ML081540390

From kanterella
Jump to navigation Jump to search
Notice of Public Meeting with Wolf Creek to Present Initiatives Being Implemented to Improve Performance in Areas of Human Performance Problem Identification & Resolution and Equipment Reliability
ML081540390
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 06/02/2008
From:
NRC/RGN-IV/DRP/RPB-B
To:
References
Download: ML081540390 (4)


Text

UNITED STATES NU CLE AR RE GU LATOR Y C O M M I S S I O N R EGI ON I V 611 R YAN PLAZA D R IV E, SU ITE 400 AR LI N GTON , TEXAS 76011-4005 June 02, 2008

SUBJECT:

MEETING WITH WOLF CREEK NUCLEAR OPERATING CORPORATION FACILITY: Wolf Creek Generating Station DOCKET: 05000482 DATE & TIME: Tuesday, June 24, 2008 1:15 p.m. (CDT)

LOCATION: Region IV Office Executive Conference Room 612 E Lamar, Suite 400 Arlington, TX 76011 PURPOSE: The purpose of the meeting is for Wolf Creek Nuclear Operating Corporation to present the initiatives being implemented to improve performance in the areas of Human Performance, Problem Identification & Resolution and Equipment Reliability.

CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the Nuclear Regulatory Commission after the business portion, but before the meeting is adjourned.

The Nuclear Regulatory Commission provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript of other information from the meeting in another format (e.g. Braille or large print), please notify the Nuclear Regulatory Commissions meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

PARTICIPANTS: NRC Elmo Collins, Regional Administrator Dwight Chamberlain, Director, Division of Reactor Projects Anton Vegel, Deputy Director, Division of Reactor Projects Roy Caniano, Director, Division of Reactor Safety Vincent Gaddy, Chief, Reactor Projects Branch B Chris Long, Resident Inspector

Wolf Creek Nuclear Operating Corporation PARTICIPANTS: (Continued)

UTILITY Rick Muench, President and Chief Executive Officer Matt Sunseri, Vice President, Operations and Plant Manager Steve Hedges, Vice President, Oversight Terry Garrett, Vice President, Engineering MEETING CONTACT: Vincent Gaddy, Branch Chief Project Branch B (817) 860-8141 vincent.gaddy@nrc.gov cc:

Rick A. Muench, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Vice President Operations/Plant Manager Wolf Creek Nuclear Operating Corp.

P.O. Box 411 Burlington, KS 66839 Jay Silberg, Esq.

Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, DC 20037 Supervisor Licensing Wolf Creek Nuclear Operating Corp.

P.O. Box 411 Burlington, KS 66839 Chief Engineer Utilities Division Kansas Corporation Commission 1500 SW Arrowhead Road Topeka, KS 66604-4027 Office of the Governor State of Kansas Topeka, KS 66612 Attorney General 120 S.W. 10th Avenue, 2nd Floor Topeka, KS 66612-1597

Wolf Creek Nuclear Operating Corporation County Clerk Coffey County Courthouse 110 South 6th Street Burlington, KS 66839-1798 Chief, Radiation and Asbestos Control Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366 Ronald L. McCabe, Chief Technological Hazards Branch National Preparedness Division DHS/FEMA 9221 Ward Parkway Suite 300 Kansas City, MO 64114-3372

Wolf Creek Nuclear Operating Corporation E-Mail To:

NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, RA Arthur Howell, DRA Dwight Chamberlain, D:DRP Roy Caniano, D:DRS Anton Vegel, DD:DRP Vincent Watkins, DD:DRS Troy Pruett, DD:DRS Ryan Lantz, C:DRS/OB Sue Bogle (OEWEB Resource)

Bruce Boger, ADRO OEMAIL, D/OE John Thorp Kevin Williams, NSIR/DRP/EP Chris Miller, NSIR/DRP/EP John Adams, RIV OEDO Coordinator Patricia Lougheed, RIV OEDO Coordinator Paul Bonnett Jack Donohew, Project Manager, NRR Vincent Gaddy, Branch Chief, PBB Richard Deese, Senior Project Engineer, PBB Steve Cochrum, Senior Resident Inspector Chris Long,Resident Inspector Victor Dricks, Region IV PAO Bill Maier, Region IV RSLO Karla Fuller, Region IV RC/ACES Michael Vasquez, Region IV Enforcement Specialist Lucy Owen, Region IV RA Secretary Judy Kilcrease, Region IV RA Secretary Anita Tannenbaum, Region IV DRP Secretary Shirley Allen, Site Secretary Lynn Berger, Region IV DRS Secretary Lenora Reyna, Region IV DRS Secretary Tracy Karl, Region IV DRS Secretary MaryJane Spivey, Region IV DNMS Secretary Sue Trifiletti, Region IV DNMS Secretary Bub Mueller, IRMB Phil Longdo, Receptionist Ann Mattila, Security Advisor SUNSI Review Completed: VGG ADAMS: Yes No Initials: VGG Publicly Available Non-Publicly Available Sensitive Non-Sensitive R:\_Reactors\_WC\2008\WC Meeting Notice06-24-2008.doc ADAMS ML0 RIV:PE:DRP/B C:DRP/B PAO RSLO PJayroe VGGaddy VLDricks WAMaier

/RA VGG for/ /RA/ /RA LAO for/ /RA/

06/02/2008 06/02/2008 06/02/2008 06/02/2008 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax