UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 September 2, 2008 Mr. J. Randy Johnson Vice President - Farley Southern Nuclear Operating Company, Inc.
7388 North State Highway 95 Columbia, AL 36319
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - JOSEPH M.
FARLEY NUCLEAR PLANT
Dear Mr. Johnson:
On August 12, 2008, the NRC staff completed its performance review of Joseph M. Farley Nuclear Plant for the first half of the calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Related Information" will include the Physical Protection/Security cornerstone performance review and resultant inspection plan.
Plant performance for the most recent quarter at Farley Unit 1 was within the Degraded Cornerstone column of the Nuclear Regulatory Commissions (NRCs) Action Matrix based on three White inputs. These included a White Mitigating System Performance Index (MSPI)
Cooling Water System performance indicator (PI) that crossed the threshold from Green to White in the third quarter 2007, a parallel White Performance Indicator Finding in the Mitigating System Cornerstone for both units regarding breaker failures in the third quarter 2007 and a Unit 1 MSPI Emergency AC PI crossed the threshold from Green to White in the first quarter 2008 due to two independent run failures of the 1B Emergency Diesel Generator. The NRC completed a supplemental inspection in accordance with supplemental inspection procedure 95002, Inspection For One Degraded Cornerstone Or Any Three White Inputs In a Strategic Performance Area, on June 13, 2008. This inspection addressed the Parallel White Performance Indicator Finding and the White MSPI Cooling Water PI.
Plant performance for the most recent quarter at Farley Unit 2 was within the Degraded Cornerstone column of the NRCs Action Matrix based on a Yellow Inspection Finding in the Mitigating System Cornerstone for repetitive failures of a Residual Heat Removal (RHR) containment sump valve and a parallel White Performance Indicator Finding in the Mitigating System Cornerstone for both units regarding breaker failures in the third quarter 2007. Also, you previously reported a White RHR MSPI in the second quarter of 2007, which was reported as Green in the second quarter 2008. The NRC completed a supplemental inspection in
SNC Inc.
2 accordance with inspection procedure 95002 Inspection For One Degraded Cornerstone Or Any Three White Inputs In a Strategic Performance Area on June 13, 2008. This inspection addressed the Yellow Inspection Finding, the Parallel White Performance Indicator Finding and the White RHR MSPI.
Although not covered under this assessment period, the NRC plans on issuing a final Notice of Violation and White Inspection Finding in accordance with the NRC=s Enforcement Policy. The finding involved inadequate work instructions to install the 1B Emergency Diesel Generator (EDG) exhaust header.
On August 21, 2008, we were notified by your staff of your readiness for the NRC to conduct a Unit 1 95001 supplemental inspection to review the actions taken to address the White MSPI Emergency AC PI and the pending White Inspection Finding associated with the 1B EDG exhaust header failure. Therefore, we plan to conduct supplemental inspection procedure 95001, Inspection For One Or Two White Inputs In A Strategic Performance Area, beginning on September 22, 2008. In addition, we plan to conduct reactor oversight process (ROP) baseline inspections at Unit 1 and 2. We also plan on conducting several non-ROP inspections of reactor coolant system dissimilar metal butt welds (Temporary Instruction (TI) 2515/172), site specific implementation of B.5.b phase 2 and 3 mitigation strategies (TI 2515/171), emergency diesel generator technical specification surveillance requirements (TI 2515/176), and Emergency Response Organization Drill/Exercise Performance Indicator (TI 2515/175).
In addition, TI 2515/173, Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative, will be performed at your facility prior to August 30, 2010. In the near term, we will contact you to assess your readiness for this inspection and then finalize our schedule accordingly.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
SNC Inc.
3 If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Scott Shaeffer at (404) 562-4521 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Luis A. Reyes Regional Administrator Docket Nos.: 50-348, 50-364 License Nos.: NPF-2, NPF-8
Enclosure:
Farley Inspection/ Activity Plan cc w/encl: (See page 4)
X SUNSI REVIEW COMPLETE /SMS/
OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE SMS /RA for/
SMS /RA/
LDW /RA/
NAME TLighty SShaeffer LWert DATE 08/29/2008 08/29/2008 09/02/2008 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
SNC, Inc.
4 cc w/encl:
B. D. McKinney Licensing Services Manager B-031 Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution William D. Oldfield Quality Assurance Supervisor Southern Nuclear Operating Company Electronic Mail Distribution L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution David H. Jones Vice President Engineering Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Moanica Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution M. Stanford Blanton, Esq.
Balch and Bingham Law Firm Electronic Mail Distribution Dr. D. E. Williamson State Health Officer Alabama Dept. of Public Health Electronic Mail Distribution Mr. Mark Culver Chairman Houston County Commission P. O. Box 6406 Dothan, AL 36302 Jim Sommerville (Acting) Chief Environmental Protection Division Department of Natural Resources Electronic Mail Distribution
SNC, Inc.
5 Letter to J. Randy Johnson from Scott M. Shaeffer dated September 2, 2008
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -JOSEPH M.
FARLEY NUCLEAR PLANT Distribution w/encl: