ML081400749

From kanterella
Jump to navigation Jump to search
Proposed Control Room Jpms for the Fermi 2 Initial Examination - January 2008
ML081400749
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/25/2008
From: Hironori Peterson
Operations Branch III
To: Jennifer Davis
Detroit Edison
References
50-341/08-301
Download: ML081400749 (75)


Text

JOB PERFORMANCE MEASURE NRC EXAM 2008 Job Position No. Revision SRO / RO 08-S-002 0 JPM Title Duration Page Manually Start the RCIC System (BANK) 10 minutes COVER SHEET Examinee: SRO / RO / NO / STA Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Evaluation Method: Perform / Walkthrough / Discuss Start Time (Circle method used) Plant / Simulator / Classroom Stop Time Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comments Element S U Comments 1.

  • 2.
  • 3.
  • 4.
  • 5.
  • 6.

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-002 Manually Start the RCIC System Revision: 0 Page 1 Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom System:

E5100 - Reactor Core Isolation Cooling System Task:

02E5100004 - Initiate Reactor Core Isolation Cooling in Manual Mode

References:

Required (R) / Available (A) 23.206, Reactor Core Isolation Cooling System, Enclosure B (R) 6M721-5709-1, RCIC Functional Operating Sketch (A)

Tools and Equipment Required:

None Initial Conditions:

  • You are the Control Room NSO.
  • A Reactor Scram has occurred and the reactor is shutdown.
  • EOP flow charts have been entered.

Initiating Cue(s):

The CRS directs you to start RCIC manually and inject to the vessel to maintain Reactor Water Level 173-214.

Terminating Cue(s):

RCIC is injecting to the RPV at approximately 650 gpm.

Task Standard:

RCIC has been started manually and is injecting to the RPV at approximately 650 gpm IAW 23.206.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

2 - Reactor Water Inventory Control K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 217000 - Reactor Core Isolation Cooling System K/A STATEMENT:

A4. Ability to manually operate and/or monitor in the control room:

A4.04 Manually initiated controls.................................................................................3.6 / 3.6 Maintenance Rule Safety Classification:

E5100-01 Maintenance Rule Risk Significant? (Yes or No)

Yes Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-002 Manually Start the RCIC System Revision: 0 Page 2 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD PREREQUSITES: None CUE: Provide Examinee with CUE SHEET.

NOTE: Examinee should use 23.206, Enclosure B hard card at H11P601. It is not intended to perform or verify 23.206, Section 5.4, Manual Initiation.

1. Start E5101-C004, RCIC Baro Cndr 1. Starts E5101-C004.

Vacuum Pump.

  • 2. Open E5150-F046, RCIC Oil Clr Clg
  • 2. Opens E5150-F046.

Water Iso Vlv.

  • 3. Open E5150-F095, RCIC Turb Stm Inlet
  • 3. Opens E5150-F095.

Byp Vlv.

  • 4. After approximately 15 seconds, open
  • 4. Opens E5150-F045.

E5150-F045, RCIC Turb Steam Inlet Vlv.

  • 5. Open E5150-F013, RCIC Disch To FW
  • 5. Opens E5150-F013.

Inbd Iso Valve.

CUE: E51-K615 may not need to be adjusted to obtain proper flow rate. Flow is indicated on E51-K613.

  • 6. Adjust flow as necessary with auto
  • 6. Examinee adjusts flow as necessary to E51-K615, RCIC Discharge Flow obtain 650 gpm.

Controller.

CUE: End JPM when RCIC is injecting a approximately 650 gpm.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-002 Manually Start the RCIC System Revision: 0 Page 3 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Ex.: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.

Verify valve open: Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.

Closing a valve: Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.

Opening a valve: Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Notify Examinee that time compression may be used for activities performed outside of the Control Room.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-002 Manually Start the RCIC System Revision: 0 Page 4 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-002 Manually Start the RCIC System Revision: 0 Page 5 Simulator Setup IC#:

Any IC with pressure >150 psig or post scram >150 psig.

Malfunctions:

Number Title Value Delay Ramp N/A Remote Functions:

Number Title Value Delay Ramp N/A Override Functions:

Number Title Value Delay Ramp N/A Special Instructions:

Ensure reactor level is approx. 130-170 inches and steady.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 Cue Sheet Initial Conditions:

  • You are the Control Room NSO.
  • A Reactor Scram has occurred and the reactor is shutdown.
  • EOP flow charts have been entered.

Initiating Cue(s):

The CRS directs you to start RCIC manually and inject to the vessel to maintain Reactor Water Level 173-214.

JOB PERFORMANCE MEASURE NRC EXAM 2008 Job Position No. Revision SRO / RO 08-S-007 0 JPM Title Duration Page Respond to Refuel Floor High Radiation 15 minutes COVER SHEET (BANK/Alt Path)

Examinee: SRO / RO / NO / STA Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Evaluation Method: Perform / Walkthrough / Discuss Start Time (Circle method used) Plant / Simulator / Classroom Stop Time Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comments Element S U Comments 1.

2.

3.

4.

  • 5.

6.

7.

8.

9.

  • 10.

11.

12.

13.

14.

15.

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-007 Respond to Refuel Floor High Radiation Revision: 0 Page 1 Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom System:

D1100 - Radiation Protection System Task:

32970 - Respond to plant alarms in accordance with Alarm Response Procedures

References:

Required (R) / Available (A) 23.404, Standby Gas Treatment System, Section 5.3, 5.4, and/or 6.1. (R) 3D31, Div 1/2 Fuel Pool Vent Exh Rad Monitor Upscale (R) 3D35, Div 1/2 Fuel Pool Vent Exh Rad Monitor Upscale Trip (R)

Tools and Equipment Required:

None Initial Conditions:

  • You are the Control Room NSO.
  • The Plant is in Mode 5.
  • Plant conditions are as you see them.
  • Fuel Handling is in progress in the Spent Fuel Pool.

Initiating Cue(s):

Respond to conditions in accordance with plant procedures.

Terminating Cue(s):

SGTS is operating maintaining Secondary Containment pressure.

Task Standard:

Manually initiate Div 2 SGTS in response to a failure of Div 1 SGTS to automatically initiate following Fuel Pool Area Radiation High.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-007 Respond to Refuel Floor High Radiation Revision: 0 Page 2 Licensed Operator Exam Information (required for NRC exams)

Safety Function:

9 - Radioactivity Release K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 272000 - Radiation Monitoring System K/A STATEMENT:

A2. Ability to (a) predict the impacts of the following on the RADIATION MONITORING SYSTEM ;

and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

A2.12 Refuel floor handling accidents/operations........................................................ 3.3 / 4.0 Maintenance Rule Safety Classification:

D1100-05 Maintenance Rule Risk Significant? (Yes or No)

No Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-007 Respond to Refuel Floor High Radiation Revision: 0 Page 3 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD PREREQUSITES: None NOTE: Unless otherwise noted, all controls and indications for this section are located on COP H11- P601 (Back), H11-P808 and P817.

Due to the nature of this event, the expected sequence of responses may differ from that listed below.

CUE: Provide Examinee with CUE SHEET. Cue the console operator to trigger the malfunction(s) when ready to begin the JPM.

1. Announce alarm 3D31, DIV I/II FP VENT 1. Examinee calls out alarm and reviews EXH RADN MONITOR UPSCALE and ARPs.

3D35 DIV I/II FP VENT EXH RADN MONITOR UPSCALE TRIP.

2. Verify > 3 mr/hr on either D11-R605 or 2. Verifies D11K609A and B, East FP Vent D11R606, Fuel Pool Vent Exh East Exhaust Radiation High.

