Other: ML070390057, ML082630799, ML083100134, ULNRC-05476, One-Time Completion Time Extension for Essential Service Water (ESW) System, ULNRC-05482, Response to Questions Received on February 7, 2008 Regarding Amendment to Revise Technical Specifications for Essential Service Water, ULNRC-05520, One-Time Completion Time Extension for Essential Service Water (ESW) System, (OL1281), ULNRC-05534, One-Time Completion Time Extension for Essential Service Water (ESW) System, ULNRC-05542, Calculation 2007-16760, Rev. 0, Buried Hdpe Piping Stress Analysis, ULNRC-05563, One-Time Completion Time Extension for Essential Service Water System
|
MONTHYEARML0703900572007-02-21021 February 2007 BVPS Doc Table M Project stage: Other ML0725504882007-08-30030 August 2007 CFR 50.55a Request: Proposed Alternative to ASME Section XI Requirements for Replacement of Class 3 Buried Piping Project stage: Request 05000483/LER-2007-003, Regarding 1 OTDT Channel Inoperable for Greater than TS Allowable Time2007-08-30030 August 2007 Regarding 1 OTDT Channel Inoperable for Greater than TS Allowable Time Project stage: Request ULNRC-05445, One-Time Completion Time Extension for Essential Service Water (ESW) System2007-10-31031 October 2007 One-Time Completion Time Extension for Essential Service Water (ESW) System Project stage: Request ML0800400232008-01-0808 January 2008 Forthcoming Meeting with Union Electric Company on the Callaway Plant Relief and Amendment Requests Dated August 3 and October 31, 2007. (Tac No. MD6792 and MD7252) Project stage: Meeting ML0802504052008-01-23023 January 2008 Licensee Handout for Meeting with Union Electric Company on the Callaway Plant Relief Request I3R-10 to Use Plastic Pipe in the Safety-Related Essential Service Water (ESW) System Project stage: Meeting ML0803802882008-02-0707 February 2008 Preliminary Request for Additional Information Project stage: RAI ULNRC-05476, One-Time Completion Time Extension for Essential Service Water (ESW) System2008-02-21021 February 2008 One-Time Completion Time Extension for Essential Service Water (ESW) System Project stage: Other ML0803806472008-02-29029 February 2008 Summary of Meeting with Union Electric Company Callaway Plant, Unit 1, 8/30/2007 Relief Request and 10/31/2007 License Amendment Request Applications Related to Replacement of Essential Service Water Piping (Tac No. MD6792 and MD7252) Project stage: Meeting ULNRC-05482, Response to Questions Received on February 7, 2008 Regarding Amendment to Revise Technical Specifications for Essential Service Water2008-03-0707 March 2008 Response to Questions Received on February 7, 2008 Regarding Amendment to Revise Technical Specifications for Essential Service Water Project stage: Other ML0808800122008-03-31031 March 2008 Request for Additional Information Related to LAR to Revise TS 3.7.8, Essential Service Water System, and TS 3.8.1, AC Sources - Operating, for One-time Completion Time Extension Re Underground Piping Project stage: RAI ULNRC-05434, CFR50.55a Request: Proposed Alternative to ASME Section X1 Requirements for Replacement of Class 3 Buried Piping2008-04-17017 April 2008 CFR50.55a Request: Proposed Alternative to ASME Section X1 Requirements for Replacement of Class 3 Buried Piping Project stage: Request ULNRC-05500, Response to Request for Additional Information One-Time Completion Time Extension for Essential Service Water (ESW) System2008-05-0606 May 2008 Response to Request for Additional Information One-Time Completion Time Extension for Essential Service Water (ESW) System Project stage: Response to RAI ML0815800112008-06-10010 June 2008 Request for Additional Information, Relief Request