TASK TITLE: 2B Rod Drive MG Set Startup and Paralleling with Auto Synch Failure JPM No.: IP-100 REV: 20070301 Task No.: R-RD-014 K/A No.: 001000 2.1.23 Objective No.: 4.C.RD-03 K/A IMP: 3.9/4.0 EXAMINEE: RO SRO (Circle One)
EVALUATOR: DATE:
The Examinee: PASSED this JPM. TIME STARTED:
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 4, 7, 12 APPROX COMPLETION TIME: 45 MINUTES EVALUATION METHOD: LOCATION:
PERFORM X IN PLANT X SIMULATE SIMULATOR GENERAL
REFERENCES:
- 1. BwOP RD-5, CONTROL ROD DRIVE MG SET STARTUP AND PARALLELING TO OPERATING MG SET, Rev. 9.
MATERIALS:
- 1. Copy of BwOP RD-5, Rev. 9.
TASK STANDARDS:
- 1. Startup the 2B rod drive MG set.
TASK CONDITIONS:
- 1. You are an extra NSO.
- 2. Unit 2 start up is in progress per 2BwGP 100-2, PLANT STARTUP.
- 3. 2A Rod Drive MG Set is running.
INITIATING CUES:
- 1. The Unit 2 US has directed you to start up and parallel the 2B Rod Drive MG Set per BwOP RD-5, CONTROL ROD DRIVE MG SET STARTUP AND PARALLELING TO OPERATING MG SET.
CUE: Hand examinee copy of BwOP RD-5.
- 2. Inform the Unit 2 US when you have completed starting up and paralleling 2B Rod Drive MG Set.
IP-100 Page 1 of 9
RECORD START TIME:
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
- 1. Refer to BwOP RD-5. Refer to BwOP RD-5. SAT UNSAT N/A CUE: All Prerequisites, Comments:
Precautions, Limitations and Actions have been met.
Comments:
CUE: Voltage Adjust
- VERIFY/SET the Potentiometer is set same Voltage Adjust as 2A MG set. Potentiometer to approximately the same position as the 2A MG set.
CUE: Motor breaker is tripped,
- VERIFY the Motor GREEN (open) light is LIT. Breaker is Tripped and the OPEN light ENERGIZED.
o VERIFY/PLACE the CUE: Synchronizer Switch is as Synchronizer Switch seen (OFF). in the OFF position.
- VERIFY the CUE: Generator breaker is tripped, Generator Breaker is GREEN (open) light is LIT. Tripped and the OPEN light ENERGIZED.
CUE: Ammeter selector switch is o VERIFY/PLACE as seen. Ammeter Selector Switch, in position A, B, or C.
CUE: Voltmeter selector switch is o VERIFY/PLACE as seen. Voltmeter Selector Switch, in position 1-2, 2-3, or 3-1.
IP-100 Page 2 of 9
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
- 3. Verify 2A Rod Drive MG Set Control Perform the following at SAT UNSAT N/A Cabinet aligned. 2RD03E:
Comments:
CUE: Synchronizer Switch is as
- Verify Synchronizer seen (OFF). Switch is in OFF position.
CUE: Ammeter selector switch is
- Verify 2A MG Set in same position as 2B MG Ammeter Selector set. Switch, is in same CUE: Voltmeter selector switch is position as 2B MG Set in same position as 2B MG Ammeter Selector set. Switch,
- Verify 2A MG Set Voltmeter Selector Switch, is in same position as 2B MG Set Voltmeter Selector Switch.
Comments:
o Ensure no targets indicating on the CUE: Relays are as seen (No following relays:
Targets are up).
o Common Generator Ground Relay for both MG NOTE: If examinee depresses the o 2B MG Set Phase relay reset pushbutton, A Dir Overcurrent.
provide the following cue: o 2B MG Set Phase CUE: Reset pushbutton has been C Dir Overcurrent.
depressed, and released. o Depress the Reset CUE: 2B MG Set Motor Breaker is pushbutton.
closed, RED (closed) light
CUE: 15 secs have elapsed, MG set is at rated speed.
o Allow 15 secs for 2B MG Set to reach rated speed.