(West) Duct PRMS Recorder (back of COP H11-P601).

CUE: Refuel floor personnel call the CR and report a fuel bundle has impacted the fuel racks, on the East side of the Fuel Pool, with visible damage.

CUE: If dispatched to the Relay Room, the Patrol NSO reports D11K609A and B, Div 1 (2) East FP Vent Exhaust Radiation Monitors indicate 10 mr/hr.

3. May direct an operator to RR H11-P606 3. Contacts Patrol NSO to investigate RR to verify D11-K609A and B, Div 1 (2) Fuel indications.

Pool East Vent Exh Duct Rad Monitors, are greater than 3 mr/hr.

CUE: As CRS, acknowledge AOP and EOP entry conditions. Direct CRNSO to continue with ARP response.

4. May notify CRS to perform 20.000.02, 4. CRS acknowledges AOP and EOP entry "Abnormal Release of Radioactive conditions.

Material," and 29.100.01 SH 5, "Secondary Containment and Rad Release," concurrently with ARP.

  • 5. Verify T4600-C003, Div 1 SGTS Exhaust
  • 5. Fan T4600-C003 indicates tripped.

Fan started.

Alternate Path Begins Here

6. Verify Reactor Building HVAC fans trip 6. Verifies RBHVAC Supply and Exhaust and isolate. fans are tripped and SCIVs are CLOSED.

NOTE: SOP 23.413 CCHVAC verification may be delayed by CRNSO as follow up action as determined by Examiner.

7. Verify per 3D35, Control Center HVAC 7. Verifies CCHVAC has shifted to RECIRC automatic shift to RECIRC in accordance Mode by identifying RECIRC light is LIT with 23.413,"Control Center HVAC." and T4100-C047, Div 1 CCHVAC Emerg Makeup Fan is operating.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-007 Respond to Refuel Floor High Radiation Revision: 0 Page 4 ELEMENT STANDARD

8. Verify per 3D35 automatic Isolations: 8. Verifies Groups 14 and 16 are isolated.

- Group 14, Drywell and Suppression (May be done as a follow up item as Pool Ventilation System determined by Examiner.)

- Group 16, Nitrogen Inerting System NOTE: The following steps are from 23.404, Standby Gas Treatment System, Section 6.1.

Sections 5.3 and 5.4 also specify actions that will accomplish the final objective of starting Division 2 SGTS. Actions IAW Section 5.3 or 5.4 are acceptable provided the critical step of Element 11 is accomplished. These actions may be implemented from memory.

9. Open or verify open or T4100-F407. 9. T4100-F407 is verified open
  • 10. Start T4600-C004, Div 2 SGTS Exhaust *10. Starts Div 2 SGTS Exhaust Fan by taking Fan. the CMC Switch to RUN.
11. Verify T4600-F004B, Div 2 SGTS Exh 11. Verifies T4600-F004B open.

Fan Inlet Iso Damper is OPEN.

12. Verify T4600-F008B, Div 2 SGTS SC 12. Verifies T4600-F008B open.

Otbd Iso Dmpr is OPEN.

13. Verify T4600-F408, Div 2 SGTS SC Inbd 13. Verifies T4600-F408 open.

Iso Dmpr is OPEN.

14. Verify T4600-F410, RB5 Air Inlet Iso Vlv 14. Verifies T4600-F410 open.

is OPEN.

15. Verify T46-R800A (B), Div 1 (2) SGTS 15. Verifies flow is in acceptable range.

Exh Gas Flow Recorder, indicates between 3420 and 4180 cfm.

CUE: End JPM when SGTS is operating maintaining Secondary Containment pressure.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-007 Respond to Refuel Floor High Radiation Revision: 0 Page 5 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Ex.: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.

Verify valve open: Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.

Closing a valve: Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.

Opening a valve: Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Notify Examinee that time compression may be used for activities performed outside of the Control Room.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-007 Respond to Refuel Floor High Radiation Revision: 0 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-007 Respond to Refuel Floor High Radiation Revision: 0 Page 7 Simulator Setup IC#:

IC-2 Malfunctions:

Number Title Value Delay Ramp D11MF0021 D11N010A Div 2 E FP Rad Monitor A 11 D11MF0022 D11N010B Div 2 E FP Rad Monitor B 11 Remote Functions:

Number Title Value Delay Ramp Override Functions:

Number Title Value Delay Ramp TCBDRL_101CRTVSP Div 2 SGTS Auto Start Failure 0 TCBASPECIFIC_F302368CC Div 1 SGTS Exh Fan Trip TRUE Special Instructions:

1. Initialize simulator to desired IC and place in RUN.
2. Open and execute Lesson 08-S-007.lsn.
3. When cued by examiner, trigger the lesson step.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 Cue Sheet Initial Conditions:

  • You are the Control Room NSO.
  • The Plant is in Mode 5.
  • Plant conditions are as you see them.
  • Fuel Handling is in progress in the Spent Fuel Pool.

Initiating Cue(s):

Respond to conditions in accordance with plant procedures.

JOB PERFORMANCE MEASURE NRC EXAM 2008 Job Position No. Revision SRO / RO 08S003 0 JPM Title Duration Page Manually Initiate Low-Low Set (BANK) 10 minutes COVER SHEET Examinee: SRO / RO / NO / STA Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Evaluation Method: Perform / Walkthrough / Discuss Start Time (Circle method used) Plant / Simulator / Classroom Stop Time Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comments Element S U Comments

  • 1.

2.

  • 3.

4.

5.

6.

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08S003 Manually Initiate Low-Low Set Revision: 0 Page 1 Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom System:

B2104 - Safety Relief Valves Task:

02B2104002 - Operate/Shutdown the Safety Relief Valves Low Low Set function

References:

Required (R) / Available (A) 23.201, Safety Relief Valves and Automatic Depressurization System, Enclosure B (R)

Tools and Equipment Required:

None Initial Conditions:

  • You are the Control Room NSO.
  • The plant is shutdown, and the MSIVs are closed.
  • CRS has entered the EOPs on Level 3.
  • CRS directs you to maintain prerssure 900-1050# using Lo-Lo Set.

Initiating Cue(s):

The CRS directs you to manually initiate Low-low Set.

Terminating Cue(s):

Low-low Set has been manually initiated.

Task Standard:

Manually initiate Low-low Set per 23.201.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

3 - Reactor Pressure Control K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 239002 - Relief/Safety Valves K/A STATEMENT:

A4. Ability to manually operate and/or monitor in the control room:

A4.01 SRVs ..................................................................................................................4.4 / 4.4 Maintenance Rule Safety Classification:

B2104-05 Maintenance Rule Risk Significant? (Yes or No)

No Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08S003 Manually Initiate Low-Low Set Revision: 0 Page 2 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD PREREQUSITES: None CUE: Provide Examinee with CUE SHEET.

NOTE: Examinee should use hard card for 23.201 Enclosure B at H11P601.

  • 1. Open selected SRV by depressing the
  • 1. Opens an SRV.

OPEN pushbutton.

2. Verify 1D38, DIV I/II LOW - LOW SET 2. Verifies 1D38.

ARMED, alarms.

  • 3. Close selected SRV by depressing the

CLOSE pushbutton.

4. Allow Reactor pressure to increase to 4. Monitors Reactor Pressure on Post Scram Pressure setpoint of 1093 psig. Accident Recorder B21R623A.

NOTE: Evaluator may terminate JPM prior to reaching SRV set pressures if RPV pressure rise is too slow.

5. Verify B2104-F013A, Div 1 MS Line D 5. Verifies LLS valves operate properly -

SRV, and B2104-F013G, Div 2 MS Line B SRV A opens at 1017 psig, SRV G at SRV, open automatically to control 1047 psig.

