ML081980055
| ML081980055 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/30/2008 |
| From: | Susquehanna |
| To: | Gerlach R Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 028401 | |
| Download: ML081980055 (29) | |
Text
Jun.
30, 2008 Page 1
of 2
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2008-32043 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#:
0363 Address: NUCSA2 Phone#:
254-3194 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSE M 06/30/2008 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUSTENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION:
"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 -
TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 06/09/2008 ADD MANUAL TABLE OF CONTENTS DATE: 06/27/2008 CATEGORY:
DOCUMENTS TYPE: TRM2 400w PjgA
Jun. 30, 2008 Page 2
of 2
ID:
TEXT 3.7.6 ADD:
REV: 2 REMOVE:
REV:1 CATEGORY:
DOCUMENTS ID:
TEXT B3.7.6 REMOVE:
REV:1 ADD:
REV: 2 TYPE: TRM2 CATEGORY:
ID:
TEXT REMOVE:
DOCUMENTS LOES REV:45 TYPE: TRM2 ADD:
REV: 46 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL
- USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUALJ Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:
06/09/2008 Procedure Name Rev TEXT LOES 45
Title:
LIST OF EFFECTIVE SECTIONS Issue Date 05/23/2008 Change ID Change Number TEXT TOC
Title:
TEXT 1.1
Title:
TEXT 2.1
Title:
TEXT 2.2
Title:
TEXT 3.0
Title:
13 01/31/2008 TABLE OF CONTENTS 0
11/19/2002 USE AND APPLICATION DEFINITIONS 1
02/04/2005 PLANT PROGRAMS AND SETPOINTS PLANT-PROGRAM 7
05/23,/20"080 PLANT PROGRAMS AND SETPOINTS INSTRUMENT
\\4
/<., -\\
,..0
~/2008 05A'23/2008 APPLICABILITY TECHNICAL REQUI~REMENT FOR
)
TRIP SETPOINT TABLE OPERATION (TRO)
APPLICABILITY TEXT 3.11 11/09/2007
Title:
REACTIVITYCONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD
- I
\\ N INJECTION-( TWS-ARI)
INSTRUMENTATION TEXT 3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT 3.1.3 3
04/09/2007
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 7
04/19/2007
Title:
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
Page 1 of 15 Report Date: 06/26/08 Page 1 of 15 Report Date: 06/26/08
SSES MANUiAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0
11/19/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 2
11/09/2007
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2
11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 5
05/23/2008
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0
11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 2
10/19/2005
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1
11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1
10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 2
04/09/2007
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1
12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1
10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.4.1 1
04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY Page2 of i~.
Report Date: 06/26/08 Page 2 of 1_55 Report Date,: 06/26/08
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.2
Title:
REACTOR TEXT 3.4.3
Title:
REACTOR TEXT 3.4.4
Title:
REACTOR TEXT 3.4.5
Title:
REACTOR TEXT 3.5.1 0
11/19/2002 COOLANT SYSTEM STRUCTURAL INTEGRITY 1
11/09/2007 COOLANT SYSTEM-REACTOR COOLANT SYSTEM (RCS) 1 12/14/2004 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1
04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1
02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1
11/09/2007
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0
11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0
11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0
11/19/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)
