Sep. 08, 2008 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2008-44519 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANqMTTTAT, TNFC)RMATTCN:
TO: GERLACH*ROSE M 09/08/2008 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS
- FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRMl - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 07/30/2008 ADD MANUAL TABLE OF CONTENTS DATE: 09/05/2008 CATEGORY: DOCUMENTS TYPE: TRMI 4oo/
Sep. 08, 2008 Page 2 of 2 ID: TEXT 3.7.7 ADD: REV: 2 REMOVE: REV:1 CATEGORY: DOCUMENTS TYPE: TRM1 ID: TEXT LOES REMOVE: REV:47 ADD: REV: 48 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
S SE S FIAMAL Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date: 09/05/2008 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 48 09/05/2008
Title:
LIST OF EF FECTIVE SECTIONS TEXT TOC 15 04/17/2008
Title:
TABLE OF CONTENTS TEXT 1.1 0 11/18/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/200,5
Title:
PLANT PROGRAMS AND SETPOINTS PLANT /PROC TEXT 2.2 7 05/23/2'008&
Title:
PLANT PROGRAMS AND ITS INSTRUMENT TRIP SETPOINT TABLE LDCN 3920 LDCN 4502 LDCN 4414 TEXT 3.0 05/23/2008
Title:
TECHNICAL REQR OPERATION (TRO), APPLICABILITY & SURVEILLANCE (TRS)
APPLICABILITY, \ ,
TEXT 3.1.1 1 11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0 11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 4 04/17/2008
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION LDCN 3920 LDCN 4502 TEXT 3.1.4 0 11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &
- - Report Date: 09/05/08 Pagel Page 1 of of ~15 Report Date: 09/05/08
Manual Name: TRMI 'I Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UN-IT 1 TEXT 3.2.1 9 04/17/2008
Title:
CORE OPERATING LIMITS REPORT (COLR)
TEXT 3.3.1 0 11/18/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 2 11/09/2007
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION' TEXT 3.3.3 2 f1I/09/-2007:
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 5 05/23/2008
Title:
INSTRUMENTATION. TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/-41/2002
Title:
INSTRUMENTATION THIS PAGE *INTENTIONALLY LEFT BLANK TEXT 3.3.6 2 10/19/2005
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION, INSTRUMENTATION TEXT 3.3.7 1 11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM
.TEXT 3.3.8 1 10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION-TEXT 3.3.9 3 04/i7/2008
Title:
OPRM INSTRUMENTATION CONFIGURATION LDCN 4502 TEXT 3.3.10 1 12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION Report Date: 09/05/08 Page 22.
,Page of of 15 15 Report Date: 09/05/08
SSES 1MUTVAL
(. Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1, TEXT 3.4.1 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 0 11/18/2002.
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4 2 04/17/2008
Title:
REACTOR COOLANT SYSTEM REACTOR'RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 0 Q4/26 /2006
Title:
REACTOR COOLANT:SYSTEM REACTOR VESSEL MATERIALS .
TEXT 3.5.1 1 02/04/2005:
Title:
EMERGENCY CORE COOLING: AND RCIC ADS _MANUAL .INHIBIT TEXT 3.5.2 1 11/09/2007.
Title:
EMERGENCY CORE COOLING AND RCIC ECCS, AND RCIC SYSTEM,MONIrORING INSTRUMENTATION TEXT 3.5.3 0 11/18/2002
Title:
EMERGENCY CORE COOLING ANDý,RCIC .LQNG TERMý NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/18/2002ý
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0 11/18/2002
Title:
CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITIONINDICATION TEXT 3.6.3 0 11/18/2002-
Title:
CONTAINMENT SUPPRESSION POOL ALARMIINSTRUMENTATION..
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEMBOUNDARIES Page 3 of 15 - - Report Date: 09/05/08
SSLA rMTA-NAL Manual Name: TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT f -
TEXT 3.7.1 0 11/18/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/i8/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS*) AND !GROUND WATER-LEVEL TEXT 3.7.3.1 1 04/26/2006
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER?-SUPPLY SYSTEM-TEXT 3.7.3.2 2 04/26/2006
Title:
PLANT SYSTEMS SPRAY AND SPRINKLER ,SYSTEMS-.
