Final As-Administered in Plant Jpms for the Braidwood Initial Examination - December 2007
ML081420286
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/05/2008
From: Valos N
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
References
50-456/07-301, 50-457/07-301
Download: ML081420286 (19)


Text

TASK TITLE: 2B Rod Drive MG Set Startup and Paralleling with Auto Synch Failure JPM No.: IP-100 REV: 20070301 Task No.: R-RD-014 K/A No.: 001000 2.1.23 Objective No.: 4.C.RD-03 K/A IMP: 3.9/4.0 EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 4, 7, 12 APPROX COMPLETION TIME: 45 MINUTES EVALUATION METHOD: LOCATION:

PERFORM X IN PLANT X SIMULATE SIMULATOR GENERAL

REFERENCES:

1. BwOP RD-5, CONTROL ROD DRIVE MG SET STARTUP AND PARALLELING TO OPERATING MG SET, Rev. 9.

MATERIALS:

1. Copy of BwOP RD-5, Rev. 9.

TASK STANDARDS:

1. Startup the 2B rod drive MG set.
2. Determine 2B rod drive MG set will not automatically synchronize to 2A rod drive MG.
3. Perform alternate synchronization of 2B rod drive MG set to 2A rod drive MG set.

TASK CONDITIONS:

1. You are an extra NSO.
2. Unit 2 start up is in progress per 2BwGP 100-2, PLANT STARTUP.
3. 2A Rod Drive MG Set is running.

INITIATING CUES:

1. The Unit 2 US has directed you to start up and parallel the 2B Rod Drive MG Set per BwOP RD-5, CONTROL ROD DRIVE MG SET STARTUP AND PARALLELING TO OPERATING MG SET.

CUE: Hand examinee copy of BwOP RD-5.

2. Inform the Unit 2 US when you have completed starting up and paralleling 2B Rod Drive MG Set.

IP-100 Page 1 of 9

RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to BwOP RD-5. Refer to BwOP RD-5. SAT UNSAT N/A CUE: All Prerequisites, Comments:

Precautions, Limitations and Actions have been met.

2. Lineup the 2B Rod Drive MG Set Perform the following at SAT UNSAT N/A Control Cabinet. 2RD03E:

Comments:

CUE: Voltage Adjust

CUE: Motor breaker is tripped,

  • VERIFY the Motor GREEN (open) light is LIT. Breaker is Tripped and the OPEN light ENERGIZED.

o VERIFY/PLACE the CUE: Synchronizer Switch is as Synchronizer Switch seen (OFF). in the OFF position.

  • VERIFY the CUE: Generator breaker is tripped, Generator Breaker is GREEN (open) light is LIT. Tripped and the OPEN light ENERGIZED.

CUE: Ammeter selector switch is o VERIFY/PLACE as seen. Ammeter Selector Switch, in position A, B, or C.

CUE: Voltmeter selector switch is o VERIFY/PLACE as seen. Voltmeter Selector Switch, in position 1-2, 2-3, or 3-1.

IP-100 Page 2 of 9

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

3. Verify 2A Rod Drive MG Set Control Perform the following at SAT UNSAT N/A Cabinet aligned. 2RD03E:

Comments:

CUE: Synchronizer Switch is as

  • Verify Synchronizer seen (OFF). Switch is in OFF position.

CUE: Ammeter selector switch is

  • Verify 2A MG Set in same position as 2B MG Ammeter Selector set. Switch, is in same CUE: Voltmeter selector switch is position as 2B MG Set in same position as 2B MG Ammeter Selector set. Switch,
  • Verify 2A MG Set Voltmeter Selector Switch, is in same position as 2B MG Set Voltmeter Selector Switch.
  • 4. Start the 2B Rod Drive MG Set. Perform the following at SAT UNSAT N/A 2RD03E:

Comments:

o Ensure no targets indicating on the CUE: Relays are as seen (No following relays:

Targets are up).

o Common Generator Ground Relay for both MG NOTE: If examinee depresses the o 2B MG Set Phase relay reset pushbutton, A Dir Overcurrent.

provide the following cue: o 2B MG Set Phase CUE: Reset pushbutton has been C Dir Overcurrent.

depressed, and released. o Depress the Reset CUE: 2B MG Set Motor Breaker is pushbutton.

closed, RED (closed) light

  • Place 2B MG Set is LIT, MG set is spinning Motor Breaker control up. switch to CLOSE.