No. 13R-10 and License Amendment Request to Revise TS 3.7.8, Essential Service Water System, and TS 3.8.1, AC Sources - Operating, for One-time CT Extension Underground Piping Project stage: RAI ML0817506442008-06-24024 June 2008 Forthcoming Meeting with Union Electric Company on the Callaway Plant to Discuss the Licensees Responses to NRC Request for Additional Information Relief and License Amendment Requests Project stage: RAI ULNRC-05517, CFR50.55a Request: Proposed Alternative to ASME Section XI Requirements for Replacement of Class 3 Buried Piping2008-07-10010 July 2008 CFR50.55a Request: Proposed Alternative to ASME Section XI Requirements for Replacement of Class 3 Buried Piping Project stage: Request ULNRC-05520, One-Time Completion Time Extension for Essential Service Water (ESW) System, (OL1281)2008-07-10010 July 2008 One-Time Completion Time Extension for Essential Service Water (ESW) System, (OL1281) Project stage: Other ULNRC-05529, CFR50.55a Request: Proposed Alternative to ASME Section XI Requirements for Replacement of Class 3 Buried Piping2008-07-24024 July 2008 CFR50.55a Request: Proposed Alternative to ASME Section XI Requirements for Replacement of Class 3 Buried Piping Project stage: Request ULNRC-05534, One-Time Completion Time Extension for Essential Service Water (ESW) System2008-08-13013 August 2008 One-Time Completion Time Extension for Essential Service Water (ESW) System Project stage: Other ML0826307992008-09-0505 September 2008 Calculation 2007-13241, Rev. 1, Minimum Wall Thickness for ESW Buried Hdpe Piping Project stage: Other ULNRC-05542, Calculation 2007-16760, Rev. 0, Buried Hdpe Piping Stress Analysis2008-09-12012 September 2008 Calculation 2007-16760, Rev. 0, Buried Hdpe Piping Stress Analysis Project stage: Other ML0826307982008-09-15015 September 2008 Transmittal of Callaway, Unit 1, Additional Information Regarding 10CFR50.55a Request: Proposed Alternative to ASME Section XI Requirements for Replacement of Class 3 Buried Piping Project stage: Request ML0829000272008-10-0909 October 2008 Follow-up Information Regarding 10CFR50.55a Request: Proposed Alternative to ASME Section XI Requirements for Replacement of Class 3 Buried Piping (TAC No. MD67920) Project stage: Request ML0826400072008-10-31031 October 2008 Relief Request I3R-10 for Use of Polyethylene Pipe in Lieu of Carbon Steel Pipe in Buried Essential Service Water Piping System Project stage: Approval ML0828106432008-10-31031 October 2008 Issuance of Amendment No. 186, Revise TS 3.7.8, Essential Service Water System, and TS 3.8.1, AC Sources - Operating, for One-time Completion Time Extension Re Underground Piping Project stage: Approval ML0831001342008-11-0606 November 2008 Correction to Amendment No. 186 Approving One-Time Extension of Completion Time for Inoperable Essential Service Water System and Emergency Diesel Generators Project stage: Other ML0831002882008-11-0707 November 2008 Relief Request 13R-10 Approved on October 31, 2008, for Third 10-Year Inservice Inspection Interval for Use of Polyethylene Pipe in Lieu of Carbon Steel Pipe in Buried Essential Service Water Piping System Project stage: Approval ULNRC-05563, One-Time Completion Time Extension for Essential Service Water System2008-12-0101 December 2008 One-Time Completion Time Extension for Essential Service Water System Project stage: Other ML0834503272008-12-19019 December 2008 Summary of Meeting with Representatives of Union Electric Company, Licensee for Callaway Plant, Unit 1 Second Round of Requests for Information, Extension of Completion Time for Essential Service Water Systems (TAC Nos. MD6792 & MD7252) Project stage: Meeting ULNRC-06115, CFR 50.55a Request: Proposed Alternative to ASME Section XI Alternative Technical Requirements for Class 3 Buried Piping2014-06-10010 June 2014 CFR 50.55a Request: Proposed Alternative to ASME Section XI Alternative Technical Requirements for Class 3 Buried Piping Project stage: Request 2008-02-07
