I Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 September 23, 2008 10 CFR 50.71 (e)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:

in the Matter of

)

Docket No. 50-390 Tennessee Valley Authority

'WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 - UPDATED FINAL SAFETY ANALYSIS REPORT (UFSAR) AMENDMENT 7 Pursuant to 10 CFR 50.71 (e), the enclosed compact disc (CD-ROM) contains Amendment 7 of WBN's UFSAR. TVA is submitting this amendment in accordance with NRC's Electronic Information Exchange.

This update reflects changes and analyses made since the issuance of Amendment 6 on May 30, 2007. It also includes editorial corrections and changes in design pursuant to 10 CFR 50.59, Changes, Tests, and Experiments. The summaries of evaluations of these changes made under the provisions of 10 CFR 50.59 are being provided to NRC by separate letter.

This letter certifies that the information provided in the enclosed Amendment 7 accurately reflects information and analysis from changes made since the issuance of Amendment 6. If you have any questions concerning this matter, please call me at (423) 365-1824.

There are no regulatory commitments associated with this submittal.

I declare under penalty of perjury that the foregoing is true and correct. Executed on this 23rd day of September, 2008.

Sincerely, M. K. Brandon Manager, Site Licensing and Industry Affairs Enclosure cc: See Page 2 Ac$

ýA

U.S. Nuclear Regulatory Commission Page 2 September 23, 2008 Enclosure cc (Enclosure):

NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 ATTN: Patrick D. Milano, Project Manager U.S. Nuclear Regulatory Commission Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation MS 0-8 H4 Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303

ENCLOSURE Watts Bar Nuclear Plant Updated Final Safety Analysis Report Amendment 7 (Provided on Enclosed Compact Disc)