Nine Mile Point 2 Extended Power Uprate Impact on Steam Dryer NRC Meeting September 9, 2008 The way energy 'J\,orks~~

Agenda

  • Meeting Objectives
  • EPU Project Schedule
  • Plant Information
  • Steam Dryer Overview
  • Acoustic Loads
  • Dryer Stresses
  • Remaining Open Issues z

Meeting Objectives

  • Provide Status of Current Dryer Analysis
  • Discuss NRC expectations for Steam Dryer Evaluation
  • Discuss Remaining Open Steam Dryer Items

NMP2 EPU Timeline 2006 2007 2008 I 2009 I 2010 I 2011 I 2012_

,... ,... co co co or r N CD o o o r o

...III o

... 1;' .Q >

o ... U

-e

...Q.

III III lQ

E

~ :E lQ o

III

-c

Pi :E :E U. o Receive NRC Submit EPU Approval of to NRC MELLLA+

(if pursued)

RFO 13 t,

Receive NRC Approval of ARTS/MELLLA Start EPU it conceptual LLLA phase C Submit MELLLA+ to commen NRC how to a 1200/00L 4

Plant Information

  • Nine Mile Point Unit :2

- GE BWR 5 Operating License in 1986 - 3323 MWt

- In 1995, uprated to 104.3% OLTP - 3467 MWt

- Extended Power Uprate to 120% OLTP - 3988 MWt

  • CLTP and EPU rated core flow = 108.5 Mlbm/hr
  • CLTP and EPU operating dome pressure = 1035 psia
  • NMP2 has two constant speed recirculation pumps with flow control valves.

5

Steam Dryer Integrity Evaluation Methods

- BWRVIP-182 "Guidance for Demonstration of Steam Dryer Integrity for Power Uprate" BWRVIP-181 "Steam Dryer Repair Design Criteria" BWRVIP LTR "Methodologies for Demonstrating Steam Dryer Integrity for Power Uprate" BWRVIP-139 "Steam Dryer Inspection and Flaw Evaluation Guidelines" 6

Steam Dryer Information

  • BWR-5 251 Curve Hood

- Figure 2-37 BWRVIP-139

- NMP2 design incorporates the structural reinforcements:

  • Center outlet plenum 0.5"
  • Tie Bars 2"x 2"
  • Two sided fillet on middle and inner hood to end plate
  • Inner hood reiniorcement strip (BWRVIP figure 2-44) in 2004
  • Support lugs 011 RPV leveled prior to service 7

Steam Dryer Inspection Baseline

  • NMP2 has completed the BWRVIP-139 baseline inspections for curved hood dryers

- IGSCC cracking identified

  • Extent and location consistent with industry experience as noted in BWRVIP,-139 section 2
  • The IGSCC has been evaluated as not structurally significant per BWRVIP-139 guidance.

Fatigue Flaw Identified in 2004 related to undersized weld at inner hood to end plate

  • Location repaired in 2004 with reinforcement 8

Steam Dryer Comparison Overview MSL MSL Dryer Type EPU MSL Branch Velocity Velocity Ops Line OLTP EPU Ft/sec Ft/sec VY 140 168 Square 120% OLTP none QC 168 202 Square 117% OLTP none Mont 146 179 Square 120% OLTP none HC 141 167 Curved 116.6% none OLTP Susq 128 153 Curved 120% OLTP Yes BF 1,2,3 135 CLTP 153 Slanted 120% OLTP Yes NMP2 143 177 Curved 120% OLTP none 9

Proprietary Information SLIDES 11 through 23 CONTAIN COl and BWRVIP PROPRIETARY INFORMATION 10

Summary

  • Status of Current Dryer Analysis
  • NRC expectations for Steam Dryer Evaluation

- Complete Steam dyer evaluation consistent with BWRVIP-182 and BWRVIP LTR for CDI methods

  • Resolution of Open Steam Dryer Items

- Plan to submit with a alternating stress margin of >2

- Plan to address IGSCC impact on FIV analysis 24