TEXT 3.7.3.3 2 08/18/2065
Title:
PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 1 64/261/2006
Title:
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 1 04/26/2006
Title:
PLANT SYSTEMS FIRE HOSE STATIONS-TEXT 3.7.3.6 1 04/26/2006
Title:
PLANTý SYSTEMS,: YAR FIR£+/-E' HDATS AND-:.- HYDRANT' HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006
Title:
'PLANT SYSTEMS FIRE RATED ASSEMBLIES - -
TEXT 3.7.3.8 6 11/09/2007
Title:
PLANT SYSTMS FIRE--DETECTION INSTRUMENTAtION LDCN 3503 TEXT 3.7.4 1 04/26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM1 '
TEXT 3.7.5.1 0 1flb8/2002
Title:
PLANT SYSTEMS MAIN CONDENSER'OFFGAS`HYDROGEN MONITOR
Report Date: 09/05/08 Page 44 of of 15 15 Report Date:' 69/05/08
- O Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1, TEXT 3.7.5.2 0 11/18/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFEGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 Q4/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS.
TEXT 3.7.6 2 06/27/2008
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER -OFFGASPRETREATMENT.LOGARITHMIC. RADIATION MONITORING TEXT 3.7.8 4 06/21/2007
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)-
TEXT 3.8.1 1 .02/04/2005 -
Title:
ELECTRICAL POWER. PRIMARY CONTAINMENT --PENETRATION CONDUCTOR OVERCURRENT-.
PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES, (MOV) THERMAL OVERLOAD PROTECTION CONTINUOUS TEXT 3.8.2.2 2 12/14,/2004
Title:
ELECTRICAL POWER MOTOR OPERATEDPALVES .(MOV) THERMAL. OVERLOAD PROTECTION -
AUTOMATIC TEXT 3.8.3 0 11118/2002
Title:
ELECTRICAL POWER DIESEL GENERATOR ,(DG) MAINTENANCE ACTIVITIES TEXT 3.8. 4- o0 11/18/2002
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM Page of 15 . 5 .... .* *- .. Report .Date:... 09/05/08...
Page 5 of .15 Report Date: 64/051/68'
ý,14Au __L Manual Name: TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.5 0 11/18/2002
Title:
ELECTRICAL POWER DEGRADED.VOLTAGE PROTECTION TEXT 3.8.6 0 11/18/2002 Titie:-ELECTRICAL POWER-EMERGENCY SWITCHGEAR 'ROOM, COOLING TEXT 3.8.7 0 12/14/2006 Tit-le: -BATTERY MAINTENANCE AND MONITORING: PROGRAM'-, "
TEXT 3.9.1 0 i1/18/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/18/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS 1ý TEXT 3.9.3 0 !1i8/2002
Title:
REFUELINGiOPERATIONS-REFUELING PLATFORM-TEXT 3.10.1 1 04/26/2006
Title:
MISCELLANEOUS.SEAL SOURCE CONTAMINATION TEXT 3.10.2 2 08/08/2006
Title:
MISCELLANEOUS SHUTbO1gJfNRiRGIN-TESTRPS- INSTRUMENTATION TEXT 3.10.3 1 04/26/2006 oTitle: MISCELLANEOUS INDEPENDENT S'PENT FUEL-STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 2 0bV17/2008
Title:
MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)' }
TEXT 3.11.1.1 1 04'/26/200-6
Title:
RADIOACTIVE EFFLUENTS LIQUID' EFFLENTS` CONCENTRATIONf TEXT 3.11.1.2 7- - - 1 04/26/20ý6
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE RePort Date: 09/05/08
-- Page Pag~66 ý of 15 15 Report Date: 09/05/ý0.8
SSES ,ATJAI Manual Name: TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT I TEXT 3.11.1.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS LIQUID-RADWASTE EFFLUENT MQNITORING INSTRUMENTATION-TEXT 3.11.1.5 2 05/02/2007
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE..LIQUIDoPROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES.
