July 8, 2008 Mr. Britt T. McKinney Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - GENERIC LETTER 2008-01, MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS, RESPONSE TO EXTENSION REQUEST (TAC NOS. MD7886 AND MD7887)
Dear Mr. McKinney:
Generic Letter (GL) 2008-01, Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal, And Containment Spray Systems, dated January 11, 2008, requests licensees to submit information to demonstrate that the emergency core cooling, decay heat removal, and containment spray systems are in compliance with the applicable regulatory requirements, and that suitable design, operational, and testing control measures are in place for maintaining this compliance. GL 2008-01 states that each licensee is requested to submit a written response within 9 months to provide requested information and that if a licensee cannot meet the requested 9 month response date, a 3-month written response is required that describes the alternative course of action that it proposes to take, including the basis for the acceptability of the proposed alternative course of action.
By letter dated April 11, 2008, PPL Susquehanna (the licensee) stated:
Generic Letter 2008-01 [(referenced above)] requires submittal of a 3-month response if it is not deemed possible to meet the requested 9-month response date. During a teleconference between PPL (R. Sgarro) and NRC (J. Wermeil) on April 8, 2008, PPL requested an extension to the timeline for the 3-month response. The extension was requested based on:
evolving expectations for the 9-month response; necessary engineering resources that are currently heavily involved in refueling outage completion and startup activities associated with extended power uprate; and the need for additional time to identify the actions, which will be completed both prior to and after the 9-month response date (October 11, 2008).
Based on the above Mr. Wermeil granted an extension of the 3-month response until May 30, 2008.
B.
This letter is to formally acknowledge the approval of the requested extension to the due date for submitting the 3-month response to GL 2008-01 and to document the telephone call with the Nuclear Regulatory Commission (NRC) staff. Specifically, you requested an extension for providing the above 3-month response from April 11, 2008, to May 30, 2008, at Susquehanna Unit 1 and Unit 2. The NRC staff finds that your justification to extend the due date for the 3-month written response to GL 2008-01 to May 30, 2008, is acceptable for granting your extension request. This letter does not alter or change the requested 9-month response date of October 11, 2008.
By letter dated May 27, 2008, you submitted a 3-month response to GL 2008-01 for Susquehanna, Units 1 and 2. The NRC staff will evaluate your alternate plans (your 3-month response) for responding to GL 2008-01 and will respond appropriately.
If you have any questions regarding this letter, please feel free to contact me at (301) 415-3308.
Sincerely,
/RA/
Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388 cc: See next page
B.
This letter is to formally acknowledge the approval of the requested extension to the due date for submitting the 3-month response to GL 2008-01 and to document the telephone call with the Nuclear Regulatory Commission (NRC) staff. Specifically, you requested an extension for providing the above 3-month response from April 11, 2008, to May 30, 2008, at Susquehanna Unit 1 and Unit 2. The NRC staff finds that your justification to extend the due date for the 3-month written response to GL 2008-01 to May 30, 2008, is acceptable for granting your extension request. This letter does not alter or change the requested 9-month response date of October 11, 2008.
By letter dated May 27, 2008, you submitted a 3-month response to GL 2008-01 for Susquehanna, Units 1 and 2. The NRC staff will evaluate your alternate plans (your 3-month response) for responding to GL 2008-01 and will respond appropriately.
If you have any questions regarding this letter, please feel free to contact me at (301) 415-3308.
Sincerely,
/RA/
Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388
Enclosures:
None cc w/encls: See next page DISTRIBUTION PUBLIC PDI-1 RF RidsNrrDorlLPL1-1 RidsNrrPMBVaidya (hard copy)
S. Little (hard copy)
Rids NrrDprPgcb(MMurphy) RidsNrrDssD(JWermeil)
DBeaulieu, NRR/PGCB ADAMS Accession Number: ML081680257 NRR-106
(*) - see previous concurrence OFFICE LPLI-1/PM(*)
LPLI-1/LA(*)
PGCB:BC(*)
DSS/DD(*)
LPLI-1/BC NAME BVaidya SLittle MMurphy JWermiel MKowal DATE 06/23/08 06/23/08 07/01/08 07/08/08 7/08/08 OFFICIAL RECORD COPY
Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:
Cornelius J. Gannon Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Robert M. Paley General Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Michael H. Crowthers Manager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Dayne R. Brophy-Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Ronald E. Smith General Manager - Site Preparedness and Services PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Michael H. Rose Manager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Joseph J. Scopelliti Community Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467 Bryan A. Snapp, Esq Assoc. General Counsel PPL Services Corporation Two North Ninth Street, GENTW20 Allentown, PA 18101-1179 Document Control Services PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Richard W. Osborne Allegheny Electric Cooperative, Inc.
212 Locust Street P.O. Box 1266 Harrisburg, PA 17108-1266 Director, Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035 Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803