IP-100 Page 3 of 9
EVALUATOR NOTE: DO NOT ALLOW EXAMINEE TO OPEN REACTOR TRIP BREAKER CABINET DOORS. Photos of the Reactor Trip and Bypass Breakers are attached on JPM pages 8 & 9.
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
- 5. Ensure locally the Reactor Trip Perform the following at SAT UNSAT N/A Breakers are closed. the Reactor Trip Switchgear: Comments:
NOTE: Provide examinee with photo of RTA and RTB (page 8) and provide the following cue:
- Determine RTA and CUE: RTA and RTB are as RTB closed.
shown in photo.
NOTE: Provide trainee with photo of BYA and BYB (page 9) and provide the following cue.
o Determine BYA and CUE: BYA and BYB are as BYB are open.
shown in photo.
- 6. Verify stationary disconnects are Above the Rod Drive SAT UNSAT N/A closed. Cabinets, ENSURE the following Stationary Comments:
Disconnects are CLOSED CUE: All switches are as seen (in ON position):
(closed).
- 2RD02JA
- 2RD03JA
- 2RD04JA
- 2RD05JA
- 2RD06JA
Comments:
CUE: Field Flash Pushbutton is
- Depress and hold the depressed. 2B MG Set Generator Field Flash pushbutton CUE: 2B MG Set voltage is ~235 until voltage is steady volts. at ~235 volts.
CUE: Field Flash Pushbutton is released.
- 8. Check the range of control of the MG Perform the following at SAT UNSAT N/A Set Voltage Adjuster. 2RD03E:
Comments:
CUE: As voltage adjust pot is
- Rotate the 2B MG Set adjusted up, voltage rises. Voltage Adjust Pot and As pot is adjusted down, CHECK the range of voltage lowers. Range of control ~230 to 300 control is 230-300 volts. volts.)
IP-100 Page 4 of 9
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
- 9. Adjust 2B MG Set voltage slightly Perform the following at SAT UNSAT N/A higher than 2A MG Set. 2RD03E:
Comments:
CUE: 2B MG set voltage is 1V
- Adjust 2B MG Set higher than 2A voltages voltage 0-2.5V higher after adjustment of 2B MG than 2A MG Set by set pot. adjusting the 2B MG set potentiometer.
- 10. Attempt automatic paralleling of 2A Perform the following at SAT UNSAT N/A and 2B MG Sets. 2RD03E:
Comments:
- Place 2B Synchronizer CUE: 2B MG Set Synch Switch is Switch to ON.
in ON position.
CUE: 2B Generator Output breaker GREEN (open) light is LIT.
- Check for closure of CUE: 40 seconds have elapsed, the 2B Generator 2B Generator Output Output Breaker.
breaker GREEN (open) light is LIT. o Determine 2B MG Set Generator Output CUE: Synch Switch is in OFF Breaker did not close.
position.
o Place 2B Synchronizer Switch to OFF.
NOTE: Examinee may attempt auto parallel 2B MG set again. If examinee attempts auto parallel, repeat cues. A maximum of 3 auto parallel attempts is allowed per note prior to step F.11. Intent is for examinee to perform alternate synchronization loading method.
EVALUATORS NOTE: Alternate path begins here.
- 11. Obtain Shift Supervisors permission Perform the following: SAT UNSAT N/A to use the alternate synchronizing and loading method.
- Obtain Shift Comments:
Supervisors CUE: Unit Supervisor authorizes permission to use the use of alternate method of alternate synchronizing synchronizing and loading and loading method.
2B MG set.
IP-100 Page 5 of 9
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
- 12. Parallel the 2A and 2B Rod Drive Perform the following at SAT UNSAT N/A MG Sets using the alternate 2RD03E:
synchronizing and loading Comments:
- Place 2B MG Set method. Synchronizer Switch to CUE: 2B synch switch is in ON ON.
position.
- Place 2B MG Set CUE: 2B MG Set Motor Breaker Motor Breaker control is tripped. Green (open) switch to TRIP.
light is energized.