SHUTDOWN Page 3 of i_5 Report Date: 06/26/08
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.2
Title:
PLANT TEXT 3.7.3.1
Title:
PLANT TEXT 3.7.3.2
Title:
PLANT TEXT 3.7.3.3
Title:
PLANT TEXT 3.7.3.4
Title:
PLANT TEXT 3.7.3.5
Title:
PLANT TEXT 3.7.3.6
Title:
PLANT TEXT 3.7.3.7
Title:
PLANT 0
11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)
AND GROUND WATER LEVEL 1
04/26/2006 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 2
04/26/2006 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 2
SYSTEMS C02 SYSTEMS 1
SYSTEMS HALON SYSTEMS 08/18/2005 04/26/2006 1
.04/26/2006 SYSTEMS FIRE HOSE STATIONS 1
.04/26/2006 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1
04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8
Title:
PLANT SYSTEMS 7
.11/09/2007 FIRE DETECTION INSTRUMENTATION TEXT 3.7.4
Title:
PLANT TEXT 3.7.5.1
Title:
PLANT TEXT 3.7.5.2
Title:
PLANT 1
04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM 0
11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0
11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE Page 4 of 15 Report Date: 06/26/08 Page 4 of
.15 Report Date: 06/26/08
SSES MANUJAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.3 1
04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 1
03/01/2005
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 1
01/31/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 6
06/21/2007
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1
08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.8.1 2
02/04/2005
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2
11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTIC CONTINUOUS TEXT 3.8.2.2 2
12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTIC AUTOMATIC TEXT 3.8.3 0
11/19/2002
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES TEXT 3.8.4 1
02/04/2005
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 0
11/19/2002
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION DN DNON ON Page 5 of 15 Report Date: 06/26/08 Page 5 of 15 Report Date: 06/26/08
SSES MANUA-L Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.6 0
11/19/2002
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 0
12/14/2006
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1
04/26/2006
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1
04/09/2007
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 1
04/26/2006
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 1
.08/28/2006
Title:
MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)
TEXT 3.11.1.1 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM Page 6 of 15 Report Date: 06/26/08
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.4
Title:
RADIOACTIVE TEXT 3.11.1.5
Title:
RADIOACTIVE TEXT 3.11.2.1
Title:
RADIOACTIVE TEXT 3.11.2.2
Title:
RADIOACTIVE TEXT 3.11.2.3
Title:
RADIOACTIVE FORM TEXT 3.11.2.4
Title:
RADIOACTIVE TEXT 3.11.2.5
Title:
RADIOACTIVE TEXT 3.11.2.6
Title:
RADIOACTIVE TEXT 3.11.3
Title:
RADIOACTIVE TEXT 3.11.4.1
Title:
RADIOACTIVE TEXT 3.11.4.2
Title:
RADIOACTIVE TEXT 3.11.4.3
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1
12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2
05/02/2007 RADIOACTIVE LIQUID. PROCESS MONITORING INSTRUMENTATION 3
04/26/2006 DOSE RATE 1
04/26/2006 DOSE NOBLE GASES 1
04/26/2006 DOSE -
11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM EFFLUENTS EFFLUENTS 3
11/14/2006 VENTILATION EXHAUST 3
05/02/2007 RADIOACTIVE GASEOUS TREATMENT SYSTEM EFFLUENT MONITORING INSTRUMENTATION EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1
04/26/2.006 TOTAL-DOSE 3
04/26/2006 MONITORING PROGRAM 2
04/26/2006 LAND USE CENSUS 1
04/26/2006 INTERLABORATORY COMPARISON PROGRAM Page 7 of
- 15.
