James A. Spina Calvert Cliffs Nuclear Power Plant, Inc.
Vice President 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410.495.5200 410.495.3500 Fax r-fti",c:tellati n En gy Nuclear Ge eration roup October 14, 2008 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
SUBJECT :
Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. I & 2; Docket Nos. 50-317 & 50-318 Nine-Month Response to NRC Generic Letter 2008-01, "Managing Gas Accumul ation in Emergency Core
- Cooling, Decay Heat
- Removal, and Containment Spray Systems" The Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01 (Reference a) to request that each licensee evaluate the licensing basis, design, testing, and corrective action programs for the Emergency Core Cooling Systems, Decay Heat Removal system, and Containment Spray system, to ensure that gas accumulation is maintained less than the amount that challenges operab ility of these systems, and that appropriate action is taken when conditions adverse to quality are identified.
Reference (a) requested each licensee to submit a written response in accordance with 10 CFR 50.54(t) within nine months of the date of the GL, consistent with the requested actions and information.
Attachment (l ) to this letter contains our nine-month response to NRC GL 2008-01.
Additionally, the NRC requested that if a licensee cannot meet the requested response date, the licensee "shall provide a response within 3 months of the date of this GL." In the three month response, we were requested to describe the alternate course of action that we proposed to take, including the basis for the acceptability of the proposed alternative course of action. In Reference (b), as revised in Reference (c),
we provided our three-month response to the requested information in NRC GL 2008-01 for Calvert Cliffs Unit 2, describing the alternative course of action we proposed to take.
As documented in Reference (d), the NRC staff reviewed our proposed alternati ve course of action and concluded that for Calvert Cliffs Unit 2, with the exception of clarifications and associated requests discussed in the enclosure to Reference (d), our proposed alternati ve course of action related to our nine-month supplemental (post-outage) response was acceptable.
Reference (d) requested that we submit a three-month supplemental response to revise our proposed alternative course of action. Reference (e) is our three-month supplemental response to NRC GL 2008-01 for both Unit 1 and Unit 2.
Document Control Desk October 14, 2008 Page 2 Should you have questions regarding this matter, please contact Mr. Jay S. Gaines at (410) 495-5219.
COMMONWEALTH OF VIRGINIA TO WIT:
CITY OF LYNCHBURG I, James A. Spina, being duly sworn, state that I am Vice President - Calvert Cliffs Nuclear Power Plant, Inc. (CCNPP), and that I am duly authorized to execute and file this response on behalf of CCNPP. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other CCNPP employees and/or consultants.
Such information has been reviewed in accordance with company practice and I believe it to be reliable.
SUbscribJ,d and sworn before me, a Notary Public in and for the Commonwealth of Virginia, this ~ day of October, 2008.
WITNESS my Hand and Notarial Seal:
My Commission Expires:
JAS/ALS/bjd
REFERENCES:
'1 f., I '....:....::
W =.-'-':::(0'---_
~ Date (a)
NRC Generic Letter 2008-01, dated January I I, 2008, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (b)
Letter from Mr. J. A. Spina (CCNPP) to Document Control Desk (NRC), dated April I 1,2008, Three-Month Response to NRC Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems"
Document Control Desk October 14, 2008 Page 3 (c)
Letter from Mr. J. A. Spina (CCNPP) to Document Control Desk (NRC), dated June 25, 2008,
Change to Three-Month
Response
to NRC Generic Letter 2008-0 I, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (d)
Letter from Mr. M. G. Kowal (NRC) to Mr. J. A. Spina (CCNPP), dated August 4,2008, Calvert Cliffs Nuclear Power Plant Unit 2-Re: Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," Proposed Alternative Course of Action (TAC No. MD7808)
(e)
Letter from Mr. J. A. Spina (CCNPP) to Document Control Desk (NRC), dated October 10,2008, Three-Month Supplemental
Response
to NRC Generic Letter 2008-0I, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems"
Attachment:
(I)
CCNPP Nine-Month Response to Generic Letter 2008-0 I cc:
D. V. Pickett, NRC S. J. Collins, NRC Resident Inspector, NRC S. Gray, DNR