Reactor pressure.

CUE: Another Operator will perform Section 5.3.

6. Perform or verify complete steps of 6. Informed by examiner that another Section 5.3, Low-Low Set Operation. operator will perform these steps.

CUE: End JPM when Low-low Set has been manually initiated.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08S003 Manually Initiate Low-Low Set Revision: 0 Page 3 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Ex.: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.

Verify valve open: Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.

Closing a valve: Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.

Opening a valve: Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Notify Examinee that time compression may be used for activities performed outside of the Control Room.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08S003 Manually Initiate Low-Low Set Revision: 0 Page 4 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08S003 Manually Initiate Low-Low Set Revision: 0 Page 5 Simulator Setup IC#:

IC-20 Malfunctions:

Number Title Value Delay Ramp N/A Remote Functions:

Number Title Value Delay Ramp N/A Override Functions:

Number Title Value Delay Ramp N/A Special Instructions:

1. Initialize the simulator to IC-20 and place in RUN.
2. Place the Mode Switch in Shutdown.
3. Ensure Low-Low Set is not armed.
4. Freeze simulator post scram with Reactor Pressure approximately 970-1000 psig.
5. Close the MSIVs
6. Place simulator in RUN once examinee indicates he understands initial conditions and initiating cues.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 Cue Sheet Initial Conditions:

  • You are the Control Room NSO.
  • The plant is shutdown, and the MSIVs are closed.
  • CRS has entered the EOPs on Level 3.
  • CRS directs you to maintain prerssure 900-1050# using Lo-Lo Set.

Initiating Cue(s):

The CRS directs you to manually initiate Low-low Set.

JOB PERFORMANCE MEASURE NRC EXAM 2008 Job Position No. Revision SRO / RO 08-S-005 0 JPM Title Duration Page Operate Div 1 Core Spray System in Test Mode (Alt 10 minutes COVER SHEET Path)

Examinee: SRO / RO / NO / STA Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Evaluation Method: Perform / Walkthrough / Discuss Start Time (Circle method used) Plant / Simulator / Classroom Stop Time Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comments Element S U Comments

  • 1.
  • 2.

3.

4.

5.

  • 6.
  • 7.

8.

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-005 Operate Div 1 Core Spray System in Test Mode Revision: 0 Page 1 Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom System:

E2100 - Core Spray System Task:

02E2100022 - Place Core Spray System in Test Mode

References:

Required (R) / Available (A) 23.203, Core Spray System ,Section 6.1 (R)

M-5707 Core Spray System Functional Operating Sketch (A)

Tools and Equipment Required:

None Initial Conditions:

  • You are the Control Room NSO.
  • Reactor Power is at 100%.
  • Corrective maintenance has just been completed on the Div 1 Core Spray System, with post maintenance testing (PMT) planned for your shift.
  • Plant conditions are stable as you see them.

Initiating Cue(s):

  • The CRS directs you to start Div 1 Core Spray System in the Test Mode IAW 23.203, Section 6.1, and establish a flow rate of 6,000 gpm, for PMT.
  • All prerequisites are met for Operation of Div1 Core Spray in the Test Mode.

Terminating Cue(s):

Examinee recognizes limitations on Core Spray Pump operation on minimum flow in Test Mode, and shuts down CS Pumps.

Task Standard:

Examinee establishes Core Spray Test Mode Line-Up to point of recognizing failure of the Test Valve; then shuts down Core Spray pumps prior to exceeding 5 minutes run time on minimum flow.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-005 Operate Div 1 Core Spray System in Test Mode Revision: 0 Page 2 Licensed Operator Exam Information (required for NRC exams)

Safety Function:

4 - Heat Removal From Reactor Core K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 209001 - Low Pressure Core Spray System K/A STATEMENT:

A2. Ability to (a) predict the impacts of the following on the LOW PRESSURE CORE SPRAY SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

A2.06 Inadequate system flow ....................................................................................3.2 / 3.2 Maintenance Rule Safety Classification:

E2100-02 Maintenance Rule Risk Significant? (Yes or No)

No Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-005 Operate Div 1 Core Spray System in Test Mode Revision: 0 Page 3 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD PREREQUSITES: None NOTE: Unless otherwise noted, all controls and indications for this section are located on COP H11-P601.

A CAUTION for this test reads, When in Test Mode, Core Spray Pumps should not be operated for more than five minutes with only E2150-F031A, Div 1 CS Pmps Min Flow Vlv, open, to prevent pump overheating.

CUE: Provide Examinee with CUE SHEET.

NOTE: JPM becomes Time Sensitive at this point which begins with start of the first pump.

Time E2101-C001A started: ____________

  • 1. Start E2101-C001A, Div 1 CS Pump A.
  • 1. Starts E2101-C001A, Div 1 CS Pump A.

NOTE: Pumps are limited to 5 minutes runtime on minimum flow.

Time E2101-C001C started: ____________

  • 2. Start E2101-C001C, Div 1 CS Pump C.
  • 2. Starts E2101-C001C, Div 1 CS Pump C.

Alternate Path Begins Here

3. Throttle open E2150-F015A, Div 1 CS 3. Valve will not respond to OPEN Test Line Iso Vlv, to establish a pump flow pushbutton.

indication between 3000 and 6600 gpm Examinee identifies condition (failure of on E21-R601A, Div 1 Core Spray Flow test valve) and concern (for operating Ind.

pumps in Test Mode on minimum flow).

CUE: If Examinee asks for guidance, as CRS ask for his recommendations. When satisfied that examinee recognizes need shut down CS Pumps, as CRS direct examinee to perform actions per 23.203, Step 6.1.2.5.

NOTE: Examinee should proceed with actions following the statement, When operation in Test Mode is no longer required, perform the following:

4. Close E2150-F015A, Div 1 CS Test Line 4. No action required, valve would not Iso Vlv. initially move.
5. Verify E2150-F031A, Div 1 CS Pmps Min 5. Valve is verified open.

Flow Vlv, opens.

NOTE: Pumps are limited to 5 minutes runtime on minimum flow.

Time E2101-C001A stopped: ____________

  • 6. Stop E2101-C001A, Div 1 CS Pump A.
  • 6. Stops E2101-C001A, Div 1 CS Pump A.

NOTE: Pumps are limited to 5 minutes runtime on minimum flow.

Time E2101-C001C stopped: ____________

  • 7. Stop E2101-C001C, Div 1 CS Pump C.
  • 7. Stops E2101-C001C, Div 1 CS Pump C.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-005 Operate Div 1 Core Spray System in Test Mode Revision: 0 Page 4 ELEMENT STANDARD CUE: Inform Examinee that another operator will establish standby lineup.

8. Place Div 1 Core Spray System in 8. Another operator will establish standby Standby Mode in accordance with Section lineup.

5.3, Standby Mode Div 1.

CUE: End JPM when examinee recognizes limitations on Core Spray Pump operation on minimum flow in Test Mode, and shuts down the Core Spray Pumps.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-005 Operate Div 1 Core Spray System in Test Mode Revision: 0 Page 5 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Ex.: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.

Verify valve open: Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.

Closing a valve: Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.