Report Date: 06/26/08 Page 7 o f 1_5 Report Date: 06/26/08
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.12.1
Title:
LOADS CONTROL 0
11/19/2002 PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4
04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT B3.0
Title:
APPLICABILITY 4
05/23/2008 BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT B3.1.3 3
04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0
11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 0
11/19/2002
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 1
11/09/2007
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 2
11/09/2007
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION Page 8 of
.15 Report Date: 06/26/08
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.4
Title:
INSTRUMENTATION TEXT B3.3.5
Title:
INSTRUMENTATION TEXT B3.3.6
Title:
INSTRUMENTATION TEXT B3.3.7
Title:
INSTRUMENTATION TEXT B3.3.8
Title:
INSTRUMENTATION TEXT B3.3.9
Title:
INSTRUMENTATION TEXT B3.3.10
Title:
INSTRUMENTATION TEXT B3.3.11
Title:
INSTRUMENTATION TEXT B3.4.1
Title:
11/09/2007 BASES TRM POST ACCIDENT MONITORING (PAM)
INSTRUMENTATION 2
11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK 3
10/19/2005 BASES TRM ISOLATION ACTUATION INSTRUMENTATION-1 11/09/2007 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1
10/22/2003 BASES TRM RPS INSTRUMENTATION 2
04/10/2007 BASES LPRM UPSCALE ALARM INSTRUMENTATION 0
11/19/2002 BASES REACTOR RECIRCULATION PUMP MG SET STOPS 1
10/22/2003 BASES MVP ISOLATION INSTRUMENTATION 0
11/19/2002 SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1
11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4
Title:
11/19/2002 SYSTEM BASES REACTOR RECIRCULATION FLOW AND'ROD LINE LIMIT Page 9 of 15 Report Date: 06/26/08 Page 9 of I_55 Report Date: 06/26/08
SSES MANUAL Manual Name:-
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.4.5 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.5.1 0
11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1
11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1
11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0
11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0
11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1
04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1
12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0
11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0
11/19'/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS)
GROUND WATER LEVEL TEXT B3.7.3.1 2
01/07/2008
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2
04/26/2006
Title:
PLANT SYSTEMS BASESSPRAY AND SPRINKLER SYSTEMS Page 10 of 15 Report Date: 06/26/08
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.3
Title:
PLANT TEXT B3.7.3.4
Title:
PLANT TEXT B3.7.3.5
Title:
PLANT TEXT B3.7.3.6
Title:
PLANT TEXT B3.7.3.7
Title:
'PLANT TEXT B3.7.3.8
Title:
PLANT TEXT B3.7.4
Title:
PLANT TEXT B3.7.5.1
Title:
PLANT TEXT B3.7.5.2
Title:
PLANT TEXT B3.7.5.3
Title:
PLANT TEXT B3.7.6
Title:
PLANT TEXT B3.7.7
Title:
PLANT 0
11/19/2002 SYSTEMS BASES C02 SYSTEMS 1
0.4/26/2006 SYSTEMS BASES HALON SYSTEMS 1
04/26/2006 SYSTEMS BASES FIRE HOSE STATIONS 1
04/26/2006 SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0
11/19/2002 SYSTEMS BASES FIRE RATED ASSEMBLIES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 1
01/12/2004 FIRE DETECTION INSTRUMENTATION 0
11/19/2002 SOLID RADWASTE:SYSTEM.
0 11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0
11/1,9/2.002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0
11/19/2002 LIQUID HOLDUP TANKS 1
03/01/2005 ESSW PUMPHOUSE VENTILATION 2
01/31/2008 MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Page 11 of 15.
Report Date: 06/26/08 Page 11 of 15 Report Date: 06/26/08
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MA1NUAL UNIT 2 TEXT B3.7.8
Title:
PLANT SYSTE TEXT B3.7.9
Title:
PLANT SYSTE TEXT B3.7.10
Title:
PLANT SYSTE TEXT.B3.8.1
Title:
ELECTRICAL PROTECTIVE TEXT B3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT B3.8.2.2
