Letter Sequence Approval |
---|
|
|
MONTHYEARML0817605672008-08-14014 August 2008 Issuance of Amendment Regarding Implementation of the Boiling- Water Reactor Pressure Vessel Integrated Surveillance Program to Address the Requirements of Appendix H to 10 CFR Part 50 Project stage: Approval 2008-08-14
[Table View] |
|
---|
Category:Letter
MONTHYEARML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) ML24190A1292024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints ML24185A1512024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) ML24176A1022024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 ML24141A2462024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24123A2012024-05-0202 May 2024 NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000259/2024404, 05000260-2024404, 05000296/2024404) and Request for Information ML24122A6852024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual CNL-24-036, – 10 CFR 50.46 Annual Report2024-04-25025 April 2024 – 10 CFR 50.46 Annual Report ML24116A2522024-04-25025 April 2024 Site Emergency Plan Implementing Procedure Revision ML24115A1652024-04-24024 April 2024 Breaker Trip Automatically Started an Emergency Diesel Generator 05000296/LER-2024-001, Primary Containment Isolation Valve Inoperable Due to Incorrect Motor Operated Valve Setup2024-04-22022 April 2024 Primary Containment Isolation Valve Inoperable Due to Incorrect Motor Operated Valve Setup CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A2302024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 2024-09-03
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARCNL-24-011, Application for Subsequent Renewed Operating Licenses, Supplemental Information - Neutron Fluence Analyses Methodology2024-01-22022 January 2024 Application for Subsequent Renewed Operating Licenses, Supplemental Information - Neutron Fluence Analyses Methodology ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-018, Request for Amendment Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves (BFN TS-540)2023-03-30030 March 2023 Request for Amendment Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves (BFN TS-540) CNL-23-027, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b (BFN TS-524)2023-03-29029 March 2023 Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b (BFN TS-524) CNL-22-045, Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 42023-03-10010 March 2023 Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 4 CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-22-089, License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546)2022-12-20020 December 2022 License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546) CNL-22-055, Application to Delete Acreage Value Discussion from Technical Specifications (BFN TS-543)2022-09-29029 September 2022 Application to Delete Acreage Value Discussion from Technical Specifications (BFN TS-543) CNL-22-083, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535).2022-09-13013 September 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535). CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-057, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Use2022-05-27027 May 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Use CNL-22-056, Supplement to License Amendment Request Regarding Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel (TS-534)2022-04-28028 April 2022 Supplement to License Amendment Request Regarding Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel (TS-534) CNL-21-009, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative2022-03-31031 March 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative CNL-21-002, Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance.2021-12-0303 December 2021 Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance. CNL-21-090, Application to Adopt TSTF-568-A, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2, Revision 2 (BFN TS-539)2021-11-19019 November 2021 Application to Adopt TSTF-568-A, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2, Revision 2 (BFN TS-539) CNL-21-020, Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie Modification to Support System Operability (BFN-TS-518)2021-11-0505 November 2021 Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie Modification to Support System Operability (BFN-TS-518) CNL-21-053, Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2, in Support of Atrium 11 Fuel Use (TS-535)2021-07-23023 July 2021 Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2, in Support of Atrium 11 Fuel Use (TS-535) CNL-21-050, License Amendment Request Regarding Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel (TS-534)2021-05-29029 May 2021 License Amendment Request Regarding Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel (TS-534) CNL-21-045, Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN82021-04-29029 April 2021 Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89- CNL-21-008, Application to Revise Technical Specifications to Adopt TSTF-582, RPV WIC Enhancements (BFN TS-532)2021-03-0505 March 2021 Application to Revise Technical Specifications to Adopt TSTF-582, RPV WIC Enhancements (BFN TS-532) CNL-20-041, License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016)2020-08-14014 August 2020 License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016) CNL-20-047, Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance2020-07-31031 July 2020 Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance Re CNL-20-002, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (TS-BFN-529)2020-07-17017 