CUE: 15 secs have elapsed, MG set is at rated speed.

o Allow 15 secs for 2B MG Set to reach rated speed.

IP-100 Page 3 of 9

EVALUATOR NOTE: DO NOT ALLOW EXAMINEE TO OPEN REACTOR TRIP BREAKER CABINET DOORS. Photos of the Reactor Trip and Bypass Breakers are attached on JPM pages 8 & 9.

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

5. Ensure locally the Reactor Trip Perform the following at SAT UNSAT N/A Breakers are closed. the Reactor Trip Switchgear: Comments:

NOTE: Provide examinee with photo of RTA and RTB (page 8) and provide the following cue:

  • Determine RTA and CUE: RTA and RTB are as RTB closed.

shown in photo.

NOTE: Provide trainee with photo of BYA and BYB (page 9) and provide the following cue.

o Determine BYA and CUE: BYA and BYB are as BYB are open.

shown in photo.

6. Verify stationary disconnects are Above the Rod Drive SAT UNSAT N/A closed. Cabinets, ENSURE the following Stationary Comments:

Disconnects are CLOSED CUE: All switches are as seen (in ON position):

(closed).

  • 2RD02JA
  • 2RD03JA
  • 2RD04JA
  • 2RD05JA
  • 2RD06JA
  • 7. Perform field flash of 2B MG Set. Perform the following at SAT UNSAT N/A 2RD03E:

Comments:

CUE: Field Flash Pushbutton is

  • Depress and hold the depressed. 2B MG Set Generator Field Flash pushbutton CUE: 2B MG Set voltage is ~235 until voltage is steady volts. at ~235 volts.

CUE: Field Flash Pushbutton is released.

8. Check the range of control of the MG Perform the following at SAT UNSAT N/A Set Voltage Adjuster. 2RD03E:

Comments:

CUE: As voltage adjust pot is

  • Rotate the 2B MG Set adjusted up, voltage rises. Voltage Adjust Pot and As pot is adjusted down, CHECK the range of voltage lowers. Range of control ~230 to 300 control is 230-300 volts. volts.)

IP-100 Page 4 of 9

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

9. Adjust 2B MG Set voltage slightly Perform the following at SAT UNSAT N/A higher than 2A MG Set. 2RD03E:

Comments:

CUE: 2B MG set voltage is 1V

  • Adjust 2B MG Set higher than 2A voltages voltage 0-2.5V higher after adjustment of 2B MG than 2A MG Set by set pot. adjusting the 2B MG set potentiometer.
10. Attempt automatic paralleling of 2A Perform the following at SAT UNSAT N/A and 2B MG Sets. 2RD03E:

Comments:

  • Place 2B Synchronizer CUE: 2B MG Set Synch Switch is Switch to ON.

in ON position.

CUE: 2B Generator Output breaker GREEN (open) light is LIT.

  • Check for closure of CUE: 40 seconds have elapsed, the 2B Generator 2B Generator Output Output Breaker.

breaker GREEN (open) light is LIT. o Determine 2B MG Set Generator Output CUE: Synch Switch is in OFF Breaker did not close.

position.

o Place 2B Synchronizer Switch to OFF.

NOTE: Examinee may attempt auto parallel 2B MG set again. If examinee attempts auto parallel, repeat cues. A maximum of 3 auto parallel attempts is allowed per note prior to step F.11. Intent is for examinee to perform alternate synchronization loading method.

EVALUATORS NOTE: Alternate path begins here.

11. Obtain Shift Supervisors permission Perform the following: SAT UNSAT N/A to use the alternate synchronizing and loading method.
  • Obtain Shift Comments:

Supervisors CUE: Unit Supervisor authorizes permission to use the use of alternate method of alternate synchronizing synchronizing and loading and loading method.

