO 2, REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST FOR MODIFICATION TO CORE SHROUD STABILIZER ASSEMBLIES, (TAC NO. MD9579)
By letter dated September 3, 2008 to the U.S. Nuclear Regulatory Commission (NRC), Southern Nuclear Operating Company (SNC, the licensee) submitted a request for authorization under the provisions of Title 10 of the Code of Federal Regulations 50.55a(a)(3)(i) for modification of the core shroud stabilizer assemblies (tie rods) for the Edwin I. Hatch Nuclear Plant, Unit 2. The NRC staff reviewed the information and identified that additional information is needed to complete the review. The NRC staff request for additional information (RAI) is enclosed. We request that SNC respond to this RAI within thirty (30) days of the date of this letter.
Sincerely,
/RA/
Robert E. Martin, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-366 cc: Distribution via ListServ
Mr. M. J. Ajluni Manager, Nuclear Licensing 40 Inverness Center Parkway PO Box 1295 Birmingham, AL 35201
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT, UNIT NO 2, REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST FOR MODIFICATION TO CORE SHROUD STABILIZER ASSEMBLIES, (TAC NO. MD9579)
By letter dated September 3, 2008 to the U.S. Nuclear Regulatory Commission (NRC), Southern Nuclear Operating Company (SNC, the licensee) submitted a request for authorization under the provisions of Title 10 of the Code of Federal Regulations 50.55a(a)(3)(i) for modification of the core shroud stabilizer assemblies (tie rods) for the Edwin I. Hatch Nuclear Plant, Unit 2. The NRC staff reviewed the information and identified that additional information is needed to complete the review. The NRC staff request for additional information (RAI) is enclosed. We request that SNC respond to this RAI within thirty (30) days of the date of this letter.
Sincerely,
/RA/
Robert E. Martin, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-366 cc: Distribution via ListServ DISTRIBUTION:
PUBLIC RidsOgcRp Resource LPL2-1 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl2-1 Resource RidsRgn2MailCenter Resource RidsNrrLAgLappert Resource RidsNrrDeEcvib Resource RidsNrrPMRMartin Resource RidsNrrDorlDPR Resource Accession Number: ML083220203 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA DCI/CVIB/BC NRR/LPL2-1/BC NAME RMartin GLappert MMitchell, by memo dtd MWong (LOlshan for)
DATE 12/8/08 11/18/08 11/06/08 12/8/08 OFFICIAL RECORD COPY
REQUEST FOR ADDITIONAL INFORMATION RELATED TO REQUEST FOR AUTHORIZATION FOR MODIFICATION OF THE CORE SHROUD STABILIZER ASSEMBLIES EDWIN I. HATCH NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-366 By letter dated September 3, 2008 to the U.S. Nuclear Regulatory Commission (NRC)
(Agencywide Document Access and Management System (ADAMS) Accession No. ML082490720), Southern Nuclear Operating Company (SNC, the licensee), submitted a request for authorization under the provisions of Title 10 of the Code of Federal Regulations 50.55a(a)(3)(i) for modification of the core shroud stabilizer assemblies (tie rods) for the Edwin I.
Hatch Nuclear Plant, Unit 2 (Hatch-2). The licensee proposes to replace the tie rod upper supports with a modified upper support design capable of operation through the end of the renewed operating license term. The NRC staff has reviewed the information that the licensee provided to support the proposed request and requires additional information from the licensee.
- 1. Section 7.2.2 of Enclosure 1 in the September 3, 2008, letter indicates that SNC will inspect the upper support arm inner and outer corner radius locations during the 2011 refueling outage and on a 10-year interval thereafter. The technique used will be VT-1, visual examination, as described in the 2001 Edition of the American Society of Mechanical Engineers (ASME) Code, Section Xl, with 2003 Addenda. The upper support is fabricated using Alloy X-750 material.
Section 2, ABackground,@ in Enclosure 1 to the September 3, 2008, letter indicates that the cause of the cracking in the upper supports in the shroud stabilizer assembly was intergranular stress corrosion cracking (IGSCC) of the Alloy X-750 material. Alloy X-750 material is susceptible to IGSCC if subjected to sustained, large peak stress conditions.
The Boiling Water Reactor Vessel and Internals Project (BWRVIP) issued letters dated March 29, 2006, and April 3, 2006, requiring plants with core shroud tie rod repairs to inspect their repairs at their next scheduled refueling outage. These letters indicated that inspections should include all the same or similar locations where indications were observed at Hatch, Unit 1 (Hatch-1) during the units 2006 refueling outage and that consideration should also be given to other locations in the tie rod repair where X-750 material is used and which may experience high-sustained stresses.
a) The licensee is requested to identify all Alloy X-750 components, excluding the replacement tie rod upper support, in the primary vertical and horizontal load paths of the core shroud stabilizer assembly.
b) The licensee is requested to identify design changes that are proposed to reduce the total stress in the Alloy X-750 components, excluding the replacement tie rod upper support, to reduce their sustained, peak stresses to a value below the IGSCC susceptibility criteria.
