Text
-3 (4)
UE, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source of special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
UE, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level UE is authorized to operate the facility at reactor core power levels not in excess of 3565 megawatts thermal (100% power) in accordance with the conditions specified herein.
(2)
Technical Specifications and Environmental Protection Plan*
The Technical Specifications contained in Appendix A, as revised through Amendment No. 185 and the Environmental Protection Plan contained in Appendix 8, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3)
Environmental Qualification (Section 3.11, SSER #3)**
Deleted per Amendment No. 169 Amendments 133, 134, & 135 were effective as of April 30, 2000 however these amendments were implemented on April 1, 2000.
The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
Amendment No. 185
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air LCO 3.8.3 The stored diesel fuel oil, lube oil, and starting air sUbsystem shall be within limits for each required diesel generator (DG).
APPLICABILITY:
When associated DG is required to be OPERABLE.
ACTIONS
NOTE ----------------------------------------------------------.
Separate Condition entry is allowed for each DG.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more DGs with fuel level < 80,900 gal and
> 69,800 gal in storage tank.
A.1 Restore fuel oil level to within limits.
48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> B.
One or more DGs with lube oil inventory < 750 gal and
> 686 gal.
B.1 Restore lube oil inventory to within limits.
48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> C.
One or more DGs with stored fuel oil total particulates not within limit.
C.1 Restore fuel oil total particulates within limit.
7 days D.
One or more DGs with new fuel oil properties not within limits.
D.1 Restore stored fuel oil properties to within limits.
30 days (continued)
CALLAWAY PLANT 3.8-19 Amendment No. 185
3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.3.1 Verify each fuel oil storage tank contains ~ 80,900 gal of fuel.
31 days SR 3.8.3.2 Verify lUbricating oil inventory is ~ 750 gal.
31 days SR 3.8.3.3 Verify fuel oil properties of new and stored fuel oil are In accordance with tested in accordance with, and maintained within the the Diesel Fuel Oil limits of, the Diesel Fuel Oil Testing Program.
Testing Program SR 3.8.3.4 Verify pressure in two starting air receivers is ~ 435 31 days psig or pressure in one starting air receiver is ~ 610 psig, for each DG starting air subsystem.
SR 3.8.3.5 Check for and remove accumulated water from each fuel oil storage tank.
SR 3.8.3.6 Not used.
31 days CALLAWAY PLANT 3.8-21 Amendment No. 185