July 2020 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (TS-BFN-529) CNL-20-044, License Amendment Request to Incorporate Tornado Missile Risk Evaluation Into the Licensing Basis2020-05-0606 May 2020 License Amendment Request to Incorporate Tornado Missile Risk Evaluation Into the Licensing Basis CNL-20-003, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516)2020-03-27027 March 2020 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516) CNL-19-125, Proposed Technical Specifications (TS) Change 510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 12, Additional License Condition2019-12-19019 December 2019 Proposed Technical Specifications (TS) Change 510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 12, Additional License Condition CNL-19-009, License Amendment Request to Revise Emergency Plan Staff Augmentation Times (TS-515)2019-09-18018 September 2019 License Amendment Request to Revise Emergency Plan Staff Augmentation Times (TS-515) CNL-19-070, TVA Request for Extension of Implementation Due Dates of Modifications 102 and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor2019-07-0303 July 2019 TVA Request for Extension of Implementation Due Dates of Modifications 102 and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor CNL-19-034, to TVA Request for Revision of Modifications 85, 102, and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Plant, Units 1, 2, and 3..2019-03-0808 March 2019 to TVA Request for Revision of Modifications 85, 102, and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Plant, Units 1, 2, and 3.. CNL-19-010, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513)2019-01-25025 January 2019 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513) CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report2018-11-29029 November 2018 Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays CNL-18-099, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 2, Operator Training Results2018-07-23023 July 2018 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 2, Operator Training Results ML18171A3372018-07-10010 July 2018 Issuance of Amendment to Revise License Condition 2.C(18)(a)3 CNL-18-085, License Amendment Request to Change the Implementation Date for License Amendments to Upgrade Emergency Action Level Scheme2018-06-15015 June 2018 License Amendment Request to Change the Implementation Date for License Amendments to Upgrade Emergency Action Level Scheme CNL-18-041, Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)32018-03-16016 March 2018 Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)3 ML18079B1402018-02-23023 February 2018 Browns Ferry Nuclear Plant, Units 1, 2, and 3: Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus NL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System2017-11-17017 November 2017 Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System. CNL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power Syste2017-11-17017 November 2017 Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System. CNL-17-056, Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program (BFN-TS-497)2017-08-15015 August 2017 Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program (BFN-TS-497) CNL-17-014, Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF)-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Pro2017-04-0505 April 2017 Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF)-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Proce CNL-16-155, Application to Revise Technical Specifications to Adopt TSTF-545, Rev. 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, to Request Alternative to the ASME Code, and To..2017-01-17017 January 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Rev. 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, to Request Alternative to the ASME Code, and To.. CNL-16-169, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision2016-10-28028 October 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision CNL-16-010, Application to Modify Technical Specification 4.3.1.2, Fuel Storage Criticality (TS-508)2016-08-12012 August 2016 Application to Modify Technical Specification 4.3.1.2, Fuel Storage Criticality (TS-508) CNL-16-016, License Amendment Request (BFN TS-509) to Change the Completion Date of Cyber Security Plan Implementation Milestone 82016-07-14014 July 2016 License Amendment Request (BFN TS-509) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 CNL-16-068, Update to License Amendment Request, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506)2016-03-28028 March 2016 Update to License Amendment Request, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506) CNL-15-056, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506)2015-09-25025 September 2015 Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506) CNL-15-073, Application to Modify the Technical Specifications by Adding New Specification TS 3.3.8.3, Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal (CAS) Logic, and Unit Priority Re-Trip Logic, And.2015-09-16016 September 2015 Application to Modify the Technical Specifications by Adding New Specification TS 3.3.8.3, Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal (CAS) Logic, and Unit Priority Re-Trip Logic, And. CNL-15-074, Update to License Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants2015-06-19019 June 2015 Update to License Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants 2024-01-22
[Table view] |
Text
August 14, 2008 Mr. William R. Campbell, Jr.
Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
BROWNS FERRY NUCLEAR PLANT UNIT 1 - ISSUANCE OF AMENDMENT REGARDING IMPLEMENTATION OF THE BOILING-WATER REACTOR VESSEL AND INTERNALS PROJECT REACTOR PRESSURE VESSEL INTEGRATED SURVEILLANCE PROGRAM TO ADDRESS THE REQUIREMENTS OF APPENDIX H TO 10 CFR PART 50 (TAC NO. MD8386)
Dear Mr. Campbell:
The Commission has issued the enclosed Amendment No. 273 to Renewed Facility Operating License No. DPR-33 for the Browns Ferry Nuclear Plant, Unit 1. This amendment consists of changes to your Updated Final Safety Analysis Report in response to your application dated March 26, 2008, and modifies the basis for Tennessee Valley Authoritys compliance with the requirements of Appendix H to Title 10 of the Code of Federal Regulations Part 50, Reactor Vessel Material Surveillance Program Requirements.
A copy of the Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Eva A. Brown, Senior Project Manager, Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-259
Enclosures:
- 1. Amendment No. 273 to License No. DPR-33
- 2. Safety Evaluation cc w/encls: See next page
ML081760567 OFFICE LPLII-2/PM LPLII-2/PM LPLII-2/LA ADES/ ADES/ OGC LPLII-2/BC DCI/CVIB DCI/CVIB NOL NAME TOrf EBrown BClayton SSheng
- BMizuno TBoyce DATE 07/29/08 07/31/08 07/29/08 07/31/08 07/31/08 08/11/08 08/14/08
- per memo from MMitchell to TBoyce TENNESSE VALLEY AUTHORITY DOCKET NO. 50-259 BROWNS FERRY NUCLEAR PLANT, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 273 Renewed License No. DPR-33
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Tennessee Valley Authority (the licensee) dated March 26, 2008, complies with the standards and requirements of the Atomic Energy Act of 1952, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, by Amendment No. 273, Renewed Facility Operating License No. DPR-33 is hereby amended to authorize the change to the Updated Final Safety Analysis Report (FSAR) as requested by letter dated March 26, 2008, and evaluated in the associated safety evaluation by the Commissions Office of Nuclear Reactor Regulation. The licensee shall submit the update of the FSAR authorized by this amendment in accordance with 10 CFR 50.71(e). Also, as indicated in the attachment to this license amendment, paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-33 is hereby amended to read as follows:
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 273, are hereby incorporated in the license. Tennessee Valley Authority shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Thomas H. Boyce, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Change to Operating License Date of Issuance: August 14, 2008
ATTACHMENT TO LICENSE AMENDMENT NO. 273 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-33 DOCKET NO. 50-259 Replace Page 3 of Renewed Operating License DPR-33 with the attached Page 3.
(3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or equipment and instrument calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I:
Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 3458 megawatts thermal.
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 273, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
For Surveillance Requirements (SRs) that are new in Amendment 234 to Facility Operating License DPR-33, the first performance is due at the end of the first surveillance interval that begins at implementation of the Amendment 234. For SRs that existed prior to Amendment 234, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the surveillance was last performed prior to implementation of Amendment 234.
BFN Unit 1 Renewed License No. DPR-33 Amendment No. 273
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 273 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-33 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-259
1.0 INTRODUCTION
By letter dated March 26, 2008, Tennessee Valley Authority (TVA), the licensee for Browns Ferry Nuclear Plant (BFN), Unit 1, submitted a request for U.S. Nuclear Regulatory Commission (NRC) review and approval of a license amendment consisting of changes to the Updated Final Safety Analysis Report (UFSAR) to reflect modification of BFN Unit 1 basis for its compliance with the requirements of Appendix H to Title 10 of the Code of Federal Regulations Part 50 (10 CFR Part 50), Reactor Vessel Material Surveillance Program Requirements. In the submittal, TVA requested that it be approved to implement the Boiling Water Reactor Vessel and Internals Project (BWRVIP) reactor pressure vessel (RPV) integrated surveillance program (ISP) as the basis for demonstrating the compliance of BFN, Unit 1 with the requirements of Appendix H to 10 CFR Part 50.
2.0 REGULATORY EVALUATION
Nuclear power plant licensees are required by Appendix H to 10 CFR Part 50 to implement RPV surveillance programs to monitor changes in the fracture toughness properties of ferritic materials in the reactor vessel beltline region . . . which result from exposure of these materials to neutron irradiation and the thermal environment. Two specific alternatives are provided with regard to the design of a facilitys RPV surveillance program which may be used to address the requirements of Appendix H to 10 CFR Part 50.
The first alternative is the implementation of a plant-specific RPV surveillance program consistent with the requirements of American Society for Testing and Materials (ASTM)
Standard Practice E 185, Standard Practice for Conduction Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels. In the design of a plant-specific RPV surveillance program, a licensee may use the edition of ASTM Standard Practice E 185, which was current on the issue date of the American Society of Mechanical Engineers Code to which the reactor vessel was purchased, or later editions through the 1982 edition.
The second alternative provided in Appendix H to 10 CFR Part 50 is the implementation of an ISP. An ISP is defined in Appendix H to 10 CFR Part 50 as occurring when, the representative materials chosen for surveillance for a reactor are irradiated in one or more other reactors that
have similar design and operating features. Five specific criteria are stated in Appendix H to 10 CFR Part 50 that must be met to support approval of an ISP:
- a. The reactor in which the materials will be irradiated and the reactor for which the materials are being irradiated must have sufficiently similar design and operating features to permit accurate comparisons of the predicted amount of radiation damage.
- b. Each reactor must have an adequate dosimetry program.
- c. There must be adequate arrangement for data sharing between plants.
- d. There must be a contingency plan to assure that the surveillance program for each reactor will not be jeopardized by operation at reduced power level or by an extended outage of another reactor from which data are expected.
- e. There must be substantial advantages to be gained, such as reduced power outages or reduced personnel exposure to radiation, as a direct result of not requiring surveillance capsules in all reactors in the set.
The BWRVIP RPV ISP was submitted for NRC staff review and approval in topical reports BWRVIP-78, BWR Vessel and Internals Project, BWR Integrated Surveillance Program Plan, and BWRVIP-86, BWR Vessel and Internals Project, BWR Integrated Surveillance Program Implementation Plan. The NRC staff approved the proposed BWRVIP ISP in a safety evaluation (SE) dated February 1, 2002, with requirements that certain plant-specific information be provided by BWR licensees who wish to implement the BWRVIP ISP for their facilities. BFN, Unit 1 was not included in these two BWRVIP reports. However, as part of the NRC review of BWRVIP-116, BWR Vessel and Internals Project, Integrated Surveillance Program (ISP)
Implementation for License Renewal [ISP(E)] (BWRVIP-116), the NRC staff evaluated and accepted the individual vessel information provided by the BWRVIP regarding BFN, Unit 1, including the final selection of its best representative weld and plate materials using the methodology and criteria previously established in BWRVIP-86-A. Subsequently, the BWRVIP agreed to add this individual vessel evaluation as Appendix A to BWRVIP-86-A to provide a complete list of the evaluations of all BWR vessels in the ISP and the proposed ISP(E). As such, the NRC staff considers that BFN, Unit 1 is covered by BWRVIP-78 and BWRVIP-86-A for the BWRVIP ISP and by BWRVIP-116 for the BWRVIP ISP(E). TVAs March 26, 2008, submittal addressed the NRC requirements stated in the February 1, 2002, BWRVIP ISP SE.