Enclosure
c) The licensee is requested to identify when the components identified in the response to RAI-1a were previously inspected for IGSCC and to identify the results from the inspection.
d) The licensee is requested to identify the proposed frequency of inspection for the Alloy X-750 components identified in RAI-1a and what type of inspection will be performed to ensure that potential IGSCC in these Alloy X-750 components will be promptly identified.e) The licensee is requested to explain why VT-1 examination was chosen as the inspection method for detecting IGSCC at the upper support arm inner and outer corner radius locations.
- 2. Please identify the water chemistry (i.e., hydrogen addition, noble metal addition, etc.)
controls that have been instituted, or will be instituted, at Hatch-2 to reduce the susceptibility of Alloy X-750 and austenitic stainless steel to IGSCC. What impact does this water chemistry control have on the susceptibility to IGSCC of the replacement tie rod upper support and tie rod top nuts?
- 3. In the licensees August 14, 2007, letter requesting approval of the Hatch-1 core shroud stabilizer modification, the licensee indicated that its Post-Modification Inspection Plan, Prior to RPV Assembly, would include an inspection of the support plate gusset and attachment welds. Since the integrity of the support plate gusset and attachment welds are necessary for maintaining tie rod preload, the staff believes inspection of these plates and welds is necessary. Section 7.2.1 of Enclosure 1 to the September 3, 2008, letter does not include inspection of the gusset plate welds and attachment welds. The NRC staff requests that the licensee either include the gusset plate and attachment welds in the reinspection plan or explain why reinspection is not necessary. The licensee is requested to identify its plan for reinspection of the gusset plate and attachment welds at future refueling outages.
- 4. Section 4.0 in Enclosure 3 to the September 3, 2008 letter indicates that several components (i.e., tie rod nut, support, etc.) in the Hatch-2 core shroud stabilizer modification will be fabricated using Alloy XM-19 austenitic stainless steel material (these components in the Hatch-1 core shroud stabilizer modification were fabricated using Alloy X-750 and Type 316 austenitic stainless steel material). Section 6.3 of Enclosure 1 in the September 3, 2008, letter indicates that surface cold work in austenitic stainless steel material was addressed by controlling machining in accordance with demonstrated procedures or solution annealing of the component subsequent to machining. For all components fabricated using austenitic stainless steel material, the licensee is requested to identify the heat treatment and surface cold work limitations for machining that were instituted to prevent IGSCC. Describe the tests performed to demonstrate that the heat treatment and surface cold work limitations will prevent IGSCC.
- 5. Section 5.2.1 in Enclosure 3 to the September 3, 2008 letter, indicates that no specific criterion for prevention of IGSCC in Alloy XM-19 material is specified in BWRVIP-84, BWR Vessel and Internals Project Guidelines for Selection and Use of Materials for Repair to BWR Internal Components, however, General Electric-Hitachi Nuclear Energy (GEH) has specified a maximum plastic strain limit to assure the materials are not susceptible to IGSCC. Please provide data and analyses that demonstrate that the
maximum plastic strain limit for Alloy XM-19 material will assure that the Alloy XM-19 material is not susceptible to IGSCC.
- 6. Section 3 of Enclosure 3 and Section 3.3 of Enclosure 1, show the replacement upper support components and contain a brief description of the components that will be repaired/replaced. Please provide a drawing (or pictorial) that illustrates the differences between the original and the proposed replacement upper components for comparison.
Also identify, dimensionally, the proposed changes to the shroud head flange.
7.a. Section 4.1.1.2 of Enclosure 1 states (in two places) that details of the GE structural analysis and results are provided in Attachment 2. Please confirm that the GE structural analysis is contained in Enclosure 3 of the application and not Attachment 2, or provide attachment 2.
7.b. Section 4.1.1.2 of Enclosure 1 also states that Structural Integrity Associates, Inc.
performed an independent third party review of the GE analysis and developed a separate ANSYS finite element analysis, the results of which compared favorably to the GE results.
Please provide a comparison of the results of the two analyses for the replacement upper support assembly parts for NRC staff review.
8.a Please describe in detail the proposed changes to the core shroud.
8.b Please clarify whether the proposed modification impacts the existing shroud stress analysis and how it has been documented.
8.c Please povide a summary of the stresses in the shroud flange due to analyzed loading conditions and due to the proposed geometry changes to the shroud head flange, along with a comparison to ASME code allowable values.
8.d Please confirm that, with the exception of the proposed modification to the shroud head flange, there are no other contact areas between the upper core shroud support assembly and core shroud that have been changed.
- 9. Section 5.3.1 of the stress analysis report (Enclosure 3) states that: The gap between the upper support and the shroud head flange is conservatively not included in the model. The contact between the top surface of the upper support and the shroud head flange would reduce the stresses in the upper support.
a) Please confirm that this is the vertical gap between the upper support and the shroud head flange.
b) Please verify that the statement, that the contact between the top surface of the upper support and the shroud head flange would reduce the stresses in the upper support, refers to the rotation of the upper support arms.
c) Please explain, under what conditions this gap is expected to close and why a horizontal force due to upper head shroud area thermal expansion against the upper support arms has not been considered.