2B MG set.

IP-100 Page 5 of 9

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 12. Parallel the 2A and 2B Rod Drive Perform the following at SAT UNSAT N/A MG Sets using the alternate 2RD03E:

synchronizing and loading Comments:

  • Place 2B MG Set method. Synchronizer Switch to CUE: 2B synch switch is in ON ON.

position.

  • Place 2B MG Set CUE: 2B MG Set Motor Breaker Motor Breaker control is tripped. Green (open) switch to TRIP.

light is energized.

  • Verify the 2B Motor CUE: 2B MG set motor and and Generator generator breakers RED Breakers BOTH (closed) lights immediately CLOSE within 5-6 LIGHT. seconds.
13. Complete switch alignment on 2B Perform the following at SAT UNSAT N/A MG Set Control Cabinet. 2RD03E:

Comments:

  • Place 2B MG Set CUE: 2B synch switch is in OFF Synchronizer Switch to position. OFF.
  • Place 2B MG Set Generator Breaker CUE: 2B MG set generator control switch to breaker control switch is in AFTER CLOSED.

after closed.

  • Place 2B MG Set CUE: 2B MG set motor breaker Motor Breaker control control switch is in after switch to AFTER closed. CLOSED.
  • Notify Unit 2 US 2B CUE: As Unit 2 US, acknowledge MG set is paralleled.

report CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

IP-100 Page 6 of 9

Conn Test Breaker Disc Closed Remove Spring Discharged IP-100 Page 7 of 9

Conn Test Breaker Disc Open Remove Spring Discharged IP-100 Page 8 of 9

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are an extra NSO.
2. Unit 2 start up is in progress per 2BwGP 100-2, PLANT STARTUP.
3. 2A Rod Drive MG Set is running.

INITIATING CUES:

1. The Unit 2 US has directed you to start up and parallel the 2B Rod Drive MG Set per BwOP RD-5, CONTROL ROD DRIVE MG SET STARTUP AND PARALLELING TO OPERATING MG SET.
2. Inform the Unit 2 US when you have completed starting up and paralleling 2B Rod Drive MG Set.

IP-100 Page 9 of 9

TASK TITLE: Local Start of 2B AF Pump with Failure of Battery Bank JPM No.: IP-400S REV: 20070301 Task No: R-AF-012 K/A No.: 061000A2.03 Objective No: 4.C.AF-02 K/A Imp: 3.1/3.4 EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 2, 6, 7 APPROX COMPLETION TIME: 35 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

PERFORM X IN PLANT X SIMULATE SIMULATOR GENERAL

REFERENCES:

1. BwOP AF-7, Rev. 28, Auxiliary Feedwater Pump B (Diesel) Startup on Recirc.
2. BwOP AF-7T1, Rev. 4, Diesel Driven Auxiliary Feedwater Pump Operating Log.

MATERIALS:

1. Copy of BwOP AF-7, Rev. 28.
2. Copy of BwOP AF-7T1, Rev. 4.
3. GA Key for accessing 2B AF pump rear door.

TASK STANDARDS:

1. Start 2B AF pump lube oil system.
2. Determine 2B AF pump battery bank has failed.
3. Align alternate 2B AF pump battery bank.
4. Start 2B AF pump.

TASK CONDITIONS:

1. You are an extra NSO.
2. Unit 2 is undergoing a loss of heat sink event.
3. Main control room HVAC is operating in makeup mode.
4. An EQUIPMENT OPERATOR is standing by at the 2B AF pump to monitor governor linkages during startup.

INITIATING CUES:

1. The Unit 2 Unit Supervisor directs you to locally start the 2B Auxiliary Feedwater pump in accordance with BwOP AF-7, Auxiliary Feedwater Pump B (Diesel) Startup on Recirc.

CUE: Hand examinee copy of BwOP AF-7 and BwOP AF-7T1.

2. BwOP AF-7 steps F.1 thru F.10 are complete.

EVALUATOR NOTE: Verify/obtain GA Key for accessing 2B AF pump room rear door.

