ML082970276
| ML082970276 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 12/15/2008 |
| From: | Leeds E Office of Nuclear Reactor Regulation |
| To: | Archie J South Carolina Electric & Gas Co |
| Martin R, NRR/DORL, 415-1493 | |
| References | |
| TAC MD6874 | |
| Download: ML082970276 (8) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 15, 2008 Mr. Jeffery B. Archie Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station PO Box 88 Jenkinsville, SC 29065
SUBJECT:
VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO.1, SAFETY EVALUATION FOR EMERGENCY ACTION LEVELS (TAC NO. MD6874)
Dear Mr. Archie:
By application dated September 28, 2007, to the U.S. Nuclear Regulatory Commission (NRC)
(Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910526), supplemented by letters dated October 11,2007, August 15, September 24, and October 9,2008 (ADAMS Accession Nos. ML072910529, ML082380246, ML082740421, and ML082840701, respectively), South Carolina Electric and Gas Company (SCE&G, the licensee), requested prior I'JRC approval for proposed changes to the emergency action levels (EALs) for the Virgil C. Summer Nuclear Station (VCSNS).
The requested changes to the licensee's EALs support a conversion from the current EAL scheme to a scheme based on Nuclear Energy Institute 99-01, "Methodology for Development of Emergency Action Levels" (Revision 5, February 2008). SCE&G currently uses an EAL scheme based on I'JUREG-0654, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants."
After performing a review of the proposed changes to the VCSNS EALs, the NRC staff determined that the licensee's incorporation of the proposed changes meets the standards in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.47(b) and the requirements of Appendix E t01 0 CFR Part 50, and provides reasonable assurance that the licensee can and will take adequate protective measures in the event of a radiological emergency. Therefore, the NRC staff concludes, as stated in further detail in the enclosure, that the licensee's proposed changes to the EALs for VCSNS, as outlined in its five submittals listed above, are acceptable.
J. Archie
-2 The licensee must implement the EALs as approved by the NRC (Le., as provided in of the licensee's letter dated September 24, 2008), which includes the implementation of the Emergency Action Level Design Basis Document. If the licensee changes the EALs via 10 CFR 50.54(q) prior to implementation, the licensee shall ensure that the changes are provided to the NRC during the next Emergency Preparedness baseline inspection.
Sincerely, Eric. Leeds, Director Office of Nuclear Reactor Regulation Docket No. 50-395
Enclosure:
Safety Evaluation cc: Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION PROPOSED REVISIONS TO EMERGENCY ACTION LEVELS VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 SOUTH CAROLINA ELECTRIC AND GAS DOCKET NO. 50-395
1.0 INTRODUCTION
By application dated September 28,2007, to the U.S. Nuclear Regulatory Commission (NRC)
(Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910526), supplemented by letters dated October 11, 2007, August 15, September 24, and October 9,2008 (ADAMS Accession Nos. ML072910529, ML082380246, ML082740421, and ML082840701, respectively), South Carolina Electric and Gas Company (SCE&G, the licensee), requested prior NRC approval for proposed changes to the emergency action levels (EALs) for the Virgil C. Summer Nuclear Station, Unit 1 (VCSNS).
The requested changes to the licensee's EALs support a conversion from the current EAL scheme to a scheme based on Nuclear Energy Institute (NEI) 99-01, "Methodology for Development of Emergency Action Levels" Revision 5, February 2008, (Reference 1). SCE&G currently uses an EAL scheme based on NUREG-0654, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants."
2.0 REGULATORY EVALUATION
The NRC staff reviewed the proposed revision against the regulations and guidance described below.
2.1 Regulations Section 47 of Part 50, "Domestic Licensing of Production and Utilization Facilities," in Title 10 of the Code of Federal Regulations (10 CFR 50.47) sets forth emergency plan requirements for nuclear power plant facilities. Paragraph 50.47(a)(1 )(i) states that"... no initial operating license for a nuclear power reactor will be issued unless a finding is made by the NRC that there is reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency." Section 50.47(b) establishes the standards that the onsite and offsite emergency response plans must meet for NRC staff to make a positive finding that there is reasonable assurance that adequate protective measures can and will be taken in the event of a ENCLOSURE
- 2 radiological emergency. One of these standards (10 CFR 50,47(b)(4)) stipulates that emergency plans include a standard emergency classification and action level scheme.
Section IV.B to Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities," to 10 CFR Part 50, states that emergency plans are to include:
"... emergency action levels that are to be used as criteria for determining the need for notification and participation of local and State agencies, the Commission, and other Federal agencies, and the emergency action levels that are to be used for determining when and what type of protective measures should be considered within and outside the site boundary to protect health and safety." EALs shall be based on in-plant conditions and instrumentation in addition to onsite and offsite monitoring.Section IV.B requires that the EALs shall be reviewed with the State and local governmental authorities on an annual basis.Section IV.B of Appendix E also requires that a revision to the EALs must be approved by the !\\IRC before implementation if: "(1) The licensee is changing from one emergency action level scheme to another emergency action level scheme (e.g., a change from an emergency action level scheme based on NUREG-0654 to a scheme based upon NUMARC/NESP-007 or NEI 99-01 )."
2.2 Guidance The NRC staff, in a letter dated February 22, 2008, from Christopher Miller to Alan Nelson (ADAMS Accession No. ML080430535), concluded that the guidance contained in "lEI 99-01, Revision 5, "Methodology for Development of Emergency Action Levels," dated February 2008 (ADAMS Accession No. ML080450149), is an acceptable alternative method to develop an EAL scheme that meet the requirements of Section IV of Appendix E to 10 CFR Part 50 and 10 CFR 50,47(b)(4).
The following methods are also acceptable to the NRC staff for developing EALs that meet the requirements of Section IV of Appendix E to 10 CFR Part 50 and 10 CFR 50,47(b)(4):
Appendix 1 to NUREG-0654/FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," dated November 1980; NUMARC/NESP-007, Revision 2, "Methodology for Development o'f Emergency Action Levels," dated January 1992; NEI 99-01, Revision 4, "Methodology for Development of Emergency Action Levels," dated January 2003.
Guidance is also provided in Regulatory Issue Summary (RIS) 2003-18, with Supplements 1 and 2, "Use of NEI 99-01, Methodology for Development of Emergency Action Levels" (ADAMS Accession l\\Ios. ML032580518, ML041550395, and ML051450482, respectively). This provides guidance for developing or changing a standard emergency classification and action level scheme. In addition, this RIS provides recommendations to assist licensees, consistent with Section IV.B to Appendix E of Part 50, in determining whether to seek prior NRC approval of deviations from the guidance.
- 3
3.0 TECHNICAL EVALUATION
The proposed changes were submitted to the NRC for approval prior to implementation by the licensee, as required under Section IV.B of Appendix E to 10 CFR Part 50.
This evaluation is based on a revision to EALs provided in the licensee's application letter and supplemented by the licensee's responses to the NRC's requests for additional information.
The VCSNS currently utilizes an EAL scheme based on NUREG-0654, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants." The licensee is converting to an EAL scheme based on NEI 99-01, Revision 5, dated February 2008.
In its application and supplemental letters, the licensee submitted the proposed EALs for the VCSNS, their technical basis, a comparison matrix, the EAL numbering scheme, and an explanation for any difference or deviation from NEI 99-01, Revision 5. The comparison matrix provided a cross reference relating the proposed EAL scheme to the EALs in I\\lEI 99-01, Revision 5. The NRC staff has reviewed the technical basis for the proposed EALs, the differences or deviations from NEI 99-01, Revision 5, and the licensee's justifications.
Therefore, the NRC staff reviewed the proposed EALs against the guidance in NEI 99-01, Revision 5, to determine if the EALs for VCSNS, as provided in it's application and supplemental letters, meet the guidelines in that document. The following NEI 99-01, Revision 5 guidelines were considered in the staff review:
Consistency (i.e., the EALs would lead to similar decisions under similar circumstances at different plants);
Human engineering and user friendliness; Potential for classification upgrade only when there is an increasing threat to public health and safety; Ease of upgrading and downgrading; Thoroughness in addressing and disposing of the issues of completeness and accuracy raised regarding Appendix 1 to NUREG-0654; Technical completeness for each classification level; Logical progression in classification for multiple events; Objective, observable values; The NRC staff reviewed the proposed EALs and has determined that the proposed EALs are consistent with EALs implemented at similarly designed plants, use objective and observable values, and are consistent with the intent of NEI 99-01, Revision 5.
- 4 The NRC staff reviewed the proposed EALs to determine if the proposed EALs are worded in a manner that addresses human engineering and user friendliness concerns. The proposed EALs use procedure language, including specific tag numbers for instrument readings and alarms; use flow charts, critical safety function status trees, check lists, and combinations of the above. Based on this review, the staff has determined that the proposed EALs meet the guidelines in NEI 99-01, Revision 5, in this area.
