ATTACHMENT (2)
MARKUP OF TECHNICAL SPECIFICATION PAGES Calvert Cliffs Nuclear Power Plant, Inc.
August 27, 2008
TABLE OF CONTENTS 3.5.4 3.5.5 3.6 3.6.1 3.6.2 3.6.3 3.6.4 3.6.5 3.6.6 3.6.7 3.6.8 3.7 3.7.1 3.7.2 3.7.3 3.7.4 3.7.5 3.7.6 3.7.7 3.7.8 3.7.9 3.7.10 3.7.11 3.7.12 3.7.13 3.7.14 3.7.15 3.7.16 3.7.17 3.8 3.8.1 3.8.2 3.8.3 3.8.4 3.8.5 3.8.6 Refueling Water Tank (RWT) 3.5.4-1 hosp ate ( SP 3.5.5-1
,,)Odl vN'Te.~o r-c~\\c..., (;'fS))
CONTAINMENT SySTEMS 3.6.1-1 Containment 3.6.1-1 Containment Air Locks 3.6.2-1 Containment Isolation Valves 3.6.3-1 Containment Pressure 3.6.4-1 Containment Air Temperature 3.6.5-1 Containment Spray and Cooling Systems 3.6.6-1 Deleted Iodine Removal System (IRS) 3.6.8-1 PLANT SySTEMS..........................................
3.7.1-1 Main Steam Safety Valves (MSSVs) 3.7.1-1 Main Steam Isolation Valves (MSIVs) 3.7.2-1 Auxil iary Feedwater (AFW) System 3.7.3-1 Condensate Storage Tank (CST) 3.7.4-1 Component Cooling (CC) System 3.7.5-1 Service Water (SRW) System 3.7.6-1 Saltwater (SW) System 3.7.7-1 Control Room Emergency Ventilation System (CREVS)..
3.7.8-1 Control Room Emergency Temperature System (CRETS)..
3.7.9-1 Emergency Core Cooling System (ECCS) Pump Room Exhaust Filtration System (PREFS) 3.7.10-1 Spent Fuel Pool Exhaust Venti lation System (SFPEVS) 3.7.11-1 Penetration Room Exhaust Ventilation System (PREVS) 3.7.12-1 Spent Fuel Pool (SFP) Water Level 3.7.13-1 Secondary Specific Activity 3.7.14-1 Main Feedwater Isolation Valves (MFIVs) 3.7.15-1 Spent Fuel Pool (SFP) Boron Concentration 3.7.16-1 Spent Fuel Pool (SFP) Storage 3.7.17-1 ELECTR ICAL POWER SySTEMS 3.8.1-1 AC Sources-Operating 3.8.1-1 AC Sources-Shutdown 3.8.2-1 Diesel Fuel Oil 3.8.3-1 DC Sources-Operating..............................
3.8.4-1 DC Sources-Shutdown 3.8.5-1 Battery Cell Parameters 3.8.6-1 CALVERT CLIFFS UNIT 1 CALVERT CLIFFS - UNIT 2 iii Amendment No. 278 Amendment No. 255
l~~
~
3.5.5 3.5 EMERGENCY CORE COOLING SYSTEM (ECCS)
~--.,. _.------...~~--v-- _~~
3.5.5 Q.r~~~ l SCdl l;rn-\\ e.-tt-c,-'co*;:n..' *,
CSTB) !
~
i STB~\\
~
LCO 3.5.5 The J;Si?J baskets shall contain
~ '289. 3 fe of~~
13 750lb cs:mY I
m
~
APPLI CAB ILITY:
ACTIONS MODES 1, 2, 3, and 4.
CONDITION REQUIRED ACTION COMPLETION TIME A.
T-sP not within A.1 Restore ~o within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limits.
limits.
2>\\8, B.
Required Action and B.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
AND B.2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE
~
FREQUENCY
---~
-~
rsf~.
SR 3.5.5.2 Verify that a sample from the~~fS 24 months provides adequate pH adjustment of water borated to be representative of a post-loss-of-coolant accident sump condition.
CALVERT CLIFFS - UN IT 1 CALVERT CLIFFS - UN IT 2 3.5.5-1 Amendment No. 227 Amendment No. 201