ML081630546

From kanterella
Jump to navigation Jump to search
Site-Specific Implementation of B.5.B Phase 2 and 3 Mitigating Strategies Temporary Instruction Inspection (NRC Inspection Report 05000445/2008008 and 05000446/2008008)
ML081630546
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/11/2008
From: Ryan Lantz
Operations Branch IV
To: Blevins M
Luminant Generation Co
References
IR-08-008
Download: ML081630546 (3)


See also: IR 05000445/2008008

Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

June 11, 2008

Mike Blevins, Executive Vice President

and Chief Nuclear Officer

Luminant Generation Company LLC

ATTN: Regulatory Affairs

Comanche Peak Steam Electric Station

P.O. Box 1002

Glen Rose, TX 76043

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION - SITE-SPECIFIC

IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES

TEMPORARY INSTRUCTION INSPECTION (NRC INSPECTION

REPORT 05000445/2008008 AND 05000446/2008008)

Dear Mr. Blevins:

In a telephone conversation on June 2, 2008, Messrs. Neil Harris and John Kirkland made

arrangements for the NRC to inspect the site-specific implementation of B.5.b Phase 2 and 3

mitigating strategies at the Comanche Peak Steam Electric Station. The inspection is planned

for the week of July 7, 2008.

In order for the NRC to adequately prepare for this inspection, please furnish the documents

listed in Enclosure 1 to Mr. John Kirkland in electronic format no later than June 20, 2008.

Please have available on site at the beginning of the inspection the arrangements and

documents listed in Enclosure 2. Mr. Neil Harris has been advised of this request and provided

with the name and address of the NRC lead inspector.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0011.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per

response, including the time for reviewing instructions, gathering and maintaining the data

needed, and completing and reviewing the collection of information. Send comments on any

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Luminant Generation Company LLC

2

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

aspect of this collection of information, including suggestions for reducing the burden, to the

Records and FOIA/Privacy Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission,

Washington, D.C. 20555-0001, or by Internet electronic mail to

INFOCOLLECTS.Resource@NRC.GOV; and to the Desk Officer, Office of Information and

Regulatory Affairs, NEOB-10202, (3150-0011), Office of Management and Budget, Washington,

D.C. 20503-0001.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records System (PARS) component of NRC's Agencywide Documents

Access and Management System (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However,

because of the sensitive information contained in the enclosures, and in accordance with

10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.

Thank you for your cooperation in this matter. If you have any questions regarding this

inspection, please contact John Kirkland at 402-426-9611, or me at 817 860-8159.

Sincerely,

/RA/

Ryan E. Lantz, Chief

Operations Branch

Division of Reactor Safety

Dockets: 50-445; 50-446

Licenses: NPF-87; NPF-89

Enclosures:

1.

Documentation Requested

Prior to the Inspection

2.

Arrangements/Documents Requested

To Be Available Onsite during the

Inspection Week

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Luminant Generation Company LLC

3

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

cc w/enclosure:

Neil Harris

Luminant Generation Company LLC

P.O. Box 1002

Glen Rose, TX 76043

cc w/o enclosure:

Fred W. Madden, Director

Regulatory Affairs

Luminant Generation Company LLC

P.O. Box 1002

Glen Rose, TX 76043