- Verify the 2B Motor CUE: 2B MG set motor and and Generator generator breakers RED Breakers BOTH (closed) lights immediately CLOSE within 5-6 LIGHT. seconds.
- 13. Complete switch alignment on 2B Perform the following at SAT UNSAT N/A MG Set Control Cabinet. 2RD03E:
Comments:
- Place 2B MG Set CUE: 2B synch switch is in OFF Synchronizer Switch to position. OFF.
- Place 2B MG Set Generator Breaker CUE: 2B MG set generator control switch to breaker control switch is in AFTER CLOSED.
after closed.
- Place 2B MG Set CUE: 2B MG set motor breaker Motor Breaker control control switch is in after switch to AFTER closed. CLOSED.
- Notify Unit 2 US 2B CUE: As Unit 2 US, acknowledge MG set is paralleled.
report CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME:
COMMENTS:
IP-100 Page 6 of 9
Conn Test Breaker Disc Closed Remove Spring Discharged IP-100 Page 7 of 9
Conn Test Breaker Disc Open Remove Spring Discharged IP-100 Page 8 of 9
JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1. You are an extra NSO.
- 2. Unit 2 start up is in progress per 2BwGP 100-2, PLANT STARTUP.
- 3. 2A Rod Drive MG Set is running.
INITIATING CUES:
- 1. The Unit 2 US has directed you to start up and parallel the 2B Rod Drive MG Set per BwOP RD-5, CONTROL ROD DRIVE MG SET STARTUP AND PARALLELING TO OPERATING MG SET.
- 2. Inform the Unit 2 US when you have completed starting up and paralleling 2B Rod Drive MG Set.
IP-100 Page 9 of 9
TASK TITLE: Local Start of 2B AF Pump with Failure of Battery Bank JPM No.: IP-400S REV: 20070301 Task No: R-AF-012 K/A No.: 061000A2.03 Objective No: 4.C.AF-02 K/A Imp: 3.1/3.4 EXAMINEE: RO SRO (Circle One)
EVALUATOR: DATE:
The Examinee: PASSED this JPM. TIME STARTED:
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 2, 6, 7 APPROX COMPLETION TIME: 35 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:
PERFORM X IN PLANT X SIMULATE SIMULATOR GENERAL
REFERENCES:
- 1. BwOP AF-7, Rev. 28, Auxiliary Feedwater Pump B (Diesel) Startup on Recirc.
- 2. BwOP AF-7T1, Rev. 4, Diesel Driven Auxiliary Feedwater Pump Operating Log.
MATERIALS:
- 1. Copy of BwOP AF-7, Rev. 28.
- 2. Copy of BwOP AF-7T1, Rev. 4.
- 3. GA Key for accessing 2B AF pump rear door.
TASK STANDARDS:
- 2. Determine 2B AF pump battery bank has failed.
- 3. Align alternate 2B AF pump battery bank.
- 4. Start 2B AF pump.
TASK CONDITIONS:
- 1. You are an extra NSO.
- 2. Unit 2 is undergoing a loss of heat sink event.
- 3. Main control room HVAC is operating in makeup mode.
- 4. An EQUIPMENT OPERATOR is standing by at the 2B AF pump to monitor governor linkages during startup.
INITIATING CUES:
- 1. The Unit 2 Unit Supervisor directs you to locally start the 2B Auxiliary Feedwater pump in accordance with BwOP AF-7, Auxiliary Feedwater Pump B (Diesel) Startup on Recirc.
CUE: Hand examinee copy of BwOP AF-7 and BwOP AF-7T1.
- 2. BwOP AF-7 steps F.1 thru F.10 are complete.
EVALUATOR NOTE: Verify/obtain GA Key for accessing 2B AF pump room rear door.
IP-400S Page 1 of 6
RECORD START TIME:
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
- 1. Refer to BwOP AF-7 Perform the following: SAT UNSAT N/A CUE: All precautions,
- Refer to BwOP AF-7 to Comments:
prerequisites and step F.9.
limitations and actions are complete.
- 2. Start Lube Oil systems: (steps Perform the following to SAT UNSAT N/A F.11 - F.14) START Auxiliary Lube Oil Comments:
NOTE: 2B AF Pump lube oil Systems:
pump panels are located
- At Aux FW Pump 2B Lube behind 2AF01J. Oil Pump 2AF01PB-C local CUE: Gearbox lube oil pump control panel, place 2HS-control switch is in AF152, Aux FW Pp 2B START. Gear Box Lube Oil Pp, L/C/S, to START CUE: If asked, you hear Gearbox lube oil pump
- At Aux FW Pump 2B Lube motor running. Oil Pump 2AF01PB-A Local Control Panel, place CUE: Aux lube oil pump 2HS-AF120, Aux FW Pp control switch is in 2B Lube Oil Pp, L/C/S to START. START.
CUE: If asked, you hear Aux o Verify pump lube oil lube oil pump motor inventory is within the running. sightglass CUE: Lube oil is within o Verify Lube Oil Filter sightglass. Differential Pressure is < 4 NOTE: After examinee locates psid inlet and outlet pressure gages, provide the following cue:
CUE: Inlet pressure (RIGHT) is 28 psig, and the outlet pressure (LEFT) is 26 psig.
- 3. Verify/Place VC in M/U mode per Verify/Place VC in M/U mode SAT UNSAT N/A BwOP VC-5: (step F.15) per BwOP VC-5, at SM Comments:
CUE: From initiating cue, VC is discretion.
operating in makeup
- From initiating cue, VC is mode. operating in makeup mode.
IP-400S Page 2 of 6
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
- 4. Align AFW system discharge ALIGN 2B AFW pump SAT UNSAT N/A flowpath (steps F.16 - F.17) discharge flowpath as Comments:
applicable:
- Determine AF pump is being started to inject into the SGs during emergency CUE: If asked, as US, direct condition that step 16a and 16b o Contact US to determine if will not be performed. CLOSURE of B Train CUE: Equipment Operator is 2MOV-AF013s or 2AOV-standing by to monitor AF004B will be necessary governor linkage. o Verify Equipment Operator standing by to monitor the governor linkage during start of the engine
- 5. Attempt to start 2B AF Pump: (step Perform the following at SAT UNSAT N/A F.18.a & b.) 2AF01J: Comments:
CUE: Engine Start Selector
- Place the Engine Start Switch is in MANUAL. Selector Switch to CUE: If asked, the Engine MANUAL.
Ready light is NOT lit.
CUE: Start pushbutton is
- Depress and Hold the start depressed and held. pushbutton.
CUE: Engine cranking sounds o Check the engine cranking are NOT present. indicator CUE: Engine Starting Light o Release the Start NOT LIT. Pushbutton.
CUE: Start pushbutton
- Determine engine did not released. start.
EVALUATOR NOTE: Alternate path begins here.
- 6. Select alternate battery bank for Perform the following at SAT UNSAT N/A 2B AF pump (step F.18.c) 2AF01J: Comments:
NOTE: When examinee locates
- Select alternate battery Battery Bank Selector bank by rotating the Switch, provide the Battery Selector Switch to following cue: POS 2 CUE: Battery Selector Switch is in POS 1.
NOTE: When examinee repositions Battery Bank Selector Switch, provide the following cue:
CUE: Battery Selector Switch is in POS 2.
NOTE: If examinee investigates AF pump batteries and/or chargers, provide the following cues:
CUE: Battery and/or chargers are as seen.