Title:
ELECTRICAL AUTOMATIC TEXT B3.8.3
Title:
ELECTRICAL TEXT B3.8.4
Title:
ELECTRICAL TEXT B3.8.5
Title:
ELECTRICAL TEXT B3.8.6
Title:
ELECTRICAL TEXT B3.8.7 3
06/21/2007 EMS BASES SNUBBERS 1
12/14/2004
- MS BASES CONTROL.STRUCTURE HVAC 1
12/14/2004 EMS BASES SPENT FUEL STORAGE POOLS 1
02/04/2005 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0
11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION 1
09./17/2004 PROTECTION -
POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 0
11/19/2002 POWER BASES DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 0
11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 0
11/19./2002 POWER BASES DEGRADED VOLTAGE PROTECTION 1
02/04/2005 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 0
12/14/2006
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME Page 12 of 15 Report Date: 06/26/08 Page 12 of.155 Report Date: 06/26/08
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0
Title:
REFUELING OPERATIONS BASES 11/19/2002 COMMUNICATIONS TEXT B3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1
Title:
MISCELLANEOUS TEXT B3.10.2
Title:
MISCELLANEOUS TEXT B3.10.3
Title:
MISCELLANEOUS 0
BASES SEALED 11/19/2002 SOURCE CONTAMINATION 1
04/10/2007 BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION 0
11/19/2002 BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.10.4 0
Title:
MISCELLANEOUS BASES LEADING 11/19/2002 EDGE FLOW METER (LEFM)
TEXT B3.11.1.1
Title:
RADIOACTIVE TEXT B3.11.1.2
Title:
RADIOACTIVE TEXT B3.11.1.3
Title:
RADIOACTIVE TEXT B3.11.1.4
Title:
RADIOACTIVE TEXT B3.11.1.5
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 0
BASES 0
BASES 11/19/2002 LIQUID EFFLUENTS CONCENTRATION 11/19/2002 LIQUID EFFLUENTS DOSE 0
11/19/2002 BASES LIQUID WASTE TREATMENT SYSTEM 0
11/19/2002 BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 0
11/19/2002 BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1
12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE Page 13 of 15 Report Date: 06/26/08 Page 13 of
.15 Report Date: 06/26/08
SSES MANUAMJ Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -
NOBLE GASES TEXT B3.11.2.3
Title:
RADIOACTIVE EFFLUENTS PARTICULATES FORM 0
11/19/2002 BASES DOSE -
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 4
11/14/2006
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION 1
01/27/2004 BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING TEXT B3.11.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 2
01/06/2006
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1
10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0
11/19/2002
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 1.4 of 15 Report Date: 06/26/08 Page 14 of
.15 Report Date: 06/26/08
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 4.1
Title:
TEXT 4.2
Title:
TEXT 4.3
Title:
TEXT 4.4
Title:
TEXT 4.5
Title:
TEXT 4.6
Title:
TEXT 4.7
Title:
ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0
09/27/2003 CONTROLS ORGANIZATION 0
09/27/2003 CONTROLS REPORTABLE EVENT ACTION 0
09/27/2003 CONTROLS SAFETY LIMIT VIOLATION 0
09/27/2003 CONTROLS PROCEDURES & PROGRAMS 0
09/27/2003 CONTROLS REPORTING REQUIREMENTS 0
09/27/2003 CONTROLS RADIATION PROTECTION PROGRAM 0
CONTROLS 09/27/2003 TRAINING Page 15 of 15 Report Date: 06/26/08 Page 15 of 15 Report Date: 06/26/08
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 46 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC 1.0 TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM / 1.0-3 2.0 3.0 3.1 3.2 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Page TRM / 2.0-8 Pages TRM / 2.0-9 through TRM / 2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM /2.0-14^,
Page TRM / 2.0-15
<\\
APPLICABILITY
(
Pages TRM / 3.0-1 and TRM/,.3. 02 Page TRM / 3.0-3 Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-'1 Pages TRM// 3'.1-2 through TRM / 3.1-5 Pages TRM/3.1-6 thlrough TRM / 3.1-8 Pages TRM/ý3.1-9 and TRM / 3.1-9a Page'TRM/. 3\\..