IP-400S Page 1 of 6

RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to BwOP AF-7 Perform the following: SAT UNSAT N/A CUE: All precautions,
  • Refer to BwOP AF-7 to Comments:

prerequisites and step F.9.

limitations and actions are complete.

  • 2. Start Lube Oil systems: (steps Perform the following to SAT UNSAT N/A F.11 - F.14) START Auxiliary Lube Oil Comments:

NOTE: 2B AF Pump lube oil Systems:

pump panels are located

  • At Aux FW Pump 2B Lube behind 2AF01J. Oil Pump 2AF01PB-C local CUE: Gearbox lube oil pump control panel, place 2HS-control switch is in AF152, Aux FW Pp 2B START. Gear Box Lube Oil Pp, L/C/S, to START CUE: If asked, you hear Gearbox lube oil pump
  • At Aux FW Pump 2B Lube motor running. Oil Pump 2AF01PB-A Local Control Panel, place CUE: Aux lube oil pump 2HS-AF120, Aux FW Pp control switch is in 2B Lube Oil Pp, L/C/S to START. START.

CUE: If asked, you hear Aux o Verify pump lube oil lube oil pump motor inventory is within the running. sightglass CUE: Lube oil is within o Verify Lube Oil Filter sightglass. Differential Pressure is < 4 NOTE: After examinee locates psid inlet and outlet pressure gages, provide the following cue:

CUE: Inlet pressure (RIGHT) is 28 psig, and the outlet pressure (LEFT) is 26 psig.

3. Verify/Place VC in M/U mode per Verify/Place VC in M/U mode SAT UNSAT N/A BwOP VC-5: (step F.15) per BwOP VC-5, at SM Comments:

CUE: From initiating cue, VC is discretion.

operating in makeup

  • From initiating cue, VC is mode. operating in makeup mode.

IP-400S Page 2 of 6

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

4. Align AFW system discharge ALIGN 2B AFW pump SAT UNSAT N/A flowpath (steps F.16 - F.17) discharge flowpath as Comments:

applicable:

  • Determine AF pump is being started to inject into the SGs during emergency CUE: If asked, as US, direct condition that step 16a and 16b o Contact US to determine if will not be performed. CLOSURE of B Train CUE: Equipment Operator is 2MOV-AF013s or 2AOV-standing by to monitor AF004B will be necessary governor linkage. o Verify Equipment Operator standing by to monitor the governor linkage during start of the engine
5. Attempt to start 2B AF Pump: (step Perform the following at SAT UNSAT N/A F.18.a & b.) 2AF01J: Comments:

CUE: Engine Start Selector

  • Place the Engine Start Switch is in MANUAL. Selector Switch to CUE: If asked, the Engine MANUAL.

Ready light is NOT lit.

CUE: Start pushbutton is

  • Depress and Hold the start depressed and held. pushbutton.

CUE: Engine cranking sounds o Check the engine cranking are NOT present. indicator CUE: Engine Starting Light o Release the Start NOT LIT. Pushbutton.

CUE: Start pushbutton

  • Determine engine did not released. start.

EVALUATOR NOTE: Alternate path begins here.

  • 6. Select alternate battery bank for Perform the following at SAT UNSAT N/A 2B AF pump (step F.18.c) 2AF01J: Comments:

NOTE: When examinee locates

  • Select alternate battery Battery Bank Selector bank by rotating the Switch, provide the Battery Selector Switch to following cue: POS 2 CUE: Battery Selector Switch is in POS 1.

NOTE: When examinee repositions Battery Bank Selector Switch, provide the following cue:

CUE: Battery Selector Switch is in POS 2.

NOTE: If examinee investigates AF pump batteries and/or chargers, provide the following cues:

CUE: Battery and/or chargers are as seen.