IP-400S Page 3 of 6
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
- 7. Start 2B AF Pump (step F.18.c.1 Perform the following at
- F.18.f) 2AF01J:
CUE: RESET pushbutton has
- Momentarily depress the been depressed and RESET pushbutton.
released. o Verfify the Ready to Start CUE: If asked, Engine Ready light is LIT.
light is as seen (BLUE
- Depress and Hold the Start light LIT). Pushbutton CUE: Start pushbutton is VERIFY Engine Starting being depressed and Light indicates starting held. sequence is in process CUE: Engine start noises are VERIFY Engine Running heard. Light is ILLUMINATED CUE: Engine starting light is when speed indicates 350 lit. RPM CUE: 2SI-AF8002, Engine RELEASE the START Speed, is rising and pushbutton Engine Running CHECK Speed between (GREEN) light is LIT at 1795-1845 RPM 350 rpm CUE: Start pushbutton is released CUE: 2SI-AF8002, Engine Speed, is 1825 rpm CUE: If examinee reports start of 2B AF pump to US, as US acknowledge report and direct examinee to continue BwOP AF-7.
- 8. Check Auxiliary Feedwater Pump Perform the following at 2FI- SAT UNSAT N/A recirc flow: (step F.18.g) AF096: Comments:
NOTE: Recirc flow gauge is Verify AF recirc flow > 85 gpm.
large black gauge located on wall to left of pump room door CUE: 2FI-AF096 indicates 90 gpm IP-400S Page 4 of 6
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
- 9. Ensure SX Cooling is supplied to Verify the following valves SAT UNSAT N/A the engine: (step F.18.h) open: Comments:
NOTE: Valves are in overhead above 2AF01J. After identifying limit switches, provide the following cues:
CUE: 2SX173 limit switch is
- 2SX173 SX Supply made up (valve is open) Isolation valve CUE: 2SX178 limit switch is
- 2SX178 SX Return made up (valve is open) Isolation valve CUE: US informs you that another operator will complete step F.18 of BwOP AF-7.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME:
COMMENTS:
IP-400S Page 5 of 6
JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1. You are an extra NSO.
- 2. Unit 2 is undergoing a loss of heat sink event.
- 3. Main control room HVAC is operating in makeup mode.
- 4. An Equipment Operator is standing by at the 2B AF pump to monitor governor linkages during startup.
INITIATING CUES:
- 1. The Unit 2 Unit Supervisor directs you to locally start the 2B Auxiliary Feedwater pump in accordance with BwOP AF-7, Auxiliary Feedwater Pump B (Diesel) Startup on Recirc.
- 2. BwOP AF-7 steps F.1 thru F.10 are complete.
IP-400S Page 6 of 6
TASK TITLE: Align the Fire Hazards Panel JPM No.: IP-704 REV: 20070301 Task No.: R-OA-001 K/A No.: 016000G2.1.30 Objective No.: 4D.OA-27 K/A IMP: 3.9/3.4 EXAMINEE: RO SRO (Circle One)
EVALUATOR: DATE:
The Examinee: PASSED this JPM. TIME STARTED:
FAILED TIME FINISHED:
JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 2, 3 APPROX COMPLETION TIME: 20 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:
PERFORM X IN PLANT X SIMULATE SIMULATOR GENERAL
REFERENCES:
- 1. 2BwOA PRI-5, CONTROL ROOM INACCESSIBILITY, Rev. 103 MATERIALS:
- 1. Copy of 2BwOA PRI-5, CONTROL ROOM INACCESSIBILITY.
TASK STANDARDS:
- 1. Align the Unit 2 Fire Hazards Panel to the Division 22 Power Supply.
- 2. Align Unit 2 S/G Levels, S/G Pressures, PZR Level, and PZR Pressure instrumentation to the Unit 2 Fire Hazards Panel TASK CONDITIONS:
- 1. You are an extra NSO.
- 2. A fire is ongoing in the Main Control Room and the Unit 2 AEER.
- 3. The Remote Shutdown Panels have been manned.
- 4. 1BwOA PRI-5 and 2BwOA PRI-5 are in progress.
- 5. Bus 241 is deenergized.
- 6. The 2HS-LV001, Fire Hazards Panel Power Switch, is in the Division 21 position.
INITIATING CUES:
- 1. The Unit 2 Unit Supervisor directs you to proceed to 2PL10J, Unit 2 Fire Hazards Panel and align 2PL10J to the Division 22 Power Supply.