4-10 CORE OPERATING LIMITS REPORT e RgeT-M
/ 3.2-1 TPage RM / 3.2-2 through TRM / 3.2-48 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Pages TRM / 3.3-4 and TRM / 3.3-5 Page 3.3-6 Page TRM 3.3-7 Page 3.3-8 Page TRM / 3.3-9 Page TRM / 3.3-9a Page TRM / 3.3-10 Page TRM / 3.3-11 Page TRM / 3.3-11a 01/30/2008 08/31/1998 10/04/2002 08/31/1998 08/31/1998 01/28/2005 06/25/2002 04/12/1999 03/27/2007 05/15/2008 12/03/2004 11/15/2004 03/27/2007 11/15/2004 11/15/2005 04/14/2008 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/27/2007 02/18/1999 02/18/1999 08/31/1998 03/30/2007 07/16/1999 10/31/2007 08/31/1998 10/31/2007 08/31/1998 04/12/2007 12/17/1998 10/31/2007 06/02/2005 04/14/2008 3.3 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 06/20/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 46 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.4 Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Page TRM / 3.3-15 Page TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM / 3.3-21 Page TRM / 3.3-21a Pages TRM /3.3-21b through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages 3.4-6 through 3.4-9 Page 3.4-10 Page 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Pages TRM / 3.7-4 and TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Page TRM / 3.7-9 Page TRM / 3.7-10 Page TRM / 3.7-11 Pages TRM / 3.7-12 and TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 03/30/2001 09/13/2005 12/14/1998 10/22/2003 06/27/2001 06/14/2002 10/31/2007 10/22/2003 03/27/2007 11/15/2004 03/27/2007 12/03/2004 05/16/2003 10/22/2003 03/31/2006 10/23/1998 08/31/1998 10/31/2007 08/31/1998 12/03/2004 03/31/2006 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 01/07/2002 08/31/1998 12/31/2002 07/29/1999 08/31/1998 03/31/2006 08/02/1999 03/31/2006 08/16/2005 01/21/2000 08/02/1999 08/09/2005 08/02/1999 03/31/2006 3.5 3.6 3.7 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 06/20/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 46 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Pages TRM / 3.7-23 and TRM / 3.7-24 Pages TRM / 3.7-25 and TRM / 3.7-26 Page TRM / 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Page TRM / 3.7-40 Page TRM / 3.7-40a Page TRM / 3.7-41 Page 3.7-42 Pages TRM / 3.7-43 through TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Pages 3.8-13 and 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Pages TRM / 3.8-26 through TRM / 3.8-29 Effective Date 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 10/31/2007 11/29/2006 11/16/2001 11/30/2005 11/16/2001 01/09/2004 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 06/20/2008 01/30/2008 08/31/1998 10/05/2006 06/07/2007 10/05/2006 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/02/2002 01/28/2005 01/31/2005 04/02/2002 10/31/2007 08/10/2004 12/03/2004 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 11/29/2006 3.8 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 06/20/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 46 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 3.10 3.11 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 Page TRM / 3.10-8 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM / 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 through TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 08/31/1998 03/31/2006 08/30/1998 03/27/2007 03/31/2006 08/16/2006 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 12/03/1004 09/01/1998 03/31/2006 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 06/20/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 46 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.12 4.0 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM 1 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 02/05/1999 03/14/2008 02/05/1999 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 06/20/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 46 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Page TRM / B 3.0-5 Page TRM / B 3.0-6 Page TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 B 3.1 B 3.2 B 3.3 B 3.4 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Pages TRM / B 3.3-2 and TRM / B-3.3-2a Pages TRM / B 3.3-3 and TRM / B 3.3-3a Pages TRM / B 3.3-4 and TRM / B 3.3-5 Pages TRM / B 3.3-6 through TRM / B 3.3-9 Page B 3.3-10 Pages TRM / B 3.3-11 and TRM / B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 through TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a through TRM / B 3.3-19e Pages TRM / B 3.3-20 and TRM / B 3.3-21 Page TRM / B 3.3-22 Page TRM / B 3.3-23 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 Effective Date 08/31/1998 01/10/2007 04/14/2008 08/31/1998 04/12/2007 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1998 04/07/2000 10/31/2007 10/31/2007 05/30/2006 10/31/2007 08/31/1998 09/13/2005 12/03/2004 06/25/2002 10/31/2007 06/14/2002 10/22/2003 03/27/2007 03/27/2007 05/16/2003 10/22/2003 05/16/2003 08/31/1998 10/31/2007 10/15/1999 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 06/202008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 46 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.5 B 3.6 B 3.7 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 and TRM / B 3.5-3a Page B 3.5-4 Page TRM / B 3.5-5 CONTAINMENT BASES Page TRM/ B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 and TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Pages TRM / B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Pages TRM / B 3.7-10a through TRM / B 3.7-11a Pages TRM / B 3.7-12 through TRM / B 3.7-14 Pages TRM / B 3.7-14a and TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Page TRM / B 3.7-21a Pages TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-29 Page TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 08/31/1998 10/31/2007 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/29/2007 04/04/2007 12/03/2004 12/31/2002 08/31/1998 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 01/09/2004 02/01/1999 08/31/1998 02/14/2005 06/20/2008 01/30/2008 10/05/2006 06/07/2007 10/05/2006 12/03/2004 03/09/2001 04/15/2003 12/03/2004 07/05/2000 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 06/20/2008
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 46 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.8 B.3.9 ELECTRICAL POWER BASES Page TRM / B &8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM /B 3.8-17 Pages TRM / B 3.8-18 through TRM / B 3.8-24 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3.