TEXT 3.11.2.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - .IODINE; TRITIUM, AND RADIONUCLIDES IN .PARTICULATE FORM TEXT 3.11.2.4 0 11/18/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTEiTREATMENT SYSTEM TEXT 3.11.2.5 3 1J./14/2006
Title:
RADIOACTIVE EFFLUENTS VENTILATION .EXHAUST*TREATMENT SYSTEM-:
TEXT 3.11.2.6 3 05/02/2007
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE v':
TEXT 3.11.4.1 4 08/'8/2006 2..
Title:
RADIOACTIVE EFFLUENTS MONITORING..PROGRAM..
TEXT 3.11.4.2 -*
-2'2- 04/26./2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS Report Date: 09/05/08 Page 77 of of 15 15 Report Date: 09/05/08
MANCJAIJ Manual Name: TRN1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.4.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLA ORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002
Title:
-LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 4 04/17/2008
Title:
LOADS CONTROL`PROGRAM HEAVY LOADS REQUIREMENTS' TEXT 3.12.3 0 1-1/19/2002 -
Title:
LOADS CbNTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT B3.0 4 05/23/2008
Title:
APPLICABILITY BASES TECHNICAL REQUiREMENT FOR OPERATION (TRO)PAPPLICABILITY-TEXT B3.1.1 1 i1:/09/2007
Title:
-REACTIVITY CONTROL- SYSTEMS BASES <ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/1-9/2002.
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE -(CRD) HOUSING SUPPORT TEXT B3.1.3 3 03/31/2006
Title:
REACTIVITY CONTROL' SYSTEMS -BASES CONTROL ROD BLOCK *INSTRUMENTATI6N-TEXT B3.1.4 0 i/19/20'02
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 i1/19/2002
Title:
CORE OPERATING LIMITS BASES'COREOPER-ATING LIMITS REPORT (COLR)
TEXT B3.3.1 0 11i*-19/2002
Title:
INSTRUMENTATION BASES-RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 1 1.
11/09/2007
Title:
INSTRUMENTATION <BASES SEISMIC MONITORING INSTRUMENTATION
-, .~-,,...~.
Page 8 of 15 Pag..8.of 15.Report Date: 09/05/08.
- SSEgS _U!ALJ Manual Name: TRM1
' Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT, 1.
TEXT B3.3.3 2 11/09/2007
Title:
INSTRUMENTATION BASES METEOROLOGICAL-MONITORING INSTRUMENTATION TEXT B3.3.4 3 11/i09/2007
Title:
INSTRUMENTATION BASES TRM.POST, ACCIDENT MONITORING.(PAM) INSTRUMENTATION .,
TEXT B3.3.5 2 11i/09/20077
Title:
INSTRUMENTATION BASES THIS PAGE. INTENTIONALLY LEFT BLANK TEXT B3.3.6 3 10/19/20,05
Title:
INSTRUMENTATION BASES TRM.ISOLATION ACTUATION. INSTRUMENTATION TEXT B3.3.7 1 11/0:9/2007
Title:
I-NSTRUMENTATION. BASES MAIN TURBINE.OVERSPEED-PROTECTION SYSTEM 0 TEXT B3.3.8 1 10/22/2003
Title:
,INSTRUMENTATION BASES, TRM REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT B3.3.9 3 04/17/2008.
Title:
OPRM INSTRUMENTATION TEXT B3.3.10 0 11/19/20,02-,
Title:
INSTRUMENTATIONBASE, S-REACTOR RECIRCULATION, PUMP MG, SET STOPS, TEXT B3.3.11 1 10/22/2003.