[Table View] |
Text
AmerenUE P0 Box 620 Callaway Plant Fulton, MO 65251 September 15, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC-05542 "Ae Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
FACILITY OPERATING LICENSE NPF-30 ADDITIOANL INFORMATION REGARDING 10CFR50.55a REQUEST:
PROPOSED ALTERNATIVE TO ASME SECTION XI REQUIREMENTS FOR REPLACEMENT OF CLASS 3 BURIED PIPING - (TAC NO. MD6792)
References:
- 1. ULNRC-05434 dated August 30, 2007
- 2. ULNRC-05490 dated April 17, 2008
- 3. ULNRC-05517 dated July 10, 2008
- 4. ULNRC-05529 dated July 24, 2008 By letter dated August 30, 2007 (Reference 1 above), Union Electric Company (AmerenUE) submitted Relief Request 13R-10 regarding paragraph IWA-4221 (b) of the American Society of Mechanical Engineers (ASME) Boiler'and Pressure Vessel Code,Section XI. The relief request, which is still under review by the NRC staff, was submitted to support the planned replacement of buried steel piping in Callaway's essential service water (ESW) system with high-density polyethylene (HDPE) piping. Subsequent to submittal of the relief request, additional letters (identified as References 2, 3 and 4 above) were submitted to provide additional or clarifying information requested by the NRC staff in regard to the request.
The additional information provided by AmerenUE included two calculations.
Specifically, in the letter of Reference 2 above, AmerenUE provided (as Enclosure 3 of that letter) a preliminary stress analysis for the new ESW piping configuration, i.e.,
Calculation 2007-16760, "Analysis of Buried HDPE ESW Piping." In the letter of Reference 3 above, AmerenUE provided (as Enclosure 4 to that letter) Calculation 2007-13241, "Minimum Wall Thickness for ESW Buried HDPE Piping," Revision 0.
AO(47 a subsidiary of Ameren Corporation
ULNRC-05542 September 15, 2008 Page 2 Per a recent telephone discussion with the NRC staff, AmerenUE was asked to provide updated versions of the calculations provided in the aforementioned letters.
Accordingly, updates of the calculations are hereby provided. Revision 1 of Calculation 2007-13241 is provided as Attachment 1, and finalized Revision 0 of Calculation 2007-1670 is provided as Attachment 2.
For questions concerning this letter or its attachments, please contact Mr. Scott Maglio at (573) 676-8719. There are no additional commitments made within this submittal.
Very truly yours, Luke H. Graessle Manager, Regulatory Affairs TBE/nls Attachments:
1 - Calculation 2007-13241 (Rev. 1) 2 - Calculation 2007-1670 (Rev. 0)
ULNRC-05542 September 15, 2008 Page 3 cc:
Mr. Elmo E. Collins, Jr.
Regional Administrator U.S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O-8G14 Washington, DC 20555-2738 I
ULNRC-05542 September 15, 2008 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
A. C. Heflin w/o F. M. Diya w/o T. E. Herrmann D. W. Neterer w/o L. H. Graessle w/o S. M. Maglio w/o T. B. Elwood w/o S. L. Abel M. D. Brandes S. L. Gallagher w/o L. M. Belsky (NSRB) w/o Mr. Ron Reynolds, Director (SEMA) w/o Mr. Edward Gray, Senior REP Planner (SEMA) w/o Mr. John Campbell, REP Planner (SEMA) w/o Ms. Diane M. Hooper (WCNOC) w/o Mr. Dennis Buschbaum (TXU) w/o Mr. Scott Bauer (Palo Verde) w/o Mr. Stan Ketelsen (PG&E) w/o Mr. Scott Head (STP) w/o Mr. John ONeill (Pillsbury Winthrop Shaw Pittman LLP) w/o Mr. Floyd Gilzow (DNR) w/o