Opening a valve: Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Notify Examinee that time compression may be used for activities performed outside of the Control Room.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-005 Operate Div 1 Core Spray System in Test Mode Revision: 0 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-005 Operate Div 1 Core Spray System in Test Mode Revision: 0 Page 7 Simulator Setup IC#:

IC-19, 20, or 21 Malfunctions:

Number Title Value Delay Ramp N/A Remote Functions:

Number Title Value Delay Ramp N/A Override Functions:

Number Title Value Delay Ramp P601_B010_1 Div 1 CS F015A Test Valve OPEN Switch 1 P601_B009_1 Div 1 CS F015A Test Valve CLOSE Switch 0 Special Instructions:

1. Initialize the simulator to the desired IC and place in RUN.
2. Open and execute Lesson 08-S-005.lsn.
3. When cued by the examiner, activate the overrides listed above.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 Cue Sheet Initial Conditions:

  • You are the Control Room NSO.
  • Reactor Power is at 100%.
  • Corrective maintenance has just been completed on the Div 1 Core Spray System, with post maintenance testing (PMT) planned for your shift.
  • Plant conditions are stable as you see them.

Initiating Cue(s):

  • The CRS directs you to start Div 1 Core Spray System in the Test Mode IAW 23.203, Section 6.1, and establish a flow rate of 6,000 gpm, for PMT.
  • All prerequisites are met for Operation of Div 1 Core Spray in the Test Mode.

JOB PERFORMANCE MEASURE NRC EXAM 2008 Job Position No. Revision SRO / RO 08-S-009 0 JPM Title Duration Page Restore a RWCU Pump After Oil Sample (Plant Hot) 15 minutes COVER SHEET With System Leak and Failure to Isolate Examinee: SRO / RO / NO / STA Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Evaluation Method: Perform / Walkthrough / Discuss Start Time (Circle method used) Plant / Simulator / Classroom Stop Time Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comments Element S U Comments

  • 1.

2.

3.

4.

5.

  • 6.
  • 7.

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-009 Restore a RWCU Pump After Oil Sample (Plant Hot) With Revision: 0 System Leak and Failure to Isolate Page 1 Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom System:

G3300 - Reactor Water Cleanup System Task:

02G3300012 - Return a Reactor Water Cleanup Pump to service

References:

Required (R) / Available (A)

ARP 1D66, Steam Leak Detection Ambient Temp High (R)

ARP 1D70, Steam Leak Detection Diff Temp High (R) 20.707.01, Loss of RWCU (A)

Tools and Equipment Required:

None Initial Conditions:

  • You are the Control Room NSO.
  • You are restoring a RWCU Pump to service (Hot Plant) after drawing an oil sample.
  • All prerequisites are complete.

Initiating Cue(s):

The CRS directs you to restore RWCU Pump B to service in accordance with SOP 23.707.

Terminating Cue(s):

RWCU is isolated.

Task Standard:

Isolate RWCU Group 11 (G3352-F004 & F220) following a system leak and failure of automatic isolation to occur.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-009 Restore a RWCU Pump After Oil Sample (Plant Hot) With Revision: 0 System Leak and Failure to Isolate Page 2 Licensed Operator Exam Information (required for NRC exams)

Safety Function:

5 - Containment Integrity K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 223002 - Primary Containment Isolation System /Nuclear Steam Supply Shut-Off K/A STATEMENT:

A2. Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT ISOLATION SYSTEM/NUCLEAR STEAM SUPPLY SHUT-OFF ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

A2.03 System logic failures ......................................................................................... 3.0 / 3.3 Maintenance Rule Safety Classification:

G3300-03 Maintenance Rule Risk Significant? (Yes or No)

Yes Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-009 Restore a RWCU Pump After Oil Sample (Plant Hot) With Revision: 0 System Leak and Failure to Isolate Page 3 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD PREREQUSITES: None NOTE: Unless otherwise noted, all controls and indications for this section are located on COP H11-P601 and P602.

CUE: Provide Examinee with CUE SHEET.

  • 1. Start RWCU Pump B and operate dead
  • 1. RWCU Pump B is started.

headed for 1-2 minutes.

NOTE: RWCU Isolation will occur in ~44 seconds after 2D115 alarms. Examinee may trip pumps and manually isolate system before the 44 seconds elapse. If an operator is in the RWCU Pump Room, Report leak when pump is started.

2. Announce alarms 2D115, RWCU DIFF 2. Alarms are announced.

HIGH FLOW, 1D66, STEAM LEAK DETECTION AMBIENT TEMP HIGH, and/or 1D70, STEAM LEAK DETECTION DIFF TEMP HIGH.

NOTE: Examinee may check IPCS Area Temperatures Screen (ARM), but RWCU Data is only available in the Relay Room. He may also check IPCS Primary Containment Isolation Status Display for indications of isolation signal(s).

3. Review ARP for alarm windows received. 3. ARPs reviewed.

CUE: Respond as Patrol NSO, who reports RWCU Pump Room B Delta T, G33-N602B, 60°F increasing AND RWCU Pump Room B Temp, G33-N600B, 185°F increasing.

NOTE: This exceeds automatic isolation setpoints of 50°F differential temperature and 175°F for G3352-F001, F004 & F220 IAW ARPs 1D66 and 1D70.

Isolation signals on IPCS - PRIMARY CONTAINMENT ISOLATION GROUP STATUS (Group 10 & 11) is adequate information for candidate to take actions to isolate RWCU.

4. Direct Patrol NSO to Relay Room Panel 4. Operator sent to Relay Room to H11-P614 to investigate alarm(s). investigate.

CUE: Acknowledge report as CRS.

5. Report information from Relay Room to 5. Information reported to CRS.

CRS.

NOTE: Candidate may mention the need to enter EOPs on High Secondary Containment Temperature and/or Perform Loss of RWCU AOP.

CUE: IF required, acknowledge (as CRS) report of need to enter EOPs on High Secondary Containment Temperature and/or Perform Loss of RWCU AOP.

  • 6. Recognize need to manually isolate
  • 6. Need to manually isolate system is RWCU from ARP information or Primary recognized.

Containment Isolation Group Status Display.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-009 Restore a RWCU Pump After Oil Sample (Plant Hot) With Revision: 0 System Leak and Failure to Isolate Page 4 ELEMENT STANDARD NOTE: Candidate may elect to shutdown RWCU pumps prior to isolation of system valves.

  • 7. Manually isolate RWCU valves G3350-
  • 7. RWCU valves G3350-F001, F004, &

F001, F004, & F220 (Groups 10 & 11). F220 are closed CUE: End JPM when RWCU is isolated.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-009 Restore a RWCU Pump After Oil Sample (Plant Hot) With Revision: 0 System Leak and Failure to Isolate Page 5 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Ex.: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.

Verify valve open: Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.

Closing a valve: Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.

Opening a valve: Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Notify Examinee that time compression may be used for activities performed outside of the Control Room.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-009 Restore a RWCU Pump After Oil Sample (Plant Hot) With Revision: 0 System Leak and Failure to Isolate Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-009 Restore a RWCU Pump After Oil Sample (Plant Hot) With Revision: 0 System Leak and Failure to Isolate Page 7 Simulator Setup IC#:

IC-19, 20, or 21 Malfunctions:

Number Title Value Delay Ramp Step G301G3303C001B_MTFSHEAR Pump Shaft Shear TRUE 0 0 2 G3BCSUM2547585K1 RWCU Flow Instrument Gain 0.55 0 5 4 G301G3352F001_MTVFAILSP F001 Fail Specified Position 1 0 0 4 G301G3352F004_MTVFAILSP F004 Fail Specified Position 1 0 0 4 G301G3352F220_MTVFAILSP F220 Fail Specified Position 100 0 0 4 G301G3352F001_MTVFAILSP F001 Fail Specified Position -1 0 0 5 cd=P602_B138_1 EQ 1 G301G3352F004_MTVFAILSP F004 Fail Specified Position -1 0 0 5 cd=P602_B181_1 EQ 1 G301G3352F220_MTVFAILSP F220 Fail Specified Position 0 0 0 5 cd=P602_B196_1 EQ 1 Remote Functions:

