3F0608-11, Withdrawal of Relief Request 08-001-IT, Revision 0

From kanterella
(Redirected from ML081770059)
Jump to navigation Jump to search

Withdrawal of Relief Request 08-001-IT, Revision 0
ML081770059
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/19/2008
From: Cahill S
Florida Power Corp, Progress Energy Co, Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0608-11, TAC MD7353
Download: ML081770059 (1)


Text

Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10CFR50.55a June 19, 2008 3F0608-11 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Withdrawal of Relief Request #08-001-IT, Revision 0, TAC No. MD7353

Reference:

FPC to NRC letter, 3F1007-12, dated October 31, 2007, "Crystal River Unit 3 -

Inservice Testing Program, Ten-Year Update," Accession No. ML073100094

Dear Sir:

Florida Power Corporation (FPC), doing business as Progress Energy Florida, Inc. hereby withdraws Relief Request #08-001-IT, Revision 0, "Pump Suction Pressure Instrument Accuracy," which is included in the referenced Inservice Testing (IST) Program, Ten-Year Update. During the review of an NRC request for additional information received by electronic mail on February 12, 2008, the determination was made that Relief Request #08-001-IT, Revision 0, is not required for implementation of the next Inservice Testing Program Ten-Year interval.

If you have any questions regarding this submittal, please contact Mr. Daniel Westcott, Supervisor, Licensing and Regulatory Programs at (352) 563-4796.

Sincerely, Stephen J. Cahill Engineering Manager SJC/par xc:

NRR Project Manager Regional Administrator, Region II Senior Resident Inspector

,4q7 Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 34428