4A-s I q DOCKETED USNRC August 12, 2008 (11:00am)
OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF EXHIBIT A U.S. N3UCLEAR REGULATORY CMIS M~ROM by: Appl Ucensee Indevemo_______
/EWcnTalmE An MECTED WW~hRAWN ls&Z03
- U.S.NRC United States Nuclear Regulatory Commission Protecting People and the Environment NUREG-1 829 Vol. 1 Estimating Loss-of-Coolant Accident (LOCA)
Frequencies Through the Elicitation Process Main Report Office of Nuclear Regulatory Research
U.S.NRC United States Nuclear Regulatory Commission Protecting People and the Environment
'NUREG-1829 Vol. 1 Estimating Loss-of-Coolant Accident (LOCA)
Frequencies Through the Elicitation Process Main Report Manuscript Completed: March 2008 Date Published: April 2008 Prepared by R. Tregoning (NRC), L. Abramson (NRC)
P. Scott (Battelle-Columbus)
A. Csontos, NRC Project Manager Office of Nuclear Regulatory Research
U.S.NR-c United States Nuclear Regu~a-
-y--G,&w
-i~sien Protecting People and the Environment--.
NG-1829..,
Estimating Loss-of-Coolant Accident (LOCA)
Frequencies Through the Elicitation Process Append ices-Athrough M..---
Office of Nuclear Regulatory Research
- U.Se:TO E
IT S--
NUREGTS United States Nuclear Regulato_ýor-kmision" Protecting People and the Enviroonme _
Estimating Loss-of-Coolant.
Accident (LOCA)
Frequencies Through the Elicitation Process Appendices A through M Manuscript Completed: March 2008 Date Published: April 2008 Prepared by R. Tregoning (NRC), L. Abramson (NRG)--
P. Scott (Battelle-Columbus)
A. Csontos, NRC Project Manager Office of Nuclear Regulatory Research
APPENDIXD PIPING BASE CASE RESULTS OF BENGTILYDELL An Application of the Parametric Attribute-Influence Methodology to Determine Loss of Coolant Accident (LOCA) Frequency Distributions Report No. 2 to the NRC Expert Panel on LOCA Frequency Distributions Prepared for U.S. Nuclear Regulatory Commission Washington (DC)
June 2004 D-1
D.3.22 FW Piping Service Experience - Figures D.9 and D. 10 summarize the service experience with FW piping. With respect to plant designed by General Electric, the Code Class I portion of BWR carbon steel feedwater piping has performed well in the field. There are no reported leaks in medium-or large-diameter RCPB piping. Foreign plants have experienced (and in some cases, continue to experience) thermal fatigue damage due to thermal mixing and stratification. In fact, 80% of the degradation of the RCPB portions of FW piping has occurred in foreign plants with a piping system design that differs from that of U.S. BWR plants.
The U.S. service experience includes a few instances of non-through wall cracking of FW nozzle-to-safe-end (bimetallic) welds. The root cause of the cracking is attributed to weld defects from original construction. As documented in Information Notice 92-35 [D. 191, Susquehanna Unit I has experienced flow-accelerated corrosion damage about 250 mm (10 inches) froma weld connecting NPSI2 piping to a 20-inch by 12-inch reducing tee. There have been no reported flaws in any U.S. plant beyond T = 15 years of operation.
14 (n
6z 12 FW Rping Inside Dryw eli E3r D Rping Outside Dryw ell 2'
0 Figure D.9 Service Experience with FW Piping (i)
D-22
12 4-0 I
Years of Operation Figure D.1O Service Experience with FW Piping (ii)
D.3.3 Review of PWR-Specific Piping Service Experience Limited to the PWR Base Case systems, this section summarizes the service experience with Code Class I piping. The results of this review are input to the pipe failure rate estimation.
D.3.3. 1 RC & HPI/NMU Piping Service Experience - There have only been a limited number of events involving through-wall cracks in the large-diameter RC piping and the Class I portion of SI/CV piping.
Evidence of axial primary water stress corrosion cracking (PWSCC) in the bimetallic safe-end to RPV nozzle welds of the RC-HL piping has been reported at Ringhals [D.20] and V.C. Summer [D.21].
During an eight-year period, the now decommissioned Trojan nuclear power plant experienced pressurizer surge line movement, which was attributed to thermal stratification [D.22]. In response, the NRC issued Bulletin 88-1 I in December of 1988 [D.23] requesting that licensees perform visuhl inspections of the pressurizer surge line at the first available cold shutdown. Purpose of the inspections was to determine presence of any "gross discernible distress or structural damage in the entire pressurizer surge line, including piping, pipe supports, pipe whip restraints, and anchor bolts."
The current version (June 2004) of the PIPExp database includes four records associated with degradation of pressurizer surge lines:
Record # 19849; during the Three Mile Island-I 2003 Refueling Outage (18-Oct-2003 to 3-Dec-2003), a UT examination found an axial flaw about 13 mm (0.5-inch) deep in the surge line nozzle-to-safe end interface in dissimilar metal weld No. SROOIOBM. This weld connects a 10-inch Schedule 140, carbon steel nozzle to stainless steel safe end.
Record # 19736; in November 2002 during UT examination of RC piping in the Belgian plant Tihange-2 (a 900 MWe series plant designed by Framatome), code rejectable indications were D-23