Number Title Value Delay Ramp Step G33RF0016 G33-F262A, RWCU Filter/Demin A FCV Auto Setpoint 118 0 30 1 G33RF0017 G33-F262B, RWCU Filter/Demin B FCV Auto Setpoint 0 0 30 1 Override Functions:

Number Title Value Delay Ramp Step H_P602_D097_1 02D97 RWCU Filter Demin Trouble Alarm 0 0 0 1 H_P602_A159_1 Clean-Up Recirc Pump B Ammeter 40 0 1 2 cd=H_P602_A160_4 EQ 1 H_P602_A159_1 Clean-Up Recirc Pump B Ammeter 5 1 1 3 cd=H_P602_A160_4 EQ 1 H_P601_D066_1 01D66 Steam Leak Detection Ambient Temp High 1 52 0 4 H_P601_D070_1 01D70 Steam Leak Detection Diff Temp High 1 58 0 4 Special Instructions:

1. Initialize simulator to desired IC and place in RUN.
2. Open and execute Lesson 08-S-009.lsn or load malfunctions/remotes/overrides as indicated above.
3. Trigger the Setup step of the lesson, allow RWCU flow to stabilize (~1.5 minutes), then stop RWCU Pump B.
4. Trigger step 2 of the lesson when the JPM has started. Steps 3, 4 & 5 automatically trigger when appropriate.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 Cue Sheet Initial Conditions:

  • You are the Control Room NSO.
  • You are restoring a RWCU Pump to service (Hot Plant) after drawing an oil sample.
  • All prerequisites are complete.

Initiating Cue(s):

The CRS directs you to restore RWCU Pump B to service in accordance with SOP 23.707.

JOB PERFORMANCE MEASURE NRC EXAM 2008 Job Position No. Revision SRO / RO 08-S-006 0 JPM Title Duration Page Respond to Multiple Control Rod Drifts and RPS Failure 10 minutes COVER SHEET (BANK/Alt Path)

Examinee: SRO / RO / NO / STA Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Evaluation Method: Perform / Walkthrough / Discuss Start Time (Circle method used) Plant / Simulator / Classroom Stop Time Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comments Element S U Comments 1.

2.

3.

4.

5.

6.

  • 7.
  • 8.

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-006 Respond to Multiple Control Rod Drifts and RPS Failure Revision: 0 Page 1 Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom System:

C1100 - Control Rod Drive Hydraulic System Task:

02A0001020 - Recognize, respond to, and correct a Control Rod Drift

References:

Required (R) / Available (A) 3D80, Control Rod Drift (R) 20.106.07, Control Rod Drift (A) 23.106, Control Rod Drive Hydraulic System (A)

ODE 10, Emergency Operating Procedure Expectations (A)

Tools and Equipment Required:

None Initial Conditions:

  • You are the P603 Operator.
  • Plant conditions are as you see them.

Initiating Cue(s):

Respond to conditions in accordance with plant procedures.

Terminating Cue(s):

Mode Switch is in SHUTDOWN, RPS has actuated using Manual Scram pushbuttons and all rods are fully inserted.

Task Standard:

Examinee places Mode Switch in Shutdown due to multiple rod drifts. Then he identifies failure of Mode Switch and depresses Manual Scram Pushbuttons resulting in a full scram.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-006 Respond to Multiple Control Rod Drifts and RPS Failure Revision: 0 Page 2 Licensed Operator Exam Information (required for NRC exams)

Safety Function:

7 - Instrumentation K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 212000 - Reactor Protection System K/A STATEMENT:

A2. Ability to (a) predict the impacts of the following on the REACTOR PROTECTION SYSTEM ;

and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

A2.16 Changing mode switch position .........................................................................4.0 / 4.1 Maintenance Rule Safety Classification:

C7100-02 Maintenance Rule Risk Significant? (Yes or No)

Yes Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-006 Respond to Multiple Control Rod Drifts and RPS Failure Revision: 0 Page 3 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD PREREQUSITES: None NOTE: Unless otherwise noted, all controls and indications for this section are located on COP H11-P603.

CUE: Provide Examinee with CUE SHEET. After examinee states he is ready, inform him he has control, then cue the console operator to trigger the rod drifts.

1. Announce alarm 3D80, CONTROL ROD 1. Examinee calls out alarm and reviews DRIFT. ARP.
2. Verify Rod Drift as follows: 2. Using Full Core Display, identifies drifting
  • Red Rod Drift light ON at Full Core rod 02-27.

Display.

If rod 02-27 is SELECTED, rod is drifting

  • Rod moving out or into core.

IN.

NOTE: Next rod begins to drift 3 seconds later. Actions for single control rod drift should not be able to be completed in their entirety but are listed here.

3. IF single Control Rod is moving inward or 3. Reviews AOP 20.106.07.

outward, PERFORM 20.106.07, "Control Rod Drift."

4. Fully insert Control Rod. 4. Selects the 02-27 and inserts to 00 using Normal Insert.

CUE: Respond as RB Rounds Operator that you are getting a peer checker and will disarm Control Rod 02-27 IAW 23.106 Section 6.6.

5. Disarm Control Rod as follows: 5. Contacts RB Rounds Operator and
a. Close C11-F103 (HCU 02-27). directs disarming 02-27 IAW 23.106.
b. Close C11-F105 (HCU 02-27).
6. Notify SNE of drifting Control Rod. 6. Contacts SNE.
  • 7. Place Reactor Mode Switch in
  • 7. Immediate actions to place the mode SHUTDOWN. switch in SHUTDOWN are carried out without direction when required by 20.106.07, Control Rod Drift.

Alternate Path Begins Here (RPS Failure)

  • 8. If one or both divisions of RPS fail to
  • 8. Manual Scram Pushbuttons are actuate after Mode Switch to Shutdown, depressed.

depress RPS Manual Scram Pushbuttons and monitor for proper operation of RPS.

CUE: End JPM when Mode Switch is in SHUTDOWN, RPS has actuated using Manual Scram pushbuttons and all rods are fully inserted.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-006 Respond to Multiple Control Rod Drifts and RPS Failure Revision: 0 Page 4 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Ex.: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.

Verify valve open: Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.

Closing a valve: Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.

Opening a valve: Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Notify Examinee that time compression may be used for activities performed outside of the Control Room.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-006 Respond to Multiple Control Rod Drifts and RPS Failure Revision: 0 Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-006 Respond to Multiple Control Rod Drifts and RPS Failure Revision: 0 Page 6 Simulator Setup IC#:

IC-19 (or any full power IC)

Malfunctions:

Number Title Value Delay Ramp Step C97MF0426 3D80 Rod Drift Alarm 1 0 0 1 C11MF0019 Control Rod 02-27 Drift In ACTIVE 0 0 1 C11MF0109 Control Rod 10-15 Drift In ACTIVE 3 0 2 C11MF0247 Control Rod 18-03 Drift In ACTIVE 6 0 2 C11MF0565 Control Rod 30-35 Drift In ACTIVE 9 0 2 C11MF0829 Control Rod 42-31 Drift In ACTIVE 12 0 2 Remote Functions:

Number Title Value Delay Ramp Step N/A Override Functions:

Number Title Value Delay Ramp Step P603_A048_4 Reactor Mode Run Handle Pos 1 0 0 1 Special Instructions:

1. Initialize the simulator to the desired IC and place in RUN.
2. Open and execute Lesson 08-S-006.lsn, or load the malfunctions/overrides as listed above.
3. Trigger the control rod drifts when cued by examiner.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 Cue Sheet Initial Conditions:

  • You are the P603 Operator.
  • Plant conditions are as you see them.

Initiating Cue(s):

Respond to conditions in accordance with plant procedures.

JOB PERFORMANCE MEASURE NRC EXAM 2008 Job Position No. Revision SRO / RO 08-S-008 0 JPM Title Duration Page Manually Initiate Div 1 Emergency Equipment Cooling 20 minutes COVER SHEET Water (Alt Path)

Examinee: SRO / RO / NO / STA Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Evaluation Method: Perform / Walkthrough / Discuss Start Time (Circle method used) Plant / Simulator / Classroom Stop Time Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comments Element S U Comments 1.

2.

3.

4.

  • 5.

6.

7.

8.

  • 9.

10.

  • 11.
  • 12.

13.

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-008 Manually Initiate Div 1 Emergency Equipment Cooling Water Revision: 0 (Alt Path) Page 1 Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom System:

P4400 - Emergency Equipment Closed Cooling Water System Task:

02P4400001 - Startup Reactor Building Closed Cooling Water/Emergency Equipment Cooling Water

References:

Required (R) / Available (A) 23.127, Reactor Building Closed Cooling Water / Emergency Equipment Closed Cooling Water System (R) 1D88, DIV 1 EECW HX OUTLET TEMPERATURE HIGH/LOW (R) 23.208, RHR Complex Service Water Systems (R)

Tools and Equipment Required:

None Initial Conditions:

  • You are the Control Room NSO.
  • RBCCW is operating normally, however heat load is expected to increase.

Initiating Cue(s):

The CRS directs you to manually initiate Div 1 EECW.

Terminating Cue(s):

Division I EECW is operating, TCV in MANUAL control, TCV is open, and EESW Flow is indicated Task Standard:

Div 1 EECW has been manually initiated in accordance with 23.127. TCV has been taken to MANUAL control, TCV is open, and EESW flow is indicated.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

8 - Plant Service Systems K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 40000 - Component Cooling Water Systems (CCWS)

K/A STATEMENT:

A4 Ability to manually operate and / or monitor in the control room: (CFR: 41.7 / 45.5 to 45.8)

A4.01 CCW indications and control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.1 / 3.0 Maintenance Rule Safety Classification:

P4400-01 Maintenance Rule Risk Significant? (Yes or No)

Yes Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-008 Manually Initiate Div 1 Emergency Equipment Cooling Water Revision: 0 (Alt Path) Page 2 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD PREREQUSITES: None CUE: T4100-B033 is in OFF

1. Place T4100-B033, Battery Room AC Unit 1. Direction given to NO to place T4100-Switch, in OFF. B033 Switch in OFF.
2. Close P4400-F613, Div 1 EECW To Batt 2. Close pushbutton depressed.

Rms A/C Iso Vlv (H11-P808).

3. Verify P4400-F613 is closed. 3. P4400-F613 is verified closed.

CUE: RPS MG set room doors are CLOSED.

4. Verify RPS MG set room doors are 4. Direction given to NO to verify RPS MG closed. set room doors are closed.
  • 5. Depress EECW Div I Manual Initiation
  • 5. Div I pushbutton is depressed.

pushbutton.

6. Verify the white Emergency Mode light 6. White Emergency light is verified ON.

comes ON.

NOTE: Div 1 EECW TCV fails closed when Emergency Mode is initiated.

7. Verify the following valves reposition as 7. Valve positions are verified.

indicated:

a. P44-F603A, Div 1 EECW Supply Iso Vlv, Closed
b. P44-F601A, Div 1 EECW Return Iso Vlv, Closed
c. P44-F602A, Div I EECW Make Up Tank Iso Vlv, Open
d. P4400-F613, Div 1 EECW to Batt Rms AC Iso, (T4100-B033 Iso Valve),

Closed

e. P44-F605A, Div 1 EECW to NW Sump HX Iso Vlv, Closed
f. P44-F614, Div 1 EECW to Penet Clrs Iso, Closed
g. P44-F606A, Div 1 EECW DW Otbd Supply Valve, Closed (if High Drywell Pressure also exists)
8. Verify EECW Pump A and EESW Pump A 8. EECW and EESW Pump A are verified auto starts. running.
  • 9. Verify all operating parameters for Div I
  • 9. All operating parameters are verified NOT EECW System are normal and all alarms normal, 1D88 is in alarm, EESW Flow is are cleared. 0%, and EECW TCV is Closed.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-008 Manually Initiate Div 1 Emergency Equipment Cooling Water Revision: 0 (Alt Path) Page 3 ELEMENT STANDARD Alternate Path Starts Here NOTE: MOP04, Section 2.3.3.2 has direction for manual control IF AUTO control is not available OR Manual control is required to maintain control band. Alternate path actions also found in 23.208, Sections 5.7.2.1.4 and 5.10.2.1.e.

10. Review ARP 1D88. 10. ARP is reviewed. ARP Step 4 directs manual control if TCV not responding in AUTO.

NOTE: Malfunction clears when manual control is taken.

  • 11. Take MANUAL Control of Div 1 EECW *11. Examinee announces taking Manual TCV. Control, depressing the A/M Pushbutton and observing the red LED Light ON.
  • 12. Open the TCV. *12. Examinee turns the Pulser Knob clockwise to open the TCV and control EECW temperature.
13. Monitor for indications of response to 13. Examinee monitors the system to observe manual control signals. indications of response to manual control signals.

CUE: End JPM when Division I EECW is operating, TCV in MANUAL control, TCV is open, and EESW Flow is indicated.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-008 Manually Initiate Div 1 Emergency Equipment Cooling Water Revision: 0 (Alt Path) Page 4 Evaluator Notes:

RBCCW should be in service and remain in service, and EECW loads should not be restored.

Evaluator should be prepared to respond as CRS to decide if EECW initiation signal and EECW cooling loads should be restored, if requested by the examinee. The initiation signal does not need to be reset. Cooling loads do not need to be restored at this time.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Ex.: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.

Verify valve open: Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.

Closing a valve: Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.

Opening a valve: Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Notify Examinee that time compression may be used for activities performed outside of the Control Room.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-008 Manually Initiate Div 1 Emergency Equipment Cooling Water Revision: 0 (Alt Path) Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-008 Manually Initiate Div 1 Emergency Equipment Cooling Water Revision: 0 (Alt Path) Page 6 Simulator Setup IC#:

Any IC, as long as EECW is in Standby Malfunctions:

Number Title Value Delay Ramp EB05TCVF400A_ATVFAILSP *FAIL TO SPECIFIED POSITION 0 30 0 cd=H_P601_B154_2 EQ 1 EB05TCVF400A_ATVFAILSP *FAIL TO SPECIFIED POSITION -1 0 0 cd=P601_A168_4 EQ 1 Remote Functions:

Number Title Value Delay Ramp None Override Functions:

Number Title Value Delay Ramp None Special Instructions:

1. Initialize simulator to selected IC.
2. Place simulator in RUN.
3. Open and execute lesson 08-S-008.lsn.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 Cue Sheet Initial Conditions:

  • You are the CRNSO.
  • RBCCW is operating normally, however heat load is expected to increase.

Initiating Cue(s):

The CRS directs you to manually initiate Div 1 EECW.

JOB PERFORMANCE MEASURE NRC EXAM 2008 Job Position No. Revision SRO / RO 08-S-001 0 JPM Title Duration Page Shift Operating CRD Pumps 15 minutes COVER SHEET Examinee: SRO / RO / NO / STA Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Evaluation Method: Perform / Walkthrough / Discuss Start Time (Circle method used) Plant / Simulator / Classroom Stop Time Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comments Element S U Comments 1.

  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.

8.

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-001 Shift Operating CRD Pumps Revision: 0 Page 1 Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom System:

C1150 - Control Rod Drive Hydraulic System Task:

02C1150004 - Shift Control Rod Drive Pumps

References:

Required (R) / Available (A) 23.106, Control Rod Drive Hydraulic System, Section 5.1, CRD Pump Shift (R) 6M721-5703-1, CRD System Functional Operating Sketch (A) 6M721-2081, CRDH System- RB Part 1 of 2 (A)

Tools and Equipment Required:

None Initial Conditions:

  • You are the Control Room NSO.
  • CRD pumps are to be shifted for upcoming maintenance.
  • A pre-job brief has been completed.
  • An operator is in the field awaiting instructions.
  • All prerequisites are met for CRD pump shift.

Initiating Cue(s):

The CRS directs you to shift operating CRD Pumps.

Terminating Cue(s):

CRD Pump shift is complete.

Task Standard:

CRD pumps are shifted in accordance with normal operating procedure (23.106).

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-001 Shift Operating CRD Pumps Revision: 0 Page 2 Licensed Operator Exam Information (required for NRC exams)

Safety Function:

1 - Reactivity Control K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 201001 - Control Rod Drive Hydraulic System K/A STATEMENT:

A4. Ability to manually operate and/or monitor in the control room:

A4.01 CRD pumps........................................................................................................ 3.1 / 3.1 Maintenance Rule Safety Classification:

C1100-08 Maintenance Rule Risk Significant? (Yes or No)

No Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-001 Shift Operating CRD Pumps Revision: 0 Page 3 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD PREREQUSITES: CRD Pump A is in service.

CUE: Provide Examinee with CUE SHEET. Hand examinee a copy of 23.106 after candidate locates the correct procedure.

CUE: RB Rounds calls back and states 5.1.2.1 through 5.1.2.3 are complete, and reports West CRD Pump ready for start.

1. Perform pre-start checks of standby 1. Contact RB Rounds and direct Steps pump. 5.1.2.1 through 5.1.2.3 of 23.106 for CRD Pump B.
  • 2. Places C11-K612 in MANUAL.

System Flow controller in MANUAL.

  • 3. Slowly decrease system flow to
  • 3. Depress CLOSE pushbutton on C11-approximately 30 gpm. K612 to decrease system flow to approximately 30 gpm as indicated on C11-R800, CRD Hyd Flow indication.

CUE: RB Rounds calls and reports good start on West CRD Pump.

  • 4. Start standby C1106-C001B, West CRD
  • 4. Starts standby pump.

Pump.

  • 5. Stop C1106-C001A, East CRD Pump.
  • 5. Stops initially running pump.

CUE: If candidate asks for desired flow, respond by stating Return to the pre-shift flow setting of 63 gpm.

  • 6. Depress OPEN pushbutton on C11-K612 System Flow controller to establish a flow to return flow to approx. 63 gpm as rate of 37 to 63 gpm. indicated on C11-R800, CRD Hydraulic Flow indicator.
  • 7. Verifies auto tracking and places Hydraulic System Flow controller, then C11-K612 in AUTO.

place in AUTO.

8. If necessary, throttle C1152-F003, CRD 8. Throttles PCV as necessary to establish Drive/Clg Water PCV, to maintain the pressures in band.

following:

a. 255 to 265 psi on C11-R602, Drive Water Diff Press Ind.
b. 6 to 30 psi on C11-R603, Cooling Wtr Diff Press Ind.

CUE: End JPM when CRD Pump shift is complete.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-001 Shift Operating CRD Pumps Revision: 0 Page 4 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Ex.: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.

Verify valve open: Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.

Closing a valve: Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.

Opening a valve: Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Notify Examinee that time compression may be used for activities performed outside of the Control Room.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-001 Shift Operating CRD Pumps Revision: 0 Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-001 Shift Operating CRD Pumps Revision: 0 Page 6 Simulator Setup IC#:

Any IC with CRD in operation.

Malfunctions:

Number Title Value Delay Ramp N/A Remote Functions:

Number Title Value Delay Ramp N/A Override Functions:

Number Title Value Delay Ramp N/A Special Instructions:

Ensure CRD Pump A is in service.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 Cue Sheet Initial Conditions:

  • You are the Control Room NSO.
  • CRD pumps are to be shifted for upcoming maintenance.
  • A pre-job brief has been completed.
  • An operator is in the field awaiting instructions.
  • All prerequisites are met for CRD pump shift.

Initiating Cue(s):

The CRS directs you to shift operating CRD Pumps.

JOB PERFORMANCE MEASURE NRC EXAM 2008 Job Position No. Revision SRO / RO 08-S-004 0 JPM Title Duration Page Temporary Removal and Restoration of Shutdown 30 minutes COVER SHEET Cooling for I&C Surveillances (Alt Path)

Examinee: SRO / RO / NO / STA Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Evaluation Method: Perform / Walkthrough / Discuss Start Time (Circle method used) Plant / Simulator / Classroom Stop Time Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comments Element S U Comments

  • 1.
  • 2.

3.

4.

5.

6.

7.

8.

  • 9.
  • 10.

11.

  • 12.

13.

14.

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-004 Temporary Removal and Restoration of Shutdown Cooling for Revision: 0 I&C Surveillances Page 1 Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom System:

E1150 - Residual Heat Removal System Task:

02E1100007 - Operate RHR in Shutdown Cooling Mode

References:

Required (R) / Available (A) 23.205, Residual Heat Removal System, Section 6.7 (R) 6M721-5703-2, RHR Div 1 Functional Operating Sketch (A) 6M721-5703-1, RHR Div 2 Functional Operating Sketch (A)

Tools and Equipment Required:

None Initial Conditions:

  • You are the Control Room NSO.
  • The plant is in Mode 4
  • Reactor Level band is 220-255 inches.
  • A pre-job brief has been completed.
  • Operators are in the field and have all required equipment to perform their evolutions.
  • All prerequisites are met for the temporary removal and restoration of SDC.
  • Another Operator is taking temperature data.
  • All MDCT Fans are operating in high speed.
  • E1100-F211 is open.

Initiating Cue(s):

The CRS directs you to temporarily remove and restore Shutdown Cooling for I&C Surveillances.

Terminating Cue(s):

Div 2 RHR Pump B or D is shutdown and E1100-F018B is directed to be unlocked and closed.

Task Standard:

Div 2 RHR Pump B or D is shutdown per 23.205.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-004 Temporary Removal and Restoration of Shutdown Cooling for Revision: 0 I&C Surveillances Page 2 Licensed Operator Exam Information (required for NRC exams)

Safety Function:

4 - Heat Removal from Reactor Core K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 205000 - Shutdown Cooling System (RHR Shutdown Cooling Mode)

K/A STATEMENT:

A4. Ability to manually operate and/or monitor in the control room:

A4.01 SDC/RHR pumps ............................................................................................... 3.7 / 3.7 A4.03 SDC/RHR discharge valves............................................................................... 3.6 / 3.5 A4.05 Minimum flow valves .......................................................................................... 3.2 / 3.2 Maintenance Rule Safety Classification:

From MMR Appendix E Maintenance Rule Risk Significant? (Yes or No)

From MMR Appendix E Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-004 Temporary Removal and Restoration of Shutdown Cooling for Revision: 0 I&C Surveillances Page 3 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD PREREQUSITES: None NOTE: Unless otherwise noted, all controls and indications for this section are located on COP H11-P602.

CUE: Provide Examinee with CUE SHEET. Examiner hands examinee a copy of 23.205 after candidate locates the correct procedure and section.

