ML082350667

From kanterella
Jump to navigation Jump to search

Notice of Meeting with Florida Power Corporation Regarding Steam Replacement Activities at Crystal River
ML082350667
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/25/2008
From: Farideh Saba
Plant Licensing Branch II
To: Boyce T
Plant Licensing Branch II
Saba F, NRR/DORL/LPL4, 301-415-1447
References
TAC MD8530
Download: ML082350667 (5)


Text

  • See Commission's Policy Statement on Enhancing Public Participation in NRC Meetings, dated May 28, 2002 (67 FR 36920).

August 25, 2008 MEMORANDUM TO: Thomas H. Boyce, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:

Farideh E. Saba, Senior Project Manager

/RA/

Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH THE FLORIDA POWER CORPORATION REGARDING UPCOMING STEAM GENERATOR REPLACEMENT ACTIVITIES AT THE CRYSTAL RIVER NUCLEAR PLANT, UNIT 3 (TAC NO. MD8530)

DATE & TIME:

Tuesday, September 16, 2008 9:00 a.m. - 12:00 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O-6B6 Rockville, Maryland CATEGORY 1*:

This is a Category 1 public meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the U.S. Nuclear Regulatory Commission (NRC) staff after the business portion but before the meeting is adjourned.

PURPOSE:

Representatives from the Crystal River Nuclear Plant, Unit 3 (CR3) and the NRC staff will discuss topics related to the upcoming planned replacement of the CR3 steam generators. Specific topics are identified on the enclosed agenda, but include discussion of the milestone schedule, overall project scope, and operating experience from other nuclear plants with replacement steam generators.

CONTACT:

Farideh Saba, NRR 301-415-1447 Farideh.Saba@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

T. Boyce PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC/NRR Farideh Saba Tom Boyce Allen Hiser Kenneth Karwoski Tom Alexion FLORIDA POWER CORPORATION Jim Terry Project Manager Bob Lemberger Lead Engineer - Component Ken Wilson Supervisor, Licensing Sid Powell Licensing Engineer Docket No. 50-302

Enclosure:

Agenda cc w/enclosure: See next page

T. Boyce PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC/NRR Farideh Saba Tom Boyce Allen Hiser Kenneth Karwoski Tom Alexion FLORIDA POWER CORPORATION Jim Terry Project Manager Bob Lemberger Lead Engineer - Component Ken Wilson Supervisor, Licensing Sid Powell Licensing Engineer Docket No. 50-302

Enclosure:

Agenda cc w/enclosure: See next page Distribution:

PUBLIC PMNS LPL2-2 R/F RidsNrrDorlLpl2-2 (TBoyce)

RidsNrrPMFSaba RidsNrrLACSola RidsNrrDorl RidsRgn2MailCenter RidsOpaMail K. Clark, OPA Rgn II RidsAcrsAcnw&mMailCenter RidsOgcMailCenter MCox, EDO, Rgn II Receptionist OWFN and TWFN (hard copy)

Accession Number: ML082350667 NRR-001 OFFICE NRR/LPL2-2/PM NRR/LPL2-2/LA NRR/LPL2-2/BC NAME FSaba RSola TBoyce DATE 8/25/08 8/25/08 8/25/08 OFFICIAL RECORD COPY

Enclosure CATEGORY 1 MEETING WITH THE FLORIDA POWER CORPORATION REGARDING UPCOMING STEAM GENERATOR REPLACEMENT ACTIVITIES AT THE CRYSTAL RIVER NUCLEAR PLANT, UNIT 3 SEPTEMBER 16, 2008 AGENDA 9:00 a.m. - 9:15 a.m.

Introductory Remarks 9:15 a.m. - 9:30 a.m.

Pre-outage Milestone Schedule Discussion 9:30 a.m. - 9:45 a.m.

Overview of Project Scope 9:45 a.m. - 10:00 a.m.

Break 10:00 a.m. - 10:30 a.m.

Discussion of Steam Generator Changes Based on Oconee and Arkansas Nuclear One Operating Experience 10:30 a.m. - 11:00 a.m.

Plans for PGN Vendor Oversight 11:00 a.m. - 11:30 a.m.

Discussion of Associated Licensing Actions 11:30 a.m. - 12:00 p.m.

Opportunity for Public Comment 12:00 p.m.

Adjourn

Florida Power Corporation Crystal River Nuclear Plant, Unit 3 cc:

Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)

ATTN: Supervisor, Licensing

& Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. R. Alexander Glenn Associate General Counsel (MAC-BT15A)

Florida Power Corporation P.O. Box 14042 St. Petersburg, Florida 33733-4042 Mr. Michael J. Annacone Plant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Jim Mallay Framatome ANP 1911 North Ft. Myer Drive, Suite 705 Rosslyn, Virginia 22209 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Inverness, Florida 34450-4245 Mr. Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Jon A. Franke Director Site Operations Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Senior Resident Inspector Crystal River Unit 3 U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, Florida 34428 Ms. Phyllis Dixon Manager, Nuclear Assessment Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. David T. Conley Associate General Counsel II - Legal Dept.

Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. Daniel L. Roderick Vice President, Nuclear Projects &

Construction Crystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. David Varner Manager, Support Services - Nuclear Crystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Robert J. Duncan II Vice President, Nuclear Operations Progress Energy Post Office Box 1551 Raleigh, North Carolina 27602-1551 Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy Post Office Box 1551 Raleigh, North Carolina 27602-1551