Withdrawal of Remote Shutdown and Post-Accident Monitoring Instrumentation TS Change
ML062720123
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/27/2006
From: Johnston G
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2006-227
Download: ML062720123 (1)


Text

0 Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 September 27, 2006 FPL L-2006-227 10 CFR 50.90 U. S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 RE: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Withdrawal of Remote Shutdown and Post-Accident Monitoring Instrumentation TS Change In FPL letter L-2005-056 dated April 21, 2005, FPL proposed changes to the St. Lucie Technical Specifications based on generic changes that have been made to the Improved Standard Technical Specifications (ISTS), NUREG-1432, Standard TechnicalSpecificationsfor Combustion EngineeringPlants, based on Technical Specifications Task Force (TSTF) travelers that were previously reviewed and approved by the Nuclear Regulatory Commission. FPL also proposed changes to remote shutdown and post-accident monitoring instrumentation based on the ISTS.

Subsequent FPL interactions with the NRC staff on the proposed remote shutdown and post-accident monitoring instrumentation changes led to the FPL decision to withdraw the proposed changes related to the remote shutdown and post-accident monitoring instrumentation.

Please contact Ken Frehafer at (772) 467-7748 if there are any questions on this matter.

Very truly yours, dLidOhnsto:,*

2ordoL.Jhs Vice President St. Lucie Plant GU/KWF cc: Mr. W. A. Passetti, Florida Department of Health and Rehabilitative Services an FPL Group company