CUE: All communications will be directed to me and I will respond as addressed.

  • 1. Close E1150-F611B, Div 2 RHR LPCI
  • 1. Closes E1150-F611B.

Bypass Vlv.

  • 2. Immediately shut down RHR Pump B.
  • 2. Stops RHR Pump B.
3. Verify closed, E1150-F007B, Div 2 RHR 3. Verifies E1150-F007B closed.

Pmps Min Flow Vlv.

CUE: RHRSW will not be required to be shutdown. I&C is done with their surveillance.

Restore RHR DIV II Shutdown Cooling to service.

4. When desired to restore Shutdown 4. The following valves are CLOSED:

Cooling, verify the following valves a. E1150-F007B, Div 2 RHR Pmps Min CLOSED: Flow Vlv

a. E1150-F007B, Div 2 RHR Pmps Min b. E1150-F004B, Div 2 RHR Pump B Flow Vlv Torus Suct Iso
b. E1150-F004B, Div 2 RHR Pump B c. E1150-F004D, Div 2 RHR Pump D Torus Suct Iso Torus Suct Iso
c. E1150-F004D, Div 2 RHR Pump D d. E1150-F017B, Div 2 LPCI Otbd Iso Torus Suct Iso Vlv
d. E1150-F017B, Div 2 LPCI Otbd Iso Vlv
5. Verify the following valves OPEN: 5. The following valves are OPEN:
a. E1150-F008, RHR SDC Otbd Suction a. E1150-F008, RHR SDC Otbd Suction Iso Vlv Iso Vlv
b. E1150-F009, RHR SDC Inbd Suction b. E1150-F009, RHR SDC Inbd Suction Iso Vlv Iso Vlv
c. E1150-F006B, Div 2 RHR Pump B c. E1150-F006B, Div 2 RHR Pump B SDC Suct Iso Vl SDC Suct Iso Vl
d. E1150-F006D, Div 2 RHR Pump D d. E1150-F006D, Div 2 RHR Pump D SDC Suct Iso Vlv SDC Suct Iso Vlv
e. E1150-F015B, Div 2 LPCI Inbd Iso e. E1150-F015B, Div 2 LPCI Inbd Iso Vlv Vlv Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-004 Temporary Removal and Restoration of Shutdown Cooling for Revision: 0 I&C Surveillances Page 4 ELEMENT STANDARD CUE: Respond as NO for direction to vent the Div 2 Shutdown Cooling Loop. After a short delay report, Div 2 Shutdown Cooling Loop high point is vented as expected, no air.

6. Direct operator to vent the high point of 6. Div 2 Shutdown Cooling Loop has been Div 2 Shutdown Cooling Loop via the directed to be vented.

following valves:

a. E1100-F204B, RHR Loop B Drywell Spray Line High Point Vent Valve
b. E1100-F205B, Loop B Drywell Spray Line High Point Vent Valve CUE: Respond as NO for direction to vent the Head Spray Line. After a short delay report, Div 2 Shutdown Cooling Loop Head Spray Line is vented as expected, no air.
7. Direct operator to vent Head Spray Line 7. The Head Spray Line has been directed via the following valves (RB3-C13): to be vented.
a. E1100-F330, RPV Head Spray Vent Iso Valve.
b. E1100-F331, RPV Head Spray Vent Iso Valve.

CUE: Respond as NO, Standing by to operate E1100-F018B.

8. Station operator at E1100-F018B and D, 8. An operator has been directed to stand Div 2 RHR Pump B and D Min Flow Line by.

Iso Vlv (RB-SB).

NOTE: The examinee should closely monitor RPV water level while performing the following steps. The following steps should be performed in rapid order.

  • 9. Start E1102-C002B or D, Div 2 RHR
  • 9. Div 2 RHR Pump B or D is started.

Pump B or D.

  • 10. Open E1150-F611B, Div 2 RHR LPCI *10. E1150-F611B, Div 2 RHR LPCI Bypass Bypass Vlv (orificed to flow rate of Vlv is open.

10,000 gpm).

ALTERNATE PATH STARTS HERE CUE: E1150-F007B, Div 2 RHR Pmps Min Flow Vlv, will fail open in the following step. The examinee should attempt to close and determine the valve has failed. He should then take appropriate action per the SOPs ALTERNATE PATH.

11. When E1150-F007B, Div 2 RHR Pmps 11. E1150-F007B, Div 2 RHR Pmps Min Flow Min Flow Vlv, opens and loop flow Vlv, CLOSE pushbutton was depressed.

exceeds 3000 gpm, depress the CLOSE pushbutton.

  • 12. Stop E1102-C002B or D, Div 2 RHR *12. Div 2 RHR Pump B or D is stopped.

Pump B or D.

CUE: Respond as CRS.

13. Notify CRS of E1150-F007B failure, either 13. CRS is notified.

by normal communication or Crew Update.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-004 Temporary Removal and Restoration of Shutdown Cooling for Revision: 0 I&C Surveillances Page 5 ELEMENT STANDARD

14. Direct field operator to unlock and close 14. Field operator is directed to unlock and E1100-F018B and D, Div 2 RHR Pump B close E1100-F018B.

and D Min Flow Line Iso Vlv.

CUE: End JPM when Div 2 RHR Pump B or D is shutdown and E1100-F018B is directed to be unlocked and closed.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-004 Temporary Removal and Restoration of Shutdown Cooling for Revision: 0 I&C Surveillances Page 6 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Ex.: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.

Verify valve open: Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.

Closing a valve: Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.

Opening a valve: Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Notify Examinee that time compression may be used for activities performed outside of the Control Room.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-004 Temporary Removal and Restoration of Shutdown Cooling for Revision: 0 I&C Surveillances Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 JPM Title No.: 08-S-004 Temporary Removal and Restoration of Shutdown Cooling for Revision: 0 I&C Surveillances Page 8 Simulator Setup IC#:

IC-01, 02, or 03 or any IC with Div 2 RHR in SDC.

Malfunctions:

Number Title Value Delay Ramp E11MF0015* Positioner Failure RHR Min Flow Bypass Valve 100 15 15 C97MF0186* 2D26 Div 2 RHR SYS Low Flow Byp Init alarm 1 15 0 C97MF0186* 2D26 Div 2 RHR SYS Low Flow Byp Init alarm -1 16 0

  • Step Condition = P602_A023_3 OR P602_A025_3 EQ 1 (RHR Pump B or D in RUN)

Remote Functions:

Number Title Value Delay Ramp N/A Override Functions:

Number Title Value Delay Ramp N/A Special Instructions:

1. Initialize simulator to IC-01, 02, or 03, and place the simulator in RUN.
2. Verify Div 2 RHR Pump B operating in SDC, Div 2 RHRSW in service, and Div 2 MDCT Fans running in high speed.
3. Install placard for E11-F003B 5 sec OPEN.
4. Flip over the E1100-F008 de-energized placard.
5. Open and Execute Lesson 08-S-004.lsn.
6. When directed by the examiner or after examinee has shut down Div 2 RHR, trigger the malfunctions set above.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE NRC EXAM 2008 Cue Sheet Initial Conditions:

  • You are the Control Room NSO.
  • The plant is in Mode 4
  • Reactor Level band is 220-255 inches.
  • A pre-job brief has been completed.
  • Operators are in the field and have all required equipment to perform their evolutions.
  • All prerequisites are met for the temporary removal and restoration of SDC.
  • Another Operator is taking temperature data.
  • All MDCT Fans are operating in high speed.
  • E1100-F211 is open.

Initiating Cue(s):

The CRS directs you to temporarily remove and restore Shutdown Cooling for I&C Surveillances.