Title:
INSTRUMENTATION BASES MVP ,ISOLATION INSTRUMENTATION TEXT B3.4.1 0 11/19/20,02
Title:
REACTOR:COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 0 11/19/2002-
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY
-TEXT B3.4.3 * - 1 .11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR Page9 of .15 .Report Date: 09/0.5/08
1At~ ~MANTJAI~
Manual Name: TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.4.4 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/f9/20O2
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.5.1 0 11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBITv"-
TEXT B3.5.2 1 ii/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC-SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007
Title:
ECCS AND RCIC BASES' LONG TERM NITROGEN-SUPPLY TO-ADS TEXT B3.6.1 0 11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWLL VACUUMBREAKER POSITION INDICATION TEXT B3.6.3 2 04/17/2008
Title:
CONTAINMENT BASES SUPPRESSION* POOL ALARM"INSTRUMENTATION LDCN .3933 TEXT B3.6.4 1 12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11-/19/2002
Title:
PLANT SYSTEMS BASES'EMERGENCY-SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 1I1919/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK "(OHS )'GROUND WATER LEVEL' TEXT B3.7.3.1 . 2 01/07/2008
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY:SYSTEM Page 10 of 15 Report'Date: 09/05/01
.W Manual Name: TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANAL, UNIT :1-TEXT B3.7.3.2 2 04/26/2006.
Title:
PLANT SYSTEMS BASES SPRAY AND:SPRINKLER SYSTEMS TEXT B3.7.3.3 0 11/,19/2002
Title:
PLANT SYSTEMS BASES C02 SYSTEMS, .; .
TEXT B3.7.3.4 1 04/26/2006
Title:
PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006
.Title: PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002
Title:
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 1
- 01/12/2-004
Title:
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002
Title:
PLANT SYSTEMS BASES., SOLI-D RADWASTE.SYSTgM* ,
TEXT B3.7.5.1 0 11/19/2002
Title:
PLANT,: SYSTEMS BASES MAIN CONDENSER.OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTUR]E TEXT B3.7.5.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS.
TEXT B3.7.6 2 06/227/2008
Title:
PLANT SYSTEMS-BASES ESSW PUMPHOUSE VENTILATION Report Date: 09/05/08 Page 21 Page 11 of of 15 15 Rýp-ort' Dat"'e:_" dý'/05"/0'd
S.-MA.NTJAL Manual Name: TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.7 2 01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 3 06/21/2007
Title:
PLANT SYSTEMS BASES SNUBBERS .
TEXT B3.7.9 1 12/14/20,04
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL'STORAGE POOLS TEXT B3.8.1 02/04/2005,
Title:
ELECTRICAL POWER BASES PRIMARY':CONTAINMENT. -PENETRATION CONDUCTOR:;.OVERCURRENT" PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/1i9/2002
Title:
ELECTRICAL -POWER BASES MOTOR 'OPERATEDVALVES (MOV)'THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2 1 09/17/2004.
Title:
ELECTRICAL POWER BASESMOTOR>'OPERATED--VALVES ý(MOV).THERMAL OVERLOAD. PROTECTION -
AUTOMATIC TEXT B3.8.3 0 11/i19/2002
Title:
ELECTRICAL POWER 'BASES' DIESEI;'GENERATOR (DG)' MAINTENANCE ACTIVITIES TEXT B3.8.4 0 Ii1/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC[ELECTRICAL.POWER.SUBSYSTEM TEXT B3.8.5 0 11/19/2002
Title:
ELECTRICAL POWER BASES DEGRADEDýiVOLTAGE PROTECTION "
TEXT B3.8.6 1 02/04/2005
Title:
ELECTRICAL POWER BASES-:EMERGENCY SWITCHGEAR ROOM COOLING.'
TEXT B3.8.7 0 12/14/2006
Title:
BATTERY MAINTENANCE -AND MONITORING ýPROGRAM Report Date: 09/ 05 / 08 Page 12 12 of of 15 15 ' Report Date: 09/ 05/08s
.SyES .KNTAL Manual Name: TRM1 W Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT, .1 TEXT B3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS. BASES DECAY TIME TEXT B3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002 ~'*1
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE' CONTAMINATION TEXT B3.10.2 1 03/31/2006
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN-TEST RPS INSTRUMENTATION_-
TEXT B3.10.3 0 11/19/2002
Title:
MISCELLANEOUS.BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (.ISFSI.)
