Acceptance Review for License Amendment Request Numbers 247 Spent Fuel Pool Criticality Control
ML082671113
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/25/2008
From: Jack Cushing
Plant Licensing Branch III
To: Meyer L
Florida Power & Light Energy Point Beach
Cushing, J S, NRR/DORL/LPLIII-1,415-1424
References
TAC MD9321, TAC MD9322
Download: ML082671113 (3)


Text

September 25, 2008 Mr. Larry Meyer Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNTIS 1 AND 2, ACCEPTANCE REVIEW FOR LICENSE AMENDMENT REQUEST NUMBER 247 SPENT FUEL POOL CRITICALITY CONTROL (TAC NOS. MD9321 AND MD9322)

Dear Mr. Meyer:

By letter dated July 24, 2008, to the U.S. Nuclear Regulatory Commission (NRC), FPL Energy Point Beach, LLC (FPL, the licensee) submitted a license amendment application to revise the Point Beach Nuclear Plant (PBNP), Units 1 and 2, licensing basis to reflect a revision to the spent fuel pool (SFP) criticality analysis methodology. The NRC staff reviewed your application and found that supplemental information was needed to complete the acceptance review. By letter dated September 19, 2008, you provided the supplemental information.

The purpose of this letter is to provide the results of the NRC staff review of the supplemental information. The NRC staff reviewed the supplemental information and together with the application concluded that the documents provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendments in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me, at (301) 415-1424.

Sincerely,

/RA/

Jack Cushing, Senior Project Manager Plant Licensing Branch 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301 cc: See next page

Mr. Larry Meyer Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNTIS 1 AND 2, ACCEPTANCE REVIEW FOR LICENSE AMENDMENT REQUEST NUMBER 247 SPENT FUEL POOL CRITICALITY CONTROL (TAC NOS. MD9321 AND MD9322)

Dear Mr. Meyer:

By letter dated July 24, 2008, to the U.S. Nuclear Regulatory Commission (NRC) FPL Energy Point Beach, LLC (FPL, the licensee) submitted a license amendment application to revise the Point Beach Nuclear Plant (PBNP), Units 1 and 2, licensing basis to reflect a revision to the spent fuel pool (SFP) criticality analysis methodology. The NRC staff reviewed your application and found that supplemental information was needed to complete the acceptance review. By letter dated September 19, 2008, you provided the supplemental information.

The purpose of this letter is to provide the results of the NRC staff review of the supplemental information. The NRC staff reviewed the supplemental information and together with the application concluded that the documents provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendments in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me, at (301) 415-1424.

Sincerely,

/RA/

Jack Cushing, Senior Project Manager Plant Licensing Branch 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301 cc: See next page DISTRIBUTION PUBLIC LPL3-1 r/f RidsOgcRp RidsAcrsAcnw&mMailCenter RidsNrrDorlDpr RidsNrrDorlLpl3-1 RidsNrrLATHarris RidsRgn3MailCenter RidsNrrPMJCushing GCranston TNakanishi KWood Accession Number: ML082671113 OFFICE NRR/LPL3-1/PM NRR/LPL3-1/LA DSS/SRXB*

NRR/LPL3-1/BC NAME JCushing GLappert GCranston LJames DATE 09 / 25 /08 09 / 25 /08 09/04/08 09 / 25 /08 OFFICIAL RECORD COPY

Point Beach Nuclear Plant, Units 1 and 2 cc:

Licensing Manager FPL Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, WI 54228 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Mr. J. A. Stall Executive Vice President, Nuclear and Chief Nuclear Officer FPL Group P. O. Box 14000 Juno Beach, FL 33408-0420 T. O. Jones Vice President, Nuclear Operations Mid-West Region Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Peter Wells Acting Vice President, Nuclear Training and Performance Improvement Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 John Bjorseth Plant General Manager Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241 Mark E. Warner Vice President, Nuclear Plant Support Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Antonio Fernandez Senior Attorney FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Mano Nazar Senior Vice President and Nuclear Chief Operating Officer FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420 Abdy Khanpour Vice President Engineering Support FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420 J. Kitsembel Electric Division Public Service Commission of Wisconsin P. O. Box 7854 Madison, WI 53707-7854 Mr. M. S. Ross Managing Attorney FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420