In this SE, all of the criteria cited above for approval of an ISP were addressed either completely or partially. For criteria that could not be fully addressed in the SE, plant-specific information was required. The NRC staff identified in the SE the specific information that would be required from licensees who wished to implement the BWRVIP for their facilities. As stated in the SE:
[L]icensees who wish to participate in the BWR ISP must provide, for NRC staff review and approval, information which defines how they will determine RPV and/or surveillance capsule fluences based on the dosimetry data which will be available for their facilities. This information must be submitted concurrently with each licensees submittal to replace their existing plant-specific surveillance
program with the BWR ISP as part of their facilitys licensing basis. The information submitted must be sufficient for the staff to determine that:
(1) RPV and surveillance capsule fluences will be established based on the use of an NRC approved fluence methodology that will provide acceptable results based on the available dosimetry data, (2) if one methodology is used to determine the neutron fluence values for a licensees RPV and one or more different methodologies are used to establish the neutron fluence values for the ISP surveillance capsules which represent that RPV in the ISP, the results of these differing methodologies are compatible (i.e., within acceptable levels of uncertainty for each calculation).
This plant-specific information, which was repeated in a slightly different fashion in the February 24, 2006, SE on BWRVIP-116, was required by the NRC staff to ensure that criterion (b.) for an ISP from Appendix H to 10 CFR Part 50 could be met by each facility and to confirm that data which would be shared as part of the BWRVIP ISP could be effectively utilized by each licensee for the monitoring of RPV embrittlement for their facility. The SE further states that, for plants that had already received approval to implement the ISP in accordance with BWRVIP-86-A, implementation of the ISP(E) in accordance with the BWRVIP-116 report may be processed using 10 CFR 50.59.
3.0 TECHNICAL EVALUATION
In the March 26, 2008, letter, TVA submitted information for BFN, Unit 1 that addressed the information requested in the NRC staffs February 1, 2002, BWRVIP ISP SE. The submittal indicated that the current pressure-temperature (P-T) limit curves (SE dated July 26, 2006) are based on an approved fluence methodology documented in NEDO-32983-A, GE Methodology for Reactor Pressure Vessel Fast Neutron Flux Evaluations, dated December 2001. The NRC staff also found that the same fluence methodology was used in calculating the fluence values reported in the approved license renewal application for BFN, Units 1, 2, and 3. In the current application, TVA provided a revised page 4.2-16 of the BFN UFSAR in Enclosure 2 to the submittal stating:
Revisions to fluence calculations using data obtained from the surveillance capsule specimens will use an NRC approved methodology that meets Regulatory Guide 1.190.
The NRC staff concludes that the statement mentioned above in the BFN UFSAR is sufficient to address both items (1) and (2) from the February 1, 2002, SE. Regarding item (1), the licensees use of an NRC-approved methodology which is consistent with the attributes of Regulatory Guide (RG) 1.190, Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence, for determining the BFN, Unit 1 RPV neutron fluence value is acceptable. Regarding item (2), the licensees use of an NRC-approved methodology which is consistent with the attributes of RG 1.190 for determining the fluences of RPV surveillance capsules tested under the BWRVIP ISP is also acceptable. The NRC staff has concluded that any two (or more) approved fluence methodologies provide compatible results if the values are within each others uncertainty bound.
As mentioned earlier, TVA already performed an updated RPV fluence analysis using the NRC-approved methodology in support of its current P-T limit curves for the BFN, Unit 1 RPV.
Inasmuch as this action was submitted as a license amendment, consistent with the decision given in Commission Memorandum and Order CLI-96-13 regarding RPV capsule withdrawal schedule and whether an NRC approval constitutes a license amendment, TVA provided revised language for page 4.2-16 of the BFN UFSAR which documented the licensees incorporation of the BWRVIP ISP into the BFN, Unit 1 licensing basis:
For Units 1, 2, and 3, Integrated Surveillance Program (ISP) implementation and surveillance specimen schedule withdrawal and testing for the initial BWR 40-year operating period is governed and controlled by BWRVIP-86-A (Updated BWR Integrated Surveillance Program (ISP) Implementation Plan), and the NRCs Safety Evaluation dated February 1, 2002. Surveillance specimen schedule withdrawal and testing during the license renewal period is governed and controlled by BWRVIP-116 (Integrated Surveillance Program (ISP)
Implementation For License Renewal), and the BWRVIP response to NRC RAIs
[requests for additional information] dated January 11, 2005.