IP-400S Page 3 of 6

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 7. Start 2B AF Pump (step F.18.c.1 Perform the following at

- F.18.f) 2AF01J:

CUE: RESET pushbutton has

  • Momentarily depress the been depressed and RESET pushbutton.

released. o Verfify the Ready to Start CUE: If asked, Engine Ready light is LIT.

light is as seen (BLUE

  • Depress and Hold the Start light LIT). Pushbutton CUE: Start pushbutton is VERIFY Engine Starting being depressed and Light indicates starting held. sequence is in process CUE: Engine start noises are VERIFY Engine Running heard. Light is ILLUMINATED CUE: Engine starting light is when speed indicates 350 lit. RPM CUE: 2SI-AF8002, Engine RELEASE the START Speed, is rising and pushbutton Engine Running CHECK Speed between (GREEN) light is LIT at 1795-1845 RPM 350 rpm CUE: Start pushbutton is released CUE: 2SI-AF8002, Engine Speed, is 1825 rpm CUE: If examinee reports start of 2B AF pump to US, as US acknowledge report and direct examinee to continue BwOP AF-7.
8. Check Auxiliary Feedwater Pump Perform the following at 2FI- SAT UNSAT N/A recirc flow: (step F.18.g) AF096: Comments:

NOTE: Recirc flow gauge is Verify AF recirc flow > 85 gpm.

large black gauge located on wall to left of pump room door CUE: 2FI-AF096 indicates 90 gpm IP-400S Page 4 of 6

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

9. Ensure SX Cooling is supplied to Verify the following valves SAT UNSAT N/A the engine: (step F.18.h) open: Comments:

NOTE: Valves are in overhead above 2AF01J. After identifying limit switches, provide the following cues:

CUE: 2SX173 limit switch is

  • 2SX173 SX Supply made up (valve is open) Isolation valve CUE: 2SX178 limit switch is
  • 2SX178 SX Return made up (valve is open) Isolation valve CUE: US informs you that another operator will complete step F.18 of BwOP AF-7.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

IP-400S Page 5 of 6

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are an extra NSO.
2. Unit 2 is undergoing a loss of heat sink event.
3. Main control room HVAC is operating in makeup mode.
4. An Equipment Operator is standing by at the 2B AF pump to monitor governor linkages during startup.

INITIATING CUES:

1. The Unit 2 Unit Supervisor directs you to locally start the 2B Auxiliary Feedwater pump in accordance with BwOP AF-7, Auxiliary Feedwater Pump B (Diesel) Startup on Recirc.
2. BwOP AF-7 steps F.1 thru F.10 are complete.

IP-400S Page 6 of 6

TASK TITLE: Align the Fire Hazards Panel JPM No.: IP-704 REV: 20070301 Task No.: R-OA-001 K/A No.: 016000G2.1.30 Objective No.: 4D.OA-27 K/A IMP: 3.9/3.4 EXAMINEE: RO SRO (Circle One)

EVALUATOR: DATE:

The Examinee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS: (*) 2, 3 APPROX COMPLETION TIME: 20 MINUTES CRITICAL TIME: NA EVALUATION METHOD: LOCATION:

PERFORM X IN PLANT X SIMULATE SIMULATOR GENERAL

REFERENCES:

1. 2BwOA PRI-5, CONTROL ROOM INACCESSIBILITY, Rev. 103 MATERIALS:
1. Copy of 2BwOA PRI-5, CONTROL ROOM INACCESSIBILITY.

TASK STANDARDS:

1. Align the Unit 2 Fire Hazards Panel to the Division 22 Power Supply.
2. Align Unit 2 S/G Levels, S/G Pressures, PZR Level, and PZR Pressure instrumentation to the Unit 2 Fire Hazards Panel TASK CONDITIONS:
1. You are an extra NSO.
2. A fire is ongoing in the Main Control Room and the Unit 2 AEER.
3. The Remote Shutdown Panels have been manned.
4. 1BwOA PRI-5 and 2BwOA PRI-5 are in progress.
5. Bus 241 is deenergized.
6. The 2HS-LV001, Fire Hazards Panel Power Switch, is in the Division 21 position.