Pages TRM / B 3.10-4 and TRM / B 3.10-5 Pages TRM / B 3.10-6 and TRM / 3.10-7 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11 a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11-23 Page TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages B 3.11-31 through B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Pages TRM / B 3.12-2 and TRM / B 3.12-3 TRM2 text LOES.doc 6/20/08 04/02/2002 01/28/2005 04/02/2002 04/02/2002 04/02/2002 08/10/2004 08/31/1998 04/02/2002 01/28/2005 11/29/2006 08/31/1998 10/23/1998 08/31/1998 03/27/2007 08/23/1999 04/17/2002 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 04/02/2002 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/31/1998 11/30/2005 12/03/2004 08/31/1998 02/12/1999 09/19/2007 02/05/1999 SUSQUEHANNA - UNIT 2 TRM / LOES-8 EFFECTIVE DATE 06/20/2008
ESSW Pumphouse Ventilation 3.7.6 PPL Rev. 2 3.7 Plant Systems 3.7.6 ESSW Pumphouse Ventilation TRO 3.7.6 Two ESSW Pumphouse Ventilation Subsystems shall be OPERABLE.
APPLICABILITY:
Whenever associated RHRSW and ESW Pumps are required to be OPERABLE.
ACTIONS NOTES
- 1.
If one or more fans and one or more dampers render ESSW Pumphouse Ventilation Subsystem fan train(s) inoperable, enter both the appropriate Condition for inoperable fan(s) and Condition E.
- 2.
Dampers gagged in the appropriate position may be un-gagged intermittently under administrative controls to allow for work and/or operability testing.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One ESSW Pumphouse A.1 Restore subsystem fan 30 days Ventilation Subsystem to OPERABLE status.
fan train in one or both subsystems inoperable due to an inoperable fan.
B.
Two ESSW Pumphouse B. 1 Restore inoperable 7 days Ventilation Subsystem equipment so at least fan trains in one or both three fans in the subsystems inoperable subsystem are in due to inoperable fans.
OPERABLE status.
C.
Three or more ESSW C.1 Restore inoperable 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Pumphouse Ventilation equipment so at least Subsystem fan trains in two fans in the one subsystem subsystem are in inoperable due to OPERABLE status inoperable fans.
SUSQUEHANNA - UNIT 2 TRM / 3.7-40 EFFECTIVE DATE 02/14/2005
ESSW Pumphouse Ventilation PPL Rev. 2 3.7.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D.
Three or more fan trains in D.1 Declare the associated Immediately both subsystems ESW/RHRSW pumps inoperable due to inoperable.
inoperable fans.
E.
NOTE ------------
E. 1 Gag the affected fans' 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Separate Condition entry is dampers in the allowed for each damper.
appropriate position One or more ESSW Pumphouse Ventilation Subsystem fan trains in one or both subsystems inoperable due to one or more inoperable dampers.
F.
Required Action and F.1 Declare the associated Immediately associated Completion ESW/RHRSW pumps Time of Conditions A, B, C, inoperable.
or E not met.
TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.7.6.1 Verify that the ESSW Pumphouse Ventilation 92 days Subsystems fans start and associated dampers automatically position when their associated pump starts.
SUSQUEHANNA - UNIT 2 TRM / 3.7-40a EFFECTIVE DATE 06/20/2008
ESSW Pumphouse Ventilation PPL Rev. 2 B 3.7.6 B 3.7.6 ESSW Pumphouse Ventilation BASES TRO The ESSW Pumphouse Ventilation System provides heat removal capability to ensure equipment temperature limits are maintained for the ESW pumps and the Unit 1 and Unit 2 RHRSW pumps. These pumps are required to operate to mitigate a design basis event. The ESSW Pumphouse ventilation system consists of two subsystems that provide the primary means to remove heat from the pumphouse. Each subsystem consists of four trains.
A train consists of a fan and associated dampers.
Each ventilation subsystem provides cooling for separate divisions of equipment. Each division consists of two ESW pumps, one Unit 1 RHRSW pump and one Unit 2 RHRSW pump. The two ESSW Pumphouse Ventilation Subsystems provide the normal and emergency ventilation for the ESSW pumphouse. (Reference 1)
ACTIONS The ACTIONS are modified by two Notes. Note 1 directs the entry into both a Condition for an inoperable fan(s) and Condition E for inoperable dampers when both one or more fans and one or more dampers are inoperable.
Should the fan(s) and one or more dampers in an ESSW Pumphouse Ventilation Subsystem fan train(s) be inoperable, entry into two Conditions is required.
Note 2 allows a gagged damper to be un-gagged intermittently under administrative controls to allow for work and/or operability testing. These controls consist of stationing a dedicated person capable of installing a gag, who is in communication with the control room, at the damper. In this way, the damper can be re-gagged if the associated ESW/RHRSW pump starts.
An exception to the administrative control requirement to have a dedicated person stationed at the damper is when a damper has been repaired and successfully tested for operability but all of the required documentation has not been completed (i.e., functional but not administratively operable). If an inoperable damper remains un-gagged under administrative controls for a period of time greater than allowed by the action statements (i.e., 72 hrs.),
the associated ESW\\RHRSW pump must be declared inoperable.
The Actions are defined to ensure proper corrective measures are taken in response to inoperable components. The completion times are similar to completion times for the ESW system and are also based on engineering judgement that accounts for the fact that the system is a support system whose function is to maintain the ESSW Pumphouse temperature within limits.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.7-21 EFFECTIVE DATE 06/20/2008
ESSW Pumphouse Ventilation B 3.7.6 PPL Rev. 2 B 3.7.6 ESSW Pumphouse Ventilation BASES ACTIONS (continued)
Each subsystem of ESSW pumphouse equipment can maintain acceptable temperatures to meet design basis limits when all ventilation subsystem fan trains are operable. If a fan's associated damper(s) are inoperable, the associated fan subsystem can perform its intended safety function provided the inoperable fan(s) damper(s) are gagged in the appropriate position as determined by Engineering. The gagged damper position ensures that the ambient temperatures will remain within limits thus assuring no degradation of ESSW pumphouse equipment. An inoperable fan reduces the cooling capability of the subsystem thus compromising the subsystem ability to maintain temperatures within design limits.
Condition E is modified by a separate note to allow separate Condition entry for each damper. This is acceptable since the Required Action for this condition provides appropriate compensatory actions.
TRS The TRSs are defined to be performed at the specified Frequency to ensure that the ESSW Pumphouse Ventilation Systems are maintained OPERABLE.
Verifying the fans are OPERABLE includes ensuring fans and associated dampers have properly functioned when operated to support normal pump operation. This ensures adequate pump heat removal capability.
REFERENCES
- 1.
FSAR Section 9.4.8
- 2.
Safety Evaluation NL-99-057 SUSQUEHANNA - UNIT 2 TRM / B 3.7-21 a EFFECTIVE DATE 06/20/2008