The NRC staff reviewed the proposed EAL sets which are groups of EALs within a category related to a common concern. For example, an Unusual Event, Alert, Site Area Emergency, and General Emergency related to a failure of the plant to shutdown via an automatic scram would be considered an EAL set. The NRC staff has determined that classification upgrades are based upon an increasing threat to public health and safety, can effectively support upgrading and downgrading, and follow a logical progression for multiple events. Based on this review, the NRC staff concludes that the EALs are in accordance with the intent of NEI 99-01, Revision 5, in these areas.
The NRC staff also reviewed the proposed EALs for technical completeness and accuracy for each classification level. The proposed EALs are based on risk assessment to set the boundaries of the emergency classification levels and assure that all EALs that trigger that emergency classification are in the same range of relative risk. Precursor conditions of more serious emergencies also represent a potential risk to the public and are appropriately classified. The NRC staff has determined that the proposed EALs are consistent with NEI 99-01, Revision 5, which has been determined to be an acceptable alternative to EALs based on NUREG-0654, Appendix 1.
Based on its review of the proposed EALs, the NRC staff concludes that these EALs meet the guidelines in NEI 99-01, Revision 5, for all of the areas listed above in this section.
4.0 CONCLUSION
The I\\lRC staff performed a technical and regulatory review of the proposed changes to the V.C.
Summer EALs. The staff has determined that the proposed changes meet the guidelines in NEI 99-01, Revision 5, which is an acceptable method for development of an EAL scheme that meets the regulatory requirements. Based on this, the staff concludes that the proposed EALs meet the standards in 10 CFR 50.47(b) and the requirements in Appendix E to 10 CFR Part 50 and provide reasonable assurance that the licensee will take adequate protective measures in a radiological emergency. Therefore, based on this conclusion, the NRC staff determines that the proposed EAL changes are acceptable.
5.0 REFERENCES
- 1.
NEI 99-01, Revision 5, "Methodology for Development of Emergency Action Levels,"
February 2008 (ADAMS Accession No. ML080450149).
- 2.
Regulatory Issue Summary 2003-18, with Supplements 1 and 2, "Use of NEI 99-01, Methodology for Development of Emergency Action Levels," January 2003 (ADAMS Accession No's. IVIL032580518, IVIL041550395, and IVIL051450482).
- 5
- 3.
Regulatory Guide 1.101, Revision 4, "Emergency Planning and Preparedness for Nuclear Power Reactors," dated July 2003 (ADAMS Accession No. ML032020276).
- 4.
NUREG-0654, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" (ADAMS Accession No. ML040420012).
- 5.
Letter, C. Miller, NRC, to A. Nelson, NEI, NRC Review and Endorsement of NEI 99-01, Revision 5, dated February 22,2008 (ADAMS Accession No. ML080430535).
Principal Contributor: D. Johnson Issuance Date:
December 15, 2008
December 15, 2008 J. Archie
-2 The licensee must implement the EALs as approved by the !\\IRC (i.e., as provided in of the licensee's letter dated September 24, 2008), which includes the implementation of the Emergency Action Level Design Basis Document. If the licensee changes the EALs via 10 CFR 50.54(q) prior to implementation, the licensee shall ensure that the changes are provided to the NRC during the next Emergency Preparedness baseline inspection.
Sincerely, IRA!
Eric J. Leeds, Director Office of Nuclear Reactor Regulation Docket No. 50-395
Enclosure:
Safety Evaluation cc: Listserv DISTRIBUTION:
PUBLIC LPL2-1 r/f RidsAcrsAcnw_MailCTR Resource RidsNrrOd Resource RidsNrrAdes Resource RidsNrrAdro Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl2-1 Resource RidsN rrLAGLappert Resource RidsNrrPMRMartin Resource RidsNrrREnnis Resource RidsNsirDprDdep Resource RidsOgcRp Resource RidsRgn2MailCenter Resource MNorris, NSIR/DPR/DDEP ADAMS Accession No.: ML082970276
- SE input memo OFFICE NRR/DORULPL2-1/PM NRR/DORULPL2-1/LA NSIR/DPR/DDEP/BC
- I\\lAME RMartin GLappert KWilliams DATE 11 /7 108 11/7 108 10/10108 OFFICE NRR/DORULPL2-1/BC NRR/DORUD NRR/D NAME MWong (LOlshan for)
UGiitter ELeeds DATE 11/7 108 12/2/08 12/15/08 OFFICIAL AGENCY RECORD