INITIATING CUES:

1. The Unit 2 Unit Supervisor directs you to proceed to 2PL10J, Unit 2 Fire Hazards Panel and align 2PL10J to the Division 22 Power Supply.
2. After aligning 2PL10J to the Division 22 Power Supply, align the following instrumentation to the Unit 2 Fire Hazards panel per step 8.c. RNO of 2BwOA PRI-5:
a. 2A & 2B SG WR Levels
b. 2A & 2B SG Pressures
c. PZR Level
d. PZR Pressure
3. Inform the Unit 2 Unit Supervisor when you have completed aligning the Unit Fire Hazards Panel.

IP-704 Page 1 of 4

RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to 2BwOA PRI-5 and proceed Perform the following: SAT UNSAT N/A to 2PL10J, Fire Hazards Panel.
  • Locate and obtain Comments:

CUE: When examinee locates 2BwOA PRI-5, step 8.c 2BwOA PRI-5, provide RNO.

copy.

  • Proceed to 2PL10J, Unit NOTE: If examinee asks for status 2 Fire Hazards Panel.

of coincident (426 S.7-24 electrical instrumentation channels, penetration area) provide the following cue:

CUE: No other coincident instrumentation channels are in test or tripped.

NOTE: 2PL10J is located in 426 Curved Wall Area, Grid S-24.

  • 2. Align the Fire Hazards Panel to Perform the following at SAT UNSAT N/A Division 22 Power Supply: 2PL10J: Comments:

NOTE: If asked for indications on 2PL10J, provide the following cues:

CUE: Division 21 Power Available Light AND o Verify the Division 22 Power Light are NOT LIT. Power Available light is Division 22 Power LIT.

Available Light is LIT.

  • Place 2HS-LV001, Fire CUE: All instrumentation Hazards Panel Power indicates off scale low. Switch, in Position 3 (Division 22 Bus 232X2).

NOTE: After examinee places 2HS-LV001 to Position 3 o Verify the Power Light is (Division 22), provide the LIT.

following cue:

CUE: Division 21 Power Available Light is NOT LIT.

Power light and Division 22 Power Available Lights are BOTH LIT.

IP-704 Page 2 of 4

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 3. Align the Fire Hazards Panel. Perform the following at SAT UNSAT N/A NOTE: As examinee aligns 2PL10J: Comments:

instrumentation, provide

  • Place the following panel the following cues: switches to the FIRE CUE: 2HS-FW309 is in FIRE position:

position and 2A SG WR is

CUE: 2HS-FW310 is in FIRE

60%.

position and 2A SG pressure is 1080 psig.

CUE: 2HS-MS194 is in FIRE position and 2B SG

  • 2HS-RY033 - PZR pressure is 1080 psig. Pressure.

CUE: 2HS-RY033 is in FIRE

  • 2HS-RY034 - PZR position and PZR pressure Level.

is 2220 psig.

CUE: 2HS-RY034 is in FIRE position and PZR level is 30%.

4 Inform Unit Supervisor Unit 2 Fire Inform Unit Supervisor Unit 2 Hazards Panel is aligned. Fire Hazards Panel is CUE: As Unit 2 Unit Supervisor, aligned.

acknowledge report.

CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

IP-704 Page 3 of 4

JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are an extra NSO.
2. A fire is ongoing in the Main Control Room and the Unit 2 AEER.
3. The Remote Shutdown Panels have been manned.
4. 1BwOA PRI-5 and 2BwOA PRI-5 are in progress.
5. Bus 241 is deenergized.
6. The 2HS-LV001, Fire Hazards Panel Power Switch, is in the Division 21 position.

INITIATING CUES:

1. The Unit 2 Unit Supervisor directs you to proceed to 2PL10J, Unit 2 Fire Hazards Panel, and align 2PL10J to the Division 22 Power Supply.
2. After aligning 2PL10J to the Division 22 Power Supply, align the following instrumentation to the Unit 2 Fire Hazards panel per step 8.c. RNO of 2BwOA PRI-5:
a. 2A & 2B SG WR Levels
b. 2A & 2B SG Pressures
c. PZR Level
d. PZR Pressure
3. Inform the Unit 2 Unit Supervisor when you have completed aligning the Unit Fire Hazards Panel.

IP-704 Page 4 of 4