- 2. After aligning 2PL10J to the Division 22 Power Supply, align the following instrumentation to the Unit 2 Fire Hazards panel per step 8.c. RNO of 2BwOA PRI-5:
- b. 2A & 2B SG Pressures
- c. PZR Level
- d. PZR Pressure
- 3. Inform the Unit 2 Unit Supervisor when you have completed aligning the Unit Fire Hazards Panel.
IP-704 Page 1 of 4
RECORD START TIME:
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
- 1. Refer to 2BwOA PRI-5 and proceed Perform the following: SAT UNSAT N/A to 2PL10J, Fire Hazards Panel.
- Locate and obtain Comments:
CUE: When examinee locates 2BwOA PRI-5, step 8.c 2BwOA PRI-5, provide RNO.
copy.
- Proceed to 2PL10J, Unit NOTE: If examinee asks for status 2 Fire Hazards Panel.
of coincident (426 S.7-24 electrical instrumentation channels, penetration area) provide the following cue:
CUE: No other coincident instrumentation channels are in test or tripped.
NOTE: 2PL10J is located in 426 Curved Wall Area, Grid S-24.
- 2. Align the Fire Hazards Panel to Perform the following at SAT UNSAT N/A Division 22 Power Supply: 2PL10J: Comments:
NOTE: If asked for indications on 2PL10J, provide the following cues:
CUE: Division 21 Power Available Light AND o Verify the Division 22 Power Light are NOT LIT. Power Available light is Division 22 Power LIT.
Available Light is LIT.
- Place 2HS-LV001, Fire CUE: All instrumentation Hazards Panel Power indicates off scale low. Switch, in Position 3 (Division 22 Bus 232X2).
NOTE: After examinee places 2HS-LV001 to Position 3 o Verify the Power Light is (Division 22), provide the LIT.
following cue:
CUE: Division 21 Power Available Light is NOT LIT.
Power light and Division 22 Power Available Lights are BOTH LIT.
IP-704 Page 2 of 4
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
- 3. Align the Fire Hazards Panel. Perform the following at SAT UNSAT N/A NOTE: As examinee aligns 2PL10J: Comments:
instrumentation, provide
- Place the following panel the following cues: switches to the FIRE CUE: 2HS-FW309 is in FIRE position:
CUE: 2HS-FW310 is in FIRE
60%.
position and 2A SG pressure is 1080 psig.
CUE: 2HS-MS194 is in FIRE position and 2B SG
- 2HS-RY033 - PZR pressure is 1080 psig. Pressure.
CUE: 2HS-RY033 is in FIRE
- 2HS-RY034 - PZR position and PZR pressure Level.
is 2220 psig.
CUE: 2HS-RY034 is in FIRE position and PZR level is 30%.
4 Inform Unit Supervisor Unit 2 Fire Inform Unit Supervisor Unit 2 Hazards Panel is aligned. Fire Hazards Panel is CUE: As Unit 2 Unit Supervisor, aligned.
acknowledge report.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME:
COMMENTS:
IP-704 Page 3 of 4
JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1. You are an extra NSO.
- 2. A fire is ongoing in the Main Control Room and the Unit 2 AEER.
- 3. The Remote Shutdown Panels have been manned.
- 4. 1BwOA PRI-5 and 2BwOA PRI-5 are in progress.
- 5. Bus 241 is deenergized.
- 6. The 2HS-LV001, Fire Hazards Panel Power Switch, is in the Division 21 position.
INITIATING CUES:
- 1. The Unit 2 Unit Supervisor directs you to proceed to 2PL10J, Unit 2 Fire Hazards Panel, and align 2PL10J to the Division 22 Power Supply.
- 2. After aligning 2PL10J to the Division 22 Power Supply, align the following instrumentation to the Unit 2 Fire Hazards panel per step 8.c. RNO of 2BwOA PRI-5:
- b. 2A & 2B SG Pressures
- c. PZR Level
- d. PZR Pressure
- 3. Inform the Unit 2 Unit Supervisor when you have completed aligning the Unit Fire Hazards Panel.
IP-704 Page 4 of 4