TEXT B3.10.4 1 04/17/2008
Title:
MISCELLANEOUS BASES LEADING EDGEýFLOW METER (LEFM)
TEXT B3.11.1.1 0 11/19/2002 "
Title:
RADIOACTIVE .EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION.,--.*
TEXT B3.11.1.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0 11/19/-2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTEý TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES: LIQUID RADWASTE.EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES-RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Report Date: 09/05/08 13 Page 13 of of 15 15 Report bate: 09/05/08
wS~ MANUAL Manual Name: TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1-TEXT B3.11.2.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.11.2.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - IODINE,--TRITIUM, AND RADIONUCLIDES INý PARTICULATES FORM TEXT B3.11.2.4 0 ii/i9/2002
Title:
RADIOACTIVE EFFLUENTS ýBASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 4 11/14/2006
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION-EXHAUST TREATMENT SYSTEM-TEXT B3.11.2.6 1 01o/7/2004
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002Z
Title:
RADIOACTIVE EFFLUENTS':BASES TOTAL DOSE TEXT B3.11.4.1 2 01/06/2006
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0 11/19/2002
Title:
LOADS: CONTROL PROGRAM- -BASES HEAVY LOADS REQUIREMENTS Page 14 of 15 Report Date: 09/05/08
- Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT. 1 TEXT B3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS TEXT 4.1 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION.
TEXT 4.2 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 0 08/31/19998
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & &PROGRAMS TEXT 4.5 0 08/31i/1998
Title:
ADMINISTRATIVE CONTROLS REPORTING, REQUIREMENTS,.
TEXT 4.6 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION-.PROGRAM TEXT 4.7 0 08/31/,1998
Title:
ADMINISTRATIVE CONTROLS TRAINING:, . -
Page 15 of 15 Report Date: 09/05/08
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 48 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 03/27/2008 1.0 USE AND APPLICATION Pages TRM / 1.0-1 through TRM / 1.0-3, 10/04/2002 2.0 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM / 2.0-2 and TRM / 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/12002 Page TRM / 2.0-5 04/02/1999 Page TRM / 2.0-6 03/27/2008 Page TRM / 2.0-7 05/15/2008 Page TRM / 2.0-8 03/27/2008 Pages TRM / 2.0-9 through TRM / 2.0-11 11/15/2004 Page TRM / 2.0-12 03/27/2008 Pages TRM / 2.0-13 and TRM / 2.0-14 11/15/2004 Page TRM / 2.0-15 11/15/2005 3.0 APPLICABILITY Page TRM / 3.0-1 04/14/2008 Page TRM / 3.0-2 04/12/2007 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 11/30/2005 3.1 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 10/31/2007 Pages TRM / 3.1-2 through TRM 13.1-5 08/31/1998 Page TRM / 3.1-6 03/22/2006 Pages TRM / 3.1-7 and TRM / 3.1-8 03/27/2008 Pages TRM / 3.1-9 and TRM / 3.1-9a 02/18/1999 Page TRM / 3.1-10 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 07/07/i1999 Pages TRM / 3.2-2 through TRM / 3.2-44 03/17/2008 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1999 Page TRM / 3.3-4 and TRM / 3.3-5 10/31/2007 Page TRM / 3.3-6 08/31/1998 Page TRM / 3.3-7 10/31/2007 Page 3.3-8 08/31/11998 Page TRM / 3.3-9 04/12/2007 Page TRM / 3.3-9a 12/17/1998 Page TRM / 3.3-10 10/31/2007 Page TRM / 3.3-11 06/02/2005 Page TRM / 3.3-11 a 04/14/2008 Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 09/13/2005 TRM / LOES-1 EFFECTIVE DATE 09/04/2008 UNIT I1 SUSQUEHANNA - UNIT SUSQUEHANNA TRM / LOES-t "EFFECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 48 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 10/22/2003 Page TRM / 3.3-16 06/27/2001 Page TRM / 3.3-17 06/14/2002 Page TRM / 3.3-18 10/31/2007 Pages TRM / 3.3-19 through TRM / 3.3-21 10/22/2003 Page TRM / 3.3-22 03/27/2008 Page TRM / 3.3-22a 11/15/2004 Pages TRM / 3.3-22b through TRM / 3.3-22d 03/22/2006 Page TRM / 3.3-23 12/03/2004 Pages TRM / 3.3-24 and TRM / 3.3-25 05/16/2003 Page TRM / 3.3-26 10/22/2003 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1009 Pages 3.4-6 through 3.4-9 08/31/i1998 Page TRM / 3.4-10 10/31/2007 Page TRM / 3.4-11 08/31/1998 Page TRM / 3.4-12 03/27/2008 Page TRM / 3.4-13 03/31/2006 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Pages TRM / 3.5-4 and TRM / 3.5-5 10/31/2007 Pages 3.5-6 and 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-3 08/31/1998 Page TRM / 3.6-4 01107/2002 Page 3.6-5 08/31/1998 Pages TRM / 3.6-6 through TRM / 3.6-8 12/31/2002 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 08/31/1998 Pages TRM / 3.7-4 and TRM / 3.7-5 03/31/2006 Pages TRM / 3.7-6 through TRM / 3.7-8 08/02/1999 Page TRM / 3.7-9 03/31/:2006 Page TRM / 3.7-10 08/16/2005 Page TRM / 3.7-11 12/29/1999 Pages TRM / 3.7-12 and TRM / 3.7.13 08/02/1999 Page TRM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 03/31/2006 SUSQUEHANNA- UNIf 1 TRM / LOES-2 EFFECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 48 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) -
Section Title Effective Date Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 03/31/2006
.Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Pages TRM / 3.7-23 and TRM / 3.7-24 03/31/2006 Pages TRM / 3.7-25 and TRM 3.7-26 08/02/1999 Page TRM 3.7-27 10/31/2007 Page TRM / 3.7-28 11/29/2006 Page TRM / 3.7-29 08/09/2005 Page TRM / 3.7-30 08/25/2005 Pages TRM / 3.7-31 and TRM / 3.7-32 11/16/2001 Page TRM / 3.7-33 01/09/2004 Page TRM / 3.7-34 11/16/2001 Page TRM / 3.7-34a 10/05/2.002 Page TRM / 3.7-35 03/31/2006 Pages TRM / 3.7-36 and TRM / 3.7-37 02/01/1999 Pages 3.7-38 and 3.7-39 08/31/1998 Page TRM / 3.7-40 03/31/2006 Page TRM / 3.7-41 02/14/2005 Page TRM / 3.7-41a 06/20/2008 Page TRM / 3.7-42 09/04/2008 I-Page TRM / 3.7-43 08/31/1998 Pages TRM 1 3.7-44 through TRM / 3.7-46 10/05/2006 Page TRM / 3.7-47 06/07/2007 Page TRM / 3.7-48 10/05/2006 Page TRM / 3.7-49 06/07/2007 Page TRM / 3.7-50 03/09/2001 Page TRM / 3.7-51 08/16/2006 Page TRM / 3.7-52 12/03/2004 Page TRM / 3.7-53 04/15/2003 Page TRM / 3.7-54 07/29/i1999 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Pages TRM / 3.8-2 through TRM / 3.8-4 01/28/2005 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Page TRM / 3.8-7 10/31/2007 Pages TRM / 3.8-8 through TRM / 3.8-10 12/03/2004 Page TRM / 3.8-11 09/03/2004 Page TRM / 3.8-12 12/03/2004 Pages 3.8-13 and 3.8-14 08/31/1998 Pages TRM / 3.8-15 through TRM / 3.8-17 04/02/2002 Page 3.8-18 08/31/1998 Page TRM / 3.8-19 04/02/2002 Page 3.8-20 08/31/1998 Pages TRM / 3.8-21 through TRM / 3.8-23 06/06/1999 Pages 3.8-24 and 3.8-25 08/31/1998 Pages