The NRC staff has concluded that the information provided in the revised BFN UFSAR is adequate to document the licensees intent to appropriately implement the BWRVIP ISP as the method for demonstrating the compliance of BFN, Unit 1 with the requirements of Appendix H to 10 CFR Part 50. For completeness, the licensee also revised BFN UFSAR by referencing BWRVIP-116 for all three BFN units, a change accomplished in accordance with the 10 CFR 50.59 process.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Alabama State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission had previously issued a proposed finding that the amendment involves no significant hazards consideration, and there have been no public comment on such finding (73 FR 31723). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The NRC staff concludes that the information provided by TVA is sufficient to conclude that the BWRVIP ISP, as approved in the February 1, 2002, SE, can be implemented for BFN, Unit 1 as
the basis for demonstrating the facilitys continued compliance with the requirements of Appendix H to 10 CFR Part 50. As part of the implementation and documentation of the licensees intent to utilize the BWRVIP ISP for this purpose, the licensee shall modify the BFN UFSAR as noted in Section 3.0 of this SE and as stated in their March 26, 2008, submittal.
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Simon Sheng Date: August 14, 2008
Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT cc:
Mr. Ashok S. Bhatnagar Mr. R. G. (Rusty) West Senior Vice President Site Vice President Nuclear Generation Development Browns Ferry Nuclear Plant and Construction Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 6A Lookout Place Decatur, AL 35609 1101 Market Street Chattanooga, TN 37402-2801 Ms. Beth A. Wetzel, Manager Corporate Nuclear Licensing Vice President and Industry Affairs Nuclear Support Tennessee Valley Authority Tennessee Valley Authority 4K Lookout Place 3R Lookout Place 1101 Market Street 1101 Market Street Chattanooga, TN 37402-2801 Chattanooga, TN 37402-2801 Mr. James E. Emens, Jr.
Mr. Michael J. Lorek Supervisor, Nuclear Site Licensing Vice President Browns Ferry Nuclear Plant Nuclear Engineering & Projects Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 3R Lookout Place Decatur, AL 35609 1101 Market Street Chattanooga, TN 37402-2801 James B. Baptist Browns Ferry Senior Project Engineer Mr. D. Tony Langley, Manager Division of Reactor Projects, Branch 6 Licensing and Industry Affairs U.S. Nuclear Regulatory Commission Browns Ferry Nuclear Plant 61 Forsyth Street, SW.
Tennessee Valley Authority Suite 24T85 P.O. Box 2000 Atlanta, GA 30303-8931 Decatur, AL 35609 Senior Resident Inspector General Counsel U.S. Nuclear Regulatory Commission Tennessee Valley Authority Browns Ferry Nuclear Plant 6A West Tower 10833 Shaw Road 400 West Summit Hill Drive Athens, AL 35611-6970 Knoxville, TN 37902 State Health Officer Mr. John C. Fornicola, General Manager Alabama Dept. of Public Health Nuclear Assurance RSA Tower - Administration Tennessee Valley Authority Suite 1552 3R Lookout Place P.O. Box 303017 1101 Market Street Montgomery, AL 36130-3017 Chattanooga, TN 37402-2801
Page 2 of 2 Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611 Mr. Larry E. Nicholson, General Manager Performance Improvement Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Michael A. Purcell Senior Licensing Manager Nuclear Power Group Tennessee Valley Authority 4K Lookout Place 1101 Market Street Chattanooga, TN 37402-2801