TRM / 3.8-26 through TRM / 3.8-29 11/29/2006 SUSQUEHANNA - UNIT 1 TRM / LOES-3 EFFECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 48 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/11998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 and 3.10-3 08/31/1998 Pages 3.10-2 and 3.10-3 08/31/i1998 Page TRM / 3.10-4 08/01/2006 Pages TRM / 3.10-5 and TRM / 3.10-6 03/22/2006 Page TRM / 3.10-7 03/31/2006 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages 3.11-2 and 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages TRM / 3.11-7 through TRM / 3.11-9 08/31 /1998 Page TRM / 3.11-10 12/03/2004 Pages 3.11-11 and 3.11-12 08/31/'1998 Page TRM / 3.11-13 04/12/2007 Page TRM / 3.11-14 12/03/2004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03/31/2006 Page 3.11-18 08/31/'1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM / 3.11-23 11/14/2006 Page TRM / 3.11-24 05/13/2005 Page TRM / 3.11-25 04/12/2007 Pages TRM / 3.11-26 through TRM / 3.11-28 01/21/2004 Page TRM / 3.11-29 12/03/2004 Pages TRM / 3.11.30 through TRM / 3.11.32 01/21/2004 Page TRM /3.11-33 03/31/2006 Page 3.11-34 08/31/'1998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Pages 3.11-40 through 3.11-43 08/31/1998 Page TRM / 3.11-44 08/01/2006 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47 03/31/2006 TRM / LOES-4 EFFECTIVE DATE 09/04/2008 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT 1 1 TRM / LOES-4 EFFECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 48 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM / 3.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/1998 SUSQUEHANNA - UNIT 1'- TRM / LOES-5 EFFECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION . PPL Rev. 48 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 08/31/1998 Page TRM / B 3.0-4 01/10/2007 Page TRM / B 3.0-5 04/14/2008 Page TRM / B 3.0-6 08/31/1998 Page TRM / B 3.0-7 04/12/2007 Pages TRM / B 3.0-8 through TRM / B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/15/2002 Pages TRM / B 3.0-13 and TRM / B 3.0-14 11/30/2005 Page TRM / B 3.0-15 03/15/2002 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 07/13/1999 Pages TRM / B 3.1-2 and TRM / B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1998 Page TRM / B 3.1-5 11/15/2005 Pages TRM / B 3.1-6 and TRM / B 3.1-7 03/22/2006 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM /"B 3.3-1 04/07/2000 Pages TRM / B 3.3-2 and TRM / B 3.3-2a- 10/31/2007 Pages TRM / B 3.3-3 and TRM / B 3.3-3A 10/31/2007 Pages TRM / B 3.3-4 and TRM / B 3.3-5 05/30/2006 Pages TRM / B 3.3-6 through TRM-/ B 3.3-9 10/31/2007 Page B 3.3-10 08/31/1998 Pages TRM / B 3.3-11 and TRM / B 3.3-12 09/13/2005 Page TRM / B 3.3-13 12/03/2004 Page TRM / B 3.3-14 06/25/:2002 Page TRM / B 3.3-14a 10/31/2007 Page TRM / B 3.3-14b 10/31/2007 Pages TRM / B 3.3-15 and TRM / B 3.3-16 10/22/2003 Page TRM / B 3.3-17 03/22/2006 Pages TRM / B 3.3-17a through TRM / B 3.3-17c 03/22/2006 Page TRM / B 3.3-17d 03/27/2008 Pages TRM / B 3.3-17e and TRM / B 3.3-17f 03/22/2006 Pages TRM / B 3.3-18 and TRM / B 3.3-19 05/16/2003 Page TRM / B 3.3-20 10/22/2003 Page TRM / B 3.3-21 05/16/2003 B 3.4 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-3 08/31/1998 Pages TRM / B 3.4-4 and TRM / B 3.4-4a 10/31/2007 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 V.
SUSQUEHANNA - UNIT I TRIM LOES-6 EFFECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 48 LIST OF EFFECTIVE SECTIONS (tECHN iCAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM / B 3.5-3 through TRM B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/i1998 Page TRM / B 3.6-4 03/27/2008 Page TRM / B 3.6-5 04/04/2007 Page TRM / B 3.6-6 12/03/2004 Pages B.3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Pages TRM / B 3.7-3 and TRM / B 3.7-3a 12/27/2007 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Page TRM / B 3.7-6 03/31/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM / B 3.7-8 08/02/1999 Page TRM / B 3.7-9 03/31/2006 Page TRM / B 3.7-10 08/02/1999 Page TRM / B 3.7-10a 03/31/2006 Page TRM / B 3.7-11 08/02/1999 Page TRM / B 3.7-11 a 03/31/2006 Pages TRM / B 3.7-12 through TRM / B 3-7-14 08/02/1999 Page TRM / B 3.7-14a 08/02/1999 Page TRM / B-3.7-14b 01/09/2004 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Page TRM / B 3.7-21 02/14/2005-Page TRM / B 3.7-21a 06/20/2008 Page TRM / B 3.7-22 and TRM / B 3.7-23 01/30/2008 Pages TRM / B 3.7-24 through TRM / B 3.7-28 10/05/2006 Pages TRM / B 3.7-29 and TRM / B 3.7-30 06/07/2007 Pages TRM / B 3.7-30a and TRM I B 3.7-30b 10/05/2006 Page TRM / B 3.7-31 12/03/2004 Page TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000 SUSQUEHANNA - UNIT 1 TRM /LOES-7 EFFECTIVE DATE 09/04/2008
SUSQUEHANNA STEAM ELECTRIC STATiON PPL Rev. 48 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 04/02/2002 Pages TRM / B 3.8-2 and.TRM J B 3.8-2a 01/28/2005 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 08/10/2004 Page TRM / B 3.8-4a 04/02/2002 Page TRM / B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-16, 04/02/2002 Page TRM / B 3.8-17 01/28/2005 Pages TRM / B 3.8-18 through TRM / B 3.8-24 11/29/2006 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 08/31/1998 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3 03/22/2006 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/30/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11-11 a 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 12/03/2004 Page TRM / B3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/30/1998 Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.11-20a 04/02/2002-Page TRM / B 3.11-21 05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11.23 11/14/2006 Page TRM / B 3.11.23a 05/13/2005 Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 and B 3.11-27 08/30/1998 Pages TRM / B 3.11-28 and TRM / B 3.11-29 11/30/2005 Page TRM / B 3.11-30 12/03/2004 Pages B 3.7-31 through B 3.7-35 08/30/1998 Page TRM / B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 09/19/2007 Pages TRM / B 3.12-2 and TRM / B 3.12-3 02/05/1999 TRM1 text LOES 8/28/08
.-
- SUSQUEHANNA - UNITI-2 TRM LLOES-8 EFFECTIVE DATE 09/04/2008
Main Condenser'Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation PPL Rev. 2 3:7.7 3.7 Plant Systems 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation TRO 3.7.7 One channel of Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation shall be OPERABLE.-
APPLICABILITY: During operation of the Main Condenser Air Ejector and Offgas Treatment System.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Main Condenser Offgas A.1 Verify that the Offgas System Immediately Pretreatment Logarithmic is not bypassed Radioactivity Monitor inoperable AND A.2 Perform TS SR 3.7.5.1 Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND A.3 Restore Main Condenser 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Offgas Pretreatment Radioactivity Monitor to OPERABLE status B. Main Condenser Offgas B.1 Verify that the Offgas.System Immediately Pretreatment Logarithmic is not bypassed Radioactivity Monitor and AND Turbine Building Vent Monitor Low Range Noble B.2 Perform TS SR 3.7.5.1 Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Gas Channel inoperable AND B.3 Restore Main Condenser 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Offgas Pretreatment Radioactivity Monitor OR Turbine Building Vent Monitor Low Range Noble Gas Channel to OPERABLE status SUSQUEHANNA- UNIT 1 TRM / 3.7-42 EFFECTIVE DATE 09/04/2008
Main Condenser Offgas Pretreatmeinit Logarithmic Radiation Monitoring Instrumentation PPL Rev. 2 3.7.7 TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.7.7.1 Perform CHANNEL CHECK 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TRS 3.7.7.2 Perform SOURCE CHECK 31 days TRS 3.7.7.3 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.7.7.4 Perform CHANNEL CALIBRATION 24 Months SUSQUEHANNA - UNIT 1 TRM / 3.7-43 EFFECTIVE DATE 08/31/1998